This is a Quality Assurance Surveillance Plan (QASP) for Unmanned Aircraft Systems (UAS) Services, version dated August 15, 2025. The QASP is a living document that establishes systematic methods for evaluating contractor performance against contract requirements, detailing what will be monitored, how monitoring will occur, who will conduct surveillance, and how results will be documented.
The assigned Contracting Officer is Kimberly Coakley (OCPO, 202-664-9732, kimberly.coakley@fema.dhs.gov), who holds ultimate responsibility for determining adequacy of contractor performance. The Contracting Officer's Representative (COR) position is currently listed as "To Be Determined" and will be responsible for technical administration and maintaining the quality assurance file. The contract applies FAR clause 52.246-4 (Inspection of Services – Fixed-Price). The QASP establishes six primary performance standards with specific Acceptable Quality Levels (AQLs): Mission Availability (>95% during mission-critical periods); Flight Operations (99% adherence to flight plans); Data Collection Accuracy (98% accuracy); Payload Delivery (95% on-time delivery within 15 minutes of scheduled time); Communication and Reporting (100% compliance with daily updates at close of business or within 2 hours of request); and Training and Certification (100% certification compliance with records available within 2 hours). Surveillance methods include periodic inspections of deliverables, 100% inspection of operations, progress/status meetings, and performance reporting. Performance ratings are classified as Exceptional (exceeds requirements), Satisfactory (meets requirements), or Unsatisfactory (does not meet requirements), with non-compliance potentially resulting in CPARS rating deductions or operational suspension. The COR will conduct weekly performance assessment meetings and document results using attached Performance Report and Contract Discrepancy Report (CDR) templates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70FB7026R00000004 Amendment 001 32626.pdf | ||
| Attachment D.1 - PWS.pdf | ||
| Attachment D.2 CLIN Price Sheet.xlsx | XLSX spreadsheet | |
| Attachment D.4 - PPQ.pdf | ||
| 70FB7026R00000004 32526.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Unmanned Aircraft Systems (UAS) Services Version – August 15, 2025
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
▪ What will be monitored.
▪ How monitoring will take place.
▪ Who will conduct the monitoring.
▪ How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the federal government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the
QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document”, and the federal government may review and revise it on a regular basis. However, the federal government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and federal government officials implementing surveillance activities.
The following Federal Acquisition Regulation (FAR) clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price
2. GOVERNMENT ROLES AND RESPONSIBILITIES
(a) The following personnel shall oversee and coordinate surveillance activities: Contracting
Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract.
The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Kimberly Coakley
Organization or Agency: OCPO
Telephone: 202-664-9732
Email: kimberly.coakley@fema.dhs.gov
(b) Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper federal government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the federal government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
Assigned COR: TBD
Telephone:
Email:
(c) Other Key Personnel:
To be determined
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s representatives for this contract:
a. Program Manager: TBD
Telephone: TBD
Email: TBD
b. Task Manager: TBD
Telephone: TBD
Email: TBD
4. PERFORMANCE STANDARDS
Performance standards define desired services. The federal government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
The Performance Requirements Summary (paragraph 1.8 in the Performance Work
Statement) includes performance standards. The federal government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL) in sections 1.8 and 6.0 of the PWS and in this Quality Assurance Surveillance Plan.
5. INCENTIVES.
The federal government shall use CPARS Ratings as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards. If stakeholder’s surveillance indicates non-compliance with performance standards as contained in the
QASP table, the sub-standard performance may be reflected in the contractor’s CPARS review.
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Periodic Inspection.
The COR will conduct scheduled inspections of contractor deliverables, such as readiness reports, maintenance logs, and mission reports, to ensure compliance with contract requirements.
b. 100% Inspection
The government will conduct inspections of all operations and deliverables to ensure compliance with contract requirements including operational readiness, data accuracy, and adherence to safety protocols.
c. Progress or Status meetings.
The COR will attend progress or status meetings, any follow-up documentation to ensure compliance with contract requirements, and the COR will monitor follow-up actions on issues or concerns raised during meetings to ensure timely resolution.
d. Performance Reporting.
The COR will track performance metrics, such as response times and availability rates, to evaluate contractor performance against the AQLs.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager, on-site representative, or contractor’s project manager, when a defect is identified, and inform the manager of the specifics of the problem. The COR, with assistance from the CO, if needed, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
7. QUALITY ASSURANCE SURVEILLANCE PLAN TABLE
Service Output
Performance
Objective
Acceptable
Quality Level
(AQL)
Method of
Inspection
Positive
Incentive
Negative
Inspection
1. Mission
Availability
UAS (hardware systems, and personnel) operational readiness at all times
>95% availability during mission critical periods
Review of readiness reports, operational readiness checks, and performance data
A positive
CPARS rating will be administered
If non-compliant as stated in the
PWS or as specified in the
Task Order, an
“Unsatisfactory”
CPARS rating will be earned
2. Flight
Operations
UAS must complete assigned missions with no more than 1% deviation from flight plan or mission parameters
99% adherence to flight plans
Review of flight logs and mission reports
A positive
CPARS rating will be administered
If non-compliant with 2 or more occurrences, or as specified in the
Task Order, an
“Unsatisfactory”
CPARS rating will be earned
3. Data Collection
Accuracy
UAS must collect and transmit data with at least 98% accuracy
98% accuracy in data collection
Post mission data analysis and validation via requestor feedback
A positive
CPARS rating will be administered
If non-compliant as stated in the
PWS or as specified in the
Task Order, an
“Unsatisfactory”
CPARS rating will be earned
4. Payload
Delivery
UAS must deliver payloads within 15 minutes of scheduled delivery time (or mutually agreed upon deviation based on operational considerations and issues)
95% on-time delivery rate
Review of delivery logs, mission reports, and requestor feedback
A positive
CPARS rating will be administered
If non-compliant as stated in the
PWS or as specified in the
Task Order, an
“Unsatisfactory”
CPARS rating will be earned
5. Communication and Reporting
Contractor must provide mission status updates daily
(at COB) or within 2 hours of request
100% compliance with reporting timelines
Review of communication logs and response times
A positive
CPARS rating will be administered
If non-compliant as stated in the
PWS or as specified in the
Task Order, an
“Unsatisfactory”
CPARS rating will be earned
6. Training and
Certification
All operators’ certifications must be current with all required training completed;
certifications and/or training records must be available within 2 hours of request
100% certification compliance
Review of training records and certifications
A positive
CPARS rating will be administered
Suspension of operations for non-compliance
8. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome.
The following ratings shall be used:
EXCEPTIONAL:
Performance significantly exceeds contract requirements to the
Government’s benefit.
SATISFACTORY Performance meets contractual requirements.
UNSATISFACTORY Performance does not meet contractual requirements.
9. DOCUMENTING PERFORMANCE
a. Acceptable Performance:
The federal government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other contractual actions.
b. Unacceptable performance:
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing within 3 business days.
The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The federal government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other contractual actions deemed necessary by the CO.
10. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract/order performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor weekly or as needed to assess performance and shall provide a written assessment.
Contracting Officer’s Representative Date
PERFORMANCE REPORT
1. Contract Number: TBD
2. Prepared by: (Insert Name of COR Here)
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.>
Prepared by: Terri Wright
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number: TBD
2. TO: (Contractor Program Manager, Task Manager or on-site representative) TBD
3. FROM: (Name of COR)
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
6. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective
Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: Terri Wright
Received by:
Contractor Program Manager, Task Manager or Date on-site representative
< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects;
anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>
THIS PAGE INTENTIONALLY LEFT BLANK