About this file
This document is a Contractor's Boiler Room Checklist of Maintenance Heating System for a PennDOT (Pennsylvania Department of Transportation) building. The checklist covers various maintenance tasks and inspections to be performed on the boiler, burner, furnace, condensate pumps, circulating pumps, water heater, and other related equipment by the contractor. The checklist includes items such as boiler blow down, water feeders, cut-offs, gauge glass, safety/relief valves, tubes/flues, combustion chamber, valves, burner controls, and efficiency testing. The contractor must provide the district, county, their company name, the date, and the time the work was performed, and sign the checklist upon completion.
The document does not provide information on pricing, set-asides, incumbents, funding requirements or sources, or contract terms. It is focused solely on the maintenance checklist and the specific tasks to be performed by the contractor for the PennDOT building's heating system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT C-Contractor's Work Schedule of Maintenance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
CONTRACTOR’S
BOILER ROOM CHECKLIST
OF MAINTENANCE
HEATING SYSTEM
District ________________ County ________________
| Contractor ________________________________ | Date _______________________________ |
| Work by __________________________________ | Boiler ______________________________ |
| Time Start _________________________________ | Time Finished ________________________ |
| PennDOT Bldg. # ____________________________ | Signature ____________________________ |
1. Boiler Blow Down ____________________________________________________________
2. Boiler Water Feeder ___________________________________________________________
3. Boiler Low Water Cut-Offs ______________________________________________________
4. Boiler Gauge Glass/Columns ____________________________________________________
5. Boiler Safety/Relief Valves ______________________________________________________
6. Boiler Barometric Damper _______________________________________________________
7. Boiler Tubes/Flues, Breeching (Initial visit)___________________________________________
8. Boiler Combustion Chamber (initial visit) ____________________________________________
9. Boiler Valves ___________________________________________________________________
10. Chemical Feed System: Pump Feeder _______________________________________________
11. Boiler Burner Controls and Gauges _________________________________________________
12. Boiler Condition ________________________________________________________________
13. Boiler Leaks ___________________________________________________________________
14. Burner Motor, Blower, Air Intake __________________________________________________
15. Burner Controls ________________________________________________________________
16. Burner Scanner, Electrodes, Nozzles ________________________________________________
17. Burner Gas/Oil Valves, Regulators __________________________________________________
18. Burner Gas/Oil Pressure Switches __________________________________________________
19. Burner Oil Pump, Filter, Gauges ____________________________________________________
20. Remote Oil Pump, Filter, Gauges ___________________________________________________
21. Burner Test – Efficiency __________________________________________________________ Burner CO2 __________________________Draft _____________________________________ Burner Stack F ________________________Smoke ___________________________________
22. Burner Condition _______________________________________________________________
23. Furnace (Dravo, Powrmatic) Flues (initial visit) ________________________________________
24. Furnace (Dravo, Powrmatic, etc.) ___________________________________________________
25. Furnace _______________________________________________________________________
26. Furnace Condition _______________________________________________________________
27. Condensate Pumps – Boiler Room __________________________________________________ Office Basement ______________________________________________ Garage Area _________________________________________________
28. Circulating Pumps _ EW Heating System _____________________________________________
29. Sump and/or Sewage Ejector Pumps – Boiler Room ____________________________________
30. Water Heater Flue Pipe (initial visit) _________________________________________________
31. Water heater – Boiler Room (Gas)___________________________________________________
| (Oil) ___________________________________________________ |
| (Electric) _______________________________________________ |
Garage Ares (Gas) __________________________________________________ (Electric) _______________________________________________
32. Water Heater Circulating Pump_____________________________________________________
33. Water Heater Relief Valve _________________________________________________________
34. Outside Air Louver and Screen _____________________________________________________
35. Gas Wall Heaters (initial visit) ______________________________________________________
36. Gas or Oil Ceiling Hung Unit Heaters (initial visit) _______________________________________
37. Boiler Room Condition (Clean) ___________________ (dirty) ____________________________ (Trash) ___________________ (Other) ___________________________
38. Remove plugs or open valves to clean strainer. Check to see if screens are in place (initial visit). ___________________________________
39. Remove plugs or open valves and flush F&T traps and verify proper operation (initial visit) ___________________________________
40. Check all radiator valves and other temperature controls valves in the heating system (initial visit)_ __________________________________
41. Perform all maintenance services recommended in manufacturer’s control manual and installation and service manual. ______________________________________________
42. Clean coil fins on all unit heaters, fin tubes, and/or cabinet heaters _________________
43. Lubricate all unit heaters, cabinet heaters and fan motors _________________________
END OF CONTRACTOR’S BOILER ROOM CHECKLIST OF MAINTENANCE HEATING SYSTEM