Attachment D Combined 100pct Drawings-VAMC Hampton VA Replace Windows.pdf

PDF 32 MB Posted

Attached to
Z2DA--590-19-105 Replace Windows Various Bldgs Federal contract opportunity
Solicitation number
36C24623B0006
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This solicitation is for construction services to replace windows at various buildings at the Hampton VA Medical Center. The scope of work involves the removal and replacement of windows and all associated caulking and sealants as shown on the attached plans and specifications. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 for project 590-19-105. Bids are due by the date listed in solicitation number 36C24623B0006. The awarded contractor will provide all labor, materials, equipment and supervision to complete the window replacement and associated sealant work at the buildings specified.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--590-19-105 Replace Windows Various Bldgs, newest first.
File Type Posted
36C24623B0006 0003.docx DOCX document
S05 VA RFI Replacement Window Responses 1-30-23.pdf PDF
36C24623B0006 0002.docx DOCX document
36C24623B0006 0001.docx DOCX document
Attachment E Wage Determination Replacement Windows.pdf PDF
Attachment C 590-19-105-100pct Specs.pdf PDF
Attachment F - Replacement Windows Itemized Schedule of Values Cost Breakdown.xls XLS spreadsheet
S02 IFB Replace Various Windows.pdf PDF
Attachment A COVID-19 Safety Protocols for Federal Contractors.doc DOC document
BASIS FOR AWARD windows.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAMPTON VA MEDICAL CENTER

100% CONSTRUCTION DOCUMENTS

100 Emancipation Drive, Hampton, Virginia 23667

PROJECT No: 590-19-105

SIGNATURE BLOCK

REPLACE WINDOWS VARIOUS BUILDINGS

INDEX OF DRAWINGS

DRAWING TITLE

DWG

NO.

GENERAL

ARCHITECTURAL

G001 COVER SHEET

G002 LEGENDS, ABBREVIATIONS AND NOTES

A001

BUILDING 110 BASEMENT LEVEL FLOOR PLANA100

BUILDING 110 FIRST FLOOR PLANA101

BUILDING 110 SECOND FLOOR PLANA102

BUILDING 110 THIRD FLOOR PLANA103

BUILDING 110 FOURTH FLOOR PLANA104

BUILDING 110 FIFTH-SIXTH-SEVENTH FLOOR PLANA105

BUILDING 146 FIRST FLOOR PLANA106

BUILDING 137A FIRST-SECOND FLOOR PLANA107

BUILDING 114 FIRST FLOOR PLAN AND EXTERIOR ELEVATIONSA108

CAMPUS PLAN

BUILDING 110 EXTERIOR ELEVATIONS - NORTHA201

BUILDING 110 EXTERIOR ELEVATIONS - SOUTHA202

BUILDING 110 EXTERIOR ELEVATIONS - EASTA203

BUILDING 110 EXTERIOR ELEVATIONS - WESTA204

BUILDING 110A EXTERIOR ELEVATIONSA205

BUILDING 146 EXTERIOR ELEVATIONSA206

BUILDING 146 EXTERIOR ELEVATIONSA207

BUILDING 137A EXTERIOR ELEVATIONSA208

WINDOW TYPES AND WINDOW ELEVATIONSA501

WINDOW, GLAZING AND PRECAST PANEL SCHEDULESA502

TYPICAL BUILDING WALL SECTIONSA301

TYPICAL WINDOW REPLACEMENT DETAILSA401

TYPICAL BUILDING WALL SECTIONSA302

TYPICAL WINDOW REPLACEMENT DETAILSA402

TYPICAL WINDOW REPLACEMENT DETAILSA403

AS001 SITE PLAN - TEMPORARY PROTECTION AT BLDG 110

STRUCTURAL

S001 STRUCTURAL NOTES

S201 WALL ELEVATIONS

S401 TYPICAL WINDOW REPLACEMENT DETAILS

BUILDING 137A EXTERIOR ELEVATIONS - DEMOLITIONAD208

HISTORICAL STUDY - BUILDING 110 - SOUTH ELEVATIONHIST

G003 WORK SAFETY AND ABATEMENT NOTES

COVER SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE WINDOWS

VARIOUS BUILDINGS

VAMC HAMPTON, VIRGINA

590-19-105

Project Director

30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

AREA MAP

AutoCAD SHX Text

CONSTRUCTION RISK ASSESSMENT

AutoCAD SHX Text

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL LEGEND

MATERIAL LEGEND

ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL ABBREVIATIONS

SAFETY SIGN CONSTRUCTION SIGNAGE

LEGENDS, ABBREVIATIONS

AND NOTES

G002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE WINDOWS

VARIOUS BUILDINGS

VAMC HAMPTON, VIRGINA

590-19-105

Project Director

30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:

AutoCAD SHX Text A

AutoCAD SHX Text + 0'-6"

AutoCAD SHX Text F.E.C.

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

DOOR NUMBER

AutoCAD SHX Text

KEY NOTE

AutoCAD SHX Text

WINDOW TYPE

AutoCAD SHX Text

PARTITION TYPE

AutoCAD SHX Text

DETAIL CALLOUT

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET WHERE DETAIL IS DRAWN

AutoCAD SHX Text

SECTION CALLOUT

AutoCAD SHX Text

VERTICAL ELEVATION

AutoCAD SHX Text

COLUMN CENTERLINE DESIGNATION

AutoCAD SHX Text

DEMOLITION NOTE

AutoCAD SHX Text

SECTION NUMBER

AutoCAD SHX Text

SHEET WHERE SECTION IS DRAWN

AutoCAD SHX Text

EXTERIOR ELEVATION CALLOUT

AutoCAD SHX Text

ELEVATION NUMBER

AutoCAD SHX Text

SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

NAME

AutoCAD SHX Text

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text A301

AutoCAD SHX Text

AutoCAD SHX Text A201

AutoCAD SHX Text

AutoCAD SHX Text

GA4

AutoCAD SHX Text

EARTH

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MORTAR, STUCCO CEMENT PLASTER

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

INSULATION RIGID

AutoCAD SHX Text

INSULATION BATT

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

WOOD (ROUGH)

AutoCAD SHX Text

WOOD FINISH

AutoCAD SHX Text

INTERIOR ELEVATION CALLOUT

AutoCAD SHX Text

ELEVATION NUMBER

AutoCAD SHX Text

SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW WALL STUDS TOP OF SLAB TOP OF MASONRY ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT. D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. E. SEAL PIPE & CONDUIT PENETRATIONS THROUGH SLABS SEAL PIPE & CONDUIT PENETRATIONS THROUGH SLABS CEILING, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING. G. PRIME CONTRACTOR TO HIRE AN ABATEMENT PRIME CONTRACTOR TO HIRE AN ABATEMENT SUB-CONTRACTOR TO PERFORM ASBESTOS ABATEMENT WORK. ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO START OF ABATEMENT. GIVE THE COR A MINIMUM OF 14 DAYS NOTICE UNO BEFORE START OF PLANNED ABATEMENT ACTIVITIES. SEE ABATEMENT SPECIFICATIONS. H. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. I. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF NEW MATERIALS. J. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED. K. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS & CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS & ACM LEAD & MOLD REPORTS & SPECIFICATIONS. WHERE INDICATED OR SUSPECTED REMEDIATE THOSE ITEMS AS SPECIFIED, TO ALLOW OTHER TRADES TO PERFORM RENOVATION WORK WITHOUT DISTURBANCE OR EXPOSURE TO ACM LEAD OR MOLD IN EXCESS OF OSHA ACTION LEVELS. RESULTING DEMOLITION DEBRIS FROM ABOVE LISTED COMPONENTS SHALL BE TESTED FOR DETERMINATION OF DISPOSAL REQUIREMENTS IN ACCORDANCE WITH LOCAL STATE AND FEDERAL REGULATION.

AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. D. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. E. SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES. F. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO PROCEEDING. G. CONTRACTOR MUST COORDINATE WORK WITH COR. PHASES CONTRACTOR MUST COORDINATE WORK WITH COR. PHASES DEPICTED ON PLANS ARE GUIDELINES FOR THE WORK. CONTRACTOR TO DETERMINE AND COORDINATE ORDER OF WORK WITH COR. H. CONTRACTOR TO MOVE ALL LOOSE FURNITURE AS REQUIRED CONTRACTOR TO MOVE ALL LOOSE FURNITURE AS REQUIRED TO PERFORM THE WORK. NO COMPUTERS OR ELECTRONIC EQUIPMENT TO BE DISCONNECTED. CONTACT IT/COR IF IT NEEDS TO BE DISCONNECTED. I. ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED. J. PROVIDE WEATHER PROTECTION IN ROOMS BG08,B438 & PROVIDE WEATHER PROTECTION IN ROOMS BG08,B438 & B501 WHILE WINDOWS ARE BEING REPLACED. TYPICAL OF ALL IT ROOMS. K. SOME WORK WILL REQUIRE INSTALLATION AFTER REGULAR SOME WORK WILL REQUIRE INSTALLATION AFTER REGULAR HOURS.

AutoCAD SHX Text

ABOVE CEILING

AutoCAD SHX Text

ACOUSTICAL CEILING TILE

AutoCAD SHX Text

ABOVE FINISH FLOOR

AutoCAD SHX Text

ALUMINUM

AutoCAD SHX Text

BATT INSULATION

AutoCAD SHX Text

BOTTOM OF

AutoCAD SHX Text

CEMENTITIOUS BACKER BOARD

AutoCAD SHX Text

COLD-FORMED METAL FRAMING

AutoCAD SHX Text

CORNER GUARD

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

CASED OPENING

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

CONTRACTING OFFICER'S REPRESENTATIVE

AutoCAD SHX Text

CERAMIC TILE

AutoCAD SHX Text

CARPET

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

EQUAL

AutoCAD SHX Text

EXPOSED STRUCTURE

AutoCAD SHX Text

ET CETERA

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXPOSED

AutoCAD SHX Text

FACTORY FINISH

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

FIRE HOSE CABINET

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

FINISH

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FACE OF

AutoCAD SHX Text

FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

INTERIOR

AutoCAD SHX Text

HANDICAPPED

AutoCAD SHX Text

HOLLOW METAL

AutoCAD SHX Text

HIGH-PRESSURE DECORATIVE LAMINATE

AutoCAD SHX Text

HEATING VENTILATION AND AIR-CONDITIONING

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

MASONRY OPENING

AutoCAD SHX Text

METAL

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

OPPOSITE HAND

AutoCAD SHX Text

PLASTER

AutoCAD SHX Text

PLASTIC LAMINATE

AutoCAD SHX Text

PRESSURE TREATED

AutoCAD SHX Text

PAIR

AutoCAD SHX Text

PAINT

AutoCAD SHX Text

QUARRY TILE

AutoCAD SHX Text

RESILIENT BASE

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

RESINOUS FLOORING

AutoCAD SHX Text

RESINOUS EPOXY WALL - CEILING

AutoCAD SHX Text

ROUGH OPENING

AutoCAD SHX Text

RUBBER FLOORING

AutoCAD SHX Text

SPECIALTY HIGH BUILD GLAZED COATING

AutoCAD SHX Text

SOAP DISPENSER

AutoCAD SHX Text

SOLID CORE WOOD

AutoCAD SHX Text

SIMILAR

AutoCAD SHX Text

SANITARY NAPKIN DISPENSER

AutoCAD SHX Text

SPECIAL FACED

AutoCAD SHX Text

STAINLESS STEEL

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

SUBSTRATE

AutoCAD SHX Text

TACK BOARD

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

TOP OF

AutoCAD SHX Text

TOILET PAPER

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

VINYL COMPOSITION TILE

AutoCAD SHX Text

VINYL WALL COVERING

AutoCAD SHX Text

WATERPROOF(ING)

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

AC

AutoCAD SHX Text

ACT

AutoCAD SHX Text

AFF

AutoCAD SHX Text

ALUM

AutoCAD SHX Text

BATT

AutoCAD SHX Text

BO

AutoCAD SHX Text

CBB

AutoCAD SHX Text

CFMF

AutoCAD SHX Text

CG

AutoCAD SHX Text C

AutoCAD SHX Text

CMU

AutoCAD SHX Text

CO

AutoCAD SHX Text

COMM

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONT

AutoCAD SHX Text

COR

AutoCAD SHX Text

CT

AutoCAD SHX Text

CP

AutoCAD SHX Text

DIA

AutoCAD SHX Text

ELECT

AutoCAD SHX Text

EQ

AutoCAD SHX Text

ES

AutoCAD SHX Text

ETC

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

EXP

AutoCAD SHX Text

FAC FIN

AutoCAD SHX Text

FD

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FHC

AutoCAD SHX Text

FF

AutoCAD SHX Text

FIN

AutoCAD SHX Text

FLR

AutoCAD SHX Text

FO

AutoCAD SHX Text

FV

AutoCAD SHX Text

GA

AutoCAD SHX Text

INT

AutoCAD SHX Text

HC

AutoCAD SHX Text

HM

AutoCAD SHX Text

HPDL

AutoCAD SHX Text

HVAC

AutoCAD SHX Text

MATL

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MO

AutoCAD SHX Text

MTL

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NTS

AutoCAD SHX Text

OC

AutoCAD SHX Text

OH

AutoCAD SHX Text

PLS

AutoCAD SHX Text

PLAM

AutoCAD SHX Text

PT

AutoCAD SHX Text

PR

AutoCAD SHX Text P

AutoCAD SHX Text

QT

AutoCAD SHX Text

RB

AutoCAD SHX Text

REF

AutoCAD SHX Text

REQD

AutoCAD SHX Text

RES

AutoCAD SHX Text

RES-W

AutoCAD SHX Text

RO

AutoCAD SHX Text

RF

AutoCAD SHX Text

SC

AutoCAD SHX Text

SD

AutoCAD SHX Text

SCW

AutoCAD SHX Text

SIM

AutoCAD SHX Text

SND

AutoCAD SHX Text

SP

AutoCAD SHX Text

SS

AutoCAD SHX Text

ST

AutoCAD SHX Text

SUBS

AutoCAD SHX Text

TB

AutoCAD SHX Text

TELE

AutoCAD SHX Text

TO

AutoCAD SHX Text

TP

AutoCAD SHX Text

TYP

AutoCAD SHX Text

UNO

AutoCAD SHX Text

VCT

AutoCAD SHX Text

VWC

AutoCAD SHX Text

WP

AutoCAD SHX Text

WD

AutoCAD SHX Text L

AutoCAD SHX Text

PORCELAIN TILE

AutoCAD SHX Text

POR

AutoCAD SHX Text

CONTROL JOINT

AutoCAD SHX Text

CJ

AutoCAD SHX Text

SOLID SURFACE MATERIAL

AutoCAD SHX Text

SSM

AutoCAD SHX Text

CARPET TILE

AutoCAD SHX Text

CPT

AutoCAD SHX Text

FIRE EXTINGUISHER

AutoCAD SHX Text

FE

AutoCAD SHX Text

JOINT

AutoCAD SHX Text

JT

AutoCAD SHX Text

GYPSUM WALL BOARD

AutoCAD SHX Text

GWB

AutoCAD SHX Text

GYPSUM

AutoCAD SHX Text

GYP

AutoCAD SHX Text

BOARD

AutoCAD SHX Text

BD

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

EJ

AutoCAD SHX Text

ELECTRIC WATER COOLER

AutoCAD SHX Text

EWC

AutoCAD SHX Text

LUXURY VINYL TILE

AutoCAD SHX Text

LVT

AutoCAD SHX Text

BLOCKING

AutoCAD SHX Text

BLKG

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

INSUL

AutoCAD SHX Text

WATER RESISTANT

AutoCAD SHX Text

WELDED SHEET FLOORING

AutoCAD SHX Text

WR

AutoCAD SHX Text

WSF

AutoCAD SHX Text

ANODIZED

AutoCAD SHX Text

ANOD

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

BLDG

AutoCAD SHX Text

FIRE-RETARDANT

AutoCAD SHX Text

FR

AutoCAD SHX Text

GLASS

AutoCAD SHX Text

GL

AutoCAD SHX Text

LAMINATED

AutoCAD SHX Text

LAM

AutoCAD SHX Text

OPENING

AutoCAD SHX Text

OPNG

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

RM

AutoCAD SHX Text

PREFORMED JOINT MATERIAL

AutoCAD SHX Text

PJF

AutoCAD SHX Text

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

SAFETY NOTESABATEMENT WORK NOTES

WORK SAFETY AND ABATEMENT

NOTES

G003

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE WINDOWS

VARIOUS BUILDINGS

VAMC HAMPTON, VIRGINA

590-19-105

Project Director

30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:

AutoCAD SHX Text A. NON-PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS NON-PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS 1) ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO OCCUPY MEDICAL CENTER AREA. PROVIDE ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO OCCUPY MEDICAL CENTER AREA. PROVIDE MINIMUM SIZE MATS OF 24 INCHES X 36 INCHES. THESE MATS SHALL BE CHANGED AS OFTEN AS REQUIRED TO MAINTAIN CLEAN WORK AREAS DIRECTLY OUTSIDE CONSTRUCTION AREA AT ALL TIMES. 2) PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE POSSIBLE. 3) WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 4) SEAL UNUSED DOORS WITH DUCT TAPE. SEAL UNUSED DOORS WITH DUCT TAPE. 5) BLOCK OFF AND SEAL AIR VENTS. BLOCK OFF AND SEAL AIR VENTS. 6) REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 7) UPON COMPLETION: UPON COMPLETION: a. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT. b. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. c. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. d. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

AutoCAD SHX Text B. PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS 1) DURING CONSTRUCTION WORK: DURING CONSTRUCTION WORK: a. OBTAIN PERMIT FROM THE COR. OBTAIN PERMIT FROM THE COR. b. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. c. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS. d. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR. e. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. f. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. 2) UPON COMPLETION: UPON COMPLETION: a. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR AND THOROUGHLY CLEANED BY THE VA DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR AND THOROUGHLY CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT. b. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS. c. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. d. WET MOP AREA WITH CLEANER/DISINFECTANT. WET MOP AREA WITH CLEANER/DISINFECTANT. e. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED. f. RETURN PERMIT TO THE COR. RETURN PERMIT TO THE COR. C. ALL SAFETY NOTES ARE APPLICABLE TO ALL ASPECTS OF THE WORK. ALL SAFETY NOTES ARE APPLICABLE TO ALL ASPECTS OF THE WORK. D. THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SPECIFICATIONS ARE APPLICABLE TO ALL ASPECTS OF THE WORK. THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SPECIFICATIONS ARE APPLICABLE TO ALL ASPECTS OF THE WORK. E. THE SAFETY AND PRIVACY OF PATIENTS, VISITORS, AND STAFF IS PARAMOUNT AT ALL TIMES. THE SAFETY AND PRIVACY OF PATIENTS, VISITORS, AND STAFF IS PARAMOUNT AT ALL TIMES. F. WORK MAY NOT PROCEED UNTIL ALL REQUIRED SAFETY PROTECTIONS AND PROTOCOLS ARE IN PLACE, INCLUDING BUT NOT LIMITED TO BARRIERS, WORK MAY NOT PROCEED UNTIL ALL REQUIRED SAFETY PROTECTIONS AND PROTOCOLS ARE IN PLACE, INCLUDING BUT NOT LIMITED TO BARRIERS, OVERHEAD PROTECTION, SAFETY WARNINGS/SIGNAGE, AND PROVISIONS FOR PRIVACY. G. ALL EQUIPMENT, INCLUDING PERSONAL PROTECTION EQUIPMENT, MUST COMPLY WITH ALL SAFETY STANDARDS AND CONSTRUCTION PROTOCOLS, ALL EQUIPMENT, INCLUDING PERSONAL PROTECTION EQUIPMENT, MUST COMPLY WITH ALL SAFETY STANDARDS AND CONSTRUCTION PROTOCOLS, INCLUDING OSHA. H. ALL ASPECTS OF THE WORK ARE SUBJECT TO INSPECTION(S) BY THE CONTRACTING OFFICERS'S DESIGNATED SAFETY OFFICER, SAID INSPECTION(S) ALL ASPECTS OF THE WORK ARE SUBJECT TO INSPECTION(S) BY THE CONTRACTING OFFICERS'S DESIGNATED SAFETY OFFICER, SAID INSPECTION(S) MAY OCCUR WITHOUT PRIOR NOTIFICATION , CONTRACTOR MUST COMPLY WITH ALL RECOMMENDATIONS RESULTING FROM SAID INSPECTIONS. I. MAINTAIN ON SITE, AT THE AREA OF THE WORK, COPES OF MSDS INFORMATION SHEETS FOR ALL MATERIALS BEING USED AT THAT PARTICULAR AREA MAINTAIN ON SITE, AT THE AREA OF THE WORK, COPES OF MSDS INFORMATION SHEETS FOR ALL MATERIALS BEING USED AT THAT PARTICULAR AREA OF THE WORK. J. AT NO TIMES SHALL BARRICADES SCAFFOLDING, OVERHEAD PROTECTIONS WARNINGS, ETC, PREVENT OR INHIBIT ACCESS TO ENTRANCES EXITS, EXIT AT NO TIMES SHALL BARRICADES SCAFFOLDING, OVERHEAD PROTECTIONS WARNINGS, ETC, PREVENT OR INHIBIT ACCESS TO ENTRANCES EXITS, EXIT DISCHARGES, ETC, FOR EMERGENCY VEHICLES AND FIRST RESPONDERS. K. CLEARLY MARK AND PROVIDE BARRIERS FOR ALL CONTRACTOR LIFTING AREAS INCLUDING DELIMITATION OF ACCESS PATHWAYS PROVIDED PERSONNEL CLEARLY MARK AND PROVIDE BARRIERS FOR ALL CONTRACTOR LIFTING AREAS INCLUDING DELIMITATION OF ACCESS PATHWAYS PROVIDED PERSONNEL TO MONITOR AND WARN NON-CONTRACTOR PERSONNEL WHEN ACCESS PATHWAYS ARE IN USE. L. PARK LIFTING EQUIPMENT IN DESIGNATED AREAS ONLY. DO NOT LEAVE EQUIPMENT/VEHICLES UNATTENDED UNLESS PARKED IN DESIGNATED AREAS AND PARK LIFTING EQUIPMENT IN DESIGNATED AREAS ONLY. DO NOT LEAVE EQUIPMENT/VEHICLES UNATTENDED UNLESS PARKED IN DESIGNATED AREAS AND LODGED/SECURED. M. SOME OVERHEAD WORK AT ENTRANCES, EXITS, EXIT DISCHARGES, ETC. MAY REQUIRE OFF-HOURS AND/OR WEEKEND WORK. COORDINATE EACH SOME OVERHEAD WORK AT ENTRANCES, EXITS, EXIT DISCHARGES, ETC. MAY REQUIRE OFF-HOURS AND/OR WEEKEND WORK. COORDINATE EACH LOCATION WITH THE CONTRACTING OFFICER'S REPRESENTATIVE FOR FINAL DETERMINATION. N. PROTECT ALL EQUIPMENTS, PIPING, TRANSFORMERS, AIR HANDLERS, ROOF(S), LANDSCAPING, ETC. FROM/OVERHEAD WORK. EQUIPMENT AND MATERIALS PROTECT ALL EQUIPMENTS, PIPING, TRANSFORMERS, AIR HANDLERS, ROOF(S), LANDSCAPING, ETC. FROM/OVERHEAD WORK. EQUIPMENT AND MATERIALS FOR OVERHEAD WORK, INCLUDING SPARE/EXCESS SCAFFOLDING COMPONENTS, MAY NOT BE STORED AT GROUND LEVEL ON SITE. P. AT AREAS OF THE WORK REQUIRING UTILITIES SUCH AS WATER, ELECTRICITY, COMPRESSED AIR, ETC, PROVIDE WARNINGS AND PROTECTIONS ALONG AT AREAS OF THE WORK REQUIRING UTILITIES SUCH AS WATER, ELECTRICITY, COMPRESSED AIR, ETC, PROVIDE WARNINGS AND PROTECTIONS ALONG THE ENTIRE PATH OF SAID UTILITIES TO PROTECT AND WARN THE PUBLIC OF THEIR PRESENCE, COORDINATE PROPOSED PATHWAYS OF UTILITIES WITH THE CONTRACTING OFFICERS REPRESENTATIVE FOR APPROVAL PRIOR TO INSTALLATION. Q. LOCATE NOISE GENERATING EQUIPMENT, SUCH AS AIR COMPRESSOR, GENERATORS, PUMPS, ETC. AS FAIR AS PRACTICAL FROM THE BUILDING LOCATE NOISE GENERATING EQUIPMENT, SUCH AS AIR COMPRESSOR, GENERATORS, PUMPS, ETC. AS FAIR AS PRACTICAL FROM THE BUILDING COORDINATE LOCATIONS WITH THE CONTRACTING OFFICERS REPRESENTATIVE FOR APPROVAL PRIOR TO PLACEMENT. R. ONCE A WINDOW IS REMOVED, A NEW WINDOW MUST BE INSERTED. NO OPENING WILL BE LEFT OPEN AND CANNOT BE LEFT UNATTENDED AT ANY ONCE A WINDOW IS REMOVED, A NEW WINDOW MUST BE INSERTED. NO OPENING WILL BE LEFT OPEN AND CANNOT BE LEFT UNATTENDED AT ANY TIME. IF THE WINDOW CANNOT BE REPLACED IMMEDIATELY AFTER REMOVAL, THAN A HARD WINDOW COVERING MUST BE INSTALLED TO PREVENT ACCESS AND TO RESTRICT PERSONAL AND PATIENTS TO THE OPEN SPACE/ THE ABILITY TO FALL OUT OF WINDOW OPENING. S. A TEMPORARY BARRIER IS REQUIRED IN THE PATIENT TELEVISION / GROUP ROOM IN GERIATRIC WARD IN BUILDING 146. PATIENTS MUST NOT HAVE A TEMPORARY BARRIER IS REQUIRED IN THE PATIENT TELEVISION / GROUP ROOM IN GERIATRIC WARD IN BUILDING 146. PATIENTS MUST NOT HAVE ACCESS TO ANY WINDOW OPENING. T. IN BUILDING 110 & 110A SURGERY SUITES, IF INSIDE ACCESS IS REQUIRED WORKERS MUST BE DRESSED OUT IN PROPER `PPE' TO ACCESS THE IN BUILDING 110 & 110A SURGERY SUITES, IF INSIDE ACCESS IS REQUIRED WORKERS MUST BE DRESSED OUT IN PROPER `PPE' TO ACCESS THE RESTRICTED AREA. U. BUILDING 114, WHEN MAKING THE REPAIRS ON THE DOOR A TEMPORARY BARRIER MUST BE INSTALLED TO RESTRICT OUTSIDE AIR INTO THE BUILDING BUILDING 114, WHEN MAKING THE REPAIRS ON THE DOOR A TEMPORARY BARRIER MUST BE INSTALLED TO RESTRICT OUTSIDE AIR INTO THE BUILDING AND TO RESTRICT PATIENT ACCESS TO EXIT AREA.

AutoCAD SHX Text

1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. THE CONTRACTOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. THE CONTRACTOR SHALL ASSUME THAT ALL WINDOW CAULKS AND WINDOW INSERT PANEL CAULKS LOCATED THROUGHOUT BUILDINGS 110 AND 137-A SHALL BE REMOVED AS ASBESTOS CONTAINING MATERIALS. THE CONTRACTOR SHALL ASSUME THAT ALL DRYWALL JOINT COMPOUND LOCATED THROUGHOUT BUILDING 110-A SHALL BE REMOVED AS ASBESTOS CONTAINING MATERIAL. THE CONTRACTOR SHALL ASSUME THAT ALL WALL MASTIC PUCKS LOCATED THROUGHOUT BUILDING 137-A SHALL BE REMOVED AS ASBESTOS CONTAINING MATERIAL. AREAS TO UNDERGO ASBESTOS ABATEMENT ARE GENERALLY LOCATED ON DRAWINGS ATTACHED TO THIS SPECIFICATION DOCUMENT REFERENCE ALSO THE ATTACHED ASBESTOS ABATEMENT SPECIFICATION. 2) THE QUANTITIES INDICATED IN THE SPECIFICATION ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING THE QUANTITIES INDICATED IN THE SPECIFICATION ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING ACTUAL QUANTITIES TO BE REMOVED. ALL MOBILIZATIONS AND PERMIT NOTIFICATIONS (AS NECESSARY) SHALL BE THE CONTRACTORS RESPONSIBILITY. 3) THE WORK SPECIFIED IN THIS DOCUMENT CONSISTS OF THE PROVISION OF SERVICES FOR THE REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING THE WORK SPECIFIED IN THIS DOCUMENT CONSISTS OF THE PROVISION OF SERVICES FOR THE REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS (ACMS). ASBESTOS MATERIALS HAVE BEEN IDENTIFIED IN THE AREAS WHERE WORK WILL BE PERFORMED. IF KNOWN OR SUSPECT ACM MATERIALS ARE DISCOVERED THAT ARE NOT ADDRESSED BY THESE DOCUMENTS, THE CONTRACTOR SHALL INFORM THE CONTRACTING OFFICER IMMEDIATELY. UNDER NO CIRCUMSTANCES ARE THESE MATERIALS TO BE DISTURBED. 4) ALL ASBESTOS ABATEMENT WORK WILL BE PERFORMED BY COMPETENT, LICENSED (BY THE VIRGINIA DEPARTMENT OF PROFESSIONAL AND ALL ASBESTOS ABATEMENT WORK WILL BE PERFORMED BY COMPETENT, LICENSED (BY THE VIRGINIA DEPARTMENT OF PROFESSIONAL AND OCCUPATIONAL REGULATION) PERSONS TRAINED, QUALIFIED, AND KNOWLEDGEABLE IN THE TECHNIQUES OF ABATEMENT, HANDLING, AND DISPOSAL OF ACBMS AND MATERIALS CONTAMINATED BY ASBESTOS, IN ACCORDANCE WITH PERTINENT LOCAL, STATE, AND FEDERAL REGULATIONS. THE BASE BID SCOPE OF WORK INCLUDES THE FOLLOWING: 1) THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. 2) THE ABATEMENT CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING ACTUAL QUANTITIES OF MATERIALS TO BE REMOVED AND REVIEWING THE THE ABATEMENT CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING ACTUAL QUANTITIES OF MATERIALS TO BE REMOVED AND REVIEWING THE SCOPE OF WORK. THE CONTRACTOR SHOULD ALLOW UNDER THEIR BASE BID FOR THE REMOVAL OF ALL MATERIALS AS DESCRIBED IN THE SURVEY REPORT AND/OR REFERENCED IN THIS SPECIFICATION. 3) THE ABATEMENT CONTRACTOR SHALL REMOVE THE FOLLOWING MATERIALS AS PART OF THE BASE BID: a) ALL ASBESTOS CONTAINING WINDOW CAULK LOCATED THROUGHOUT BUILDING 110 (SEE DRAWINGS). APPROXIMATELY 13,000 LINEAR FEET. WINDOW ALL ASBESTOS CONTAINING WINDOW CAULK LOCATED THROUGHOUT BUILDING 110 (SEE DRAWINGS). APPROXIMATELY 13,000 LINEAR FEET. WINDOW CAULK NOTE 1: FOR THE PURPOSES OF THIS PROJECT THE WINDOW CAULKS THROUGHOUT BUILDING 110 ARE ASSUMED TO BE ASBESTOS CONTAINING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF WINDOW CAULKING ON BOTH THE INTERIOR AND EXTERIOR SIDES OF THE WINDOWS NOTE 2: RIGID CRITICAL BARRIERS WILL BE INSTALLED ON THE INTERIOR WINDOW OPENINGS OF THE WINDOWS PRIOR TO REMOVAL FROM THE EXTERIOR OF THE BUILDING CREATING A REGULATED WORK AREA. THE ABATEMENT CONTRACTOR SHALL UTILIZE A NEGATIVE AIR MACHINE ADJACENT TO EACH REMOVAL AREA DURING ANY ABATEMENT WORK. NOTE 3: THE ASBESTOS ABATEMENT CONTRACTOR WILL BE REQUIRED TO REMOVE THE WINDOWS IN ORDER TO ACCESS THE CAULK AROUND THE WINDOW FRAME. b) ALL ASBESTOS CONTAINING WINDOW CAULK (APPROXIMATELY 3,800 LINEAR FEET) AND WINDOW INSERT PANEL CAULK (APPROXIMATELY 2,000 LINEAR ALL ASBESTOS CONTAINING WINDOW CAULK (APPROXIMATELY 3,800 LINEAR FEET) AND WINDOW INSERT PANEL CAULK (APPROXIMATELY 2,000 LINEAR FEET) LOCATED THROUGHOUT BUILDING 137-A (SEE DRAWINGS). NOTE 1: FOR THE PURPOSES OF THIS PROJECT THE WINDOW CAULKS THROUGHOUT BUILDING 137-A ARE ASSUMED TO BE ASBESTOS CONTAINING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF WINDOW CAULKING ON BOTH THE INTERIOR AND EXTERIOR SIDES OF THE WINDOWS. NOTE 2: RIGID CRITICAL BARRIERS WILL BE INSTALLED ON THE INTERIOR WINDOW OPENINGS OF THE WINDOWS PRIOR TO REMOVAL FROM THE EXTERIOR OF THE BUILDING IN A REGULATED WORK AREA. THE ABATEMENT CONTRACTOR SHALL UTILIZE A NEGATIVE AIR MACHINE ADJACENT TO EACH REMOVAL AREA DURING ANY ABATEMENT WORK. NOTE 3: THE ASBESTOS ABATEMENT CONTRACTOR WILL BE REQUIRED TO REMOVE THE WINDOWS IN ORDER TO ACCESS THE CAULK AROUND THE WINDOW FRAME. c)UNDER THE BASE BID, THE ABATEMENT CONTRACTOR SHALL ASSIST THE GENERAL CONTRACTOR IN PERFORMING ALL DEMOLITION ACTIVITIES THAT INVOLVE THE DISTURBANCE OF THE CMU BLOCK FILLER PAINT CONTAINING TRACE <1% ASBESTOS IN BUILDING 110, THE DRYWALL JOINT COMPOUND IN BUILDING 110-A AND THE WALL MASTIC PUCKS IN BUILDING 137-A, IF NECESSARY, AS PART OF THE BASE BID SCOPE OF WORK FOR THIS PROJECT. IF THESE MATERIALS ARE TO BE DISTURBED THE ABATEMENT CONTRACTOR SHALL REMOVE THESE MATERIALS WITHIN A NEGATIVE PRESSURE ENCLOSURE OR INTACT (WITHOUT ENCLOSURE), AS DESCRIBED IN THE PROJECT ASBESTOS ABATEMENT SPECIFICATIONS. FINAL CLEARANCE AIR SAMPLING MAY BE PERFORMED BY THE OWNER’S QP FOLLOWING ALL REMOVAL WITHIN NEGATIVE PRESSURE ENCLOSURES. S QP FOLLOWING ALL REMOVAL WITHIN NEGATIVE PRESSURE ENCLOSURES. NOTE: THE ABATEMENT CONTRACTOR SHALL SUBMIT UNIT COST ESTIMATES FOR THE ABATEMENT OF FOLLOWING ITEMS: 1. ASBESTOS-CONTAINING CEMENTITIOUS WINDOW PANELS FROM AN EXTERIOR REGULATED AREA, PER WINDOW (POTENTIALLY CONCEALED). ASBESTOS-CONTAINING CEMENTITIOUS WINDOW PANELS FROM AN EXTERIOR REGULATED AREA, PER WINDOW (POTENTIALLY CONCEALED). 2. ASBESTOS CONTAINING WINDOW CAULK, PER LINEAR FOOT. ASBESTOS CONTAINING WINDOW CAULK, PER LINEAR FOOT. Note 1: For unit cost pricing the Abatement Contractor shall assume that all mobilization, insurance, notification, profit, etc. are to be included in the unit cost estimate. Note 2: Assume the materials will be removed in accordance with the contract documents/specifications. ADDITIONAL NOTES: 1) THE CONTRACTOR SHALL ADEQUATELY SECURE ALL CONTAINMENTS AND PREVENT UNAUTHORIZED ENTRY THROUGH CONSTRUCTION OF LOCKABLE THE CONTRACTOR SHALL ADEQUATELY SECURE ALL CONTAINMENTS AND PREVENT UNAUTHORIZED ENTRY THROUGH CONSTRUCTION OF LOCKABLE PLYWOOD/WOOD FRAME ENTRANCES/DECON. THESE AREAS WILL BE LOCKED OUT WHEN WORK IS NOT OCCURRING. UNDER NO CIRCUMSTANCES WILL ENTRANCES TO CONTAINMENTS BE LEFT UNATTENDED WHEN WORK IS OCCURRING. 2) NOTE: IT IS POSSIBLE THAT ADDITIONAL QUANTITIES OF MATERIALS MAY BE UNCOVERED DURING REMOVAL IN EACH OF THE BUILDINGS. THE GENERAL NOTE: IT IS POSSIBLE THAT ADDITIONAL QUANTITIES OF MATERIALS MAY BE UNCOVERED DURING REMOVAL IN EACH OF THE BUILDINGS. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ASBESTOS CONTRACTOR AND THE OWNERS QP IF ADDITIONAL SUSPECT ASBESTOS CONTAINING MATERIALS ARE UNCOVERED DURING REMOVAL ACTIVITIES. THE GENERAL CONTRACTOR SHALL STOP WORK IMMEDIATELY IF THESE MATERIALS ARE UNCOVERED DURING RENOVATION WORK. THE OWNER’S QP WILL TEST IF NEEDED AND THE ABATEMENT CONTRACTOR’S SCOPE OF WORK WILL BE ADJUSTED AS S QP WILL TEST IF NEEDED AND THE ABATEMENT CONTRACTOR’S SCOPE OF WORK WILL BE ADJUSTED AS S SCOPE OF WORK WILL BE ADJUSTED AS NECESSARY TO ADDRESS ANY ADDITIONAL MATERIALS UNDER UNIT COST ESTIMATES SUPPLIED BY THE ABATEMENT CONTRACTOR. 3) DURING THE PERFORMANCE OF THE PROJECT, THE CONTRACTOR WILL BE SUBJECT TO INSPECTION BY THE OWNER’S REPRESENTATIVE. IF THE S REPRESENTATIVE. IF THE CONTRACTOR IS FOUND NOT IN COMPLIANCE WITH THE PROJECT SPECIFICATIONS, THE CONTRACTOR WILL STOP ALL WORK IMMEDIATELY TO RESOLVE THE VIOLATION. STANDBY TIME SHALL BE AT THE CONTRACTORS EXPENSE. 4) FOLLOWING COMPLETION OF WORK, THE OWNER’S REPRESENTATIVE SHALL VISUALLY VERIFY THAT ALL ACMS SCHEDULED FOR REMOVAL HAVE BEEN S REPRESENTATIVE SHALL VISUALLY VERIFY THAT ALL ACMS SCHEDULED FOR REMOVAL HAVE BEEN REMOVED AND THAT THE REGULATED AREAS AND CONTAINMENTS ARE CLEAN AND READY FOR FINAL AIR SAMPLING. US EPA AHERA PROTOCOLS (PCM ANALYSIS) WILL BE FOLLOWED FOR CLEARANCE CRITERIA. CONTRACTOR WILL RECLEAN THE CONTAINMENT AREAS AT THEIR OWN EXPENSE UNTIL CONTAINMENT PASSES BOTH VISUAL AND AGGRESSIVE AIR SAMPLING. 5) LEAD CONTAINING PAINT (LCP) AND LEAD-BASED PAINT (LBP): IT IS ANTICIPATED THAT SOME OF THE PAINTED SURFACES IN THE BUILDING CONTAIN LEAD. THE CONTRACTOR SHALL ASSUME ALL SURFACES CONTAIN LCP OR LBP. IT IS IMPORTANT TO NOTE THAT OSHA, UNDER ITS LEAD IN CONSTRUCTION STANDARD (29 CFR 1926.62, PARAGRAPH D), DOES NOT DEFINE ACCEPTABLE LEVELS OF LEAD IN PAINT AT WHICH NO EXPOSURE TO AIRBORNE LEAD (ABOVE THE ACTION LEVEL) WOULD BE EXPECTED. RATHER, OSHA DEFINES AIRBORNE CONCENTRATIONS, AND REFERENCES SPECIFIC TYPES OF WORK PRACTICES AND OPERATIONS FROM WHICH A LEAD HAZARD MAY BE GENERATED. ENVIRONMENTAL AND PERSONNEL MONITORING SHOULD BE CONDUCTED DURING ANY REMOVAL/DEMOLITION PROCESS (AS APPROPRIATE) TO VERIFY THAT ACTUAL PERSONAL EXPOSURES ARE BELOW THE PERMISSIBLE EXPOSURE LIMIT (PEL) UNDER OSHA REQUIREMENTS. ALL CONTRACTORS PERFORMING RENOVATION/DEMOLITION WORK IN THE BUILDINGS WILL BE REQUIRED TO CONDUCT THIS MONITORING AND FOLLOW ALL OF THE OTHER REQUIREMENTS FOUND UNDER 29 CFR 1926.62. ALL CONTRACTORS PERFORMING WORK AT THE SITE SHOULD ALLOW FOR UNDER THEIR BASE BID COMPLIANCE WITH THE OSHA STANDARD FOR LEAD IN CONSTRUCTION 29 CFR 1926.62. 6) MOLD IS ASSUMED TO BE PRESENT IN THE BUILDINGS. THE CONTRACTOR SHALL REMOVE ALL WATER STAINED/MOLD IMPACTED BUILDING MATERIALS THROUGHOUT THE BUILDINGS WHERE RENOVATION WORK WILL OCCUR UNDER THE PROJECT SCOPE OF WORK UNDER THE BASE BID. THE CONTRACTOR SHALL ABATE ALL MATERIALS AS OUTLINED UNDER THE PROJECT SPECIFICATIONS. 7) ISOLATE ROOMS WHERE WORK IS OCCURING FROM THE REST OF THE HOSPITAL. TYPICAL. SEE 028211 (P.4) SPECIFICATIONS FOR ADDITIONAL ISOLATE ROOMS WHERE WORK IS OCCURING FROM THE REST OF THE HOSPITAL. TYPICAL. SEE 028211 (P.4) SPECIFICATIONS FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

BLDG 110

BLDG 110A

BLDG 137A

BLDG 114

BLDG 146

CONTRACTOR'S

STAGING AREA

-VERIFY WITH COR

CAMPUS PLAN

A001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE WINDOWS

VARIOUS BUILDINGS

VAMC HAMPTON, VIRGINA

590-19-105

Project Director

30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text A001

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FULL CAMPUS PLAN

AutoCAD SHX Text NOTES: 1). LAYDOWN AREAS, WORK AREAS, DUMPSTER LOCATIONS, CONSTRUCTION WORKERS BATHROOM LAYDOWN AREAS, WORK AREAS, DUMPSTER LOCATIONS, CONSTRUCTION WORKERS BATHROOM CONSTRUCTION WORKERS BATHROOM LOCATION TO BE LOCATED PER DIRECTION OF THE COR. 2). SECURE LAYDOWN AREAS, WORK AREAS WITH 7' HIGH CONSTRUCTION FENCING WITH MAN AND SECURE LAYDOWN AREAS, WORK AREAS WITH 7' HIGH CONSTRUCTION FENCING WITH MAN AND CONSTRUCTION FENCING WITH MAN AND VEHICLE GATES AS NECESSARY AND APPROVED BY THE COR. 3). PROVIDE PROTECTION BARRIERS AROUND WORK ZONES AND STAGING AREAS TO KEEP OUT HOSPITAL PROVIDE PROTECTION BARRIERS AROUND WORK ZONES AND STAGING AREAS TO KEEP OUT HOSPITAL PERSONNEL AND GENERAL PUBLIC.

AutoCAD SHX Text NOTES: 1). WINDOWS ARE REQUIRED TO BE STORED WINDOWS ARE REQUIRED TO BE STORED OFF CAMPUS

AutoCAD SHX Text

590 MEANS STREET NW STE. 200 ATLANTA, GA 30318

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

SITE STAGING NOTES

BLDG 110

BLDG 110A

DN TO

SUB BASEMENT

RAMP

DN

UP

DN

UP

UP

DN

DN

DN

TO BLDG 110 B

TO BLDG 110 A

TO BLDG 110 B

TO BLDG 110

TO BLDG 110 A

TO BLDG 110 A

CGB-2

CG56A

OFFICE

GC-103

VESTIBULE

SGC-SUB

SHOWER

NOURISHMENT

BG15B1

WOMENS TOILET

CG54B

DATA

CLOSET

DG18

DG05B

GC-103B

STAFF WOMENS

SHOWER

STAFF MENS

SHOWER

ELECTRICAL

CLOSET RM

HAC RM

CG42

CG48B.1

STAIR

SUB-BASEMENT

TELECOM

RM

DG28

DG16

STAFF TOILET

ELECTRICAL

CLOSET

DG20A

ELECT/DATA CLOSET

BG16H

BG10

CGD-3

ELECTRICAL

CORRIDOR

CG53

ANTEROOM

CG58B

SUPPLY RM

CGD-5

CORRIDOR

CCG-3

CORRIDOR

CGC-2

CORRIDOR

CORRIDOR

CORRIDOR

CCG-4

RECEIVING

CG54

MENS TOILET

CG58

STORAGE

RM

CG57

CG54A

ANTEROOM

CG48A.1CLEAN ANTEROOM

HAC

CG58C

CG48A

CORRIDOR

ELECTRICAL

RM

MAIL DIST

STERILIZER RM

GC-106

CGC-33

GC-105

OPER SUPER

GC-104

REPRODUCTION

STERILIZER WORKRM

CGC-34

CORRIDOR

STAIRS #6

SCG6

CG48B

CONTAMINATION AREA

AN

TE

RO

OM

CG48

CG

B

WOMENS

SHOWER

CG56B

MENS SHOWER

CG50

CORRIDOR

CCG-5

BREAKOUT

EQUIP

STAIRS #7

SCG7

CLEAN STORAGE

CG56C

OFFICE

CG56

CG56D

CORRIDOR

CGC-30

GC-101C

HAC

GC-100H

TEL/COMM

EGC

SGC4

STAFF WOMENS

TOILETSTAIRS #4

STAFF MENS

TOILET

MENS

LOCKER RM

CGC-28GC-102

GC-102A

DG05P

NURSE

STATION 2

CGD-1

LINEN STORAGE

STAIRS #3 PRIVATE RM

MEDS RM

DG13

DG01A

DG10

EBG-9

GC-102B

CG02A

STERILE STORAGE

SOILED

UTILITY RM

GC-109

SOILED LINEN

CORRIDOR

CG58E

STORAGEMEDICAL GAS

STORAGE

GC-110CG-111

CGC-35

GC-112

DIALYSIS

BAYS

EMS

STORAGE

DG05

CG52

NURSE

STATION 1

DG05M

CGD-2

CORRIDOR

DG05N

NURSE STATION 3

CORRIDOR

PATIENT TRAINING RM

CORRIDOR

DG05K

DIALYSIS STORAGE

CGC-1

MECH

PUBLIC

TOILET

DG25

DG23

DG27

GC-100L

ELEVATOR

#7

ECG7

DG21

MECH RM

STAIRS #1LINEN

SHOOT

GC-108

DG21A

DIALYSIS

STORAGE

DATA

CLOSET

DG05H

CONTROLLED DRUG

STORAGE

GC-107

DG05H.1

SGD3

DG05J.1

DG05G

RECEPTION/

WAITING

EDG-6

ELEC RM

DG05E

ELEVATO

ELEV #6

DG05F

PRIVATE RM

CLEAN

SUPPLY RM

DG05D

PRIVATE

TOILET

DG05C

PRIVATE RM

DG05C.1

DG01D

WOMENS

LOCKER

CLEAN

LINEN

FEMALE

LOCKER

DG05A

GC-103A

HAC

LOCKER RM

DG06

EXAM RM

OFFICE

NURSE MGR

OFFICE

DG02

SGD4

DG01C

DG04

PUBLIC

TOILET

DG01B

STAIRS #4

STAFF LOUNGE

DG20

WATER

CONCENTRATE

PREP

DIALYSIS EQUIP

TESTING

DG22

DG24

CGB-1

DG26

EMS STORAGE

CORRIDOR

DIALYSIS

SOCIAL

WORKER

CORRIDOR

CGB-3

CG01

EMS STORAGE

CG01A

CORRIDOR

CG47

TELECOM

RM

CG47A

EDUCATION SPS

ASST CHIEF

OFFICE

CG49

CG47

OFFICE

CG47B

ELECTRICAL RM

MECH RM

CG46

CG03

ELEV #8

EBG-8

ELEV #9LACTATION RM

BG01

CORRIDOR

CGB-4

VESTIBULE

BG03

ESCORT OFFICE

BG05CREDIT

UNION ATM

BG09

CREDIT

UNION ATM

BG09AWHEELCHAIR

STORAGE

BG11

STAIRS #2

SGB2

BG13

BG13A

VACANT

BG13A.3

BG13A.2

BG13A.1

MORGUE

AUTOPSY AREA

BG15

MORGUE STORAGE

BG15C

STORAGE

BG15A

LOCKER RM

BG15B

SPECIALITY

CLINIC WAITING

BG16

ELEV #10

EBG-10

MALE

TOILET

BG19

MH AND BS

OFFICE

BG21

MH AND BS

OFFICE

BG23

TELEHEALTH

OFFICE

BG25

TRIAGE AREA

BG22

NEURO

BG22A

EXAM RM

BG22E

EXAM RM

BG22D

EXAM RM

BG22C

EXAM RM

BG22B

EMS LOUNGE

BG02

PATIENT CLOTHING RM

BG06

STAFF OFFICE

BG06A

DATA

CLOSET

BG08

WHEELCHAIR

STORAGE

BG12

STORAGE

BG12A

ELECTRICAL

BG14AHAC

BG14

STORAGE

BG16A

WOMENS

TOILET

BG16B

CLEAN

UTILITY

BG16C

MED RM

BG16D

DERMATOLOGY

BG16I

DERMATOLOGY

BG16M

PULMONARY

BG16P

DERMATOLOGY

BG16R

DERM

BG16T

STAIRS #5

SGB5

BG16F

STAFF

LOUNGE

RECEPTION

CHARGE NURSE

BG16F.1

BG16E

NEPH

BG16Q

OFFICE

BG16J

OFFICE

BG16K

NEPH

BG16N

TOILET

BG16N1

NEPH

BG16Q

MECH

BG16S

DERM

BG16U

CG02

CG113

SGC1

PRIVATE RM

PRIVATE

TOILET

DG05J

PRIVATE

TOILET

STAFF

TOILET

DG01

PRIVATE

TOILET

DG05D.1

ELECTRICAL

CLOSET

VESTIBULE

DG14

DG12

CONFERENCE RM

VACANT

VACANT

CH

AS

E

CHASE

CHASE

CH

AS

E

CHASE

CHASE

CH

AS

E

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASE

CHASECHASE

CH

AS

E

CHASE

CHASE

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

N/ A

N/A

N/A

N/A

N/A

N/A

N/ A

N/A

N/A

N/A

N/ A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/AN/A

N/ A

N/A

N/A

BLDG 135

PORCH

SITE PLAN - TEMPORARY

PROTECTION AT BLDG 110

AS100

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE WINDOWS

VARIOUS BUILDINGS

VAMC HAMPTON, VIRGINA

590-19-105

Project Director

30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:

AutoCAD SHX Text

1. THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN BE REQUIRED TO SUBMIT A DETAILED WORK PLAN BE REQUIRED TO SUBMIT A DETAILED WORK PLAN REQUIRED TO SUBMIT A DETAILED WORK PLAN REQUIRED TO SUBMIT A DETAILED WORK PLAN TO SUBMIT A DETAILED WORK PLAN TO SUBMIT A DETAILED WORK PLAN SUBMIT A DETAILED WORK PLAN SUBMIT A DETAILED WORK PLAN A DETAILED WORK PLAN A DETAILED WORK PLAN DETAILED WORK PLAN DETAILED WORK PLAN WORK PLAN WORK PLAN PLAN PLAN WITHIN (15) FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED (15) FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED (15) FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED OF CONTRACT AWARD THAT PROVIDES ESTIMATED OF CONTRACT AWARD THAT PROVIDES ESTIMATED CONTRACT AWARD THAT PROVIDES ESTIMATED CONTRACT AWARD THAT PROVIDES ESTIMATED AWARD THAT PROVIDES ESTIMATED AWARD THAT PROVIDES ESTIMATED THAT PROVIDES ESTIMATED THAT PROVIDES ESTIMATED PROVIDES ESTIMATED PROVIDES ESTIMATED ESTIMATED ESTIMATED PERFORMANCE TIMES FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION TIMES FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION TIMES FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION EACH MAJOR TASK, ANTICIPATED DATE AND DURATION EACH MAJOR TASK, ANTICIPATED DATE AND DURATION MAJOR TASK, ANTICIPATED DATE AND DURATION MAJOR TASK, ANTICIPATED DATE AND DURATION TASK, ANTICIPATED DATE AND DURATION TASK, ANTICIPATED DATE AND DURATION ANTICIPATED DATE AND DURATION ANTICIPATED DATE AND DURATION DATE AND DURATION DATE AND DURATION AND DURATION AND DURATION DURATION DURATION OF WORK PER EACH PHASE. 2. G.C. TO COORDINATE LAY-DOWN AREAS WITH COR. G.C. TO COORDINATE LAY-DOWN AREAS WITH COR. 3. AS PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO AS PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO CONTROL WILL BE ESSENTIAL. ACCESS TO CONTROL WILL BE ESSENTIAL. ACCESS TO WILL BE ESSENTIAL. ACCESS TO WILL BE ESSENTIAL. ACCESS TO BE ESSENTIAL. ACCESS TO BE ESSENTIAL. ACCESS TO ESSENTIAL. ACCESS TO ESSENTIAL. ACCESS TO ACCESS TO ACCESS TO TO TO THE WORK SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. WORK SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. WORK SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. FOR MATERIALS AND CONSTRUCTION PERSONNEL. FOR MATERIALS AND CONSTRUCTION PERSONNEL. MATERIALS AND CONSTRUCTION PERSONNEL. MATERIALS AND CONSTRUCTION PERSONNEL. AND CONSTRUCTION PERSONNEL. AND CONSTRUCTION PERSONNEL. CONSTRUCTION PERSONNEL. CONSTRUCTION PERSONNEL. PERSONNEL. PERSONNEL.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .