This solicitation is for construction services to replace windows at various buildings at the Hampton VA Medical Center. The scope of work involves the removal and replacement of windows and all associated caulking and sealants as shown on the attached plans and specifications. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 for project 590-19-105. Bids are due by the date listed in solicitation number 36C24623B0006. The awarded contractor will provide all labor, materials, equipment and supervision to complete the window replacement and associated sealant work at the buildings specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24623B0006 0003.docx | DOCX document | |
| S05 VA RFI Replacement Window Responses 1-30-23.pdf | ||
| 36C24623B0006 0002.docx | DOCX document | |
| 36C24623B0006 0001.docx | DOCX document | |
| Attachment E Wage Determination Replacement Windows.pdf | ||
| Attachment C 590-19-105-100pct Specs.pdf | ||
| Attachment F - Replacement Windows Itemized Schedule of Values Cost Breakdown.xls | XLS spreadsheet | |
| S02 IFB Replace Various Windows.pdf | ||
| Attachment A COVID-19 Safety Protocols for Federal Contractors.doc | DOC document | |
| BASIS FOR AWARD windows.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAMPTON VA MEDICAL CENTER
100% CONSTRUCTION DOCUMENTS
100 Emancipation Drive, Hampton, Virginia 23667
PROJECT No: 590-19-105
SIGNATURE BLOCK
REPLACE WINDOWS VARIOUS BUILDINGS
INDEX OF DRAWINGS
DRAWING TITLE
DWG
NO.
GENERAL
ARCHITECTURAL
G001 COVER SHEET
G002 LEGENDS, ABBREVIATIONS AND NOTES
A001
BUILDING 110 BASEMENT LEVEL FLOOR PLANA100
BUILDING 110 FIRST FLOOR PLANA101
BUILDING 110 SECOND FLOOR PLANA102
BUILDING 110 THIRD FLOOR PLANA103
BUILDING 110 FOURTH FLOOR PLANA104
BUILDING 110 FIFTH-SIXTH-SEVENTH FLOOR PLANA105
BUILDING 146 FIRST FLOOR PLANA106
BUILDING 137A FIRST-SECOND FLOOR PLANA107
BUILDING 114 FIRST FLOOR PLAN AND EXTERIOR ELEVATIONSA108
CAMPUS PLAN
BUILDING 110 EXTERIOR ELEVATIONS - NORTHA201
BUILDING 110 EXTERIOR ELEVATIONS - SOUTHA202
BUILDING 110 EXTERIOR ELEVATIONS - EASTA203
BUILDING 110 EXTERIOR ELEVATIONS - WESTA204
BUILDING 110A EXTERIOR ELEVATIONSA205
BUILDING 146 EXTERIOR ELEVATIONSA206
BUILDING 146 EXTERIOR ELEVATIONSA207
BUILDING 137A EXTERIOR ELEVATIONSA208
WINDOW TYPES AND WINDOW ELEVATIONSA501
WINDOW, GLAZING AND PRECAST PANEL SCHEDULESA502
TYPICAL BUILDING WALL SECTIONSA301
TYPICAL WINDOW REPLACEMENT DETAILSA401
TYPICAL BUILDING WALL SECTIONSA302
TYPICAL WINDOW REPLACEMENT DETAILSA402
TYPICAL WINDOW REPLACEMENT DETAILSA403
AS001 SITE PLAN - TEMPORARY PROTECTION AT BLDG 110
STRUCTURAL
S001 STRUCTURAL NOTES
S201 WALL ELEVATIONS
S401 TYPICAL WINDOW REPLACEMENT DETAILS
BUILDING 137A EXTERIOR ELEVATIONS - DEMOLITIONAD208
HISTORICAL STUDY - BUILDING 110 - SOUTH ELEVATIONHIST
G003 WORK SAFETY AND ABATEMENT NOTES
COVER SHEET
G001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE WINDOWS
VARIOUS BUILDINGS
VAMC HAMPTON, VIRGINA
590-19-105
Project Director
30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
AREA MAP
AutoCAD SHX Text
CONSTRUCTION RISK ASSESSMENT
AutoCAD SHX Text
590 MEANS STREET NW STE. 200 ATLANTA, GA 30318
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text
THOMAS C. STEELE JR.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
ARCHITECTURAL LEGEND
MATERIAL LEGEND
ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL ABBREVIATIONS
SAFETY SIGN CONSTRUCTION SIGNAGE
LEGENDS, ABBREVIATIONS
AND NOTES
G002
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE WINDOWS
VARIOUS BUILDINGS
VAMC HAMPTON, VIRGINA
590-19-105
Project Director
30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:
AutoCAD SHX Text A
AutoCAD SHX Text + 0'-6"
AutoCAD SHX Text F.E.C.
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
ROOM NAME AND NUMBER
AutoCAD SHX Text
DOOR NUMBER
AutoCAD SHX Text
KEY NOTE
AutoCAD SHX Text
WINDOW TYPE
AutoCAD SHX Text
PARTITION TYPE
AutoCAD SHX Text
DETAIL CALLOUT
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DETAIL IS DRAWN
AutoCAD SHX Text
SECTION CALLOUT
AutoCAD SHX Text
VERTICAL ELEVATION
AutoCAD SHX Text
COLUMN CENTERLINE DESIGNATION
AutoCAD SHX Text
DEMOLITION NOTE
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
SHEET WHERE SECTION IS DRAWN
AutoCAD SHX Text
EXTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A201
AutoCAD SHX Text
AutoCAD SHX Text
GA4
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MORTAR, STUCCO CEMENT PLASTER
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
INSULATION RIGID
AutoCAD SHX Text
INSULATION BATT
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
WOOD (ROUGH)
AutoCAD SHX Text
WOOD FINISH
AutoCAD SHX Text
INTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW WALL STUDS TOP OF SLAB TOP OF MASONRY ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT. D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. E. SEAL PIPE & CONDUIT PENETRATIONS THROUGH SLABS SEAL PIPE & CONDUIT PENETRATIONS THROUGH SLABS CEILING, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING. G. PRIME CONTRACTOR TO HIRE AN ABATEMENT PRIME CONTRACTOR TO HIRE AN ABATEMENT SUB-CONTRACTOR TO PERFORM ASBESTOS ABATEMENT WORK. ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO START OF ABATEMENT. GIVE THE COR A MINIMUM OF 14 DAYS NOTICE UNO BEFORE START OF PLANNED ABATEMENT ACTIVITIES. SEE ABATEMENT SPECIFICATIONS. H. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. I. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF NEW MATERIALS. J. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED. K. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS & CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS & ACM LEAD & MOLD REPORTS & SPECIFICATIONS. WHERE INDICATED OR SUSPECTED REMEDIATE THOSE ITEMS AS SPECIFIED, TO ALLOW OTHER TRADES TO PERFORM RENOVATION WORK WITHOUT DISTURBANCE OR EXPOSURE TO ACM LEAD OR MOLD IN EXCESS OF OSHA ACTION LEVELS. RESULTING DEMOLITION DEBRIS FROM ABOVE LISTED COMPONENTS SHALL BE TESTED FOR DETERMINATION OF DISPOSAL REQUIREMENTS IN ACCORDANCE WITH LOCAL STATE AND FEDERAL REGULATION.
AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. D. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. E. SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES. F. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO PROCEEDING. G. CONTRACTOR MUST COORDINATE WORK WITH COR. PHASES CONTRACTOR MUST COORDINATE WORK WITH COR. PHASES DEPICTED ON PLANS ARE GUIDELINES FOR THE WORK. CONTRACTOR TO DETERMINE AND COORDINATE ORDER OF WORK WITH COR. H. CONTRACTOR TO MOVE ALL LOOSE FURNITURE AS REQUIRED CONTRACTOR TO MOVE ALL LOOSE FURNITURE AS REQUIRED TO PERFORM THE WORK. NO COMPUTERS OR ELECTRONIC EQUIPMENT TO BE DISCONNECTED. CONTACT IT/COR IF IT NEEDS TO BE DISCONNECTED. I. ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED. J. PROVIDE WEATHER PROTECTION IN ROOMS BG08,B438 & PROVIDE WEATHER PROTECTION IN ROOMS BG08,B438 & B501 WHILE WINDOWS ARE BEING REPLACED. TYPICAL OF ALL IT ROOMS. K. SOME WORK WILL REQUIRE INSTALLATION AFTER REGULAR SOME WORK WILL REQUIRE INSTALLATION AFTER REGULAR HOURS.
AutoCAD SHX Text
ABOVE CEILING
AutoCAD SHX Text
ACOUSTICAL CEILING TILE
AutoCAD SHX Text
ABOVE FINISH FLOOR
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
BATT INSULATION
AutoCAD SHX Text
BOTTOM OF
AutoCAD SHX Text
CEMENTITIOUS BACKER BOARD
AutoCAD SHX Text
COLD-FORMED METAL FRAMING
AutoCAD SHX Text
CORNER GUARD
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
CASED OPENING
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
CONTRACTING OFFICER'S REPRESENTATIVE
AutoCAD SHX Text
CERAMIC TILE
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text
EXPOSED STRUCTURE
AutoCAD SHX Text
ET CETERA
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXPOSED
AutoCAD SHX Text
FACTORY FINISH
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
FIRE HOSE CABINET
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FACE OF
AutoCAD SHX Text
FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)
AutoCAD SHX Text
GAGE
AutoCAD SHX Text
INTERIOR
AutoCAD SHX Text
HANDICAPPED
AutoCAD SHX Text
HOLLOW METAL
AutoCAD SHX Text
HIGH-PRESSURE DECORATIVE LAMINATE
AutoCAD SHX Text
HEATING VENTILATION AND AIR-CONDITIONING
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MASONRY OPENING
AutoCAD SHX Text
METAL
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
OPPOSITE HAND
AutoCAD SHX Text
PLASTER
AutoCAD SHX Text
PLASTIC LAMINATE
AutoCAD SHX Text
PRESSURE TREATED
AutoCAD SHX Text
PAIR
AutoCAD SHX Text
PAINT
AutoCAD SHX Text
QUARRY TILE
AutoCAD SHX Text
RESILIENT BASE
AutoCAD SHX Text
REFRIGERATOR
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
RESINOUS FLOORING
AutoCAD SHX Text
RESINOUS EPOXY WALL - CEILING
AutoCAD SHX Text
ROUGH OPENING
AutoCAD SHX Text
RUBBER FLOORING
AutoCAD SHX Text
SPECIALTY HIGH BUILD GLAZED COATING
AutoCAD SHX Text
SOAP DISPENSER
AutoCAD SHX Text
SOLID CORE WOOD
AutoCAD SHX Text
SIMILAR
AutoCAD SHX Text
SANITARY NAPKIN DISPENSER
AutoCAD SHX Text
SPECIAL FACED
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
SUBSTRATE
AutoCAD SHX Text
TACK BOARD
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
TOP OF
AutoCAD SHX Text
TOILET PAPER
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
VINYL COMPOSITION TILE
AutoCAD SHX Text
VINYL WALL COVERING
AutoCAD SHX Text
WATERPROOF(ING)
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
AC
AutoCAD SHX Text
ACT
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ALUM
AutoCAD SHX Text
BATT
AutoCAD SHX Text
BO
AutoCAD SHX Text
CBB
AutoCAD SHX Text
CFMF
AutoCAD SHX Text
CG
AutoCAD SHX Text C
AutoCAD SHX Text
CMU
AutoCAD SHX Text
CO
AutoCAD SHX Text
COMM
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONT
AutoCAD SHX Text
COR
AutoCAD SHX Text
CT
AutoCAD SHX Text
CP
AutoCAD SHX Text
DIA
AutoCAD SHX Text
ELECT
AutoCAD SHX Text
EQ
AutoCAD SHX Text
ES
AutoCAD SHX Text
ETC
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EXP
AutoCAD SHX Text
FAC FIN
AutoCAD SHX Text
FD
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FHC
AutoCAD SHX Text
FF
AutoCAD SHX Text
FIN
AutoCAD SHX Text
FLR
AutoCAD SHX Text
FO
AutoCAD SHX Text
FV
AutoCAD SHX Text
GA
AutoCAD SHX Text
INT
AutoCAD SHX Text
HC
AutoCAD SHX Text
HM
AutoCAD SHX Text
HPDL
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
MATL
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MECH
AutoCAD SHX Text
MFR
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MO
AutoCAD SHX Text
MTL
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NTS
AutoCAD SHX Text
OC
AutoCAD SHX Text
OH
AutoCAD SHX Text
PLS
AutoCAD SHX Text
PLAM
AutoCAD SHX Text
PT
AutoCAD SHX Text
PR
AutoCAD SHX Text P
AutoCAD SHX Text
QT
AutoCAD SHX Text
RB
AutoCAD SHX Text
REF
AutoCAD SHX Text
REQD
AutoCAD SHX Text
RES
AutoCAD SHX Text
RES-W
AutoCAD SHX Text
RO
AutoCAD SHX Text
RF
AutoCAD SHX Text
SC
AutoCAD SHX Text
SD
AutoCAD SHX Text
SCW
AutoCAD SHX Text
SIM
AutoCAD SHX Text
SND
AutoCAD SHX Text
SP
AutoCAD SHX Text
SS
AutoCAD SHX Text
ST
AutoCAD SHX Text
SUBS
AutoCAD SHX Text
TB
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TO
AutoCAD SHX Text
TP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
UNO
AutoCAD SHX Text
VCT
AutoCAD SHX Text
VWC
AutoCAD SHX Text
WP
AutoCAD SHX Text
WD
AutoCAD SHX Text L
AutoCAD SHX Text
PORCELAIN TILE
AutoCAD SHX Text
POR
AutoCAD SHX Text
CONTROL JOINT
AutoCAD SHX Text
CJ
AutoCAD SHX Text
SOLID SURFACE MATERIAL
AutoCAD SHX Text
SSM
AutoCAD SHX Text
CARPET TILE
AutoCAD SHX Text
CPT
AutoCAD SHX Text
FIRE EXTINGUISHER
AutoCAD SHX Text
FE
AutoCAD SHX Text
JOINT
AutoCAD SHX Text
JT
AutoCAD SHX Text
GYPSUM WALL BOARD
AutoCAD SHX Text
GWB
AutoCAD SHX Text
GYPSUM
AutoCAD SHX Text
GYP
AutoCAD SHX Text
BOARD
AutoCAD SHX Text
BD
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
EJ
AutoCAD SHX Text
ELECTRIC WATER COOLER
AutoCAD SHX Text
EWC
AutoCAD SHX Text
LUXURY VINYL TILE
AutoCAD SHX Text
LVT
AutoCAD SHX Text
BLOCKING
AutoCAD SHX Text
BLKG
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
INSUL
AutoCAD SHX Text
WATER RESISTANT
AutoCAD SHX Text
WELDED SHEET FLOORING
AutoCAD SHX Text
WR
AutoCAD SHX Text
WSF
AutoCAD SHX Text
ANODIZED
AutoCAD SHX Text
ANOD
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
FIRE-RETARDANT
AutoCAD SHX Text
FR
AutoCAD SHX Text
GLASS
AutoCAD SHX Text
GL
AutoCAD SHX Text
LAMINATED
AutoCAD SHX Text
LAM
AutoCAD SHX Text
OPENING
AutoCAD SHX Text
OPNG
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
RM
AutoCAD SHX Text
PREFORMED JOINT MATERIAL
AutoCAD SHX Text
PJF
AutoCAD SHX Text
590 MEANS STREET NW STE. 200 ATLANTA, GA 30318
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text
THOMAS C. STEELE JR.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
SAFETY NOTESABATEMENT WORK NOTES
WORK SAFETY AND ABATEMENT
NOTES
G003
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE WINDOWS
VARIOUS BUILDINGS
VAMC HAMPTON, VIRGINA
590-19-105
Project Director
30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:
AutoCAD SHX Text A. NON-PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS NON-PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS 1) ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO OCCUPY MEDICAL CENTER AREA. PROVIDE ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO OCCUPY MEDICAL CENTER AREA. PROVIDE MINIMUM SIZE MATS OF 24 INCHES X 36 INCHES. THESE MATS SHALL BE CHANGED AS OFTEN AS REQUIRED TO MAINTAIN CLEAN WORK AREAS DIRECTLY OUTSIDE CONSTRUCTION AREA AT ALL TIMES. 2) PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE POSSIBLE. 3) WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 4) SEAL UNUSED DOORS WITH DUCT TAPE. SEAL UNUSED DOORS WITH DUCT TAPE. 5) BLOCK OFF AND SEAL AIR VENTS. BLOCK OFF AND SEAL AIR VENTS. 6) REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 7) UPON COMPLETION: UPON COMPLETION: a. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT. b. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. c. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. d. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
AutoCAD SHX Text B. PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS PATIENT CARE AREA INFECTION CONTROL REQUIREMENTS 1) DURING CONSTRUCTION WORK: DURING CONSTRUCTION WORK: a. OBTAIN PERMIT FROM THE COR. OBTAIN PERMIT FROM THE COR. b. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. c. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS. d. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR. e. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. f. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. 2) UPON COMPLETION: UPON COMPLETION: a. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR AND THOROUGHLY CLEANED BY THE VA DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR AND THOROUGHLY CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT. b. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS. c. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. d. WET MOP AREA WITH CLEANER/DISINFECTANT. WET MOP AREA WITH CLEANER/DISINFECTANT. e. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED. f. RETURN PERMIT TO THE COR. RETURN PERMIT TO THE COR. C. ALL SAFETY NOTES ARE APPLICABLE TO ALL ASPECTS OF THE WORK. ALL SAFETY NOTES ARE APPLICABLE TO ALL ASPECTS OF THE WORK. D. THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SPECIFICATIONS ARE APPLICABLE TO ALL ASPECTS OF THE WORK. THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SPECIFICATIONS ARE APPLICABLE TO ALL ASPECTS OF THE WORK. E. THE SAFETY AND PRIVACY OF PATIENTS, VISITORS, AND STAFF IS PARAMOUNT AT ALL TIMES. THE SAFETY AND PRIVACY OF PATIENTS, VISITORS, AND STAFF IS PARAMOUNT AT ALL TIMES. F. WORK MAY NOT PROCEED UNTIL ALL REQUIRED SAFETY PROTECTIONS AND PROTOCOLS ARE IN PLACE, INCLUDING BUT NOT LIMITED TO BARRIERS, WORK MAY NOT PROCEED UNTIL ALL REQUIRED SAFETY PROTECTIONS AND PROTOCOLS ARE IN PLACE, INCLUDING BUT NOT LIMITED TO BARRIERS, OVERHEAD PROTECTION, SAFETY WARNINGS/SIGNAGE, AND PROVISIONS FOR PRIVACY. G. ALL EQUIPMENT, INCLUDING PERSONAL PROTECTION EQUIPMENT, MUST COMPLY WITH ALL SAFETY STANDARDS AND CONSTRUCTION PROTOCOLS, ALL EQUIPMENT, INCLUDING PERSONAL PROTECTION EQUIPMENT, MUST COMPLY WITH ALL SAFETY STANDARDS AND CONSTRUCTION PROTOCOLS, INCLUDING OSHA. H. ALL ASPECTS OF THE WORK ARE SUBJECT TO INSPECTION(S) BY THE CONTRACTING OFFICERS'S DESIGNATED SAFETY OFFICER, SAID INSPECTION(S) ALL ASPECTS OF THE WORK ARE SUBJECT TO INSPECTION(S) BY THE CONTRACTING OFFICERS'S DESIGNATED SAFETY OFFICER, SAID INSPECTION(S) MAY OCCUR WITHOUT PRIOR NOTIFICATION , CONTRACTOR MUST COMPLY WITH ALL RECOMMENDATIONS RESULTING FROM SAID INSPECTIONS. I. MAINTAIN ON SITE, AT THE AREA OF THE WORK, COPES OF MSDS INFORMATION SHEETS FOR ALL MATERIALS BEING USED AT THAT PARTICULAR AREA MAINTAIN ON SITE, AT THE AREA OF THE WORK, COPES OF MSDS INFORMATION SHEETS FOR ALL MATERIALS BEING USED AT THAT PARTICULAR AREA OF THE WORK. J. AT NO TIMES SHALL BARRICADES SCAFFOLDING, OVERHEAD PROTECTIONS WARNINGS, ETC, PREVENT OR INHIBIT ACCESS TO ENTRANCES EXITS, EXIT AT NO TIMES SHALL BARRICADES SCAFFOLDING, OVERHEAD PROTECTIONS WARNINGS, ETC, PREVENT OR INHIBIT ACCESS TO ENTRANCES EXITS, EXIT DISCHARGES, ETC, FOR EMERGENCY VEHICLES AND FIRST RESPONDERS. K. CLEARLY MARK AND PROVIDE BARRIERS FOR ALL CONTRACTOR LIFTING AREAS INCLUDING DELIMITATION OF ACCESS PATHWAYS PROVIDED PERSONNEL CLEARLY MARK AND PROVIDE BARRIERS FOR ALL CONTRACTOR LIFTING AREAS INCLUDING DELIMITATION OF ACCESS PATHWAYS PROVIDED PERSONNEL TO MONITOR AND WARN NON-CONTRACTOR PERSONNEL WHEN ACCESS PATHWAYS ARE IN USE. L. PARK LIFTING EQUIPMENT IN DESIGNATED AREAS ONLY. DO NOT LEAVE EQUIPMENT/VEHICLES UNATTENDED UNLESS PARKED IN DESIGNATED AREAS AND PARK LIFTING EQUIPMENT IN DESIGNATED AREAS ONLY. DO NOT LEAVE EQUIPMENT/VEHICLES UNATTENDED UNLESS PARKED IN DESIGNATED AREAS AND LODGED/SECURED. M. SOME OVERHEAD WORK AT ENTRANCES, EXITS, EXIT DISCHARGES, ETC. MAY REQUIRE OFF-HOURS AND/OR WEEKEND WORK. COORDINATE EACH SOME OVERHEAD WORK AT ENTRANCES, EXITS, EXIT DISCHARGES, ETC. MAY REQUIRE OFF-HOURS AND/OR WEEKEND WORK. COORDINATE EACH LOCATION WITH THE CONTRACTING OFFICER'S REPRESENTATIVE FOR FINAL DETERMINATION. N. PROTECT ALL EQUIPMENTS, PIPING, TRANSFORMERS, AIR HANDLERS, ROOF(S), LANDSCAPING, ETC. FROM/OVERHEAD WORK. EQUIPMENT AND MATERIALS PROTECT ALL EQUIPMENTS, PIPING, TRANSFORMERS, AIR HANDLERS, ROOF(S), LANDSCAPING, ETC. FROM/OVERHEAD WORK. EQUIPMENT AND MATERIALS FOR OVERHEAD WORK, INCLUDING SPARE/EXCESS SCAFFOLDING COMPONENTS, MAY NOT BE STORED AT GROUND LEVEL ON SITE. P. AT AREAS OF THE WORK REQUIRING UTILITIES SUCH AS WATER, ELECTRICITY, COMPRESSED AIR, ETC, PROVIDE WARNINGS AND PROTECTIONS ALONG AT AREAS OF THE WORK REQUIRING UTILITIES SUCH AS WATER, ELECTRICITY, COMPRESSED AIR, ETC, PROVIDE WARNINGS AND PROTECTIONS ALONG THE ENTIRE PATH OF SAID UTILITIES TO PROTECT AND WARN THE PUBLIC OF THEIR PRESENCE, COORDINATE PROPOSED PATHWAYS OF UTILITIES WITH THE CONTRACTING OFFICERS REPRESENTATIVE FOR APPROVAL PRIOR TO INSTALLATION. Q. LOCATE NOISE GENERATING EQUIPMENT, SUCH AS AIR COMPRESSOR, GENERATORS, PUMPS, ETC. AS FAIR AS PRACTICAL FROM THE BUILDING LOCATE NOISE GENERATING EQUIPMENT, SUCH AS AIR COMPRESSOR, GENERATORS, PUMPS, ETC. AS FAIR AS PRACTICAL FROM THE BUILDING COORDINATE LOCATIONS WITH THE CONTRACTING OFFICERS REPRESENTATIVE FOR APPROVAL PRIOR TO PLACEMENT. R. ONCE A WINDOW IS REMOVED, A NEW WINDOW MUST BE INSERTED. NO OPENING WILL BE LEFT OPEN AND CANNOT BE LEFT UNATTENDED AT ANY ONCE A WINDOW IS REMOVED, A NEW WINDOW MUST BE INSERTED. NO OPENING WILL BE LEFT OPEN AND CANNOT BE LEFT UNATTENDED AT ANY TIME. IF THE WINDOW CANNOT BE REPLACED IMMEDIATELY AFTER REMOVAL, THAN A HARD WINDOW COVERING MUST BE INSTALLED TO PREVENT ACCESS AND TO RESTRICT PERSONAL AND PATIENTS TO THE OPEN SPACE/ THE ABILITY TO FALL OUT OF WINDOW OPENING. S. A TEMPORARY BARRIER IS REQUIRED IN THE PATIENT TELEVISION / GROUP ROOM IN GERIATRIC WARD IN BUILDING 146. PATIENTS MUST NOT HAVE A TEMPORARY BARRIER IS REQUIRED IN THE PATIENT TELEVISION / GROUP ROOM IN GERIATRIC WARD IN BUILDING 146. PATIENTS MUST NOT HAVE ACCESS TO ANY WINDOW OPENING. T. IN BUILDING 110 & 110A SURGERY SUITES, IF INSIDE ACCESS IS REQUIRED WORKERS MUST BE DRESSED OUT IN PROPER `PPE' TO ACCESS THE IN BUILDING 110 & 110A SURGERY SUITES, IF INSIDE ACCESS IS REQUIRED WORKERS MUST BE DRESSED OUT IN PROPER `PPE' TO ACCESS THE RESTRICTED AREA. U. BUILDING 114, WHEN MAKING THE REPAIRS ON THE DOOR A TEMPORARY BARRIER MUST BE INSTALLED TO RESTRICT OUTSIDE AIR INTO THE BUILDING BUILDING 114, WHEN MAKING THE REPAIRS ON THE DOOR A TEMPORARY BARRIER MUST BE INSTALLED TO RESTRICT OUTSIDE AIR INTO THE BUILDING AND TO RESTRICT PATIENT ACCESS TO EXIT AREA.
AutoCAD SHX Text
1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. THE CONTRACTOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. THE CONTRACTOR SHALL ASSUME THAT ALL WINDOW CAULKS AND WINDOW INSERT PANEL CAULKS LOCATED THROUGHOUT BUILDINGS 110 AND 137-A SHALL BE REMOVED AS ASBESTOS CONTAINING MATERIALS. THE CONTRACTOR SHALL ASSUME THAT ALL DRYWALL JOINT COMPOUND LOCATED THROUGHOUT BUILDING 110-A SHALL BE REMOVED AS ASBESTOS CONTAINING MATERIAL. THE CONTRACTOR SHALL ASSUME THAT ALL WALL MASTIC PUCKS LOCATED THROUGHOUT BUILDING 137-A SHALL BE REMOVED AS ASBESTOS CONTAINING MATERIAL. AREAS TO UNDERGO ASBESTOS ABATEMENT ARE GENERALLY LOCATED ON DRAWINGS ATTACHED TO THIS SPECIFICATION DOCUMENT REFERENCE ALSO THE ATTACHED ASBESTOS ABATEMENT SPECIFICATION. 2) THE QUANTITIES INDICATED IN THE SPECIFICATION ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING THE QUANTITIES INDICATED IN THE SPECIFICATION ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING ACTUAL QUANTITIES TO BE REMOVED. ALL MOBILIZATIONS AND PERMIT NOTIFICATIONS (AS NECESSARY) SHALL BE THE CONTRACTORS RESPONSIBILITY. 3) THE WORK SPECIFIED IN THIS DOCUMENT CONSISTS OF THE PROVISION OF SERVICES FOR THE REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING THE WORK SPECIFIED IN THIS DOCUMENT CONSISTS OF THE PROVISION OF SERVICES FOR THE REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS (ACMS). ASBESTOS MATERIALS HAVE BEEN IDENTIFIED IN THE AREAS WHERE WORK WILL BE PERFORMED. IF KNOWN OR SUSPECT ACM MATERIALS ARE DISCOVERED THAT ARE NOT ADDRESSED BY THESE DOCUMENTS, THE CONTRACTOR SHALL INFORM THE CONTRACTING OFFICER IMMEDIATELY. UNDER NO CIRCUMSTANCES ARE THESE MATERIALS TO BE DISTURBED. 4) ALL ASBESTOS ABATEMENT WORK WILL BE PERFORMED BY COMPETENT, LICENSED (BY THE VIRGINIA DEPARTMENT OF PROFESSIONAL AND ALL ASBESTOS ABATEMENT WORK WILL BE PERFORMED BY COMPETENT, LICENSED (BY THE VIRGINIA DEPARTMENT OF PROFESSIONAL AND OCCUPATIONAL REGULATION) PERSONS TRAINED, QUALIFIED, AND KNOWLEDGEABLE IN THE TECHNIQUES OF ABATEMENT, HANDLING, AND DISPOSAL OF ACBMS AND MATERIALS CONTAMINATED BY ASBESTOS, IN ACCORDANCE WITH PERTINENT LOCAL, STATE, AND FEDERAL REGULATIONS. THE BASE BID SCOPE OF WORK INCLUDES THE FOLLOWING: 1) THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL ASBESTOS-CONTAINING MATERIALS IMPACTED BY THIS PROJECT. 2) THE ABATEMENT CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING ACTUAL QUANTITIES OF MATERIALS TO BE REMOVED AND REVIEWING THE THE ABATEMENT CONTRACTOR HAS THE RESPONSIBILITY FOR DETERMINING ACTUAL QUANTITIES OF MATERIALS TO BE REMOVED AND REVIEWING THE SCOPE OF WORK. THE CONTRACTOR SHOULD ALLOW UNDER THEIR BASE BID FOR THE REMOVAL OF ALL MATERIALS AS DESCRIBED IN THE SURVEY REPORT AND/OR REFERENCED IN THIS SPECIFICATION. 3) THE ABATEMENT CONTRACTOR SHALL REMOVE THE FOLLOWING MATERIALS AS PART OF THE BASE BID: a) ALL ASBESTOS CONTAINING WINDOW CAULK LOCATED THROUGHOUT BUILDING 110 (SEE DRAWINGS). APPROXIMATELY 13,000 LINEAR FEET. WINDOW ALL ASBESTOS CONTAINING WINDOW CAULK LOCATED THROUGHOUT BUILDING 110 (SEE DRAWINGS). APPROXIMATELY 13,000 LINEAR FEET. WINDOW CAULK NOTE 1: FOR THE PURPOSES OF THIS PROJECT THE WINDOW CAULKS THROUGHOUT BUILDING 110 ARE ASSUMED TO BE ASBESTOS CONTAINING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF WINDOW CAULKING ON BOTH THE INTERIOR AND EXTERIOR SIDES OF THE WINDOWS NOTE 2: RIGID CRITICAL BARRIERS WILL BE INSTALLED ON THE INTERIOR WINDOW OPENINGS OF THE WINDOWS PRIOR TO REMOVAL FROM THE EXTERIOR OF THE BUILDING CREATING A REGULATED WORK AREA. THE ABATEMENT CONTRACTOR SHALL UTILIZE A NEGATIVE AIR MACHINE ADJACENT TO EACH REMOVAL AREA DURING ANY ABATEMENT WORK. NOTE 3: THE ASBESTOS ABATEMENT CONTRACTOR WILL BE REQUIRED TO REMOVE THE WINDOWS IN ORDER TO ACCESS THE CAULK AROUND THE WINDOW FRAME. b) ALL ASBESTOS CONTAINING WINDOW CAULK (APPROXIMATELY 3,800 LINEAR FEET) AND WINDOW INSERT PANEL CAULK (APPROXIMATELY 2,000 LINEAR ALL ASBESTOS CONTAINING WINDOW CAULK (APPROXIMATELY 3,800 LINEAR FEET) AND WINDOW INSERT PANEL CAULK (APPROXIMATELY 2,000 LINEAR FEET) LOCATED THROUGHOUT BUILDING 137-A (SEE DRAWINGS). NOTE 1: FOR THE PURPOSES OF THIS PROJECT THE WINDOW CAULKS THROUGHOUT BUILDING 137-A ARE ASSUMED TO BE ASBESTOS CONTAINING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF WINDOW CAULKING ON BOTH THE INTERIOR AND EXTERIOR SIDES OF THE WINDOWS. NOTE 2: RIGID CRITICAL BARRIERS WILL BE INSTALLED ON THE INTERIOR WINDOW OPENINGS OF THE WINDOWS PRIOR TO REMOVAL FROM THE EXTERIOR OF THE BUILDING IN A REGULATED WORK AREA. THE ABATEMENT CONTRACTOR SHALL UTILIZE A NEGATIVE AIR MACHINE ADJACENT TO EACH REMOVAL AREA DURING ANY ABATEMENT WORK. NOTE 3: THE ASBESTOS ABATEMENT CONTRACTOR WILL BE REQUIRED TO REMOVE THE WINDOWS IN ORDER TO ACCESS THE CAULK AROUND THE WINDOW FRAME. c)UNDER THE BASE BID, THE ABATEMENT CONTRACTOR SHALL ASSIST THE GENERAL CONTRACTOR IN PERFORMING ALL DEMOLITION ACTIVITIES THAT INVOLVE THE DISTURBANCE OF THE CMU BLOCK FILLER PAINT CONTAINING TRACE <1% ASBESTOS IN BUILDING 110, THE DRYWALL JOINT COMPOUND IN BUILDING 110-A AND THE WALL MASTIC PUCKS IN BUILDING 137-A, IF NECESSARY, AS PART OF THE BASE BID SCOPE OF WORK FOR THIS PROJECT. IF THESE MATERIALS ARE TO BE DISTURBED THE ABATEMENT CONTRACTOR SHALL REMOVE THESE MATERIALS WITHIN A NEGATIVE PRESSURE ENCLOSURE OR INTACT (WITHOUT ENCLOSURE), AS DESCRIBED IN THE PROJECT ASBESTOS ABATEMENT SPECIFICATIONS. FINAL CLEARANCE AIR SAMPLING MAY BE PERFORMED BY THE OWNER’S QP FOLLOWING ALL REMOVAL WITHIN NEGATIVE PRESSURE ENCLOSURES. S QP FOLLOWING ALL REMOVAL WITHIN NEGATIVE PRESSURE ENCLOSURES. NOTE: THE ABATEMENT CONTRACTOR SHALL SUBMIT UNIT COST ESTIMATES FOR THE ABATEMENT OF FOLLOWING ITEMS: 1. ASBESTOS-CONTAINING CEMENTITIOUS WINDOW PANELS FROM AN EXTERIOR REGULATED AREA, PER WINDOW (POTENTIALLY CONCEALED). ASBESTOS-CONTAINING CEMENTITIOUS WINDOW PANELS FROM AN EXTERIOR REGULATED AREA, PER WINDOW (POTENTIALLY CONCEALED). 2. ASBESTOS CONTAINING WINDOW CAULK, PER LINEAR FOOT. ASBESTOS CONTAINING WINDOW CAULK, PER LINEAR FOOT. Note 1: For unit cost pricing the Abatement Contractor shall assume that all mobilization, insurance, notification, profit, etc. are to be included in the unit cost estimate. Note 2: Assume the materials will be removed in accordance with the contract documents/specifications. ADDITIONAL NOTES: 1) THE CONTRACTOR SHALL ADEQUATELY SECURE ALL CONTAINMENTS AND PREVENT UNAUTHORIZED ENTRY THROUGH CONSTRUCTION OF LOCKABLE THE CONTRACTOR SHALL ADEQUATELY SECURE ALL CONTAINMENTS AND PREVENT UNAUTHORIZED ENTRY THROUGH CONSTRUCTION OF LOCKABLE PLYWOOD/WOOD FRAME ENTRANCES/DECON. THESE AREAS WILL BE LOCKED OUT WHEN WORK IS NOT OCCURRING. UNDER NO CIRCUMSTANCES WILL ENTRANCES TO CONTAINMENTS BE LEFT UNATTENDED WHEN WORK IS OCCURRING. 2) NOTE: IT IS POSSIBLE THAT ADDITIONAL QUANTITIES OF MATERIALS MAY BE UNCOVERED DURING REMOVAL IN EACH OF THE BUILDINGS. THE GENERAL NOTE: IT IS POSSIBLE THAT ADDITIONAL QUANTITIES OF MATERIALS MAY BE UNCOVERED DURING REMOVAL IN EACH OF THE BUILDINGS. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ASBESTOS CONTRACTOR AND THE OWNERS QP IF ADDITIONAL SUSPECT ASBESTOS CONTAINING MATERIALS ARE UNCOVERED DURING REMOVAL ACTIVITIES. THE GENERAL CONTRACTOR SHALL STOP WORK IMMEDIATELY IF THESE MATERIALS ARE UNCOVERED DURING RENOVATION WORK. THE OWNER’S QP WILL TEST IF NEEDED AND THE ABATEMENT CONTRACTOR’S SCOPE OF WORK WILL BE ADJUSTED AS S QP WILL TEST IF NEEDED AND THE ABATEMENT CONTRACTOR’S SCOPE OF WORK WILL BE ADJUSTED AS S SCOPE OF WORK WILL BE ADJUSTED AS NECESSARY TO ADDRESS ANY ADDITIONAL MATERIALS UNDER UNIT COST ESTIMATES SUPPLIED BY THE ABATEMENT CONTRACTOR. 3) DURING THE PERFORMANCE OF THE PROJECT, THE CONTRACTOR WILL BE SUBJECT TO INSPECTION BY THE OWNER’S REPRESENTATIVE. IF THE S REPRESENTATIVE. IF THE CONTRACTOR IS FOUND NOT IN COMPLIANCE WITH THE PROJECT SPECIFICATIONS, THE CONTRACTOR WILL STOP ALL WORK IMMEDIATELY TO RESOLVE THE VIOLATION. STANDBY TIME SHALL BE AT THE CONTRACTORS EXPENSE. 4) FOLLOWING COMPLETION OF WORK, THE OWNER’S REPRESENTATIVE SHALL VISUALLY VERIFY THAT ALL ACMS SCHEDULED FOR REMOVAL HAVE BEEN S REPRESENTATIVE SHALL VISUALLY VERIFY THAT ALL ACMS SCHEDULED FOR REMOVAL HAVE BEEN REMOVED AND THAT THE REGULATED AREAS AND CONTAINMENTS ARE CLEAN AND READY FOR FINAL AIR SAMPLING. US EPA AHERA PROTOCOLS (PCM ANALYSIS) WILL BE FOLLOWED FOR CLEARANCE CRITERIA. CONTRACTOR WILL RECLEAN THE CONTAINMENT AREAS AT THEIR OWN EXPENSE UNTIL CONTAINMENT PASSES BOTH VISUAL AND AGGRESSIVE AIR SAMPLING. 5) LEAD CONTAINING PAINT (LCP) AND LEAD-BASED PAINT (LBP): IT IS ANTICIPATED THAT SOME OF THE PAINTED SURFACES IN THE BUILDING CONTAIN LEAD. THE CONTRACTOR SHALL ASSUME ALL SURFACES CONTAIN LCP OR LBP. IT IS IMPORTANT TO NOTE THAT OSHA, UNDER ITS LEAD IN CONSTRUCTION STANDARD (29 CFR 1926.62, PARAGRAPH D), DOES NOT DEFINE ACCEPTABLE LEVELS OF LEAD IN PAINT AT WHICH NO EXPOSURE TO AIRBORNE LEAD (ABOVE THE ACTION LEVEL) WOULD BE EXPECTED. RATHER, OSHA DEFINES AIRBORNE CONCENTRATIONS, AND REFERENCES SPECIFIC TYPES OF WORK PRACTICES AND OPERATIONS FROM WHICH A LEAD HAZARD MAY BE GENERATED. ENVIRONMENTAL AND PERSONNEL MONITORING SHOULD BE CONDUCTED DURING ANY REMOVAL/DEMOLITION PROCESS (AS APPROPRIATE) TO VERIFY THAT ACTUAL PERSONAL EXPOSURES ARE BELOW THE PERMISSIBLE EXPOSURE LIMIT (PEL) UNDER OSHA REQUIREMENTS. ALL CONTRACTORS PERFORMING RENOVATION/DEMOLITION WORK IN THE BUILDINGS WILL BE REQUIRED TO CONDUCT THIS MONITORING AND FOLLOW ALL OF THE OTHER REQUIREMENTS FOUND UNDER 29 CFR 1926.62. ALL CONTRACTORS PERFORMING WORK AT THE SITE SHOULD ALLOW FOR UNDER THEIR BASE BID COMPLIANCE WITH THE OSHA STANDARD FOR LEAD IN CONSTRUCTION 29 CFR 1926.62. 6) MOLD IS ASSUMED TO BE PRESENT IN THE BUILDINGS. THE CONTRACTOR SHALL REMOVE ALL WATER STAINED/MOLD IMPACTED BUILDING MATERIALS THROUGHOUT THE BUILDINGS WHERE RENOVATION WORK WILL OCCUR UNDER THE PROJECT SCOPE OF WORK UNDER THE BASE BID. THE CONTRACTOR SHALL ABATE ALL MATERIALS AS OUTLINED UNDER THE PROJECT SPECIFICATIONS. 7) ISOLATE ROOMS WHERE WORK IS OCCURING FROM THE REST OF THE HOSPITAL. TYPICAL. SEE 028211 (P.4) SPECIFICATIONS FOR ADDITIONAL ISOLATE ROOMS WHERE WORK IS OCCURING FROM THE REST OF THE HOSPITAL. TYPICAL. SEE 028211 (P.4) SPECIFICATIONS FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
590 MEANS STREET NW STE. 200 ATLANTA, GA 30318
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text
THOMAS C. STEELE JR.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
BLDG 110
BLDG 110A
BLDG 137A
BLDG 114
BLDG 146
CONTRACTOR'S
STAGING AREA
-VERIFY WITH COR
CAMPUS PLAN
A001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE WINDOWS
VARIOUS BUILDINGS
VAMC HAMPTON, VIRGINA
590-19-105
Project Director
30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text A001
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FULL CAMPUS PLAN
AutoCAD SHX Text NOTES: 1). LAYDOWN AREAS, WORK AREAS, DUMPSTER LOCATIONS, CONSTRUCTION WORKERS BATHROOM LAYDOWN AREAS, WORK AREAS, DUMPSTER LOCATIONS, CONSTRUCTION WORKERS BATHROOM CONSTRUCTION WORKERS BATHROOM LOCATION TO BE LOCATED PER DIRECTION OF THE COR. 2). SECURE LAYDOWN AREAS, WORK AREAS WITH 7' HIGH CONSTRUCTION FENCING WITH MAN AND SECURE LAYDOWN AREAS, WORK AREAS WITH 7' HIGH CONSTRUCTION FENCING WITH MAN AND CONSTRUCTION FENCING WITH MAN AND VEHICLE GATES AS NECESSARY AND APPROVED BY THE COR. 3). PROVIDE PROTECTION BARRIERS AROUND WORK ZONES AND STAGING AREAS TO KEEP OUT HOSPITAL PROVIDE PROTECTION BARRIERS AROUND WORK ZONES AND STAGING AREAS TO KEEP OUT HOSPITAL PERSONNEL AND GENERAL PUBLIC.
AutoCAD SHX Text NOTES: 1). WINDOWS ARE REQUIRED TO BE STORED WINDOWS ARE REQUIRED TO BE STORED OFF CAMPUS
AutoCAD SHX Text
590 MEANS STREET NW STE. 200 ATLANTA, GA 30318
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text
THOMAS C. STEELE JR.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
SITE STAGING NOTES
BLDG 110
BLDG 110A
DN TO
SUB BASEMENT
RAMP
DN
UP
DN
UP
UP
DN
DN
DN
TO BLDG 110 B
TO BLDG 110 A
TO BLDG 110 B
TO BLDG 110
TO BLDG 110 A
TO BLDG 110 A
CGB-2
CG56A
OFFICE
GC-103
VESTIBULE
SGC-SUB
SHOWER
NOURISHMENT
BG15B1
WOMENS TOILET
CG54B
DATA
CLOSET
DG18
DG05B
GC-103B
STAFF WOMENS
SHOWER
STAFF MENS
SHOWER
ELECTRICAL
CLOSET RM
HAC RM
CG42
CG48B.1
STAIR
SUB-BASEMENT
TELECOM
RM
DG28
DG16
STAFF TOILET
ELECTRICAL
CLOSET
DG20A
ELECT/DATA CLOSET
BG16H
BG10
CGD-3
ELECTRICAL
CORRIDOR
CG53
ANTEROOM
CG58B
SUPPLY RM
CGD-5
CORRIDOR
CCG-3
CORRIDOR
CGC-2
CORRIDOR
CORRIDOR
CORRIDOR
CCG-4
RECEIVING
CG54
MENS TOILET
CG58
STORAGE
RM
CG57
CG54A
ANTEROOM
CG48A.1CLEAN ANTEROOM
HAC
CG58C
CG48A
CORRIDOR
ELECTRICAL
RM
MAIL DIST
STERILIZER RM
GC-106
CGC-33
GC-105
OPER SUPER
GC-104
REPRODUCTION
STERILIZER WORKRM
CGC-34
CORRIDOR
STAIRS #6
SCG6
CG48B
CONTAMINATION AREA
AN
TE
RO
OM
CG48
CG
B
WOMENS
SHOWER
CG56B
MENS SHOWER
CG50
CORRIDOR
CCG-5
BREAKOUT
EQUIP
STAIRS #7
SCG7
CLEAN STORAGE
CG56C
OFFICE
CG56
CG56D
CORRIDOR
CGC-30
GC-101C
HAC
GC-100H
TEL/COMM
EGC
SGC4
STAFF WOMENS
TOILETSTAIRS #4
STAFF MENS
TOILET
MENS
LOCKER RM
CGC-28GC-102
GC-102A
DG05P
NURSE
STATION 2
CGD-1
LINEN STORAGE
STAIRS #3 PRIVATE RM
MEDS RM
DG13
DG01A
DG10
EBG-9
GC-102B
CG02A
STERILE STORAGE
SOILED
UTILITY RM
GC-109
SOILED LINEN
CORRIDOR
CG58E
STORAGEMEDICAL GAS
STORAGE
GC-110CG-111
CGC-35
GC-112
DIALYSIS
BAYS
EMS
STORAGE
DG05
CG52
NURSE
STATION 1
DG05M
CGD-2
CORRIDOR
DG05N
NURSE STATION 3
CORRIDOR
PATIENT TRAINING RM
CORRIDOR
DG05K
DIALYSIS STORAGE
CGC-1
MECH
PUBLIC
TOILET
DG25
DG23
DG27
GC-100L
ELEVATOR
#7
ECG7
DG21
MECH RM
STAIRS #1LINEN
SHOOT
GC-108
DG21A
DIALYSIS
STORAGE
DATA
CLOSET
DG05H
CONTROLLED DRUG
STORAGE
GC-107
DG05H.1
SGD3
DG05J.1
DG05G
RECEPTION/
WAITING
EDG-6
ELEC RM
DG05E
ELEVATO
ELEV #6
DG05F
PRIVATE RM
CLEAN
SUPPLY RM
DG05D
PRIVATE
TOILET
DG05C
PRIVATE RM
DG05C.1
DG01D
WOMENS
LOCKER
CLEAN
LINEN
FEMALE
LOCKER
DG05A
GC-103A
HAC
LOCKER RM
DG06
EXAM RM
OFFICE
NURSE MGR
OFFICE
DG02
SGD4
DG01C
DG04
PUBLIC
TOILET
DG01B
STAIRS #4
STAFF LOUNGE
DG20
WATER
CONCENTRATE
PREP
DIALYSIS EQUIP
TESTING
DG22
DG24
CGB-1
DG26
EMS STORAGE
CORRIDOR
DIALYSIS
SOCIAL
WORKER
CORRIDOR
CGB-3
CG01
EMS STORAGE
CG01A
CORRIDOR
CG47
TELECOM
RM
CG47A
EDUCATION SPS
ASST CHIEF
OFFICE
CG49
CG47
OFFICE
CG47B
ELECTRICAL RM
MECH RM
CG46
CG03
ELEV #8
EBG-8
ELEV #9LACTATION RM
BG01
CORRIDOR
CGB-4
VESTIBULE
BG03
ESCORT OFFICE
BG05CREDIT
UNION ATM
BG09
CREDIT
UNION ATM
BG09AWHEELCHAIR
STORAGE
BG11
STAIRS #2
SGB2
BG13
BG13A
VACANT
BG13A.3
BG13A.2
BG13A.1
MORGUE
AUTOPSY AREA
BG15
MORGUE STORAGE
BG15C
STORAGE
BG15A
LOCKER RM
BG15B
SPECIALITY
CLINIC WAITING
BG16
ELEV #10
EBG-10
MALE
TOILET
BG19
MH AND BS
OFFICE
BG21
MH AND BS
OFFICE
BG23
TELEHEALTH
OFFICE
BG25
TRIAGE AREA
BG22
NEURO
BG22A
EXAM RM
BG22E
EXAM RM
BG22D
EXAM RM
BG22C
EXAM RM
BG22B
EMS LOUNGE
BG02
PATIENT CLOTHING RM
BG06
STAFF OFFICE
BG06A
DATA
CLOSET
BG08
WHEELCHAIR
STORAGE
BG12
STORAGE
BG12A
ELECTRICAL
BG14AHAC
BG14
STORAGE
BG16A
WOMENS
TOILET
BG16B
CLEAN
UTILITY
BG16C
MED RM
BG16D
DERMATOLOGY
BG16I
DERMATOLOGY
BG16M
PULMONARY
BG16P
DERMATOLOGY
BG16R
DERM
BG16T
STAIRS #5
SGB5
BG16F
STAFF
LOUNGE
RECEPTION
CHARGE NURSE
BG16F.1
BG16E
NEPH
BG16Q
OFFICE
BG16J
OFFICE
BG16K
NEPH
BG16N
TOILET
BG16N1
NEPH
BG16Q
MECH
BG16S
DERM
BG16U
CG02
CG113
SGC1
PRIVATE RM
PRIVATE
TOILET
DG05J
PRIVATE
TOILET
STAFF
TOILET
DG01
PRIVATE
TOILET
DG05D.1
ELECTRICAL
CLOSET
VESTIBULE
DG14
DG12
CONFERENCE RM
VACANT
VACANT
CH
AS
E
CHASE
CHASE
CH
AS
E
CHASE
CHASE
CH
AS
E
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASE
CHASECHASE
CH
AS
E
CHASE
CHASE
SHAFT
SHAFT
SHAFT
SHAFT
SHAFT
N/ A
N/A
N/A
N/A
N/A
N/A
N/ A
N/A
N/A
N/A
N/ A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/AN/A
N/ A
N/A
N/A
BLDG 135
PORCH
SITE PLAN - TEMPORARY
PROTECTION AT BLDG 110
AS100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE WINDOWS
VARIOUS BUILDINGS
VAMC HAMPTON, VIRGINA
590-19-105
Project Director
30 JULY, 2021 T. Steele D. BRANDTRevisions: Date:
AutoCAD SHX Text
1. THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN THE CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN CONTRACTOR WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN WILL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN BE REQUIRED TO SUBMIT A DETAILED WORK PLAN BE REQUIRED TO SUBMIT A DETAILED WORK PLAN REQUIRED TO SUBMIT A DETAILED WORK PLAN REQUIRED TO SUBMIT A DETAILED WORK PLAN TO SUBMIT A DETAILED WORK PLAN TO SUBMIT A DETAILED WORK PLAN SUBMIT A DETAILED WORK PLAN SUBMIT A DETAILED WORK PLAN A DETAILED WORK PLAN A DETAILED WORK PLAN DETAILED WORK PLAN DETAILED WORK PLAN WORK PLAN WORK PLAN PLAN PLAN WITHIN (15) FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED (15) FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED (15) FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED FIFTEEN DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED DAYS OF CONTRACT AWARD THAT PROVIDES ESTIMATED OF CONTRACT AWARD THAT PROVIDES ESTIMATED OF CONTRACT AWARD THAT PROVIDES ESTIMATED CONTRACT AWARD THAT PROVIDES ESTIMATED CONTRACT AWARD THAT PROVIDES ESTIMATED AWARD THAT PROVIDES ESTIMATED AWARD THAT PROVIDES ESTIMATED THAT PROVIDES ESTIMATED THAT PROVIDES ESTIMATED PROVIDES ESTIMATED PROVIDES ESTIMATED ESTIMATED ESTIMATED PERFORMANCE TIMES FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION TIMES FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION TIMES FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION FOR EACH MAJOR TASK, ANTICIPATED DATE AND DURATION EACH MAJOR TASK, ANTICIPATED DATE AND DURATION EACH MAJOR TASK, ANTICIPATED DATE AND DURATION MAJOR TASK, ANTICIPATED DATE AND DURATION MAJOR TASK, ANTICIPATED DATE AND DURATION TASK, ANTICIPATED DATE AND DURATION TASK, ANTICIPATED DATE AND DURATION ANTICIPATED DATE AND DURATION ANTICIPATED DATE AND DURATION DATE AND DURATION DATE AND DURATION AND DURATION AND DURATION DURATION DURATION OF WORK PER EACH PHASE. 2. G.C. TO COORDINATE LAY-DOWN AREAS WITH COR. G.C. TO COORDINATE LAY-DOWN AREAS WITH COR. 3. AS PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO AS PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO PART OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO OF THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO THIS WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO WORK INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO INFECTION CONTROL WILL BE ESSENTIAL. ACCESS TO CONTROL WILL BE ESSENTIAL. ACCESS TO CONTROL WILL BE ESSENTIAL. ACCESS TO WILL BE ESSENTIAL. ACCESS TO WILL BE ESSENTIAL. ACCESS TO BE ESSENTIAL. ACCESS TO BE ESSENTIAL. ACCESS TO ESSENTIAL. ACCESS TO ESSENTIAL. ACCESS TO ACCESS TO ACCESS TO TO TO THE WORK SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. WORK SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. WORK SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. SPACE. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. ROUTE FOR MATERIALS AND CONSTRUCTION PERSONNEL. FOR MATERIALS AND CONSTRUCTION PERSONNEL. FOR MATERIALS AND CONSTRUCTION PERSONNEL. MATERIALS AND CONSTRUCTION PERSONNEL. MATERIALS AND CONSTRUCTION PERSONNEL. AND CONSTRUCTION PERSONNEL. AND CONSTRUCTION PERSONNEL. CONSTRUCTION PERSONNEL. CONSTRUCTION PERSONNEL. PERSONNEL. PERSONNEL.