Attachment C Table for Factor 1 Experience - Google Docs.pdf
PDF 66 KB Posted
- Solicitation number
- GSANDER6II2024
About this file
This document is an Attachment C - Table of Experience for the GSA/PBS National Deep Energy Retrofit (NDER) Round 6 II ESPC Procurement in Region 4. It is a template for contractors to provide details on up to 5 relevant past projects, including information on the contract/task order, project details, energy and water savings, and experience achieving federal sustainability goals.
The related federal contract opportunity is a solicitation for current DOE ESPC IDIQ (2017) contract holders to submit an Expression of Interest for potential task order awards under the DOE ESPC IDIQ for the NDER Round 6 II program in GSA Region 4. The solicitation number is GSANDER6II2024 and the period of performance is to be determined. Interested contractors must complete and submit the Attachment C experience table as part of their response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B Past Performance Questionnaire.pdf | ||
| Attachment A EOI Supplemental Data.xlsx | XLSX spreadsheet | |
| ESPC NDER 6 II NOO - Google Docs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C - Table of Experience ESPC NDER Round 6 II
Factor 1 – Past Experience Table Complete this table for each of the 5 projects submitted for Factor 1 (remove text in red). Table can be modified as needed, but please do not delete categories. If a category does not apply to the project mark it as N/A (do not leave it blank.)
Contract/Task Order # Project Name:
Award Date: (Identify award date by phase, if applicable) :
Contract/Task Order Term ( # Yrs )
Most Recently Completed Performance Year ( e.g.
Performance Year #3)
ESPC or UESC Contract/Task Order?
(yes/no If yes, indicate whether ESPC or
UESC)
If ESPC or UESC: Did contract/task order include a savings guarantee? (yes/no or N/A)
Agency/Owner Point of Contact (Name )
POC Title Phone Number Email Address Location of Project ( city & state )
Project Details Deep Energy Retrofit Goals
Did the project achieve deep energy retrofit goals reduction of at least 30% energy use intensity (EUI)?
Provide the % of overall energy savings for the project (Mbtu % reduction) and indicate whether the savings has been verified.
Building Types Include a brief description of the facilities including types, occupancy, and approximate age of buildings.
Buildings that consist primarily of one or more of the following will be considered for Round 6 II : National Register of Historic Places, office buildings; laboratory space; data centers; prisons; courthouses and military bases.
Multiple Locations or Campuses
Provide the proximity of each location to the other locations under the contract/task order.
Project Gross Square Footage
Provide total gsf for the project and list gsf for primary buildings (small buildings do not need to be itemized).
ECMs Indicate if the project included any of the following ECMs: heating and cooling systems, building envelope upgrades (including insulation and infiltration reduction),smart metering technology, metering and submetering systems, building automation system controls, lighting and lighting controls, energy storage, variable frequency drives (VFDs), geothermal heat pumps, water or air source heat pumps, and photovoltaic (PV) or onsite renewable technologies.
ESCO obtained financing and was the borrower of record.
yes/no
Were any of the facilities on the National Historic Building Registry?
Yes/no if yes include building names and addresses.
Building(s) eliminating scope 1 emissions as defined in the Federal Building Performance Standard (BPS)
Yes/no if yes include building names and addresses and summary of projects planned/executed to meet this objective.
Identify any experience with meeting the goals identified in EO 14057 and the
BPS.
Yes/No. If yes identify the Executive order and Building Standard
ESCO Designed and constructed a project with multiple buildings.
Yes/NO. If yes, which ecms was included.
The quoted IGA fee (project
Yes/ No List Project development percentage.
Attachment C - Table of Experience ESPC NDER Round 6 II development fee) % is favorable in comparison to the IGE
Annual Energy Data (totals for the entire project)
Energy Usage Intensity Pre-Retrofit (Mbtu/sf/yr) Post Retrofit (Mbtu/sf/yr)
Annual Energy Consumption
EUI (Mbtu/yr) ESCO’s must demonstrate it meets the annual savings guarantee through the most recently completed performance year. Show the estimated savings (project level), guaranteed savings, and contractual savings. Savings should be stated in Mbtu/yr and in dollars. If savings fell short, provide a brief explanation of the reasons why (government delay, mission impact, etc.)
Annual Water Consumption
(Kgal/yr ) ESCO’s must demonstrate it meets the annual savings guarantee through the most recently completed performance year. Show the estimated savings (project level), guaranteed savings, and contractual savings. Savings should be stated in Kgal/yr and in dollars. If savings fell short, provide a brief explanation of the reasons why (government delay, mission impact, etc.)