This is a specifications document for the Louisiana Department of Agriculture and Forestry (LDAF) Tower Removal project, detailing demolition and removal work at three fire tower locations. The project involves the complete demolition and removal of three fire towers: Beaver Fire Tower (125 feet tall, located at coordinates 32°01'45.80"N, -92°39'16.8"W), Elizabeth Fire Tower (110 feet tall, located at 30°77'230"N, -92°86'159"W), and Pitkin Fire Tower (110 feet tall, located at 30°96'117"N, -92°96'319"W). The contractor must provide all labor, supervision, equipment, materials, transportation, hauling, disposal, site cleanup, and any required permits to complete the work. The specifications indicate that no construction prints or detailed tower specifications are available; therefore, a site visit is recommended prior to bid submission. The contractor is responsible for dismantling and removing entire tower structures, with all tower parts remaining on the landowner's property when dropped, and must excavate and remove four pyramid-style foundation blocks and all concrete foundations below grade.

The contractor shall conduct all demolition activities in compliance with applicable federal, state, and local laws and safety requirements, and must submit a demolition plan, safety plan, and equipment plan before beginning work. The contractor is responsible for contacting Louisiana 811 for utility locates and must ensure proper disposal of all materials at approved facilities. All bridges, access roads, and surrounding property must be protected from damage and restored to their original condition upon project completion. The contractor shall backfill excavations to the surrounding natural grade using suitable fill material, with no specific soil type required. Contact for questions is Benji Rhame at (318) 481-7647 with the Louisiana Department of Health. The file does not specify pricing terms, contract duration, award dates, response deadlines, or set-asides.

View the file

Other files

File Type Posted
3000026686-1.pdf PDF
Attachment D - Price Sheet - Page 1.docx DOCX document
3000026686.pdf PDF
Attachment B - Mandatory Site Visit Instructions - Pages 1-4.docx DOCX document
Attachment A - Special Terms and Conditions Pages 1-13.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 30000266866

Scope of Work:

The Contractor shall provide all labor, supervision, equipment, materials, transportation, hauling, disposal, site cleanup, permits if required, and incidentals necessary to complete the demolition and removal work for the Department of Agriculture and Forestry (LDAF).

Locations:

Beaver Fire Tower - (32 0145.80 N, -92 39 16.8W) Elizabeth Fire Tower - (30 77230 N, -92 86159 W) Pitkin Fire Tower - (30 96117 N, -92 96319 W)

LDH Contact:

Benji Rhame, (318) 481-7647

Specification:

The Contractor shall perform the following:

Beaver Fire Tower

· 125 feet tall

Elizabeth Fire Tower

· 110 feet tall

Pitkin Fire Tower

· 110 feet tall

There are no prints or other specifications available for the towers. A site visit is recommended to become familiar with the tower.

Removal and demolition of the tower, including cutting up, dismantling, and removing the entire tower structure from the property.

· The method of demolition is at the Contractor’s discretion; however, all tower parts must remain on the landowner’s property when the tower is dropped.

· Everything at the location of the tower, including the foundation, must be removed and disposed of once the demolition is complete.

· There is no minimum required depth for the foundation.

Excavation and removal of the four pyramid-style foundation blocks at the tower location. The tower is not connected to any electrical, communications, security, or other utilities.

Backfilling each excavation to the surrounding natural grade/elevation using suitable fill material. There is not a specific dirt or soil required. There is concrete foundation below grade.

Terms and Conditions:

The Contractor shall verify all site conditions, access routes, utilities, and location-specific requirements before submitting a bid and before beginning work.

The Contractor shall protect existing improvements, roadways, gates, fences, utilities, trees, and surrounding property from avoidable damage.

The Contractor shall conduct demolition activities in a safe manner and in compliance with all applicable federal, state, and local laws, rules, regulations, permits, and safety requirements.

The Contractor shall be responsible for proper disposal of all materials at an approved disposal facility or in accordance with applicable laws and regulations.

The Contractor shall not leave demolished material, foundation material, scrap, trash, or debris on site unless specifically authorized in writing by LDAF.

The Contractor shall bring in excavators, skid steers, cranes, dump trucks, or other heavy equipment needed for the demolition.

Reaching out to Louisiana 811 shall be the responsibility of the awarded Contractor.

The bridges and access roads must be in the same shape as they were when the project began.

Vegetation and shrubs on the natural land near the tower may be trimmed as necessary to provide equipment and personnel access.

The Contractor shall submit a demolition plan, safety plan, or equipment plan before beginning work.