This specification document details asphalt overlay work requirements for the Louisiana Department of Corrections (DOC) at two locations: Dixon Correctional Institute and Compound Four in Jackson, LA. The scope requires contractors to provide all labor, materials, tools, and equipment necessary to pour a 2" compressed asphalt overlay. The work involves overlaying parking lots with 2" compacted thickness asphalt, including 4" Hot Mix Asphalt patches for failure spots at the Dixon location. Both sites require milling of low spots, removal of debris, application of tack coating (SS1H or equivalent), and ensuring smooth transitions with existing roadways. Work hours are scheduled for 7:00 AM to 4:00 PM Monday through Friday, with prior coordination required with Maintenance Manager William Bunch.

The specifications mandate that all finished surfaces must be smooth with no voids, rough, or un-compacted areas, and completed work must prevent water pooling. All work must comply with National Asphalt Pavement Association industry standards and practices. The contractor must ensure proper surface preparation, including cleaning, tacking, and leveling of low places and potholes. Any unsatisfactory surfaces must be removed and replaced with new asphalt at the contractor's expense. No pricing terms or set-aside requirements are specified in this document.

View the file

Other files

File Type Posted
Attachment A - Special Terms and Conditions Pages 1-13.docx DOCX document
3000024381.pdf PDF
Attachment B - Job Site Verification Form - Page 1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000024381

Scope of Work:

The Contractor shall furnish all labor, materials, tools and equipment necessary to pour a 2” compressed asphalt overlay at two locations for the Louisiana Department of Corrections (DOC).

Site Visit Contact:

William Bunch 225-634-6101

Location #1:

Dixon Correctional Institute 5568 Highway 68 Jackson, LA 70748

Specifications:

· The Contractor shall overlay the parking lot with a 2” compacted thickness asphalt, including 4” (Hot Mix Asphalt) compacted thickness patches for failure spots.

· Low places and/or potholes shall be cleaned, tacked and leveled with asphalt by the Contractor.

· The Contractor shall mill any low spots or failures in parking lot prior to asphalt overlay.

· The Contractor shall remove all dirt, loose rocks, and other loose debris. No areas shall be overlaid until roadbed is filled, compacted and free of debris.

· The Contractor shall apply a tack coating (liquid tar) SS1H or equal, to entire area before overlay is applied.

Specify Tack Coating Bidding: ___________________

· All transitions shall be milled where joined to existing roadways and driveways to maintain a 2” compacted thickness with a smooth and even transition by the Contractor.

· Areas shall be dry and clean before tack and asphalt is applied by the Contractor.

· Finished asphalt surface shall be smooth-surfaced with no voids, rough, or un-compacted surfaces. All finished surfaces that are not smooth-surfaces shall be removed and replaced with new asphalt by the Contractor.

· Roads/parking lot shall not hold water after work has concluded.

· All work shall meet National Asphalt Pavement Association industry standards and practices.

Location #2:

Compound Four 2500 Creekfield Rd.

Jackson, LA 70748

Specifications:

· The Contractor shall overlay the parking lot with a 2” compacted thickness asphalt.

· Low places and/or potholes shall be cleaned, tacked and leveled with asphalt by the Contractor.

· The Contract shall mill any low spots or failures in the road prior to asphalt overlay.

· The Contractor shall remove all dirt, loose rocks, and other loose debris. No areas shall be overlaid until roadbed is filled, compacted and free of debris.

· The Contractor shall apply a tack coating (liquid tar) SS1H or equal, to entire area before overlay is applied.

Specify Tack Coating Bidding: ___________________

· All transitions shall be milled where joined to existing roadways and driveways to maintain a 2” compacted thickness with a smooth and even transition by the Contractor.

· Areas shall be dry and clean before tack and asphalt is applied by the Contractor.

· Finished asphalt surface shall be smooth-surfaced with no voids, rough, or un-compacted surfaces. All finished surfaces that are not smooth-surfaces shall be removed and replaced with new asphalt by the Contractor.

· Roads shall not hold water after work has concluded.

· All work shall meet National Asphalt Pavement Association industry standards and practices.

General Terms and Conditions:

· The Contractor shall contact Maintenance Manager William Bunch for scheduling of work before starting work.

· Work hours to be 7:00am to 4:00 pm Monday through Friday unless approved by Maintenance Manager.