Attachment C - Specifications - Page 1.docx
DOCX document 20 KB Posted
- Solicitation number
- 3000024124
- Issued by
- East Feliciana Parish, Baton Rouge City, Louisiana
About this file
This is a specifications document (Attachment C) for RFx 3000024124 issued by the Louisiana Department of Corrections (DOC) for roof repair work at Tower 11 of Dixon Correctional Institute in Jackson, LA. The scope includes removing the storm-damaged existing roof system and installing new components including 2"x6" wood nailers, Poly ISO 1 insulation, 60mm TPO roofing, and stainless steel edge metal. Material quantities specified include 360 SF of fiberboard, 3.62 SQ of modified bitumen roof, 362 SF of plywood sheathing, 69.27 LF of cap flashing, and 69.27 LF of lumber for perimeter nailers. Work hours are 7:30 AM to 4:00 PM Monday through Friday, and the project requires a minimum 2-year warranty.
The contractor must provide a unit price per square foot for replacement of any unforeseen deteriorated decking discovered during the project. All work must be coordinated with the facility's Maintenance Supervisor, William Bunch. The contractor is responsible for removing and properly disposing of all debris generated during the project at an approved landfill.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3000024124-1.pdf | ||
| 3000024124.pdf | ||
| Attachment D - Pictures of Damage - Pages 1-2.pdf | ||
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document | |
| Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Specifications RFx 3000024124
Scope of Work:
The Contractor shall provide all labor and materials in order to repair the damages to the roof of Tower 11 at Dixon Correctional Institute for the Louisiana Department of Corrections (DOC).
Location:
Dixon Correctional Institute Compound 2 – Tower 11 5568 Highway 68 Jackson, LA 70748
Specifications:
· The Contractor shall remove the existing roof system damaged from the storm event.
· The Contractor shall install new 2” by 6” wood nailer as needed around perimeter.
· The Contractor shall fully adhere new Poly ISO 1 insulation to level of new wood nailer.
· The Contractor shall fully adhere new 60 mm TPO over the new insulation as per industry standards.
· The Contractor shall install new stainless steel edge metal and strip into the new TPO as per industry standards.
· All Debris generated shall be removed from the property and disposed of in an approved land fill.
· See Attachment D – Pictures of Damage – Pages 1-2 for more information.
| Materials Description: | Approximate QTY: | |||
| · R&R Fiberboard (or equal)– 1” | 360.00 SF | |||
| · R&R Modified bitumen roof (or equal) | 3.62 SQ | |||
| · R&R Sheathing – plywood – ½” CDX (or equal) | 362.00 SF | |||
| · R&R Cap flashing (or equal) | 69.27 LF | |||
| · R&R 2” x 6” lumber (1BF per LF) (or equal) | 69.27 LF |
Perimeter nailer around roof
Deteriorated Decking:
Contractor shall give a unit price per square foot for replacement of unforeseen deteriorated decking. New decking shall match existing.
Price per square foot: ________________________________
Warranty:
· Minimum 2 year warranty
Planning and Scheduling:
· The Contractor shall coordinate any work with the agency’s Maintenance Supervisor, William Bunch 225-634-6101
· Work hours shall be 7:30 AM to 4:00 PM Monday through Friday unless approved by the Maintenance Supervisor.
File details come from the government source that posted it. Updated .