Attachment C - Pricing Matrix.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SWC- VEH122 -RFP:31-26 Fleet EV charging stations installations
Solicitation number
BD-26-1206-MBTA-MBTA-126475
Issued by
Middlesex County, Massachusetts

About this file

This is a Pricing Matrix attachment for a state and local contract opportunity issued by the Massachusetts Bay Transportation Authority (MBTA) for a turnkey installation of Electric Vehicle Supply Equipment (EVSE) at the Everett Shops facility located at 80 Broadway Street, Everett, Massachusetts. The project encompasses five primary categories of work: contractor-procured hardware including two ChargePoint CPE250 62kW DC Fast Chargers, four ChargePoint CPF Dual Port Level 2 Fleet Chargers, and associated five-year assurance plans; Heliox installation services including two 180kW DC distribution cabinets, six 250A DC column dispensers, secondary DC cabling, and pre-commissioning testing; site infrastructure and civil work including ground penetrating radar surveying, concrete pad construction, utility transformer installation, electrical switchboards and pedestals, trenching and paving, and crash bollard installation; safety, compliance, and deliverables encompassing MUTCD pavement striping, fleet stall striping with signposts, emergency power shut-off installation, and as-built drawings with training documentation; and provisional unit prices for potential contract adjustments covering rock removal, hand excavation, bituminous paving, conduit repair, and evening/weekend labor differentials.

The pricing matrix presents a firm, fixed turnkey price structure with individual line items for each component and service, though the actual dollar amounts are not populated in the matrix. The document is structured to allow bidders to provide comprehensive pricing across all categories, including both firm costs for defined work and unit pricing for potential contingencies and change orders. This format enables the MBTA to evaluate complete project costs while maintaining flexibility for unforeseen site conditions such as rock obstruction or utility conflicts that may require additional work at pre-agreed unit rates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Item #DescriptionQuantityUnitTotal Cost
1Contractor-Procured Hardware
1.1ChargePoint CPE250 62kW DC Fast Charger (Paired)2EA$
1.2ChargePoint CPF Dual Port Level 2 Fleet Chargers with Integrated Cable Management Kits4EA$
1.3ChargePoint 5-Year Assure Plan (DCFC Assets)1Lot$
1.4ChargePoint 5-Year Assure Plan (L2 Assets)1Lot$
2Heliox Installation (Agency-Provided Hardware)
2.1Install Heliox Flex 180kW DC Distribution Cabinets2EA$
2.2Install Heliox Flex 250A DC Column Dispensers6EA$
2.3Secondary DC Cabling (Cabinets to Dispensers)1Lot$
2.4Pre-Commissioning Continuity & Voltage Isolation Testing1Lot$
3Site Infrastructure & Civil Work
3.1Ground Penetrating Radar (GPR) Survey & Reporting1Lot$
3.2Cement Concrete Pad (Poured Islands/Curbing)1Lot$
3.3NGrid Utility Transformer Pad and Oil Curbing1Lot$
3.4112.5 kVA Step-Down Transformer (NEMA 3R)1EA$
3.53000A 277/480V Switchboard & Branch Breakers1Lot$
3.6400A 277/480V Pedestal & Branch Breakers1EA$
3.7400A 120/208V Pedestal & Branch Breakers1EA$
3.8Trenching, Backfill, and Bituminous Paving (Everett Site)1Lot$
3.9K-Rated Crash Bollards (Procurement & Installation)1Lot$
4Safety, Compliance, & Deliverables
4.1BEB Charging MUTCD Pavement Striping/Travel Lanes & Pedestrian Crosswalks1Lot$
4.2Fleet Stall Striping and Signposts: Install 10 Posts + Logos/Striping - Agency to provide signage for contractor to install.10EA$
4.3Emergency Power Shut-off (Installation & Labeling)1Lot$
4.4As-Built Drawings & Training (Maintenance/Fire/EMS)1Lot$
5Provisional Unit Prices (For Contract Adjustments)
5.1Rock/Obstruction Removal (Mass)1CY$
5.2Hand Excavation (Near Sensitive Utilities)1CY$
5.3Additional Bituminous Paving (Patching)1SY$
5.4Unforeseen Conduit Repair1LF$
5.5Evening/Weekend Labor Differential1HR$
TOTALFirm, Fixed Turnkey Price$0.00