Attachment C - Preliminary IGCE.pdf

PDF 598 KB Posted

Attached to
3D Elevation Program (3DEP)
Opportunity number
G19AS00124
Issued by

About this file

Attachment C - Preliminary IGCE

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140G0119R0029 FY19 / 20 BAA Solicitation Page 1

G19AS00124

US Geological Survey Broad Agency Announcement (BAA) for 3D Elevation Program (3DEP)

140G0119R0029 / G19AS00124

Attachment C Request for a *PRELIMINARY Independent Government Cost Estimate (IGCE). Submit form to gs_baa@usgs.gov Subject: URGENT - REQUEST FOR PRELIMINARY IGCE

A *preliminary IGCE will provide an estimate of project costs sufficient for project planning and partnership development A full and final IGCE will be completed after award.

Organization: Date:

First Name: Last Name:

Email Address: Phone:

Project Title:

300 characters maximum

GEOGRAPHIC EXTENT OF PROJECT, COORDINATE REFERENCE SYSTEM

State(s):

Geographic Extent: ☐ County(ies) Please specify:

☐ Watershed Please specify:

☐ Other Please specify:

3DEP National Indexing Scheme:

Square Miles:

Project GIS File:

Acknowledgement required; please read and check box

A project vector GIS file has been submitted with this request for a

PRELIMINARY IGCE.

A vector GIS file defining the location and coverage area of your project is required to develop the PRELIMINARY IGCE. Your project area must be represented by a polygon in shapefile or KML/KMZ format.

Note: Minimum shapefile components required are: .shp, .sbx, .dbf, .prj.

Coordinate Reference System:

Tiling Scheme: Specify Tiling Scheme:

Specify Coordinate Reference System:

3DEP collections within the lower 48 will be coordinated by using an Albers Equal Area 1 km x 1 km indexing scheme. The project boundaries of all 3DEP projects will be converted to conform to the Albers Equal Area (AEA) projection and extended to complete all 1km x I km tiles that intersect the project boundary. Additional information and instructions for converting and expanding a project boundary to the AEA projection are included in Attachment B. Expansion to the AEA tiling scheme only applies to definition/extent of the project boundary. The data will be delivered to the USGS in a spatial reference system and tiling scheme of the applicant’s choice. Shapefile has been expanded: Yes No mailto:gs_baa@usgs.gov?subject=URGENT - REQUEST FOR PRELIMINARY IGCE https://nationalmap.gov/3DEP/3dep_national_indexing_scheme.html

140G0119R0029 FY19 / 20 BAA Solicitation Page 2

DATA SPECIFICATION

Data must adhere to the USGS Lidar Base Specifications V2.1. In addition to the requirements outlined in the USGS Base Lidar Specification V2.1, lidar data and derived products must meet the current definition of Quality Level 2 (QL2). Upgrades to QL1 are allowed but the cost of the upgrades is the responsibility of the applicant.

Project will be collected to:

Select Only One Option

QL2

☐ QL1

QL1 / QL2 combination (Provide details and/or delineate QL1 and QL2 Areas on project graphic and in project GIS file)

☐ Other:

DATA DELIVERABLES

Standard 3DEP deliverables are defined in the USGS Lidar Base Specification V2.1

Additional Products and Services:

Select Only One Option

Standard 3DEP deliverables are defined in the USGS Lidar Base Specification V2.1.

Additional products and services are available. The cost of additional products is the responsibility of the applicant.

☐ The applicant does not currently anticipate the need for any additional products or services

The applicant anticipates the need for additional products and services generated from the lidar data. The cost of these additional products and services are the responsibility of the applicant and will be incorporated into partner funding agreement(s). For those applicants proposing to use the Geospatial Products and Services Contracts (GPSC), the following additional products may be available, check all that apply. See the next page.

PROPOSED TIMELINE and COLLECTION CONDITIONS

Acquisition:

Select Only One Option

Fall 2020/Winter 2021☐ Spring 2020

☐ Leaf-off

Leaf-on

Collection Conditions:

Select Only One Option

Check if TIDE COORDINATION is required. If checked, applicant will be contacted by GPSC Commercial Partnership Team (CPT) staff to discuss your requirements.

Check if US Forest Service Guranteed 50% sidelap is required.

https://www.usgs.gov/core-science-systems/ngp/ss/lidar-base-specification-online https://www.usgs.gov/core-science-systems/ngp/ss/lidar-base-specification-online ajason Sticky Note Accepted set by ajason

140G0119R0029 FY19 / 20 BAA Solicitation Page 3

ADDITIONAL PROJECT DETAILS OR CLARIFICATIONS

(1500 characters maximum)

Additional Products and Services continued:

Additions to the Minimum Lidar Classification Scheme (additional point cloud classifications)

Additions to the Hydro Flattening Requirements for Inland Lakes and Ponds

Additions to the Hydro Flattening Requirements for Inland Rivers and Streams

Hydro Enforced Digital Elevation Model (DEM)

First Return DSM (non-hydroflattened)

Machine generated contours

Machine generated building footprints

Hillshades

Other Please specify: ______

For those applicants proposing to use the Geospatial Products and Services Contracts (GPSC), the following additional products may be available, check all that apply:

Blank Page

Last Name:
First Name:
Organization:
Email:
Phone:
Project Title:
IndexScheme: Off
AddProducts: Off
Date:
Quality: Off
Quality Other:
States:
Please specify_County:
County: Off
Watershed: Off
Other: Off
Please specify_Watershed:
Square Miles: 0
Acknowledgement: Off
Coordinate System:
Tiling Scheme:
Acquisition: Off
Acquisition Other:
Collection Conditions: Off
TideCoord: Off
Sidelap: Off
minlidarclass: Off
HFlakesponds: Off
HFriversstreams: Off
HydroEnforce: Off
firstreturndsm: Off
contours: Off
Hillshades: Off
footprints: Off
otherproduct: Off
Additional Project Details:
Additional Products Other:
Please specify_Other:

File details come from the government source that posted it.