Attachment C - Plan Design.pdf
PDF 1 MB Posted
- Solicitation number
- 12FPC325B0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S01_12FPC325B0003 rev3.pdf | ||
| Attachment C - Plan Design_REV.pdf | ||
| Attachment A -SOW_rev.pdf | ||
| S01_12FPC325B0003.pdf | ||
| Attachment B - WD- 2015-5171.pdf | ||
| Attachment A -SOW.pdf | ||
| S01_12FPC325B0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plum Bluff Part 2 EmErgEncy ProtEction gEorgE coiunty
USER TO ENTER SEEDING INFO
USER TO ENTER PRACTICES
USER TO ENTER SEEDING INFO
USER TO ENTER PRACTICES
USER TO ENTER INFORMATIONUSER TO ENTER INFORMATION
USER TO INSERT SHEET LIST TABLE
SAFETY REGULATIONS
ALL EXCAVATION AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
MARYLAND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (MOSHA) STANDARDS AS
SET FORTH IN THE LATEST VERSION OF THE CODE OF MARYLAND REGULATIONS
The Contractor/Owner is to notify the SOIL CONSERVATION DISTRICT at least 72 hours prior to construction to facilitate any scheduling, layout, or preliminary mobilization necessary to ensure proper construction inspection to enable appropriate certification of the project.
It is the Landowner's responsibility to obtain all County, State, and Federal permits that may be needed, and to maintain this structure and related regulations.
CONSTRUCTION NOTIFICATION
George
THERE WILL BE NO CHANGES IN SPECIFICATION, DIMENSIONS, OR
MATERIALS UNLESS APPROVED BY THE ENGINEER RESPONSIBLE FOR
THIS DRAWING. THE DRAWINGS ARE PREPARED COOPERATIVELY BY THE
NATURAL RESOURCE CONSERVATION SERVICE FOR THE NAMED
LANDOWNER.
CONSTRUCTION FOUND NOT IN ACCORDANCE WITH THESE DRAWINGS
AND SPECIFICATIONS SHALL VIOLATE THE COOPERATIVE AGREEMENT
AND ALL DRAWINGS, SPECIFICATIONS, AND QUANTITIES ESTIMATE SHALL
IMMEDIATELY BE RETURNED TO THE LOCAL NRCS OFFICE.
I CERTIFY THAT THIS DESIGN HAS BEEN EXPLAINED TO ME
BY A REPRESENTATIVE OF THE PROJECT ENGINEER
, AND I UNDERSTAND THE CONTENTS, ALL CONSTRUCTION
WILL BE DONE ACCORDING TO THESE PLANS AND
SPECIFICATIONS, I FURTHER UNDERSTAND THAT ALL
CONSTRUCTION WILL BE UNDER THE INSPECTION OF THIS
OFFICE.
OWNER/OPERATOR SIGNATURE DATE
CONTRACTOR'S SIGNATURE DATE
SIGNATURE DATE
INSPECTED BY
CONSTRUCTION APPROVAL
SCE Approval
SIGNATURE DATE
SIGNATURE DATE
GENERAL NOTES:
· PLEASE CONTACT THE PROJECT ENGINEER NORMAN PATTERSON 6019093525 AT LEAST 3
DAYS PRIOR TO CONSTRUCTION TO ARRANGE A PRE-CONSTRUCTION MEETING
· A CONSERVATION TECHNICIAN SHALL SET CUT/GRADE STAKES AT THE CONTRACTORS
REQUEST
USER TO UPDATE SEQUENCE AS NEEDED
CONSTRUCTION SEQUENCE:
1. Contact the Project Engineer at 6019093525 to arrange a pre-construction meeting
2. Contact miss utility at 811
3. Install upper sandbag diversion
4. Install upper dewatering basin
5. Install upper pump around device
6. Excavate area for footer stone and install footer stone
7. Install footer imbricated riprap, backfilling with #57 clean stone and geotextile fabric
8. Install next course of imbricated riprap, install final course when previous course has been backfilled with #57 stone and geotextile fabric
9. Backfill top course with topsoil and grade into existing bank
10. Install erosion control matting(jute) and shrubs on shoreline as indicated on the plan
11. Remove sediment controls and stabilize disturbed areas in upper section
12. Install lower sandbag diversion
13. Install lower dewaterwing device
14. Install lower pump around device
15. Follow same procedure as explained above in #6 - #10
16. Remove all sediment controls and stabilize all disturbed areas
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in Feet
AutoCAD SHX Text
THE CONSERVATION PRACTICE(S) MEETS OR EXCEEDS NRCS STANDARDS AND SPECIFICATIONS
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
UNIT
AutoCAD SHX Text
PRICE
AutoCAD SHX Text
AutoCAD SHX Text
CONTRACT
AutoCAD SHX Text
ESTIMATE
AutoCAD SHX Text
AMOUNT
AutoCAD SHX Text
UNIT
AutoCAD SHX Text
AMOUNT
AutoCAD SHX Text
DOLLARS
AutoCAD SHX Text
QUANTITIES
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
FINAL PAY
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text L.S. = Lump Sum
AutoCAD SHX Text Protective Cover
AutoCAD SHX Text
AutoCAD SHX Text Acres
AutoCAD SHX Text Geotextile
AutoCAD SHX Text 5390.68
AutoCAD SHX Text S.Y.
AutoCAD SHX Text Mobilization & Demobilization
AutoCAD SHX Text
AutoCAD SHX Text L.S.
AutoCAD SHX Text Rock Riprap
AutoCAD SHX Text
AutoCAD SHX Text Tons
AutoCAD SHX Text Earthfill, Class C (offsite)
AutoCAD SHX Text
AutoCAD SHX Text C.Y.
AutoCAD SHX Text Excavation, Commom
AutoCAD SHX Text
AutoCAD SHX Text C.Y.
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Drawn
AutoCAD SHX Text
NP
AutoCAD SHX Text
OL
AutoCAD SHX Text
AutoCAD SHX Text Ol
AutoCAD SHX Text 4/18/24
AutoCAD SHX Text 4/18/24
AutoCAD SHX Text 4/24/24
AutoCAD SHX Text 4/24/24
AutoCAD SHX Text Plum Bluff 2.1.dwg
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text File No.
AutoCAD SHX Text
PLUM BLUFF 2
AutoCAD SHX Text
STREAMBANK PROTECTION
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text George County, MS County, MSMS
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Drawn
AutoCAD SHX Text
NP
AutoCAD SHX Text
OL
AutoCAD SHX Text
AutoCAD SHX Text Ol
AutoCAD SHX Text 4/18/24
AutoCAD SHX Text 4/18/24
AutoCAD SHX Text 4/24/24
AutoCAD SHX Text 4/24/24
AutoCAD SHX Text Scale in Feet
AutoCAD SHX Text
AutoCAD SHX Text 78.15
AutoCAD SHX Text 78.15
AutoCAD SHX Text 156.3
AutoCAD SHX Text 234.45
AutoCAD SHX Text Plum Bluff 2.1.dwg
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text File No.
AutoCAD SHX Text
PLUM BLUFF 2
AutoCAD SHX Text
STREAMBANK PROTECTION
AutoCAD SHX Text
PLAN VIEW (2)
George County, MS County, MSMS
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
AutoCAD SHX Text
AutoCAD SHX Text Normal Water Line
AutoCAD SHX Text Geotextile
AutoCAD SHX Text Existing Grade
AutoCAD SHX Text Match Constructed Grade To Existing Grade
AutoCAD SHX Text Rock Riprap Shall Be Gradation No____ Quality Designation "A" As Per IDOT Standard Specification.
AutoCAD SHX Text Backfill Trench With Soil And Compact To A Density Equal To Or Greater Than Surrounding Soil.
AutoCAD SHX Text
SECTION
AutoCAD SHX Text Geotextile
AutoCAD SHX Text
ROCK RIPRAP GRADATION CHART
AutoCAD SHX Text
GRADATION NO. 1
AutoCAD SHX Text
GRADATION NO. 2
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WEIGHT
AutoCAD SHX Text
POUNDS
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WEIGHT
AutoCAD SHX Text
POUNDS
AutoCAD SHX Text
CUMULATIVE
AutoCAD SHX Text
PERCENT LIGHTER
AutoCAD SHX Text
BY WEIGHT
AutoCAD SHX Text
CUMULATIVE
AutoCAD SHX Text
PERCENT LIGHTER
AutoCAD SHX Text
BY WEIGHT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 50 - 85
AutoCAD SHX Text 15 - 50
AutoCAD SHX Text 0 - 15
AutoCAD SHX Text
AutoCAD SHX Text 50 - 85
AutoCAD SHX Text 15 - 50
AutoCAD SHX Text 0 - 15
AutoCAD SHX Text Note: Spalls and rock dust that will pass a
AutoCAD SHX Text 3" sieve shall consist of not more
AutoCAD SHX Text than 5% by weight.
AutoCAD SHX Text
AutoCAD SHX Text Elev 28
AutoCAD SHX Text Elev 11
AutoCAD SHX Text
ROCK RIPRAP KEY DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text Geotextile
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text Designed
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Drawn
AutoCAD SHX Text
NP
AutoCAD SHX Text
OL
AutoCAD SHX Text
AutoCAD SHX Text Ol
AutoCAD SHX Text 4/18/24
AutoCAD SHX Text 4/18/24
AutoCAD SHX Text 4/24/24
AutoCAD SHX Text 4/24/24
AutoCAD SHX Text Plum Bluff 2.1.dwg
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text File No.
AutoCAD SHX Text
PLUM BLUFF 2
AutoCAD SHX Text
STREAMBANK PROTECTION
AutoCAD SHX Text
LAYOUT W DOC FIELDS
AutoCAD SHX Text George County, MS County, MSMS
NOTES: 1. MATCH THE FINISHED GRADE OF THE CROSSING TO THE SLOPE AND ELEVATIONS OF THE THALWEG (LOW FLOW CHANNEL) OF THE EXISTING STREAMBED. FOLLOW THE EXISTING STREAMBED GRADE AS CLOSELY AS POSSIBLE. 2. IF BEDROCK IS PRESENT, FIELD ADJUST THE CROSSING WITH INPUT FROM THE NRCS TECHNICAL REPRESENTATIVE. THE CRUSHED AGGREGATE SURFACING AND BASE FILL IS NOT REQUIRED WHERE THE BEDROCK IS AT THE CORRECT BED ELEVATION FOR THE CROSSING. 3. USE WELL-GRADED STONE WITH A RANGE OF MATERIALS TO FILL VOIDS AND ALLOW COMPACTION (SEE BASE MATERIAL SIZE REQUIREMENTS). COMPACT BY ROLLING OVER SURFACE OF BASE WITH HEAVY EQUIPMENT USED IN CONSTRUCTION. 4. USE CLASS I, NON-WOVEN GEOTEXTILE FABRIC PER GEOTEXTILE SPECIFICATION. 5. SEED AND MULCH DISTURBED AREAS ABOVE BANKFULL FLOW ELEVATION, INCLUDING SIDE CUT SLOPES. SEE SEEDING SPECIFICATION. 6. LOCATE AT THE HEAD OF A RIFFLE AND IN A STRAIGHT, STABLE REACH OF STREAM AWAY FROM THE INFLUENCE OF MEANDERS. IF THAT IS NOT POSSIBLE, LOCATE IN THE FARTHEST UPSTREAM PORTION OF THE RIFFLE POSSIBLE, OR IN A STRAIGHT SHALLOW STREAM REACH. 7. CONSTRUCT DURING LOW FLOW ONLY. WHILE WORKING ON ONE SIDE OF STREAM, DIVERT FLOW TO THE OTHER SIDE. MINIMIZE DISTURBANCE TO STREAMBED.
2:1
AutoCAD SHX Text 2:1
AutoCAD SHX Text 2:1
AutoCAD SHX Text 2:1
AutoCAD SHX Text Elev.
AutoCAD SHX Text 11.0
AutoCAD SHX Text 2'
AutoCAD SHX Text (200# Size Rock Riprap)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Geotextile
AutoCAD SHX Text Elev.
AutoCAD SHX Text 11.0
AutoCAD SHX Text Elev.
AutoCAD SHX Text 28.0
AutoCAD SHX Text Elev.
AutoCAD SHX Text 28.00
FLOW
| Sheets and Views |
| Plan View |
File details come from the government source that posted it. Updated .