Attachment C - Plan Design.pdf

PDF 1 MB Posted

Attached to
EWP – Erosion Control - Plum Bluff Part 2 Emergency Protection – George County, MS
Solicitation number
12FPC325B0003
Issued by

View the file

Other files

File Type Posted
S01_12FPC325B0003 rev3.pdf PDF
Attachment C - Plan Design_REV.pdf PDF
Attachment A -SOW_rev.pdf PDF
S01_12FPC325B0003.pdf PDF
Attachment B - WD- 2015-5171.pdf PDF
Attachment A -SOW.pdf PDF
S01_12FPC325B0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Plum Bluff Part 2 EmErgEncy ProtEction gEorgE coiunty

USER TO ENTER SEEDING INFO

USER TO ENTER PRACTICES

USER TO ENTER SEEDING INFO

USER TO ENTER PRACTICES

USER TO ENTER INFORMATIONUSER TO ENTER INFORMATION

USER TO INSERT SHEET LIST TABLE

SAFETY REGULATIONS

ALL EXCAVATION AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE

MARYLAND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (MOSHA) STANDARDS AS

SET FORTH IN THE LATEST VERSION OF THE CODE OF MARYLAND REGULATIONS

The Contractor/Owner is to notify the SOIL CONSERVATION DISTRICT at least 72 hours prior to construction to facilitate any scheduling, layout, or preliminary mobilization necessary to ensure proper construction inspection to enable appropriate certification of the project.

It is the Landowner's responsibility to obtain all County, State, and Federal permits that may be needed, and to maintain this structure and related regulations.

CONSTRUCTION NOTIFICATION

George

THERE WILL BE NO CHANGES IN SPECIFICATION, DIMENSIONS, OR

MATERIALS UNLESS APPROVED BY THE ENGINEER RESPONSIBLE FOR

THIS DRAWING. THE DRAWINGS ARE PREPARED COOPERATIVELY BY THE

NATURAL RESOURCE CONSERVATION SERVICE FOR THE NAMED

LANDOWNER.

CONSTRUCTION FOUND NOT IN ACCORDANCE WITH THESE DRAWINGS

AND SPECIFICATIONS SHALL VIOLATE THE COOPERATIVE AGREEMENT

AND ALL DRAWINGS, SPECIFICATIONS, AND QUANTITIES ESTIMATE SHALL

IMMEDIATELY BE RETURNED TO THE LOCAL NRCS OFFICE.

I CERTIFY THAT THIS DESIGN HAS BEEN EXPLAINED TO ME

BY A REPRESENTATIVE OF THE PROJECT ENGINEER

, AND I UNDERSTAND THE CONTENTS, ALL CONSTRUCTION

WILL BE DONE ACCORDING TO THESE PLANS AND

SPECIFICATIONS, I FURTHER UNDERSTAND THAT ALL

CONSTRUCTION WILL BE UNDER THE INSPECTION OF THIS

OFFICE.

OWNER/OPERATOR SIGNATURE DATE

CONTRACTOR'S SIGNATURE DATE

SIGNATURE DATE

INSPECTED BY

CONSTRUCTION APPROVAL

SCE Approval

SIGNATURE DATE

SIGNATURE DATE

GENERAL NOTES:

· PLEASE CONTACT THE PROJECT ENGINEER NORMAN PATTERSON 6019093525 AT LEAST 3

DAYS PRIOR TO CONSTRUCTION TO ARRANGE A PRE-CONSTRUCTION MEETING

· A CONSERVATION TECHNICIAN SHALL SET CUT/GRADE STAKES AT THE CONTRACTORS

REQUEST

USER TO UPDATE SEQUENCE AS NEEDED

CONSTRUCTION SEQUENCE:

1. Contact the Project Engineer at 6019093525 to arrange a pre-construction meeting

2. Contact miss utility at 811

3. Install upper sandbag diversion

4. Install upper dewatering basin

5. Install upper pump around device

6. Excavate area for footer stone and install footer stone

7. Install footer imbricated riprap, backfilling with #57 clean stone and geotextile fabric

8. Install next course of imbricated riprap, install final course when previous course has been backfilled with #57 stone and geotextile fabric

9. Backfill top course with topsoil and grade into existing bank

10. Install erosion control matting(jute) and shrubs on shoreline as indicated on the plan

11. Remove sediment controls and stabilize disturbed areas in upper section

12. Install lower sandbag diversion

13. Install lower dewaterwing device

14. Install lower pump around device

15. Follow same procedure as explained above in #6 - #10

16. Remove all sediment controls and stabilize all disturbed areas

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Scale in Feet

AutoCAD SHX Text

THE CONSERVATION PRACTICE(S) MEETS OR EXCEEDS NRCS STANDARDS AND SPECIFICATIONS

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

PRICE

AutoCAD SHX Text

AutoCAD SHX Text

CONTRACT

AutoCAD SHX Text

ESTIMATE

AutoCAD SHX Text

AMOUNT

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

AMOUNT

AutoCAD SHX Text

DOLLARS

AutoCAD SHX Text

QUANTITIES

AutoCAD SHX Text

ITEM

AutoCAD SHX Text

FINAL PAY

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text L.S. = Lump Sum

AutoCAD SHX Text Protective Cover

AutoCAD SHX Text

AutoCAD SHX Text Acres

AutoCAD SHX Text Geotextile

AutoCAD SHX Text 5390.68

AutoCAD SHX Text S.Y.

AutoCAD SHX Text Mobilization & Demobilization

AutoCAD SHX Text

AutoCAD SHX Text L.S.

AutoCAD SHX Text Rock Riprap

AutoCAD SHX Text

AutoCAD SHX Text Tons

AutoCAD SHX Text Earthfill, Class C (offsite)

AutoCAD SHX Text

AutoCAD SHX Text C.Y.

AutoCAD SHX Text Excavation, Commom

AutoCAD SHX Text

AutoCAD SHX Text C.Y.

AutoCAD SHX Text Designed

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Drawn

AutoCAD SHX Text

NP

AutoCAD SHX Text

OL

AutoCAD SHX Text

AutoCAD SHX Text Ol

AutoCAD SHX Text 4/18/24

AutoCAD SHX Text 4/18/24

AutoCAD SHX Text 4/24/24

AutoCAD SHX Text 4/24/24

AutoCAD SHX Text Plum Bluff 2.1.dwg

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text File No.

AutoCAD SHX Text

PLUM BLUFF 2

AutoCAD SHX Text

STREAMBANK PROTECTION

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text George County, MS County, MSMS

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

AutoCAD SHX Text Designed

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Drawn

AutoCAD SHX Text

NP

AutoCAD SHX Text

OL

AutoCAD SHX Text

AutoCAD SHX Text Ol

AutoCAD SHX Text 4/18/24

AutoCAD SHX Text 4/18/24

AutoCAD SHX Text 4/24/24

AutoCAD SHX Text 4/24/24

AutoCAD SHX Text Scale in Feet

AutoCAD SHX Text

AutoCAD SHX Text 78.15

AutoCAD SHX Text 78.15

AutoCAD SHX Text 156.3

AutoCAD SHX Text 234.45

AutoCAD SHX Text Plum Bluff 2.1.dwg

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text File No.

AutoCAD SHX Text

PLUM BLUFF 2

AutoCAD SHX Text

STREAMBANK PROTECTION

AutoCAD SHX Text

PLAN VIEW (2)

George County, MS County, MSMS

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

AutoCAD SHX Text

AutoCAD SHX Text Normal Water Line

AutoCAD SHX Text Geotextile

AutoCAD SHX Text Existing Grade

AutoCAD SHX Text Match Constructed Grade To Existing Grade

AutoCAD SHX Text Rock Riprap Shall Be Gradation No____ Quality Designation "A" As Per IDOT Standard Specification.

AutoCAD SHX Text Backfill Trench With Soil And Compact To A Density Equal To Or Greater Than Surrounding Soil.

AutoCAD SHX Text

SECTION

AutoCAD SHX Text Geotextile

AutoCAD SHX Text

ROCK RIPRAP GRADATION CHART

AutoCAD SHX Text

GRADATION NO. 1

AutoCAD SHX Text

GRADATION NO. 2

AutoCAD SHX Text

STONE

AutoCAD SHX Text

WEIGHT

AutoCAD SHX Text

POUNDS

AutoCAD SHX Text

STONE

AutoCAD SHX Text

WEIGHT

AutoCAD SHX Text

POUNDS

AutoCAD SHX Text

CUMULATIVE

AutoCAD SHX Text

PERCENT LIGHTER

AutoCAD SHX Text

BY WEIGHT

AutoCAD SHX Text

CUMULATIVE

AutoCAD SHX Text

PERCENT LIGHTER

AutoCAD SHX Text

BY WEIGHT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50 - 85

AutoCAD SHX Text 15 - 50

AutoCAD SHX Text 0 - 15

AutoCAD SHX Text

AutoCAD SHX Text 50 - 85

AutoCAD SHX Text 15 - 50

AutoCAD SHX Text 0 - 15

AutoCAD SHX Text Note: Spalls and rock dust that will pass a

AutoCAD SHX Text 3" sieve shall consist of not more

AutoCAD SHX Text than 5% by weight.

AutoCAD SHX Text

AutoCAD SHX Text Elev 28

AutoCAD SHX Text Elev 11

AutoCAD SHX Text

ROCK RIPRAP KEY DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text Geotextile

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text Designed

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Drawn

AutoCAD SHX Text

NP

AutoCAD SHX Text

OL

AutoCAD SHX Text

AutoCAD SHX Text Ol

AutoCAD SHX Text 4/18/24

AutoCAD SHX Text 4/18/24

AutoCAD SHX Text 4/24/24

AutoCAD SHX Text 4/24/24

AutoCAD SHX Text Plum Bluff 2.1.dwg

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text File No.

AutoCAD SHX Text

PLUM BLUFF 2

AutoCAD SHX Text

STREAMBANK PROTECTION

AutoCAD SHX Text

LAYOUT W DOC FIELDS

AutoCAD SHX Text George County, MS County, MSMS

NOTES: 1. MATCH THE FINISHED GRADE OF THE CROSSING TO THE SLOPE AND ELEVATIONS OF THE THALWEG (LOW FLOW CHANNEL) OF THE EXISTING STREAMBED. FOLLOW THE EXISTING STREAMBED GRADE AS CLOSELY AS POSSIBLE. 2. IF BEDROCK IS PRESENT, FIELD ADJUST THE CROSSING WITH INPUT FROM THE NRCS TECHNICAL REPRESENTATIVE. THE CRUSHED AGGREGATE SURFACING AND BASE FILL IS NOT REQUIRED WHERE THE BEDROCK IS AT THE CORRECT BED ELEVATION FOR THE CROSSING. 3. USE WELL-GRADED STONE WITH A RANGE OF MATERIALS TO FILL VOIDS AND ALLOW COMPACTION (SEE BASE MATERIAL SIZE REQUIREMENTS). COMPACT BY ROLLING OVER SURFACE OF BASE WITH HEAVY EQUIPMENT USED IN CONSTRUCTION. 4. USE CLASS I, NON-WOVEN GEOTEXTILE FABRIC PER GEOTEXTILE SPECIFICATION. 5. SEED AND MULCH DISTURBED AREAS ABOVE BANKFULL FLOW ELEVATION, INCLUDING SIDE CUT SLOPES. SEE SEEDING SPECIFICATION. 6. LOCATE AT THE HEAD OF A RIFFLE AND IN A STRAIGHT, STABLE REACH OF STREAM AWAY FROM THE INFLUENCE OF MEANDERS. IF THAT IS NOT POSSIBLE, LOCATE IN THE FARTHEST UPSTREAM PORTION OF THE RIFFLE POSSIBLE, OR IN A STRAIGHT SHALLOW STREAM REACH. 7. CONSTRUCT DURING LOW FLOW ONLY. WHILE WORKING ON ONE SIDE OF STREAM, DIVERT FLOW TO THE OTHER SIDE. MINIMIZE DISTURBANCE TO STREAMBED.

2:1

AutoCAD SHX Text 2:1

AutoCAD SHX Text 2:1

AutoCAD SHX Text 2:1

AutoCAD SHX Text Elev.

AutoCAD SHX Text 11.0

AutoCAD SHX Text 2'

AutoCAD SHX Text (200# Size Rock Riprap)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Geotextile

AutoCAD SHX Text Elev.

AutoCAD SHX Text 11.0

AutoCAD SHX Text Elev.

AutoCAD SHX Text 28.0

AutoCAD SHX Text Elev.

AutoCAD SHX Text 28.00

FLOW

Sheets and Views
Plan View

File details come from the government source that posted it. Updated .