Attachment C - Map - Page 1.pdf
PDF 1 MB Posted
- Attached to
- Lost Lake Stop Logs - CPRA
- Solicitation number
- 3000025491
- Issued by
- Winn Parish, Baton Rouge City, Louisiana
About this file
This is an as-built project plan for the Coastal Protection and Lost Lake Marsh Creation and Hydrologic Restoration Project, developed by the Coastal Protection and Restoration Authority (CPRA) located in Baton Rouge, Louisiana. The document is dated August 2016 and covers State Project Number TE-72 and Federal Project Number TE-71. The project involves comprehensive coastal restoration activities, including marsh creation, marsh nourishment, earthen terrace construction, and dredge pipeline alignment across multiple areas around Lost Lake and Fourleague Bay. The plan includes detailed estimated quantities for borrow areas, marsh creation zones, and earthen containment dikes, with specific volume and area measurements for different project segments.
The project map illustrates multiple geographic zones including marsh creation areas, borrow areas, marsh nourishment areas, and earthen terraces. Key infrastructure components include water control structures, dredge pipeline alignments, and earthen containment dikes. The project appears to be focused on coastal restoration and land building in a Louisiana coastal region, with precise engineering specifications for material movement, land formation, and hydrologic restoration. The detailed quantitative tables provide volumes in cubic yards and areas in acres for each project segment, indicating a methodical approach to coastal landscape reconstruction and environmental preservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A - Special Terms and Conditions - Pages 1-4.docx | DOCX document | |
| Attachment D - Structure Details - Pages 1-12.pdf | ||
| 3000025491.pdf | ||
| Attachment B - Scope of Services - Pages 1 -8.doc | DOC document | |
| Attachment E - Online Bidding Instructions - Pages 1-10.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ESTIMATED QUANTITIES
AVAILABLE BORROW
LOST LAKE
FOURLEAGUE BAY
NOTE:
MODIFICATIONS TO THE DREDGE PIPELINE ALIGNMENT SHOWN SHALL REQUIRE PRIOR
APPROVAL FROM THE ENGINEER.
\4,000' 2,000' O' 4,000' 8,000'
LEGEND
E'.ZZ] MARSH CREATION AREA
ISc2SI BORROW AREA
� MARSH NOURISHMENT AREA
- EARTHEN TERRACE
PIPELINE
EARTHEN CONTAINMENT DIKE
DREDGE PIPELINE ALIGNMENT
WATER CONTROL STRUCTURE
2/5/18 !As-Built COASTAL PROTECTION AND LOST LAKE MARSH CREATION
AND I-IYDROLOGIC RESTORATION PROJECT PLAN
RESTORATION AUTHORITY'
450 LAUREL STREET
BATON ROUGE. LOUISIANA 70801
STATE PROJECT NUMBER TE-72
FEDl:RALPROJECl' NUMBER: Tf:,.7'1. l)ATE. AUGUST 2016
ORAIVN BY: SHANE FAUST IJESIONED BY. SHANNON II;\YNES, PE. I APPROVED DY: RUSS JOFFRION, P.E SHEn J OF 61
RFx No.: 3000025491 Attachment C – Map Title: Lost Lake Stop Logs - CPRA
File details come from the government source that posted it. Updated .