ATTACHMENT C - HVAC Gas and Electric Line Item Description and Price List -updated HSPF Addendum 1.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
RFO - Purchase of Surplus Compost
Solicitation number
S-C25102-00006254
Issued by
Marion County, Oregon

About this file

This is an HVAC service line item price list addendum prepared by Clackamas County Weatherization in Oregon City, Oregon, containing detailed descriptions and pricing for heating, ventilation, and air conditioning services available to residential customers. The document is divided into two primary sections: one for electric home customers and one for gas home customers. For electric homes, the line items encompass 36 service categories ranging from thermostat installation and ductwork modifications to heat pump replacements, ductless mini-split installations, and various diagnostic tests including heat rise tests and static pressure evaluations. For gas homes, the line items include 34 service categories covering thermostat installation, flue pipe work, combustion air installation, furnace replacements, gas range service, and ventilation system installations. The scope of work details specific installation requirements, code compliance standards, permit requirements, and quality specifications for each service. All line items are listed with $0.00 pricing, indicating this is a template document awaiting contractor bids. The document requires contractor and program approval signatures and specifies that the Clackamas County Weatherization Department will schedule final inspections upon receipt of invoices.

The pricing structure requires contractors to submit competitive bids for each line item, with unit pricing specified per installation, per lineal foot, per ton capacity, or per test as applicable. Contractors submitting bids must provide proof of mechanical permits with invoices to receive payment, and those performing emergency furnace evaluations or "no heat" repairs are subject to 18-24 hour response time requirements. The document indicates that repair work completed during evaluations cannot exceed $800, with costs above this threshold requiring program approval. Contractors must possess EPA CFC certification for refrigerant recovery work, and all installations must include AHRI certificates where applicable. The weatherization program reserves the right to award replacement work to the lowest bidder, potentially reassigning jobs if the lowest bidder cannot complete installations within specified timeframes. Additional requirements include submission of test results, static pressure documentation, and air balance data with invoices. Program contact information is provided as (503) 650-3335 or weatherization@clackamas.us for questions regarding service specifications and project coordination.

View the file

Other files

File Type Posted
OregonBuys - County Portal Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRIC

Clackamas County Weatherization
112 11th StreetRequest Date:
Oregon City, OR 97045Prepared by:
(503) 650-3335Job#:
weatherization@clackamas.us
ELECTRIC
CUSTOMERS INFORMATIONFURNACE INFORMATION
Name:Make:
Address:Model#:
City, Zip Code:Serial #:
Phone #:Year:
KW/BTU:
ACCEPT OR DENY BY:
LINE
ITEM #LINE ITEM DETAIL DescriptionBid
UnitsBid
PriceTotal
1Furnish & Install Sight-Impaired Thermostat For Heating and Cooling Systems.

(Bid per one)

1. Remove old thermostat.

2. Furnish new sight-impaired thermostat for furnace.

3. Replacement thermostat shall meet or exceed original electrical and mechanical Specification.

4. Replace thermostat shall have a heat anticipator.

5. Thermostat shall be readable by the sight-impaired. A large digital readout is preferred.

*Replacement thermostats include electric, gas, oil and prane furnaces, heat pumps / air conditioners and electric baseboard or in wall electric heaters.$0.00
2Furnish & Install Thermostat Wiring For Heating and Cooling Systems. (Bid per one)

1. Install new thermostat wiring to code.

2. New thermostat location must be code approved.$0.00
3Furnish & Install Dedicated Circuit. (Bid per one)

1. Furnish and Install a dedicated circuit in an existing electric panel capable of handling the load of a new heat pump, 115V service outlet

2. Bid shall include all materials and labor to install this circuit. Must include a permit from the local

building enforcement jurisdiction.$0.00
4Furnish & Install GFCI Protected Outlet with a Light Switch and Light. (Bid per one)

1. To be installed in crawl space or attic as required by local code.

2. Bid shall include all materials and labor to install these items.

3. Must include a permit from the local building enforcement jurisdiction.$0.00
5Install Cross Over Duct in a Mobile Home 26 Gauge Metal Duct. (Bid per lineal foot)
1. Duct must be the same diameter as the output / supply ducts on each side of the mobile home.$0.00
6Add a Supply Duct 26 Gauge Metal Duct up to 8 Inches in Diameter. (Bid per lineal foot)
1. Install a new supply duct run to the room needed from the main trunk or plenum.$0.00
7Add a Cold Air Return 26 Gauge Metal Duct up to 14 Inches in Diameter. (Bid per lineal foot)

1. Install a new cold air return duct run to the room needed from the main cold air return trunk or

plenum.$0.00
8Add or Replace a Supply Register up to 6 Inches x 14 Inches Made of Metal. (Bid per one)

1. New register must be screwed to the surface and have a damper.

2. New register must be white or brown.

3. New register must be installed to local mechanical code.$0.00
9Add or Replace a Cold Air Return Up to 16 Inches x 24 Inches Made of Metal. (Bid per one)

1. New return must be screwed to the surface.

2. New return must be white or brown.

3. New register must be installed to local mechanical code.$0.00
10Install a Filter Cabinet on Cold Air Return Side of the Furnace. (Bid per one)

1. Filter cabinet must be the same size as the cold air return.

2. Contractor must install the filter, minimum MERV 6 in the filter cabinet and leave two additional filters with the resident.

3. Filter cabinet must be installed to local mechanical code.$0.00
11Remove the Cold Air Return Grill and Install a Filter Grill at the Cold Air Return Opening.

(Bid per one)

1. Filter grill must be the same size as the cold air return.

2. Contractor must install the filter in the filter grill and leave two additional filters with the resident.

3. Filter grill must be white or brown.

4. Filter grill must be installed to local mechanical code.$0.00
12Time to Evaluate Dead Furnace and write up Scope of Work Proposal for Stick Built or Mobile Homes with Electric Furnaces and Heat Pumps. (Bid per one)

1. Indicate what is needed to repair the furnace or indicate that the furnace needs to be replaced.

2. Repair work may be conducted at the time of the evaluation as long as the total cost does not exceed $800. Repair work must be installed to local mechanical code.

3. Fax or email the evaluation to the Weatherization Program within 24 hours of completing the evaluation or the next business day whichever one is sooner.

4. Note: The contractor doing the evaluation may not receive the repair or replacement work unless the repair work is less than $800.$0.00
13Respond to NO Heat Situation Within 18-24 Clock Hour Period. (Bid per one)

1. Respond to NO heat situation within 18-24 hours of receiving the fax work order from the Weatherization Program.

2. If the lowest bid contractor cannot respond within the 18-24 hour period the Weatherization Program reserves the right to go to the next lowest bidder.

3. If repair is $800 or less, complete the repair at the time of the visit.

4. If repair exceeds $800 call the Weatherization Program for approval.

5. If the furnace must be replaced and your company is the lowest bidder for that replacement item the Weatherization Program will approve the replacement at the bid price.

6. If your company is not the lowest bidder for the replacement item and the lowest bidder can install the furnace within 24-48 hours the Weatherization Program reserves the right to have the contractor bidding the lowest install the furnace.$0.00
14Electrical Furnace Tune-Up. (Bid per one)

1. Materials used shall meet or exceed Original Equipment Manufacture (OEM) specifications.

2. Inspect blower belt for wear and tension, replace as needed.

3. Oil blower motor and clean fan blades.

4. Check thermostat operation and set heat anticipator if needed.

5. Inspect wiring for frayed or burnt wiring and loose connection.

6. Test continuity for each element circuit component.

7. Check sequencer and control systems for proper operation.

8. Report findings to the Weatherization Program.$0.00
15Air Conditioner/Heat Pump Tune-Up. (Bid per one)

1. Materials used shall meet or exceed Original Equipment Manufacture (OEM.

2. Inspect blower belt for wear and tension, replace if needed.

3. Oil blower motor and clean fan blades.

4. Clean A coil and fins, provide 2 filters.

5. Check thermostat operation and set heat anticipator if needed.

6. Test continuity for each element circuit component, if electric back up system.

7. Check sequencer and control systems for proper operation.

8. Check refrigerant pressure and charge if necessary.

9. Conduct a static pressure test.

10. Report findings to the Weatherization Program.$0.00
16Remove and Replace Existing Outdoor Heat Pump Unit, with a new Heat Pump unit up to 2.5 Tons. (Bid per one)

Efficiency rating is defined in the most recently published GAMA Efficiency Certification Book

1. The installation must meet the manufacturer’s specifications, and meet local mechanical codes .2. Minimum HSPF2: 7.8 SEER2: 15.2

3. Conduct a static pressure test and report finding to the Weatherization Program.

4. New installation shall include new matching indoor air handler unit and provide 2 air filters minimum MERV 6

5. Indoor A coil, TXV valve, insulated refrigerant lines and outdoor coil 6. UL Listed 7. Install outdoor thermostat w/ 40 degree auxiliary heat lockout and Indoor Thermostat 8. Programmable such as LUX DMH 110 or equivalent.

9. 10 KW back up heat strips.

10. New 115V and 230V if needed.

11. Permits for installation are required.

12. Contractor must submit proof of mechanical permit with invoice in order to receive payment.

13. Make sure back up heat source is operational prior to leaving job site.

14. Removal of old system and Freon capture is included in price when removing and installing new HP

15. Seal plenum with mastic when installing new HP,

16. Must Provide AHRI certificate with invoice.

NOTE: The appliance vendor/contractor recovering the refrigerant must possess CFC certification by EPA-approved section 608 Type I, or universal certification

$0.00
17New Heat Pump Install - Line Items 17a to 17d MUST Include the Following Items:

1. Install must meet manufacturer’s specifications and meet local mechanical codes.

2. Minimum HSPF2: 7.8 SEER2: 15.2 3. Conduct a static pressure test and report finding to the Weatherization Program.

4. New installation shall include new indoor air handler unit and provide 2 air filters, minimum MERV 6.

5. Indoor A coil, insulated refrigerant lines, TXV valve and outdoor coil.

6. UL listed.

7. Install outdoor thermostat w/ 40 degree auxiliary heat lockout and Indoor Thermostat

8. Programmable such as LUX DMH 110 or equivalent.

9. 10KW back up heat strip. 10. Permits for installation are required.

11. Make sure back up heat source is operational prior to leaving job site.

12. Removal and disposal of old system.

13. All electrical connections including new 115V and 230V dedicated circuits.

14. Seal connection to plenum with mastic when installing new system.

15. Must Provide AHRI certificate with invoice Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
17A.New Heat Pump Install at 1.5 Tons. (Bid per one)$0.00
17B.New Heat Pump Install at 2.0 Tons. (Bid per one)$0.00
17C.New Heat Pump Install at 2.5 Tons. (Bid per one)$0.00
17D.New Heat Pump Install at 3.0 Tons. (Bid per one)$0.00
18Ductless Heat Pumps Models - Line Items 18a to 18d MUST Meet the following specifications:

Have variable speed compressor (“inverter technology”) – providing more efficient operation to match the heating/cooling needs of the house under a variety of weather conditions.

Be listed in the AHRI directory and provide at least 50 percent of rated capacity efficient operation when outside air is 17° F. and have no built-in electric resistance heat.

(Bid per one head) Daikin or Mitsubishi System or equivalent.

1. Appliance must have a HSPF of as indicated per line item.

2. Bid to include the following:

a. All refrigerant lines to each indoor head/unit.

b. Complete charge of refrigerant lines.

c. Line set cover to be included with the installation

d. All electrical permits by the governing body must be included with the invoice.

e. All necessary electrical dedicated circuits’ 115V service outlet and 230V dedicated circuit.

f. Level pad installed under unit.

g. Installation of indoor head in largest room in home (e.g. living room), including material required for wall mount, cutting/patching wall board, flashing, caulk, etc.

h. Installation of condensate system, including all drainage, and pump if needed.

18A.Install Ductless Mini-Split Heat Pump System – 1.5 Ton Outdoor Unit, minimum 8.7 HSPF
(Bid per one head)$0.00
18B.Install Ductless Mini-Split Heat Pump System – 2.0 Ton Outdoor Unit, minimum 9.0 HSPF
(Bid per one head)$0.00
18C.Install Ductless Mini-Split Heat Pump System – 2.5 Ton Outdoor Unit, minimum 9.4 HSPF
(Bid per one head)$0.00
18D.Install Ductless Mini-Split Heat Pump System – 3.0 Ton Outdoor Unit, minimum 9.4 HSPF
(Bid per one head)$0.00
19Install Ductless Mini-Split Heat Pump System—Each Additional Head. (Bid per head)

Bid to Include:

a. All refrigerant lines.

b. Line set cover

c. All necessary electrical connections and dedicated circuits.

d. Material required for wall mount, cutting/patching wall board, flashing, caulk, etc.

e. Installation of condensate system, including all drainage and pump if needed. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
20Perform & Record Heat Rise Test on Furnace. (Bid per test)

1. Test shall be performed by taking one reading on the supply air.

2. A second test reading shall be performed on the return air.

3. With the two readings, a heat rise test will be compared to that recommended by the furnace manufacturer and the furnace fan shall be adjusted accordingly.

4. Test results with any corrective measures taken shall be submitted with the invoice to the

Weatherization Program$0.00
21Perform & Record Static Pressure. (Bid per one)

Perform a static pressure test, make necessary corrections and report the findings to the

Weatherization Program in either inches of water/column or pascals$0.00
22Air Balance a Forced Air HVAC System Using a Flow Hood. (Bid per one)

1. Air Balance a Forced Air HVAC system using a Flow Hood.

2. Conduct the pre and post tests and make adjustments as necessary and record on a data form.

The completed pre and post data must be completed on a separate document and attached to

the contractor’s invoice.$0.00
23Remove and Replace ‘A’ Coil; heat pumps. (Bid per one)$0.00
24Install outdoor thermostat on existing heat pump. (Bid per one)$0.00
25Install programmable thermostat (as option for all furnace types). (Bid per one)

1. For electric heat pumps use such as LUX DMH 110 or equivalent with the following settings, 0 degree- compressor lockout, 35 degree-auxiliary heat lockout, 0-extended fan time heating, 90-

extended fan time cooling.$0.00
26Install a Programmable Hard wired T-Stat for mini splits (Bid per one)$0.00
27Reduce fan speed on existing furnace. (Bid per one)

1. Measure static pressure and heat rise after reducing fan speed (heat rise not to exceed manufacturer’s recommendation after adjustment).

2. Document test results on invoice.$0.00
28Furnish and Install Condensate Pump. (Bid per one)
1. Bid to include all connections necessary for functional condensate system, including drainage.$0.00
29Furnish and Install Heat Recovery Ventilation System (HRV). (Bid per system.)

1. Install in conjunction with existing duct system.

2. Build additional ductwork per appropriate bid item.

3. Bid shall include:

a. All electrical connections.

b. Pressure balancing; pressure in fresh air supply and return ducts during operation must be equal.

4. System shall operate in conjunction with furnace air handler.

5. Contractor shall determine appropriate size of HRV based on volume of home.

6. Document static pressure test in all four duct areas: furnace supply, furnace return, fresh air

supply, fresh air return. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
30Furnish and Install Energy Recovery Ventilation System (ERV). (Bid per system)

1. Install in conjunction with existing duct system.

2. Build additional ductwork per appropriate bid item.

3. Bid shall include:

a. All electrical connections.

b. Pressure balancing; pressure in fresh air supply and return ducts during operation must be equal.

4. System shall operate in conjunction with furnace air handler.

5. Contractor shall determine appropriate size of ERV based on volume of home.

6. Document static pressure test in all four duct areas: furnace supply, furnace return,

fresh air supply, fresh air return. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
31Remove and Replace Element on Electric Furnace. (Bid per element)$0.00
32Remove and Replace High Limit Switch – All furnaces.
Maximum temperature shall be no higher than 180 degrees. (Bid per one)$0.00
33Remove and Replace Furnace Sequencer – Electric Furnaces. (Bid per one)$0.00
34Remove and Replace Furnace Transformer – All furnaces. (Bid per one)$0.00
35Remove and Replace Furnace Fan Switch – All furnaces. (Bid per one)$0.00
36Remove and Replace Existing Forced Air Electric Furnace up to 25 - KW (Bid per one)

1. The installation must meet the Manufactures Specifications and meet local Mechanical codes

2. This item shall include, but not be limited to; all equipment, electrical and material necessary.

3. Removal and proper disposal of old equipment.

4. Install filter cabinet on cold air return side of furnace; provide 2 air filters, minimum MERV-6.

5. Seal plenums with mastic.

6. Conduct static pressure test and report findings to Weatherization.

7. Permits for installation are required.

8. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
Total$ - 0
Additional Details to Line Items above:
Comments:

CCWX Approval Signature Date

Contractor Approval Signature Date

Clackamas County Weatherization Department will schedule the Final Inspection of any replacement/repair upon receipt of final Invoice.
If you have any questions please call (503) 650-3335
THANK YOU FOR YOUR BUSINESS!

ELECTRIC HOME

GAS HOME

Clackamas County Weatherization
112 11th StreetRequest Date:
Oregon City, OR 97045Prepared by:
(503) 650-3335Job#:
weatherization@clackamas.us
GAS
CUSTOMERS INFORMATIONFURNACE INFORMATION
Name:Make:
Address:Model#:
City, Zip Code:Serial #:
Phone #:Year:
KW/BTU:
ACCEPT OR DENY BY:
FURNACE COMPONENTS
LINE
ITEM #LINE ITEM DETAILBid
UnitsBid
PriceTotal
1Furnish & Install Thermostat For Heating and Cooling Systems. (Bid per one)

Install per manufacturer's installation instructions and to local code.

*Replacement thermostats include electric, gas, oil and propane furnaces, heat pumps/air

conditioners and electric baseboard or in wall electric heaters.$0.00
2Furnish & Install Thermostat Wiring For Heating and Cooling Systems. (Bid per one)
1. Install new thermostat wiring and locate to code.$0.00
3Furnish & Install Dedicated Circuit. (Bid per one)

1. Furnish and Install a dedicated circuit in an existing electric panel capable of handling the

load of a new gas furnace, to code.$0.00
4Furnish & Install GFCI Protected Outlet with a Light Switch and Light. (Bid per one)
1. To be installed in crawl space or attic as required by local code.$0.00
5Furnish & Install Flue Pipe (B-vent) for Gas Appliance. (Bid per lineal foot)
1. Furnish and install double-wall pipe from appliance to chimney or appliance to outside.$0.00
6Furnish & Install Flue Pipe (Single Wall) for Gas Furnace. (Bid per lineal foot)
1. Furnish and install single-wall flue pipe from furnace to chimney.$0.00
7Install Additional Combustion Air up to Four (4) Grills in Appliance Enclosure.

(Bid per set of four (4), two (2) on each side of the door)

1. This application will be applied when the space in which fuel-burning appliances are located and does not meet the criteria for indoor air.

2. One opening shall be within 12-inches of the bottom of the space and 12-inches from the ceiling.

3. Sizing of combustion air grills must meet local code in effect at the time the work in being

performed.$0.00
8Install Outside Combustion Air to Appliance. (Bid per lineal foot)

1. Outside combustion air shall be supplied through ducts that are at least six (6) inches in

diameter and 26 gauge metal, extending from the appliance room to the outdoors.$0.00
N/ANot applicable---
DUCTING COMPONENTS
LINE
ITEM #LINE ITEM DETAILBid
UnitsBid PriceTotal
9Install Cross Over Duct in a Mobile Home 26 Gauge Metal Duct.

(Bid per lineal foot)

1. Duct must be the same diameter as the supply ducts on each side of the mobile home.$0.00
10Add a Supply Duct 26 Gauge Metal Duct up to 8 Inches in Diameter.

(Bid per lineal foot

1. Install a new supply duct run to the room needed from the main trunk or plenum.$0.00
11Add a Cold Air Return 26 Gauge Metal Duct up to 14 Inches in Diameter.

(Bid per lineal foot)

1. Install a new cold air return duct run to the room needed from the main cold air return

trunk or plenum.$0.00
12Add or Replace a Supply Register up to 6 Inches x 14 Inches Made of Metal.

(Bid per one)

1. New register must be screwed to the surface and have a damper.

2. New register must be white or brown.$0.00
13Add or Replace a Cold Air Return Register Up to 16 Inches x 24 Inches Made of Metal. (Bid per one)

1. New register must be screwed to the surface.

2. New register must be white or brown.$0.00
14Install a Filter Cabinet on Cold Air Return Side of the Furnace.

(Bid per one)

1. Filter cabinet must be the same size as the cold air return.

2. Contractor must install the filter in the filter cabinet and leave two additional filters with the

resident.$0.00
15Remove the Cold Air Return Grill and Install a Filter Grill at the Cold Air Return Opening. (Bid per one)

1. Filter grill must be the same size as the cold air return.

2. Contractor must install the filter in the filter grill and leave two additional filters with the resident.

3. Filter grill must be white or brown.$0.00
N/ANot applicable---
EQUIPMENT EVALUATIONS
LINE
ITEM #LINE ITEM DETAILBid
UnitsBid
PriceTotal
16Time to Evaluate Dead Furnace and write up Scope of Work Proposal for Stick

Built or Mobile Homes with Gas Furnaces. (Bid per one)

1. Indicate what is needed to repair the furnace or indicate that the furnace needs to be replaced.

2. Minor repair work may be conducted at the time of the evaluation as long as the total cost (evaluation & repair) does not exceed $800.

3. Fax or email written evaluation to the Weatherization Program within 24 hours of completing the evaluation or the next business day whichever one is sooner.

4. If repair work is over $800.00, the contractor doing the evaluation may not receive the

major repair or replacement work.$0.00
17Respond to NO Heat Situation Within 18-24 Clock Hour Period. (Bid per one)

1. Respond to NO heat situation within 18-24 hours of receiving the emailed work order from the Weatherization Program.

2. If the lowest bid contractor cannot respond within the 18-24 hour period the Weatherization Program reserves the right to go to the next lowest bidder.

3. If minor repair is $800 or less, complete the repair at the time of the visit.

4. If repair exceeds $800 contact the Weatherization Program for next steps.

5. If the furnace must be replaced and your company is the lowest bidder for that replacement item the Weatherization Program will approve the replacement at the bid price.

6. If your company is not the lowest bidder for the replacement item and the lowest bidder can install the furnace within 24-48 hours the Weatherization Program reserves the right

to have the contractor bidding the lowest install the furnace.$0.00
N/ANot applicable---
GAS FURNACES
LINE
ITEM #LINE ITEM DETAILBid
UnitsBid PriceTotal
18Furnish and Install Energy Star 96% plus AFUE Gas Furnace up to 120,000 BTU

(Bid per one)

1. The installation must meet the manufacturer’s Specifications.

2. This item shall include, but not be limited to, all equipment, electrical, venting and materials necessary to install new furnace and connect existing ductwork to new furnace.

3. Install a filter cabinet on cold air return side of the furnace, and provide 2 air filters,

minimum MERV 6. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
19Furnish & Install 78% AFUE Wall Mounted Gas Furnace with Fan Switch

(Exterior / Direct Vent). (Bid per one)

1. The installation must meet the manufacturer’s Specifications.

2. This item shall include, but not be limited to, all equipment and material necessary to install new furnace including the venting materials, and condensate pump when needed (including drainage).

3. Disposal of the old furnace in accordance with the rules and regulations of the State of

Oregon. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
20Furnish & Install Energy Star Rated Direct Vent Gas Furnace.

(Bid per one)

1. The installation must meet the manufacturer’s Specifications.

2. This item shall include all material and labor necessary to install new furnace to code. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
21Furnish & Install Gas Shutoff Valve for Furnace, Gas Stove and/or Gas Water Heater. (Bid per one)

1. An accessible, code approved shutoff valve shall be installed in the fuel-gas piping outside of each appliance and ahead of the union connection thereto in addition to any

valve provided on the appliance.$0.00
22Natural Gas Boiler Tune Up – (Bid per one)$0.00
23Perform Gas Furnace Tune-up. (Bid per one)
1. Perform in accordance with specifications in Attachment ????.$0.00
N/ANot applicable---
GAS RANGE / STOVE
LINE
ITEM #LINE ITEM DETAILBid
UnitsBid PriceTotal
24Perform Gas Range Stove Tune-Up. (Bid per one complete unit)

1. Clean burners.

2. Perform carbon monoxide test on oven and burners.

3. Check for burner operation, flame color and flame rollout.

4. Carbon Monoxide shall not exceed 200 PPM as measured or 800 ppm airfree in oven.$0.00
25Furnish & Install Gas Range / Stove. (Bid per one)
1. Install gas stove to manufacturer’s specifications$0.00
N/ANot applicable---
MISCELLANEOUS
LINE
ITEM #LINE ITEM DETAILBid
UnitsBid
PriceTotal
26Reduce fan speed on existing furnace. (Bid per one)

1. Measure static pressure and heat rise after reducing fan speed (heat rise not to exceed manufacturer’s recommendation after adjustment).

2. Document test results on invoice.$0.00
27Add PVC Vent Pipe – per lineal foot supply and exhaust.

1. Bid to include termination to outside and all connections.

2. Includes exhaust and supply air termination in excess of 18 inches from one another.$0.00
28Furnish and Install Condensate Pump. (Bid per one)
1. Bid to include all connections necessary for functional condensate system, including drainage.$0.00
29Furnish and Install Heat Recovery Ventilation System (HRV). (Bid per system.)

1. Install in conjunction with existing duct system.

2. Build additional ductwork per appropriate bid item.

3. Bid shall include:

a. All electrical connections.

b. Pressure balancing; pressure in fresh air supply and return ducts during operation must be equal.

4. System shall operate in conjunction with furnace air handler.

5. Contractor shall determine appropriate size of HRV based on volume of home.

6. Document static pressure test in all four duct areas: furnace supply, furnace return,

fresh air supply, fresh air return. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
30Furnish and Install Energy Recovery Ventilation System (ERV). (Bid per system)

1. Install in conjunction with existing duct system.

2. Build additional ductwork per appropriate bid item.

3. Bid shall include:

a. All electrical connections.

b. Pressure balancing; pressure in fresh air supply and return ducts during operation must be equal.

4. System shall operate in conjunction with furnace air handler.

5. Contractor shall determine appropriate size of ERV based on volume of home.

6. Document static pressure test in all four duct areas: furnace supply, furnace return, fresh air

supply, fresh air return. Contractor must submit proof of mechanical permit with invoice in order to receive payment.$0.00
31Remove and Replace High Limit Switch – All furnaces. Maximum temperature shall be no higher than 180 degrees. (Bid per one)$0.00
32Remove and Replace Furnace Sequencer (Bid per one)$0.00
33Remove and Replace Furnace Transformer (Bid per one)$0.00
34Remove and Replace Furnace Fan Switch (Bid per one)$0.00
N/ANot applicable---
Total$0.00
Additional Details to Line Items above:
Comments:

CCWX Approval Signature Date

Contractor Approval Signature Date

Clackamas County Weatherization Department will schedule the Final Inspection of any replacement/repair upon receipt of final Invoice.
If you have any questions please call (503) 650-3335
THANK YOU FOR YOUR BUSINESS!

GAS HOME

image1.jpeg

File details come from the government source that posted it. Updated .