Attachment C-Drawings-VA-LA-Pineville-Replace-Elevators-502-24-102.pdf

PDF 31 MB Posted

Attached to
J035--502-24-102 | Replace Elevators in Bldg 7 & 9 | Pineville, LA
Solicitation number
36C77626R0101
Issued by

About this file

This document is a set of architectural drawings for the replacement and modernization of elevators at Alexandria VA Medical Center in Alexandria, Louisiana, serving as Attachment C to the solicitation for Project 502-24-102.

The project encompasses modernization and replacement of elevators in Building 7 and Building 9 at the facility. Building 7 work includes: upgrading interiors and doors of traction elevators (Elevators 1 and 2), retrofitting and modernizing a hydraulic medical records elevator (Elevator 3), and retrofitting and modernizing a traction cartlift serving sterile processing department with two stops spanning five floors (Elevator 4 and 5). Building 9 requires retrofit and modernization of two hydraulic elevators serving the entire building. The drawings indicate that construction must be phased with only one elevator per building operational during work at any given time, and both buildings may be worked on simultaneously. Work on levels 2 and 3 involving door and jamb replacement must occur outside regular business hours. All work must comply with ICRA (Infectious Control Risk Assessment) Class II, III, and IV requirements as specified in specification section 01 35 26 - Safety Requirements, with temporary barriers, HEPA-equipped exhaust systems, and adhesive walk-off mats required at construction entrances. The 102-sheet drawing set includes floor plans for all levels (basement through penthouse), ICRA plans showing construction zone isolation for each phase, demolition plans, reflected ceiling plans, and detailed architectural, mechanical, electrical, and fire protection drawings. The design team includes Spees Design Build as architect/engineer of record and Northbay Elevator as the elevator consultant. The drawings are dated March 24, 2026 (100% Construction Documents phase) and comply with NFPA 101 Life Safety Code and International Building Code 2024, with the VA serving as the Authority Having Jurisdiction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECT

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECT

ELECTRICAL

PLUMBING

MECHANICAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

ELEVATOR

NORTHBAY ELEVATOR

PHONE: (707) 583-3100

3715 SANTA ROSA AVE

SANTA ROSA, CA 95407

PROJECT INFORMATION

STATE:

COUNTY:

JURISDICTION:

OWNER:

SITE ZONING:

CONST TYPE:

OCCUPANCY:

CODE ANALYSIS PROJECT DESCRIPTION

MODERNIZATION AND REPLACEMENT OF

ELEVATORS IN BUILDING 7 AND BUILDING 9 AT

ALEXANDRIA VA MEDICAL CENTER.

BUILDING 7:

1. TRACTION ELEVATORS. SCOPE LIMITED

TO UPGRADING THE INTERIORS AND

DOORS.

2. MEDICAL RECORDS ELEVATOR -

HYDRAULIC ELEVATOR THAT WILL

REQUIRE RETROFIT AND

MODERNIZATION.

3. STERILE PROCESSING DEPARTMENT

CARTLIFT - TRACTION ELEVATOR WITH

ONLY TWO STOPS AND SPANNING 5

FLOORS. ELEVATOR WILL REQUIRE

RETROFIT AND MODERNIZATION.

BUILDING 9:

1. TWO HYDRAULIC ELEVATORS SERVING

THE BUILDING WILL REQUIRE RETROFIT

AND MODERNIZATION.

APPLICABLE BUILDINGS

BUILDING 7 & BUILDING 9

ICRA CLASS REQUIREMENTS

SEE ICRA SHEET(S) & SPEC SECTION 01 35 26 -

SAFETY REQUIREMENTS

LOUISIANA

RAPIDES PARISH

ALEXANDRIA

GOV, VETERANS AFFAIRS

SEE FIRE LIFE SAFETY SHEET(S)

SEE FIRE LIFE SAFETY SHEET(S)

GENERAL NOTES

1. DO NOT SCALE DRAWINGS.

BUILDING 9

BUILDING 7

BUILDINGS IN SCOPE OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

G-001

COVER SHEET

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

REPLACE ELEVATORS IN BLDG 7 & BLDG 9

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

PROJECT #: 502-24-102

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 OF 102 G-001 COVER SHEET

2 OF 102 GS101 PHASING PLAN - BUILDING 7

3 OF 102 GS102 PHASING PLAN - BUILDING 9

ARCHITECTURAL

4 OF 102 A-001 ARCH SYMBOLS, ABBREVIATIONS, & GENERAL NOTES

5 OF 102 AS100 BUILDING 7 - ICRA PLANS - ELEVATORS 1 & 2

6 OF 102 AS101 BUILDING 7 - ICRA PLANS - ELEVATORS 1& 2

7 OF 102 AS102 BUILDING 7 - ICRA PLANS - ELEVATOR 3 & ROOM 29

8 OF 102 AS103 BUILDING 7 - ICRA PLANS - ELEVATORS 4, 5

9 OF 102 AS104 BUILDING 7 - ICRA PLANS - ELEVATORS 4, 5

10 OF 102 AS105 BUILDING 7 - ICRA PLANS - ELEVATORS 4, 5

11 OF 102 AS106 BUILDING 7 - ICRA PLANS - MED RECORDS & SPS CARTLIFT

12 OF 102 AS107 BUILDING 7 - ICRA PLANS - PENTHOUSE

13 OF 102 AS108 BUILDING 9 - ICRA PLANS

14 OF 102 AS109 BUILDING 9 - ICRA PLANS

15 OF 102 AS110 BUILDING 9 - ICRA PLANS

16 OF 102 A-100 BUILDING 7 - BASEMENT - OVERALL FLOOR PLAN

17 OF 102 A-101 BUILDING 7 - LEVEL 01 - OVERALL FLOOR PLAN

18 OF 102 A-102 BUILDING 7 - LEVEL 02 - OVERALL FLOOR PLAN

19 OF 102 A-103 BUILDING 7 - LEVEL 03 - OVERALL FLOOR PLAN

20 OF 102 A-104 BUILDING 7 - LEVEL 04 - OVERALL FLOOR PLAN

21 OF 102 A-105 BUILDING 7 - PENTHOUSE - OVERALL FLOOR PLAN

22 OF 102 A-106 BUILDING 9 - LEVEL 01 - OVERALL FLOOR PLAN

23 OF 102 A-107 BUILDING 9 - LEVEL 02 - OVERALL FLOOR PLAN

24 OF 102 A-108 BUILDING 9 - LEVEL 03 - OVERALL FLOOR PLAN

25 OF 102 A-109 BUILDING 9 - PENTHOUSE - OVERALL FLOOR PLAN

26 OF 102 AD100 BUILDING 7 - BASEMENT - DEMO ENLARGED PLANS

27 OF 102 AD101 BUILDING 7 - LEVEL 01 - DEMO ENLARGED PLANS

28 OF 102 AD102 BUILDING 7 - LEVEL 02 - DEMO ENLARGED PLANS

29 OF 102 AD103 BUILDING 7 - LEVEL 03 - DEMO ENLARGED PLANS

30 OF 102 AD104 BUILDING 7 - LEVEL 04 - DEMO ENLARGED PLANS

31 OF 102 AD106 BUILDING 7 - PENTHOUSE - DEMO ENLARGED PLANS

32 OF 102 AD107 BUILDING 9 - LEVELS 01, 02, 03, PH. - DEMO ENLARGED PLANS

33 OF 102 AD110 BUILDING 7 - BASEMENT - DEMO ENLARGED RCP

34 OF 102 AD111 BUILDING 7 - LEVEL 01 - DEMO ENLARGED RCP

35 OF 102 AD112 BUILDING 7 - LEVEL 02 - DEMO ENLARGED RCP

36 OF 102 AD113 BUILDING 7 - LEVEL 03 - DEMO ENLARGED RCP

37 OF 102 AD114 BUILDING 7 - LEVEL 04 - DEMO ENLARGED RCP

38 OF 102 AD116 BUILDING 7 - PENTHOUSE - DEMO ENLARGED RCP

39 OF 102 AD117 BUILDING 9 - LEVELS 01, 02, 03, PH. - DEMO ENLARGED RCP

40 OF 102 AE100 BUILDING 7 - BASEMENT - ENLARGED PLANS

41 OF 102 AE101 BUILDING 7 - LEVEL 01 - ENLARGED PLANS

42 OF 102 AE102 BUILDING 7 - LEVEL 02 - ENLARGED PLANS

43 OF 102 AE103 BUILDING 7 - LEVEL 03 - ENLARGED PLANS

44 OF 102 AE104 BUILDING 7 - LEVEL 04 - ENLARGED PLANS

45 OF 102 AE105 BUILDING 7 - PENTHOUSE - ENLARGED PLANS

46 OF 102 AE106 BUILDING 9 - LEVELS 01, 02, 03, PH. - ENLARGED PLANS

47 OF 102 AC100 BUILDING 7 - BASEMENT - ENLARGED RCPS

48 OF 102 AC101 BUILDING 7 - LEVEL 01 - ENLARGED RCPS

49 OF 102 AC102 BUILDING 7 - LEVEL 02 - ENLARGED RCPS

50 OF 102 AC103 BUILDING 7 - LEVEL 03 - ENLARGED RCPS

51 OF 102 AC104 BUILDING 7 - LEVEL 04 - ENLARGED RCPS

52 OF 102 AC105 BUILDING 7 - PENTHOUSE - ENLARGED RCPS

53 OF 102 AC106 BUILDING 9 - LEVELS 01, 02, 03, PH. - ENLARGED RCPS

54 OF 102 A-601 ROOM FINISH SCHEDULE, DETAILS

55 OF 102 A-602 BLDG 7 - ELEVATOR SCOPE

56 OF 102 A-603 BLDG 7 - ELEVATOR SCOPE

57 OF 102 A-604 BLDG 7 & 9 - ELEVATOR SCOPE

FIRE PROTECTION

58 OF 102 F-001 FIRE PROTECTION GENERAL NOTES & ABBREVIATIONS

59 OF 102 F-101 BUILDING 7 - BASEMENT OVERALL FIRE PROTECTION FLOOR PLAN

60 OF 102 F-102 BUILDING 7 - PENTHOUSE -OVERALL FIRE PROTECTION FLOOR PLAN

61 OF 102 FD401 BUILDING 7 - FIRE PROTECTION - DEMOLITION ENLARGED PLANS

62 OF 102 F-401 BUILDING 7 - FIRE PROTECTION - ENLARGED PLANS

MECHANICAL

63 OF 102 M-001 MECHANICAL GENERAL NOTES & ABBREVIATIONS

64 OF 102 M-002 MECHANICAL LEGENDS

65 OF 102 M-101 BUILDING 7 - BASEMENT - OVERALL FLOOR PLAN

66 OF 102 M-102 BUILDING 7 - PENTHOUSE - OVERALL FLOOR PLAN

67 OF 102 M-103 BUILDING 9 - PENTHOUSE - OVERALL FLOOR PLAN

68 OF 102 MD401 BUILDING 7 - PENTHOUSE - ENLARGED DEMOLITION PLANS

69 OF 102 M-401 BUILDING 7 - BASEMENT - ENLARGED PLANS

70 OF 102 M-402 BUILDING 7 - PENTHOUSE - ENLARGED PLANS

71 OF 102 M-403 BUILDING 9 - PENTHOUSE ENLARGED FLOOR PLAN

72 OF 102 M-501 MECHANICAL DETAILS

73 OF 102 M-601 MECHANICAL SCHEDULES

ELECTRICAL

74 OF 102 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX

75 OF 102 E-002 ELECTRICAL LEGENDS

76 OF 102 E-100 BUILDING 07 - BASEMENT - OVERALL FLOOR PLAN

77 OF 102 E-101 BUILDING 07 - PENTHOUSE - OVERALL FLOOR PLAN

78 OF 102 E-102 BUILDING 09 - LEVEL 01 - OVERALL FLOOR PLAN

79 OF 102 E-103 BUILDING 09 - PENTHOUSE - OVERALL FLOOR PLAN

TRUE

NORTH

NOT TO SCALE

FACILITY SITE PLAN

SIGNATURES

DIRECTOR

ASSOCIATE DIRECTOR

CHIEF ENGINEERING

COR

SAFETY OFFICER

INFECTION CONTROL

Revisions: Date:

DRAWING INDEX

PAGE # SHEET # SHEET NAME

80 OF 102 E-401 BLDG 07 - PENTHOUSE- ENLARGED ELECTRICAL PLANS

81 OF 102 E-402 BLDG 07 - BASEMENT - ENLARGED ELECTRICAL PLANS

82 OF 102 E-403 BLDG 07 - ELECTRICAL ROOM 29 - ENLARGED ELECTRICAL PLANS

83 OF 102 E-404 BLDG 07 - BASEMENT - ENLARGED ELECTRICAL PLANS

84 OF 102 E-405 BLDG 07 - PENTHOUSE - ENLARGED ELECTRICAL PLANS

85 OF 102 E-406 BLDG 07 - BASEMENT - ENLARGED ELECTRICAL PLANS

86 OF 102 E-407 BLDG 07 - BASEMENT - ENLARGED ELECTRICAL PLANS

87 OF 102 E-408 BLDG 07 - BASEMENT - ENLARGED ELECTRICAL PLANS

88 OF 102 E-409 BLDG 9 - PENTHOUSE - ENLARGED ELECTRICAL PLANS

89 OF 102 E-410 BLDG 9 - LEVEL 01 - ENLARGED ELECTRICAL PLANS

90 OF 102 E-501 ELECTRICAL DETAILS

91 OF 102 E-502 BUILDING 07 ELECTRICAL DETAILS

92 OF 102 E-503 BUILDING 09 ELECTRICAL DETAILS

93 OF 102 EF601 FIRE ALARM RISER DIAGRAM

94 OF 102 E-601 BUILDING 07 - ONE-LINE DIAGRAMS - EXISTING - PART 1 OF 2

95 OF 102 E-602 BUILDING 07 - ONE-LINE DIAGRAMS - EXISTING - PART 2 OF 2

96 OF 102 E-603 BUILDING 09 - ONE-LINE DIAGRAMS - EXISTING

97 OF 102 E-611 BUILDING 07 - ONE-LINE DIAGRAMS - REVISED - PART 1 OF 2

98 OF 102 E-612 BUILDING 07 - ONE-LINE DIAGRAMS - REVISED - PART 2 OF 2

99 OF 102 E-613 BUILDING 09 - ONE-LINE DIAGRAMS - REVISED

100 OF 102 E-701 ELECTRICAL SCHEDULES

101 OF 102 E-702 ELECTRICAL SCHEDULES

102 OF 102 E-703 ELECTRICAL SCHEDULES

03/23/2026

UP

UP

PB

PB

A

B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BB CC DD EE FF GG HH II JJ KK LL MM NN OO PP

CLOSET

HAC

11E

SPD BULK

STORAGE

SPD ADMIN

23B

CLERK

23C

CHIEF

ASST CHIEF

23A

DISPATCH AREA

CART

25A

HAC

34B

PROCUREMENT

TR

TLT

MECH CHASE

STOR

H.K. RM.

OFFICE

5PBX

5ABREAK

5B

ELEC SWITCH

STORAGE

TRANSFORMER

ELECTRICAL

SWITCHGEAR

STAIR

PIPE BASEMENT

MEDICAL

RECORDS

MECH

15A

PIPE BASEMENT

LINEN CHUTE

PIPE BASEMENT

PREP ASSEMBLY

35STERL

MECHANICAL

EQUIPMENT

MECH CHASE

BM2

MENS LOCKER

26 TLT

26A

WOMEN'S LOCK

TLT

ETO

DECONTAM

TRASH

ELEC

29ELEC

STAIR

MECH CHASE

BM4

STERILE/NONSTERILE

STORAGE

EXTERIOR SILVER

RECOV

EXTERIOR MED

GAS

ASST CHIEF

OFFICE

40-

BM5 STAIR

SECRETARY

OFFICE

CHIEF OFFICE

41B

CLEAN LINEN

SUPPLY

TELEPHONE/COMPUTER

IRM OFFICES

LOBBY

BM1

STORAGE

ENTRY

1A

OFFICE

1B

OFFICE

1C

OFFICE

SPECIMEN

STORAGE

11B

AUTOPSY

11A

VEST

BATH

11C

MORGUE

11D

WORK AREA

WORK AREA

WORK AREA

WORK AREA

57D

OFFICE

57E

WORK AREA

57C

BIOMEDICAL

ENGINEERING

FILES

57A

RECEIVING &

CLEANING

MECHANICAL

EQUIPMENT

BATTERY

FILES

57B

EMS LOCKERS

54 IRM SOFTWARE

SUPPORT

STAIR

TLT

TLT

HAC

BM6

COMPUTER

STOR

STOR

45A

TLT

TLT

STOR

52A

PIPE BASEMENT

LOBBY

LOBBY

E-3

CORRIDOR

ELEV

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

ELEVATOR

ELEV-3

CARTLIFT

ELEVATORS TO BE RENOVATED IN

TWO PHASES. TO DO ONE ELEVATOR

PER PHASE.

ELEVATORS TO BE RENOVATED IN

TWO PHASES. TO DO ONE ELEVATOR

PER PHASE.

OUT OF SCOPE

2 HR FIRE RATED WALL (EXISTING)

1 HR FIRE RATED WALL (EXISTING)

SMOKE RATED WALL (EXISTING)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS101

PHASING PLAN - BUILDING 7

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

1/16" = 1'-0"

BUILDING 7 - BASEMENT - PHASING PLAN

LEGEND

GENERAL NOTES

1. BOTH BUILDINGS MAY BE WORKED ON AT THE SAME TIME,

BUT ONLY ONE ELEVATOR PER BUILDING MAY BE WORKED

ON AT A TIME.

2. COORDINATE ORDER OF ELEVATOR PHASING WITH THE VA

COR.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

A

B

C

D

E

F

G

H

I

OCCUP. THERAPY

GROUP EXERCISE

TRASH AREA

PATIENT LAUNDRY

SOILED LINEN COLLECTION

PATIENT CLOTHES

M STAFF LOCKERS

F STAFF LOCKERS

RECREATION THERAPY STORAGE

ELEC

VRS LOBBY

121A

CORRIDOR

121B

CORRIDOR

121C

VRS

121D

VRS WORKROOM

121E

VRS PROGRAM MANAGER

121F

VHS BREAK ROOM

121G

VRS CONF

121H

VRS PEER

121J

VRS PSA

121K

COPY

121L

STOR

121M

PSYCHOLOGY

VRS

DINING

STOR

122A

ELEC

122B

INPATIENT PA

PATIENT WAITING

PATIENT WAITING

PTSD TESTING ROOM

124A

PSYCOLOGY

124B PDSD PSYCH

124C

PSYCHOLOGY

124D

PTSD MSA

124E

F TLT

125B

M TLT

125C

PTSD

125D

PTSD

125E

PTSD

125F

PTSD

125G

VESTIBULE

RECREATION THERAPY OFFICE

ELEC

INPATIENT DIETARY

PTSD

PSYCH INTERN

PSYCH INTERN

SW RECOVERY

ACOS MH

ASST HEAD NRUSE

INPATIENT PSYCH

TLT

ELEC

CLO

TLT

STORAGE

HAC

CHAPLAIN

GROUP AREA

108INPT SOC WORK

109STOR.

110A

STORAGE

111A

TELEPHONE EQUIPMENT

115A

STOR

115B

WATER HEATER

115C

ELEC EQUIP

115D

M STAFF TLT

116A

F STAFF TLT

117A

MH AO

127A

DACOS MH

127B

BREAK EQUIP

127C

ACOS MH

127D

CORRIDOR

100A

CORRIDOR

100C

CORRIDOR

100B

CORRIDOR/ELEV LOBBY

100D CLERKS

125A

CORRIDOR

CORRIDOR

CORRIDOR

122C

STAIR

STAIR

STAIR

ELEVATOR

ELEVATOR

OUT OF SCOPE

2 HR FIRE RATED WALL (EXISTING)

1 HR FIRE RATED WALL (EXISTING)

SMOKE RATED WALL (EXISTING)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS102

PHASING PLAN - BUILDING 9

MK Author

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

PROJECT

NORTH

TRUE NORTH

(DASHED)

1/8" = 1'-0"

BUILDING 9 - PHASING PLAN

ELEVATORS TO BE RENOVATED IN

TWO PHASES. TO DO ONE

ELEVATOR PER PHASE.

Revisions: Date:

LEGEND

GENERAL NOTES

1. BOTH BUILDINGS MAY BE WORKED ON AT THE SAME TIME,

BUT ONLY ONE ELEVATOR PER BUILDING MAY BE WORKED

ON AT A TIME.

2. COORDINATE ORDER OF ELEVATOR PHASING WITH THE VA

COR.

101A

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION / LEVEL MARKER

KEY NOTE

ROOM TAG

(SF OPTIONAL)

CEILING HEIGHT TAG

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

TOILET

150 SF

A

01A

TRUE

NORTH

W1

PROJECT

NORTH

TRUE NORTH

(DASHED)

A01

D88

A5175SOAP DISH

ACT 2x2

9' - 0" AFF

F-1

R-1

SYMBOLS

A-101

A-101

A-101

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

(DEMO SHEET(S) ONLY)

ABOVE

BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

(DEMO SHEET(S) ONLY)

NEW DOOR

AREA SHOWN ON SHEET

OUT OF SCOPE

INACCESSIBLE DURING PHASE

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA BOUNDRY

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA BARRIER

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA DOOR

(ICRA SHEET(S) ONLY)

ADHESIVE WALK-OFF MATS

(ICRA SHEET(S) ONLY)

TEMPORARY ICRA AIR PRESSURE

(ICRA SHEET(S) ONLY)

CONTRACTOR PATH OF TRAVEL

(ICRA SHEET(S) ONLY)

SMOKE COMPARTMENT PERIMETER

(FIRE LIFE SAFETY SHEET(S) ONLY)

SMOKE RATED WALL

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINET

(FIRE LIFE SAFETY SHEET(S) ONLY)

EMERGENCY EGRESS ROUTE

(FIRE LIFE SAFETY SHEET(S) ONLY)

SPRINKLER PER FIRE PROTECTION

DIFFUSER PER MECHANICAL

(SIZE & PROPORTION MAY VARY)

LIGHT FIXTURE PER ELECTRICAL

(SIZE & PROPORTION MAY VARY)

MATERIALS

EARTH

SAND

BATT INSULATION

RIGID INSULATION

CONCRETE

STEEL

PLYWOOD, FIRE RATED

GYPSUM BOARD, TYPE 'X'

GYPSUM BOARD, LEAD LINED

ACOUSTICAL CEILING TILE, 2' x 2'

ACOUSTICAL CEILING TILE, 2' x 4'

A-101

A-101

FEC

IN-04.02-01

ABBREVIATIONS

SYMBOLS

& AND

∠ ANGLE

@ AT

℄ CENTERLINE

° DEGREES

# NUMBER

A

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT

A(C)T ACOUSTICAL (CEILING) TILE

ACM ASBESTOS CONTAINING MATERIAL

ACW ACOUSTICAL WALL

ADA AMERICANS W/ DISABILITIES ACT

ADJ ADJACENT

A/E ARCHITECT/ENGINEER

AF ACCESS FLOOR

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATELY

ARCH ARCHITECT(URAL)

ASPH ASPHALT

A/V AUDIO / VIDEO

B

BARR BARRIER

BATH BATHROOM

BB BACKER BOARD

BLD(G) BUILDING

BLK(G) BLOCK(ING)

BLW BELOW

BM BEAM

BMT(U) BONE MARROW TRANSPLANT (UNIT)

BO BOTTOM OF

BOC BOTTOM OF CURB

BOS BOTTOM OF SLAB

BRC BRACE, BRACING

BRKT BRACKET

BRNG BEARING

BTM BOTTOM

BTWN BETWEEN

C

CAB CABINET

CC CONTRACTOR FURN, CONTRACTOR INST

CD CONSTRUCTION / CONTRACT DOCUMENTS

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR(ANCE)

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMP COMPOSITION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER REPRESENTATIVE

CORR CORRIDOR

CS CONCRETE SEALER

CT CERAMIC TILE

CTR CENTER

CV CONTRACTOR FURNISHED, VA INSTALLED

D

DB DESIGN BUILD

DBL DOUBLE

DC DIRECT CURRENT

DD DESIGN DEVELOPMENT

DEMO DEMOLISH(ION)

DEPT DEPARTMENT

DG DESIGN GUIDE

DIA DIAMETER

DIM DIMENSION

DM DESIGN MANUAL

DWN DOWN

DR DOOR

DTL DETAIL

DWG DRAWING(S)

E

E EAST

EA EACH

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

ELEV ELEVATION OR ELEVATOR

ENG ENGINEER(ING)

EOC EDGE OF CURB

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

ETS EXPOSED TO STRUCTURE

EX(IST) EXISTING

EXP EXPANSION

EXT EXTERIOR

F

FA FIRE ALARM

FD FLOOR DRAIN

FE(C) FIRE EXTINGUISHER (CABINET)

FF FACTORY FINISH

FFB FINISH FLOOR BREAK

FIN FINISH(ED)

FLASH FLASHING

FLR FLOOR(ING)

FLRSNT FLORESCENT

FNDN FOUNDATION

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOS FACE OF STUDS

FP FIRE PROOF

FR FIRE RATED

FRM FRAME

FT FOOT, FEET

FTG FOOTING

FUR FURRING

FURN FURNISHED

G

GA GAGE, GAUGE

GALV GALVANIZED

GE GENERAL ELECTRIC

G(W)B GYPSUM (WALL) BOARD

GC GENERAL CONTRACTOR

GL GRID LINE

GLB GLUE LAMINATED BEAM

GMU GLASS MASONRY UNIT

GOV(T) GOVERNMENT

GYP GYPSUM BOARD

H

HAC HOUSEKEEPING AIDES CLOSET

HDR HEADER

H(D)W(E) HARDWARE

HM HOLLOW METAL

HORZ HORIZONTAL

HPDL HIGH PRESSURE DECORATIVE LAM

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATION & AIR CONDITIONING

I

ICRA INFECTIOUS CONTROL RISK ASSESSMENT

ID INSIDE DIAMETER OR DIM

ILSM INTERIM LIFE SAFETY MEASURES

INCL INCLUDE(D,ING)

INST INSTALL

INSUL INSULATION

INT INTERIOR

J

JT JOINT

K

KV KILOVOLT

L

LAM LAMINATE(D)

LAV LAVATORY

LCM LEAD CONTAINING MATERIAL(S)

LD LEAD

LT LIGHT

M

MAT MATERIAL(S)

MAX MAXIMUM

MDF MEDIUM-DENSITY FIBREBOARD

MECH MECHANIC(AL)

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFR MANUFACTURE(R)

MIN MINIMUM

MISC MISCELLANEOUS

MOD MODIFIED

MTL METAL

N

N NORTH

N(/)A NOT APPLICABLE

NEG NEGATIVE

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O.C. ON CENTER(S)

OPN(G) OPEN(ING)

OPP OPPOSITE

OPT OPTION(AL)

OVHD OVERHEAD

P

P PAINT

PCONC PRECAST CONCRETE

PCRA PRE-CONSTRUCTION RISK ASSESSMENT

PL PLATE

PLAM PLASTIC LAMINATE

PLY(WD) PLYWOOD

PNL PANEL

PR PAIR

PRFB PREFABRICATED

PS PLASTIC

PT PORCELAIN TILE

PTN(S) PARTITION(S)

PVMT PAVEMENT

PREP PREPAIR

Q

QTY QUANTITY

R

RAD RADIUS

RB RESILIENT BASE

RCP(S) REFLECTED CEILING PLAN(S)

REF REFERENCE

REINF REINFORCE(D,ING)

REP REPRESENTATIVE

REQ(S,(')D) REQUIRE(D,S,MENT(S))

RESIL RESILIENT

REV REVERSE

RF ROOF

RM ROOM

RMV REMOVE

RO ROUGH OPENING

S

S SOUTH

SCHED SCHEDULE

SCI(D) SPINAL CORD INJURY (& DISABILITY)

SD SCHEMATIC DESIGN

SDSF SOLID SURFACE

SECT SECTION

SF SQUARE FEET

SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHG SHINGLES

SHLD(G) SHEILD(ING)

SHT(G) SHEET (SHEATHING)

SIM SIMILAR

SM SEAM

SOW SCOPE OF WORK

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

ST STAIN

STDG STANDING

STF STAFF

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SURG SURGERY, SURGICAL

SUSP SUSPENDED

SV SHEET VINYL

SYS SYSTEM

T

TBD TO BE DETERMINED

TBL TABLE

TEMP TEMPORARY

T&G TONGUE AND GROOVE

THK THICK(NESS)

THRESH THRESHOLD

TOC TABLE OF CONTENTS

TOS TOP OF SLAB

TPH TOILET PAPER HOLDER

TRANS TRANSITION

TS TUBE STEEL

TYP TYPICAL

U

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

V

VA VETERANS AFFAIRS

VAR VARIES

VB VAPOR BARRIER

VC VA FURNISHED, CONTRACTOR INSTALLED

VERT VERTICAL

VIF VERIFY IN FIELD

VV VA FURNISHED, VA INSTALLED

W

W WEST

W/ WITH

WD WOOD

WDW WINDOW

WGHT WEIGHT

W/O WITHOUT

WP WATERPROOF(ING)

WR WATER RESISTANT

WRK WORK

X

XRY X-RAY

FIRE LIFE SAFETY NOTES

1. COMPLY WITH NFPA 241 FOR ALL CONSTRUCTION WORK.

THIS INCLUDES REPLACING CEILING TILES AT THE END OF

EACH WORK SHIFT.

2. PLEASE NOTE, AS AN AGENCY OF THE FEDERAL

GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL

IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES

(DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,

FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY

HAVING JURISDICTION (AHJ).

3. THE BELOW CODES HAVE BEEN USED FOR ANALYSIS.

A. NATIONAL FIRE PROTECTION AGENCY (NFPA) 101

LIFE SAFETY CODE, 2024. NFPA 101 TAKES

PRECEDENCE OVER IBC.

B. INTERNATIONAL BUILDING CODE (IBC), 2024.

4. EXISTING BUILDING CONSTRUCTION TYPES SHALL NOT BE

ALTERED AS PART OF THIS PROJECT.

5. EXISTING BUILDING OCCUPANCY SHALL NOT BE ALTERED

AS PART OF THIS PROJECT.

6. EXISTING EGRESS SHALL NOT BE ALTERED AS PART OF

THIS PROJECT. AS SUCH, EGRESS CALCULATIONS ARE

NOT PROVIDED.

7. OCCUPANT LOADS SHALL NOT BE ALTERED AS PART OF

THIS PROJECT. AS SUCH, EXISTING EXIT WIDTHS SHALL

NOT BE ALTERED.

8. EXISTING FIRE RATED ASSEMBLIES SHALL BE MAINTAINED.

ANY EXISTING PENETRATIONS TO BE DEMOLISHED SHALL

BE PATCHED TO MATCH ADJACENT EXISTING FIRE

RATINGS. ANY NEW PENETRATIONS SHALL BE

FIRESTOPPED.

9. ANY NEW PENETRATIONS THROUGH EXISTING FIRE RATED

ASSEMBLIES SHALL BE FIRE STOPPED AND EXISTING

RATING MAINTAINED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-001

ARCH SYMBOLS, ABBREVIATIONS,

& GENERAL NOTES

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

Revisions: Date:

OUT OF SCOPE

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

LOBBY

BM1

STORAGE

OFFICE

1C

CORRIDOR

I1 I2

I3

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

LOBBY

BM1

OFFICE

1C

CORRIDOR

I1 I2

I3

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

ELEVATOR LOBBY

E-1-2

CORRIDOR

I1 I2

I3

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

ELEVATOR LOBBY

E-1-2

CORRIDOR

I1 I2

I3

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

LOBBY

CORRIDOR

C2-7

CONF

200H

CORRIDOR

I1 I2

I3

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

LOBBY

CORRIDOR

C2-7

CONF

200H

CORRIDOR

I1

I2

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1 & 2

BUILDING 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS100

BUILDING 7 - ICRA PLANS -

ELEVATORS 1 & 2

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.1/4" = 1'-0"

BLDG 7 - ELEV 1,2 - BASEMENT - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BLDG 7 - ELEV 1,2 - BASEMENT - ICRA PLAN - PHASE 2

1/4" = 1'-0"

BUILDING 7 - ELEV 1,2 - LEVEL 01 - ICRA PLAN - PHASE 2

1/4" = 1'-0"

BUILDING 7 - ELEV 1,2 - LEVEL 01 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 1, 2 - LEVEL 02 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 1, 2 - LEVEL 02 - ICRA PLAN - PHASE 2

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

CORRIDOR

LOBBY

MEDICAL

SERVICE

300A

SECRETARY

300G

I1

I2

I3

ELEVATOR

ELEV-2

ELEC

4M1

ELEVATOR

ELEV-1

OFFICE

400E

LOBBY

CORRIDOR

I1 I2

I3

ELEVATOR

ELEV-2

ELEVATOR

ELEV-1

CORRIDOR

LOBBY

MEDICAL

SERVICE

300A

SECRETARY

300G

I1

I2

I3

ELEVATOR

ELEV-2

ELEC

4M1

ELEVATOR

ELEV-1

OFFICE

400E

LOBBY

LOBBY

C4-16

ELEVATOR

ELEV-3

OFFICE

400A

CORRIDOR

I1

I2

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1 & 2

BUILDING 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS101

BUILDING 7 - ICRA PLANS -

ELEVATORS 1& 2

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

1/4" = 1'-0"

BUILDING 7 - ELEV 1, 2 - LEVEL 03 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 1, 2 - LEVEL 04 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 1, 2 - LEVEL 03 - ICRA PLAN - PHASE 2

1/4" = 1'-0"

BUILDING 7 - ELEV 1, 2 - LEVEL 04 - ICRA PLAN - PHASE 2

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

9' - 2"

ELEVATOR

ELEV-3

I1

I2

I3

CORRIDOR

ELEVATOR

ELEV-3

ELEVATOR LOBBY

E-3

CASHIER

168B

I1

I2

I3

CORRIDOR

LOBBY

ELEVATOR

ELEV-3

CORRIDOR

CHIROPRACTOR

OFFICE

COPY

200B

CORRIDOR

C2-7

I1

I2

I3

LOBBY

2E-3

LOBBY

LOBBY

C4-16

ELEVATOR

ELEV-3

WAITING

ROOM

OFFICE

400A

I1

I2

I3

ELEVATOR

ELEV-3

CORRIDOR

LOBBY

MEDICAL

SERVICE

300A

OFFICE

300B

CONFERENCE

I1

I2

I3

LOBBY

3E-3

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 7

RM 29

I2

ELEC

ELEC

TRASH

STAIR

BM3

CLASS II

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS102

BUILDING 7 - ICRA PLANS -

ELEVATOR 3 & ROOM 29

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. ICRA CLASS II & III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

1/4" = 1'-0"

BLDG 7 - ELEV 3 - BASEMENT - ICRA PLAN

1/4" = 1'-0"

BUILDING 7 - ELEV 3 - LEVEL 01 - ICRA PLAN

1/4" = 1'-0"

BUILDING 7 - ELEV 3 - LEVEL 02 - ICRA PLAN

1/4" = 1'-0"

BUILDING 7 - ELEV 3 - LEVEL 04 - ICRA PLAN

1/4" = 1'-0"

BUILDING 7 - ELEV 3 - LEVEL 03 - ICRA PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

1/4" = 1'-0"

BUILDING 7 - BASEMENT - ROOM 29 - ICRA PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

OFFICE

LOBBY

PROCUREMENT

TR

I1 I2

I3

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

OFFICE

LOBBY

PROCUREMENT

TR

4' - 0"

I1

I2

I3

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

AMBULATORY

EXAM

ELEVATOR LOBBY

INSTR

ELEC

100B

ELEVATOR LOBBY

1008A

WAITING AREA

I1

I2

I3

I1I2

I3

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

EXAM

ELEVATOR LOBBY

ELEVATOR LOBBY

1008A

ELEC

100B

INSTR

WAITING AREA

AMBULATORY

I1

I2

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

4 & 5

BUILDING 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS103

BUILDING 7 - ICRA PLANS -

ELEVATORS 4, 5

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

PROJECT

NORTH

TRUE NORTH

(DASHED)

1/4" = 1'-0"

BLDG 7 - ELEV 4,5 - BASEMENT - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BLDG 7 - ELEV 4,5 - BASEMENT - ICRA PLAN - PHASE 2

1/4" = 1'-0"

BUILDING 7 - ELEV 4,5 - LEVEL 01 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 4,5 - LEVEL 01 - ICRA PLAN - PHASE 2

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

LOBBY

TELE

2M4

ELEC

2M3

CORRIDOR

EMG/NCS

EXAM

SECRETARY

OFFICES

I1

I2

I3

4' - 3 5/8"

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

LOBBY

TELE

2M4

ELEC

2M3

CORRIDOR

EMG/NCS

EXAM

SECRETARY

OFFICES

I1

I2

I3

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

LOBBY

STORAGE

TEL

3M4

ELEC

3M3

CORRIDOR

PATIENT

WAITING

PATIENT

WAITING

I1 I2

I3

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

LOBBY

STORAGE

TEL

3M4

ELEC

3M3

CORRIDOR

PATIENT

WAITING

PATIENT

WAITING

I1

I2

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

4 & 5

BUILDING 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS104

BUILDING 7 - ICRA PLANS -

ELEVATORS 4, 5

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

PROJECT

NORTH

TRUE NORTH

(DASHED)

1/4" = 1'-0"

BUILDING 7 - ELEV 4 & 5 - LEVEL 02 - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 4 & 5 - LEVEL 02 - PHASE 2

1/4" = 1'-0"

BUILDING 7 - ELEV 4 & 5 - LEVEL 03 - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 4 & 5 - LEVEL 03 - PHASE 2

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

LOBBY

CONTROL

STATION

TLT

404B

M

IN

4'

0"

5' - 0"

OFFICE

406C

BRONCH

406B

HAC

406A

LOBBY

C4-5

STORAGE

406F

STORAGE

406G

LOBBY

C4-7

ENDOSCOPY

XRAY CONTROL

459C

OR SUPV

444A

ELEC

4M7

I1

I2

I3

I1

I2

I3

ELEVATOR

ELEV-5

ELEVATOR

ELEV-4

LOBBY

CONTROL

STATION

TLT

404B

OFFICE

406C

STERIS ROOM

406D

LOBBY

BRONCH

406B

HAC

406A

EXAM

OR SUPV

444A

C4-7

STORAGE

406F

STORAGE

406G

STORAGE

406H

MIN

6' - 0"

I1

I2

I3I1

I2

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

4 & 5

BUILDING 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS105

BUILDING 7 - ICRA PLANS -

ELEVATORS 4, 5

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

PROJECT

NORTH

TRUE NORTH

(DASHED)

1/4" = 1'-0"

BUILDING 7 - ELEV 4 & 5 - LEVEL 04 - PHASE 1

1/4" = 1'-0"

BUILDING 7 - ELEV 4 & 5 - LEVEL 04 - PHASE 2

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

CARTLIFT

BUILDING 7

MED RECORDS

MEDICAL

RECORDS

ELEV

MECH

15A

PIPE BASEMENT

PIPE BASEMENT

CLASS II

I2 I1

DOWN

CARTLIFT

STERILE/NONSTERILE

STORAGE

MIN

3' - 8"

CLASS IV

I1

I2

I3

I1

M

IN

ELEV

RECORDS,

WORKING

SUPPLY

OFFICE

114BCLASS II

I2

I2

I3

I1

I3

I1

UP

CARTLIFT

CLEAN CORE

SUPPORT CARE

UROLOGY

459B

ENDOSCOPY

DICTATION

499D

LOUNGE

449A

GENERAL OR

TLT

449F

I4

CLASS IV

I1

I2

I3

I1

EXISTING SINK

TO REMAIN

XRAY CONTROL

459C

INSTRUMENT PREP

AND

STERILIZATION

OUT OF SCOPE

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

CONTRACTOR PATH OF TRAVEL

HEPA EQUIPPED EXHAUST

HEPA EQUIPED FILTER

2 HR FIRE RATED WALL (EXISTING & NEW)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS106

BUILDING 7 - ICRA PLANS - MED

RECORDS & SPS CARTLIFT

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. ICRA CLASS II & IV REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

I4 TEMPORARILY SEAL DOOR FOR DURATION OF

CONSTRUCTION PHASE.

PROJECT

NORTH

TRUE NORTH

(DASHED)

1/4" = 1'-0"

BUILDING 7 - MED RECORDS ELEV - BASEMENT - ICRA PLAN

1/4" = 1'-0"

BLDG 7 - BASEMENT - SPS CARTLIFT - ICRA PLAN

1/4" = 1'-0"

BUILDING 7 - MED RECORDS ELEV - LEVEL 01 - ICRA PLAN

1/4" = 1'-0"

BUILDING 7 - LEVEL 04 - SPS CARTLIFT - ICRA PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 7

OUT OF SCOPE

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

CONTRACTOR PATH OF TRAVEL

HEPA EQUIPPED EXHAUST

HEPA EQUIPED FILTER

2 HR FIRE RATED WALL (EXISTING & NEW)

PASSENGER

ELEVATOR PH

PB3

SURGERY

ELEVATOR PH

PB2

STAIR

CART ELEVATOR

PH

PB4

I2

I2

I2

I2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS107

BUILDING 7 - ICRA PLANS -

PENTHOUSE

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. ICRA CLASS II REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I2 TACKY MAT.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Revisions: Date:

1/8" = 1'-0"

BUILDING 7 - PENTHOUSE - FLOOR PLAN - ICRA PLANS

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

ELEVATOR

CORRIDOR/ELEV

LOBBY

100D

INPATIENT PA

PSYCOLOGY

124B

CORRIDOR

I4

ELEVATOR

I1

I2

I3

ELEVATOR

CORRIDOR/ELEV

LOBBY

100D

INPATIENT PA

PSYCOLOGY

124B

CORRIDOR

ELEVATOR

I1

I2

I3

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9

ELEVATOR

TLT

201A

BREAK AREA

ELEV LOBBY

HAC

CLEAN LINEN

203 STOR

CLEAN UTIL

ELEVATOR

ELEV LOBBY

250A

+ I1

I2

I3

ELEVATOR

TLT

201A

BREAK AREA

ELEV LOBBY

HAC

CLEAN LINEN

203 STOR

CLEAN UTIL

ELEVATOR

I1

I2

I3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS108

BUILDING 9 - ICRA PLANS

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

I4 TEMPORARILY SEAL DOOR FOR DURATION OF

CONSTRUCTION PHASE.

1/4" = 1'-0"

BUILDING 9 - ELEV 1 & 2 - LEVEL 01 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 9 - ELEV 1 & 2 - LEVEL 01 - ICRA PLAN - PHASE 2

1/4" = 1'-0"

BUILDING 9 - ELEV 1 & 2 - LEVEL 02 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 9 - ELEV 1 & 2 - LEVEL 02 - ICRA PLAN - PHASE 2

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9

ELEVATOR

WAITING AREA

PHYS OFFICE

B.M.S. EQUIP

STORAGE

ELEVATOR

I1

I2

I3

ELEVATOR

LOBBY

ELEVATOR

WAITING AREA

PHYS OFFICE

B.M.S. EQUIP

STORAGE

COMMUNICATION

CENTER

3C-6

CORRIDOR

CORRIDOR

ELEVATOR

I2 ELEVATOR

LOBBY

COORDINATE ICRA BARRIERS TO

AVOID DISRUPTION OF ACCESS TO

ELEVATOR 2 WHILE ELEVATOR 1 IS IN

CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS109

BUILDING 9 - ICRA PLANS

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPEES DESIGN BUILD

23830 PACIFIC HWY S

KENT, WA 98032

(206)-209-2246

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

TRUE NORTH

(DASHED)

1. ICRA CLASS III REQUIREMENTS MUST BE MET

THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.

2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

4. ADHESIVE WALK-OFF MATS TO BE USED AT ALL

CONSTRUCTION ENTRANCES AND EXITS, INCLUDING ANTE

ROOMS.

5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

6. TEMPORARY FIRE RESISTIVE SHEET PLASTIC WITH ZIPPER

ACCESS MAY BE USED AS A MEANS OF DUST CONTROL

WHILE CONSTRUCTING AND DEMOLISHING TEMPORARY

ICRA BARRIERS.

7. CONSTRUCTION WORK TO BE DONE IN PHASES SO ONE

ELEVATOR REMAINS OPERATIONAL.

8. WORK AT LEVELS 2 AND 3 FOR REPLACEMENT OF DOOR

AND JAMB TO BE DONE OUTSIDE OF REGULAR BUSINESS

HOURS.

9. DO NOT DISTURB FLOORING WHILE CONSTRUCTION

OCCURS ON ANY FLOOR, UNLESS OTHERWISE NOTED.

I1 TEMPORARY ICRA DOOR.

I2 TACKY MAT.

I3 TEMPORARY ICRA BARRIER.

1/4" = 1'-0"

BUILDING 9 - ELEV 1 & 2 - LEVEL 03 - ICRA PLAN - PHASE 1

1/4" = 1'-0"

BUILDING 9 - ELEV 1 & 2 - LEVEL 03 - ICRA PLAN - PHASE 2

PROJECT

NORTH

TRUE NORTH

(DASHED)

INACCESSIBLE DURING PHASE

EXISTING WALL TEMPORARILY ACTING AS AN ICRA

BOUNDRY. SEAL ALL OPENINGS, PENETRATIONS, &

HVAC DUCTS AS REQUIRED PER SPECIFICATION

SECTION 01 35 26 - SAFETY REQUIREMENTS.

TEMPORARY ICRA BARRIER FRAMED TO

STRUCTURE ABOVE. CONSTRUCT AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA DOOR AND FRAME AS REQUIRED

PER SPECIFICATION SECTION 01 35 26 - SAFETY

REQUIREMENTS.

TEMPORARY ICRA AIR PRESSURE

HEPA EQUIPPED EXHAUST

2 HR FIRE RATED WALL (EXISTING)

AREA SHOWN

PROJECT

NORTH

TRUE NORTH

(DASHED)

BUILDING 9

ELEV

MACHINE

I2

CLASS II

STAIR

STAIR

STAIR

I2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS110

BUILDING 9 - ICRA PLANS

MK AJ

100% CONSTRUCTION

DOCUMENTS

03/24/2026

502-24-102

ALEXANDRIA VA MEDICAL CENTER, ALEXANDRIA - LA

REPLACE ELEVATORS IN BLDG 7

& BLDG 9

SPE…