Attachment C Construction Drawings - 38 pages.pdf
PDF 20 MB Posted
- Attached to
- Y1DA--437-23-103 Update Wing 4B Federal contract opportunity
- Solicitation number
- 36C26325B0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26325B0009.pdf | ||
| Attachment B - Specifications - 530 Pages.pdf | ||
| Attachment D Wage Determination ND20250013 April 4 2025.pdf | ||
| Attachment A SOW - 12 pages.pdf | ||
| Attachment F Safety or Environmental Violations and WMR Information 2 pages.pdf | ||
| Attachment E VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:2
P
M
BID DOCUMENTS
7/17/2024
COVER SHEET
G0.00
UPDATE WING 4B
KZJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
UPDATE WING 4B
FARGO VA HEALTH CARE SYSTEM
DEPARTMENT OF VETERAN'S AFFAIRS
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
PROJECT NO. 437-23-103
VA
U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION
# POUND OR NUMBER
& AND
@ AT
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALUM ALUMINUM
ANOD ANODIZED
ASD ALTERNATE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BD BOARD
BLK BLOCK
BM BEAM
B.O. BOTTOM OF
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BLDG BUILDING
BYND BEYOND
CAB CABINET
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CPT CARPET TILE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
DBL DOUBLE
DEMO DEMOLISH OR DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIR DIRECTION
DN DOWN
DR DOOR
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR OR ELEVATION
EQ EQUAL
ES EACH SIDE
EXIST EXISTING
FD FLOOR DRAIN OR FIRE DEPARTMENT
FIN FINISH
FIXT FIXTURE
FLR FLOOR
F.O. FACE OF
FT FOOT OR FEET
GA GAUGE
GR GRADE
GYP GYPSUM
HDR HEADER
HEF HORIZONTAL EACH FACE
HI HIGH
HM HOLLOW METAL
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
ICBO INTERNATIONAL CONFERENCE OF BUILDING
OFFICIALS
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INCL INCLUDE
INSUL INSULATED OR INSULATION
INT INTERIOR
JT JOINT
K KIP (1000 POUNDS)
LP LOW POINT
LVL LEVEL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURED
MIN MINIMUM
MTL METAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OZ OUNCE
ABBREVIATIONS
P PAINT
PL PLATE
PLUMB PLUMBING
PLY PLYWOOD
PNL PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PT POINT
PR PAIR
PROP PROPERTY
R RADIUS
RBR RUBBER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RE RIGHT END
REF REFERENCE
REQD REQUIRED
RET RETURN
RM ROOM
R.O. ROUGH OPENING
SDI STEEL DECK INSTITUTE
SECT SECTION
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLER OR SPEAKER
SQ SQUARE
SSTL STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURE OR STRUCTURAL
SUP SUPPORT
SYM SYMMETRICAL
T&B TOP AND BOTTOM
TBD TO BE DETERMINED
TEMP TEMPERATURE
THK THICK OR THICKNESS
THRD THREADED
T.O. TOP OF
T.O.C TOP OF CONCRETE
T.O.F TOP OF FRAMING
T.O.S TOP OF STEEL/STUD
T.O.W TOP OF WALL
TYP TYPICAL
U/S UNDERSIDE
UNO UNLESS NOTED OTHERWISE
US UNDERSIDE
VB VAPOR BARRIER
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
WD WOOD
WDW WINDOW
WSF WELDED SHEET FLOORING
Room name
1t
VIEW NAME
1/8" = 1'-0"1 DRAWING TITLE
SCALE
BUILDING SECTION
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
WALL SECTION
DETAIL CUT
A101
DETAIL CALLOUT
A101
A101
A101
A101
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
INTERIOR ELEVATION
DRAWING NUMBER
DIRECTION OF SIGHT
SHEET NUMBER
ROOM TAG
ROOM NAME
ROOM NUMBER
KEYNOTE TAG
5-04 KEYNOTE DESIGNATION
1 DOOR TAG
DOOR NUMBER
PARTITION TAG
WALL DESIGNATION
WINDOW TAG
WINDOW DESIGNATION
ELEVATION MARKER
HEIGHT
NORTH ARROW
TRUE NORTH
PLAN NORTH
ARCHITECTURAL SYMBOLS
M3A
STEEL/METAL STUD
WOOD (ROUGH) BLOCKING OR SHIM
CONCRETE
PLAN AND SECTION
WOOD (ROUGH)
2'X2' ACT CEILING SYSTEM WITH HOLD
DOWN CLIPS
GYPSUM BOARD
CEILING
CONCRETE
ELEVATION
CENTER LINE
LINE SYMBOLS
GRID LINE
PROPERTY LINE
CUT LINE
BATT INSULATION
WOOD SUBSTRATE
MATERIAL LEGEND
FLOORING
DEMO LINE
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN
EXISTING 2'X2' ACT CEILING SYSTEM TO REMAIN
UNLESS OTHERWISE NOTED
EXISTING GYPSUM BOARD
CEILING/SOFFIT TO REMAIN UNLESS
OTHERWISE NOTED
2'X2' SECURITY METAL CEILINGS
DEMOLISH ACT CEILING SYSTEM
CPT-1 - CARPET TILE
EXISTING - TO REMAIN AS-IS
WSF-1 - WELDED SEAM FLOORING, WOOD PATTERN,
VERTICAL GRAIN
WSF-2 - WELDED SEAM FLOORING, LINEN PATTERN
WSF-1 - WELDED SEAM FLOORING, WOOD PATTERN,
HORIZONTAL GRAIN
LEGEND NOTES
1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE
PERTINENT TO THE CONDITIONS ON THIS SET OF DRAWINGS TO THE
EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY APPEAR IN THIS
SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF
SYMBOLS SHOWN ON THIS SHEET.
V.A. SYMBOLS
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE RESISTIVE RATED LINE, 4 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR
V V ITEM - VA SUPPLIED AND INSTALLED
VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED
A
COLUMN GRID
DIMENSION LINE
NORTH ARROW
CL CENTER LINE
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:4
P
M
BID DOCUMENTS
7/17/2024
SHEET INDEX, ABBREVIATIONS,
SYMBOLS, LEGENDS AND GENERAL
NOTES
G0.01
UPDATE WING 4B
KZJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
SHEET INDEX
GENERAL
G0.00 COVER SHEET
G0.01 SHEET INDEX, ABBREVIATIONS, SYMBOLS, LEGENDS AND GENERAL NOTES
G0.02 LOCATION MAP AND CONTRACTOR STAGING
G1.00 PHASING PLAN
G2.00 INFECTION CONTROL RISK ASSESSMENT
G3.00 LIFE SAFETY PLAN
ARCHITECTURAL
AD1.00 DEMOLITION PLAN
AD1.10 DEMOLITION REFLECTED CEILING PLAN
A1.00 FLOOR PLAN
A1.10 REFLECTED CEILING PLAN
A5.00 ROOM FINISH SCHEDULE
A5.10 FLOOR AND WALL FINISH PLAN
A5.20 INTERIOR ELEVATIONS
A5.21 INTERIOR ELEVATIONS AND CASEWORK DETAILS
A5.30 WALL PROTECTION PLAN AND DETAILS
A5.40 SIGNAGE PLAN, SCHEDULE AND DETAILS
A6.00 DOOR SCHEDULE, ELEVATIONS AND DETAILS
MECHANICAL
M0.00 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
MD1.01 HVAC DEMOLITION PLAN
M1.01 NEW HVAC PLAN
M2.00 MECHANICAL DETAILS AND SCHEDULES
PLUMBING
P0.00 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
P1.01 PLUMBING REMODEL PLAN
ELECTRICAL
E0.00 ELECTRICAL LEGENDS AND ABBREVIATIONS
E0.01 ELECTRICAL SCHEDULES
E0.02 DOOR ACCESS CONTROL DETAILS AND SEQUENCES
E0.03 ELECTRICAL DETAILS AND SCHEMATIC DIAGRAMS
E0.04 ELECTRICAL CONSTRUCTION PHASING PLAN
ED1.00 POWER DEMOLITION PLAN
ED2.00 LIGHTING DEMOLITION PLAN
ED3.00 SPECIAL SYSTEMS DEMOLITION PLAN
E1.00 POWER PLAN - NEW CONSTRUCTION
E2.00 LIGHTING PLAN - NEW CONSTRUCTION
E3.00 SPECIAL SYSTEMS PLAN - NEW CONSTRUCTION
FAD1.00 FIRE ALARM DEMOLITION PLAN
FA1.00 FIRE ALARM PLAN - NEW CONSTRUCTION
FIRE PROTECTION
FD1.01 FIRE PROTECTION DEMOLITION PLAN
FP1.01 NEW FIRE PROTECTION PLAN
GENERAL NOTES:
1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, AND ORDINANCES.
2. THE CONTRACTOR SHALL PERFORM ALL TESTING AND INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO
DEMONSTRATE A COMPLETE AND SATISFACTORY INSTALLATION.
3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND MATERIALS NOTED TO REMAIN, AND SHALL BE
RESPONSIBLE FOR DAMAGE TO THE SAME RESULTING FROM WORK UNDER THIS CONTRACT. THE
CONTRACTOR SHALL RESTORE DAMAGED EXISTING BUILDING MATERIALS TO THEIR ORIGINAL CONDITION.
4. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO
COMMENCING CONSTRUCTION. CONTRACTOR SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER
REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES.
5. CONTRACTOR SHALL COORDINATE ALL WORK AND SHOP DRAWINGS WITH OTHER TRADES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL WORK. CONTRACTOR SHALL ANTICIPATE
AREAS WHERE THE INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WILL BE RESTRICTED, CONGESTED, OR DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION BETWEEN ALL TRADES.
7. SUB-CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL MECHANICAL AND ELECTRICAL ITEMS WITH THE
GENERAL CONTRACTOR. CONTRACTOR SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER
REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO INSTALLATION AND/OR FABRICATION.
8. ALL ANGLES ON PLANS ARE 45- OR 90-DEGREES, UNLESS NOTED OTHERWISE. CURVED ELEMENTS ARE
LOCATED AS DIMENSIONED.
9. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS EXISTING.
10. SEE LIFE SAFETY PLAN FOR LOCATIONS OF FIRE- AND SMOKE-RATED PARTITIONS.
11. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR INSTALLATION OF WALL-MOUNTED CABINETS, TOILET ACCESSORIES, WALL STOPS, AND MISCELLANEOUS ITEMS.
12. ALL CONTRACTORS WORKING WITHIN THE CONSTRUCTION LIMITS MUST PARTICIPATE IN AN HOUR LONG
ORIENTATION PROVIDED BY THE COR.
13. ALL CONTRACTORS MAY BE SUBJECT TO A TOOL AND MATERIAL CHECK PRIOR TO AND IMMEDIATELY AFTER
LEAVING THE CONSTRUCTION LIMITS.
14. ALL CONSTRUCTION ACTIVITIES WHICH ARE CONSIDERED BY OSHA TO BE "HOT WORK" SHALL ABIDE BY THE
FARGO VA HOT WORK PERMITTING POLICY. HOT WORK MAY BE INSPECTED AT ANY TIME.
15. CONTRACTOR SHALL COORDINATE A BEHIND THE WALL INSPECTION WITH THE OWNER PRIOR TO
REPLACING ANY FINISHES WHICH MAY OBSTRUCT FROM PLAIN SIGHT WORK THAT HAS BEEN COMPLETED.
B O
TT
O
M O
F D
I K E
S
LO
PE
MC
MC
UND
UND
AFGE
AFGE
AFGE
AFGE
RO EOM
HCHV
C P
C P
C P
C P
C P
C P
C P
C P
V A
N V
A N
R
MC
R
R R
19th AVE. N.
21st AVE. N.
E L M
S T
R E
E T
E L M
S T
R E
E T
BLDG. NO.
1 MEDICAL CENTER
3 ADMINISTRATION OFFICE
8 FLAGPOLE
9 MEDICAL CENTER
10 BOILER PLANT
11 MAINTENANCE GARAGE
12 WAREHOUSE
13 LAUNDRY
30 ADMINISTRATION OFFICE
39 HIGH VOLTAGE SWITCHGEAR BLDG
42 UND SCHOOL OF MEDICINE
46 MEDICAL CENTER
MC- MOTORCYCLE PARKING
CP- CAR/VAN POOL PARKING
- HANDICAPPED PARKING
40 VBA REGIONAL OFFICE
41 OXYGEN STORAGE TANK
43 PICNIC SHELTER AND PATIO
44 XCEL ENERGY BLDG (NATURAL GAS)
20 GATE WELL
50 COLD STORAGE BUILDING
51 HRMS
52 ADMINISTRATION OFFICE
53 HAZMAT STORAGE BUILDING
54 PANDEMIC FLU STORAGE BUILDING
56 CHILLER PLANT
R- RESERVED PARKING
UND- UNIVERSITY OF NORTH DAKOTA
AFGE- AMERICAN FEDERATION GOVERNMENT EMPLOYEE
RO EOM- REGIONAL OFFICE EMPLOYEE OF THE MONTH
HCHV- HEALTH CARE HOMELESS VETERANS
NFFE- NATIONAL FEDERATION FEDERAL EMPLOYEE
R E D
R
IV
E R
O F T
H E N
O R
T H
30W 30E
12 13
CITY
LIFT
STATION
(STORM
SEWER)
MAIN HOSPITAL
BUILDING
1-9-46
8 3
PROJECT AREA -
WING 4B
SHARED
CONTRACTOR
STAGING
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.01 FOR GENERAL NOTES.
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
KEY PLAN
PROJECT AREA - WING 4B
4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:4
P
M
BID DOCUMENTS
7/17/2024
LOCATION MAP AND CONTRACTOR
STAGING
G0.02
UPDATE WING 4B
KZJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
LOCATION MAP
GENERAL NOTES:
N
R
REF.
DW
REF.
DW
R
REF.
PHASE 1
PHASE 2
PHASING LEGEND:
PHASE 3
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.01 FOR GENERAL NOTES.
STORAGE
4B-55A
LAUNDRY
4B-55
STAIRWELL #14
S14-4
1 BED
4B-57
TOILET
4B-57A
TOILET
4B-59A
1 BED
4B-59
TOILET
4B-63A
1 BED
4B-63
DINING /
ACTIVITIES
4B-65
CORRIDOR
4B-C5
1 BED
4B-58
TOILET
4B-58A
TOILET
4B-60A
1 BED
4B-60
SOILED
4B-62
ANTE
4B-64
TOILET
4B-64B
SECLUSION
4B-64A
NURSE STATION
4B-70
CORRIDOR
4B-C3
ACTIVITY / DINING
ROOM
4B-40
SALLY PORT
4B-C2
NUTRITION
4B-42
PSYCH RES
4B-44
PSYCH OFFICE
4B-46
REPORT
4B-48
HAC
4B-50
STORAGE
4B-66
NOURISH.
4B-67
CORRIDOR
4B-C1
TEMPORARY CONSTRUCTION BARRIER,
LOCATION TO BE COORDINATED WITH
COR AND WING 4B TO ALLOW NEEDED
ACCESS THROUGH CORRIDOR FOR
PATIENT, STAFF, RAPID RESPONSE
TEAM AND GURNEY/EQUIPMENT, ETC.
CONTRACTOR ACCESS FOR PHASE 3
CONSTRUCTION ANTE ROOM
A
CORRIDOR
4B-C4
A
1HR TEMPORARY CONSTRUCTION PARTITION - WALL TYPE A. SECURE WALL
TO FLOOR AND SURFACES THAT MEETS FIRE RATED ASSEMBLY
REQUIREMENTS AND FIRE TAPED AND SEALED. CONTRACTOR SHALL NOT
DRILL ANY HOLES INTO FLOOR TO SECURE TEMPORARY CONSTRUCTION
PARTITIONS. SEE SHEET G2.00 FOR WALL TYPE A.
TEMP. CONSTRUCTION BARRIER:
WALL RATING LEGEND:
1 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
2 HOUR FIRE BARRIER
STORAGE
4B-55A
LAUNDRY
4B-55
STAIRWELL #14
S14-4
1 BED
4B-57
TOILET
4B-57A
TOILET
4B-59A
1 BED
4B-59
TOILET
4B-63A
1 BED
4B-63 DINING /
ACTIVITIES
4B-65
CORRIDOR
4B-C5
1 BED
4B-58
TOILET
4B-58A
TOILET
4B-60A
1 BED
4B-60
SOILED
4B-62
ANTE
4B-64
TOILET
4B-64B
SECLUSION
4B-64A
NURSE STATION
4B-70
CORRIDOR
4B-C4
REPORT
4B-48
HAC
4B-50
STORAGE
4B-66
NOURISH.
4B-67
B
-5
B
-5
B
-6
B
-5
B
-6
A
T4B-C2.1
A
CONTRACTOR ACCESS
FOR PHASE 1
CONSTRUCTION ANTE ROOM
TEMPORARY
SALLYPORT
T4B-C2A
TEMPORARY CONSTRUCTION BARRIER IN NURSES STATION
WILL REQUIRE SPECIAL COORDINATION DUE TO SPLITTING IT
IN HALF. COORDINATE WITH VA COR AND WING 4B.
NURSE STATION
4B-70
TOILET
4B-70A
NURSE LOUNGE
4B-70B
1 BED
4B-72
TOILET
4B-72A
TOILET
4B-74A
1 BED
4B-74
1 BED
4B-76
TOILET
4B-76A
1 BED
4B-75
TOILET
4B-75A
TOILET
4B-73A
1 BED
4B-73STAIRWELL #15
S15-4
MECH/ELEC
4B-71
CLEAN
4B-49
SOILED
4B-47
CORRIDOR
4B-C4
CORRIDOR
4B-C3
NURSE MANAGER
4B-45
EXAM ROOM
4B-43
ACTIVITY / DINING
ROOM
4B-40 SALLY PORT
4B-C2
NUTRITION
4B-42
PSYCH RES
4B-44
PSYCH OFFICE
4B-46
REPORT
4B-48
HAC
4B-50
CORRIDOR
4B-C1
TEMPORARY
SALLYPORT
T4B-C2
A
A
TEMPORARY SALLY PORT
WILL BE USED WHEN WORK
ON EXISTING SALLY PORT
ELECTRICAL AND VIDEO
SECURITY SYSTEM IS BEING
WORKED ON.
TEMPORARY
CONSTRUCTION
BARRIER IN NURSES
STATION WILL REQUIRE
SPECIAL
COORDINATION DUE TO
SPLITTING IT IN HALF.
COORDINATE WITH VA
COR AND WING 4B.
TEMPORARY CONSTRUCTION
BARRIER, LOCATION TO BE
COORDINATED WITH COR AND
WING 4B TO ALLOW NEEDED
ACCESS THROUGH CORRIDOR FOR
PATIENT, STAFF, RAPID RESPONSE
TEAM AND GURNEY/EQUIPMENT,
ETC.
T4B-C2.1
A
CONTRACTOR ACCESS
FOR PHASE 2
CONSTRUCTION ANTE ROOM
A
SHEET LEGEND:
LIMITS OF PROJECT/CONSTRUCTION
UNDER THIS CONTRACT
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
KEY PLAN
PROJECT AREA - WING 4B
4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:5
P
M
BID DOCUMENTS
7/17/2024
PHASING PLAN
G1.00
UPDATE WING 4B
KZJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
GENERAL NOTES:
1/8" = 1'-0"
PHASING PLAN - WING 4B - PHASE 3
PHASING NOTES:
1. THE CONTRACTOR SHALL ACCOMPLISH THE WORK FOR EACH PHASE WITH MINIMAL INTERRUPTIONS AND AGITATION OF PATIENTS. IF PATIENTS BECOME AGITATED, WORK WILL BE SUSPENDED AND MAY
START AGAIN WITH APPROVAL OF THE CO,CS, COR OR THE NURSE MANAGER.
2. THE GENERAL CONTRACTOR SHALL OBTAIN THE ICRA AND ILSM FORMS FROM THE VA SAFETY FOR EACH WORK AREA AND/OR PHASE OF WORK.
3. THE PROVIDED PHASING PLAN AND NOTES ARE GENERAL IN NATURE BUT REFLECT THE VA REQUIREMENTS FOR THE PROJECT. THE GENERAL CONTRACTOR SHALL PROVIDE THE FINAL PHASING PLAN AND
CPM SCHEDULE, PROCURE THE VA’S AGREEMENT OF THOSE PLANS, AND BE RESPONSIBLE FOR RECOGNIZING AND SCHEDULING ALL ASPECTS OF THE WORK WITH THE VA. ALL PHASES SHALL BE APPROVED BY THE VA/COR BEFORE COMMENCEMENT OF WORK AND BE UPDATED AS WORK PROCEEDS. THE VA MUST BE NOTIFIED IN WRITING OF ANY UNFORESEEN DELAYS.
4. THE MEDICAL CENTER MUST MAINTAIN ITS OPERATION 24 HOURS A DAY 7 DAYS A WEEK. THEREFORE, ANY INTERRUPTION IN SERVICE MUST BE SCHEDULED AND COORDINATED WITH THE COR TO ENSURE THAT NO LAPSES IN OPERATION OCCUR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A WORK PLAN AND SCHEDULE DETAILING, AT A MINIMUM, THE PROCEDURES TO BE EMPLOYED, THE EQUIPMENT AND MATERIALS TO BE USED, THE INTERIM LIFE SAFETY MEASURE TO BE USED DURING THE WORK, AND A SCHEDULE DEFINING THE DURATION OF THE WORK WITH MILESTONE SUBTASKS. THE WORK TO BE OUTLINED SHALL BE COORDINATED WITH VA COR TO PROTECT PATIENT SAFETY FOR ALL PHASES OF WORK.
5. CONTRACTOR SHALL FURNISH THE COR WITH A SCHEDULE OF APPROXIMATE PHASING DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF THE BUILDING OR PORTION THEREOF. THE VA WILL REVIEW THE PROJECT WORK DATES FOR APPROVAL AND NOTICE OF WORK. IF PROPOSED DATES DO NOT WORK, THE VA SHALL PROVIDE DATES FOR ACCOMPLISHMENT OF WORK IN SPECIFIC AREA OF THE PROJECT. IN ADDITION, THE CONTRACTOR SHALL NOTIFY THE COR TWO WEEKS IN ADVANCE OF COMPLETION OF WORK IN SPECIFIC AREA OR PHASE.
6. CONTRACTOR'S SCHEDULE HAS TO INCLUDE VA MOVE TIME.
7. THE PROJECT DURATION HAS 90 DAYS INCLUDED IN THE BEGINNING OF THE JOB FOR THE GENERAL CONTRACTOR AND SUBCONTRACTORS TO COORDINATE WITH THE VA FOR ID BADGES. BACKGROUND
CHECKS, ETC. WILL NEED TO BE COMPLETED FOR ID BADGING. NO CONTRACTOR SHALL BE ABLE TO BE ON A JOB SITE WITHOUT THE OFFICIAL ID BADGE. TRAINING IS REQUIRED FOR ALL CONTRACTORS WHO
WISH TO ACCESS THE SITE.
8. REMODEL WING 4B – PHASING SCHEDULE STANDARD WORK HOURS FOR THE FARGO VA MEDICAL CENTER ARE MONDAY–FRIDAY, 8:00 A.M. TO 4:00 P.M. AFTER HOURS WORK MAY BE REQUIRED BY THE CONTRACTOR PENDING NOISE, VIBRATION OR OTHER CONSTRUCTION IMPACTS THAT WOULD LIMIT CARE TO PATIENTS.
9. ANY CONTRACTOR WORKING ON SITE SHALL CHECK IN AND OUT OF WING 4B WITH THE CHARGE NURSE AND WILL CREATE AN INVENTORY SHEET FOR ANYTHING BROUGHT ONTO WING 4B. CONTRACTORS SHALL ONLY BRING WHAT IS ACTUALLY NEEDED SINCE EACH ITEM NEEDS TO BE ACCOUNTED FOR WHETHER INSTALLED BY CONTRACTOR OR BEING TAKEN OFF THE SITE WHEN WORK IS DONE. THE INVENTORY SHEET SHALL BE CHECKED AGAINST THE INVENTORY SHEET GENERATED WHEN THE CONTRACTOR ENTERED THE SITE. EVERYTHING SHALL BE ACCOUNTED FOR BEING BROUGHT OFF SITE OR
INSTALLED DOWN TO INDIVIDUAL SCREWS.
10. IF THE GENERAL CONTRACTOR NEEDS TO ACCESS ANY AREA OUTSIDE OF THE PHASE WHERE THE STAIRWELL CANNOT BE ACCESSED TO THE PHASE AND NEEDS TO BE IN AN AREA WHERE PATIENTS ARE PRESENT, FOR THESE SITUATIONS THE CONTRACTOR WILL NEED TO ACCESS THROUGH THE MAIN SALLY PORT DOORS OF WING 4B AND SHALL GO THROUGH ALL THE PROCEDURES, CHECKS, TRAINING, AND
INVENTORY SHEETS TO ACCESS WORK.
11. CONTRACTOR SHALL NOT DRILL ANY HOLES INTO FLOOR TO SECURE TEMPORARY CONSTRUCTION PARTITIONS.
PRE-CONSTRUCTION PHASING ACTIVITIES:
• IT IS THE INTENT THAT THE MENTAL HEALTH DEPARTMENT SHALL STAY OPERATIONAL DURING THE COURSE OF THIS CONSTRUCTION PROJECT. ESTABLISH CONTRACTOR STAGING AREA IN COORDINATION
WITH THE COR ON STATION.
• SUBMIT PROJECT SCHEDULE TO THE COR. IDENTIFY ALL TRADES THAT WILL BE NECESSARY TO COMPLETE DEMOLITION EFFICIENTLY AND CONCURRENTLY.
• INSTALL TEMPORARY ONE-HOUR FIRE RATED CONSTRUCTION BARRIERS TO SEPARATE AREAS OF CONSTRUCTION ACTIVITY FROM ADJACENT AREAS OF THE LOCKED WARD THAT WILL REMAIN OCCUPIED
AND OPERATIONAL.
• ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK PROOF, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL
INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK.
• INSTALL HEPA FILTERS AND SEAL PROJECT BOUNDARY TO ENSURE NEGATIVE AIR PRESSURE AS PER INFECTION CONTROL REQUIREMENTS. OBTAIN FROM THE VA A PRE-CONSTRUCTION RISK ASSESSMENT
AS PER VA REQUIREMENTS.
• PROTECT ALL ITEMS AND EQUIPMENT NOTED TO REMAIN AS NECESSARY. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE EXISTING CONDITION AND REPAIR ANY DAMAGE TO PRE-
CONSTRUCTION CONDITION PRIOR TO PROJECT COMPLETION.
PHASE 1
• THE GENERAL CONTRACTOR SHALL USE STAIRWELL #14 FOR ENTERING AND LEAVING THE PROJECT WORK AREA FOR PHASE 1. THIS INCLUDES REMOVING DEMOLITION MATERIALS AND TRANSPORTING NEW
MATERIALS TO THE PHASE 1 WORK AREA.
• CONSTRUCT TEMPORARY SALLY PORT WITH ALL ELECTRICAL AND SECURITY MEASURES AND HARDWARE. COODINATE WITH FARGO VA.
• AT THE NURSE STATION, THE CONTRACTOR SHALL WORK WITH THE VA COR TO DETERMINE WORK AREA SIZE AND LOCATION OF THE CONSTRUCTION BARRIER.
• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 1.
• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION DESIGNATED BY THE COR (ON-SITE). IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RELOCATE SALVAGED
ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION CONDITION.
• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR DEMOLITION.
• PERFORM DEMOLITION OF AREAS WITHIN PHASING AREA IN OCCUPIED WORK AREA. COORDINATE TIME OF DEMOLITION WITH THE COR.
• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF FINISH FLOORING SEALANT.
• INSTALL NEW ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.
• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR INSTALLED ITEMS INDICATED IN THE DOCUMENTS
• COMPLETE FINISH AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING AS NECESSARY.
• TURN THE NEWLY REMODELED SPACE OVER TO THE WING 4B.
1/8" = 1'-0"
ENLARGED PLAN - WING 4B - PHASE 1
1/8" = 1'-0"
ENLARGED PLAN - WING 4B - PHASE 2
PHASE 2
• THE GENERAL CONTRACTOR SHALL USE STAIRWELL #15 FOR ENTERING AND LEAVING THE PROJECT WORK AREA FOR PHASE 2. THIS INCLUDES REMOVING DEMOLITION MATERIALS AND TRANSPORTING NEW
MATERIALS TO THE PHASE 2 WORK AREA.
• AT THE NURSE STATION, THE CONTRACTOR SHALL WORK WITH THE VA COR TO DETERMINE WORK AREA SIZE AND LOCATION OF THE CONSTRUCTION BARRIER.
• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 2.
• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION DESIGNATED BY THE COR (ON-SITE).
• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION CONDITION.
• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR DEMOLITION.
• PERFORM DEMOLITION OF AREAS OUTSIDE OF PHASING AREA IN OCCUPIED WORK AREA. COORDINATE TIME OF DEMOLITION WITH COR.
• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF FINISH FLOORING SEALANT.
• INSTALL NEW ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.
• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR INSTALLED ITEMS INDICATED IN THE DOCUMENTS.
• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING AS NECESSARY.
• COMPLETE DEMO AND FINISHES INSTALLATION IN CORRIDOR 4B-C1 OUTSIDE OF LOCKED WARD SALLY PORT AT THE END OF PHASE 2.
• REMOVE TEMPORARY SALLY PORT AT THE END OF PHASE 2.
• TURN THE NEWLY REMODELED SPACE OVER TO THE FARGO VA WING 4B.
N N
N
PHASE 3
• THE GENERAL CONTRACTOR SHALL USE STAIRWELL #14 FOR ENTERING AND LEAVING THE PROJECT WORK AREA FOR PHASE 3. THIS INCLUDES REMOVING DEMOLITION MATERIALS AND TRANSPORTING NEW
MATERIALS TO THE PHASE 3 WORK AREA.
• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 3.
• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION DESIGNATED BY THE COR (ON-SITE).
• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION CONDITION.
• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR DEMOLITION.
• PERFORM DEMOLITION OF AREAS OUTSIDE OF PHASING AREA IN OCCUPIED WORK AREA. COORDINATE TIME OF DEMOLITION WITH COR.
• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF FINISH FLOORING SEALANT.
• INSTALL NEW ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.
• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR INSTALLED ITEMS INDICATED IN THE DOCUMENTS.
• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING AS NECESSARY.
• COMPLETE DEMO AND FINISHES INSTALLATION IN CORRIDOR 4B-C1 OUTSIDE OF LOCKED WARD SALLY PORT AT THE END OF PHASE 3.
• TURN THE NEWLY REMODELED SPACE OVER TO THE FARGO VA WING 4B.
SECURITY NOTE: ALL CONTRACTOR
STAFF IS REQUIRED TO CHECK IN
AND OUT WITH THE CHARGE NURSE
DAILY AND ENTER AND EXIT
THROUGH THE MAIN CORRIDOR
SALLY PORT. CONTRACTOR WILL
ALSO BE REQUIRED TO PROVIDE AN
ONGOING INVENTORY OF ALL
MATERIALS AND EQUIPMENT
BROUGHT INTO AND OUT OF THE
CONSTRUCTION ZONE. THIS
INVENTORY CONTROL WILL BE
REQUIRED TO BE IN WRITTEN FORM
AND GIVEN TO THE CHARGE NURSE
IN ORDER TO MAINTAIN
CONSISTENT VIGILANT INVENTORY
OF ANY ITEM USED FOR THE
PURPOSES OF THIS PROJECT.
COVER WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE
THAN ONE).
1-HR FIRE RATED
LOCKED DOOR AND
HARDWARE.
(CONSTRUCTION SITES
MUST REMAIN SECURE
AT ALL TIMES.
FIRE PULL
STATION WITH
AUDIO / VISUAL
(ONLY IF EXISTING)
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
AS NECESSARY TO
MAINTAIN CLEANLINESS).
NO STICKY MAT ON
PATIENT SIDE OF ROOM.
PROVIDE OTHER MEANS
OF DUST CONTROL IN
COORDINATION WITH VA.
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
G2.00
RE-CIRCULATING HEPA
NEGATIVE AIR UNIT
* ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK.
3' - 0"
V .I
.F
E X
IS
T
IN
G
W A
L L
V .I
.F
E X
IS
T
IN
G
W A
L L
RE-CIRCULATING
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED MUST BE
PROTECTED. COVER WITH ROSIN PAPER / FIRE
RATED PLYWOOD
* ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR
TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK.
A P
P R
O X
A .F
.F
POST ICRA, ILSM,
FIRE INSPECTION
SHEETS VISIBLE TO
PUBLIC
1-HR FIRE RATED LOCKED DOOR AND
HARDWARE. DOORS MUST ALSO
MAINTAIN A SECURED 1-HR
TEMPORARY CONSTRUCTION BARRIER.
NEGATIVE PRESSURE
LOG WITH HOURLY
CHECKED AND SIGNITURE
ELECTRONIC NEGATIVE AIR
MONITORING STATION WITH
ALARM. MUST MAINTAIN AT
LEAST -0.01" WC NEGATIVE
PRESSURE TO OCCUPIED AREA.
CONSTRUCTION SIGN
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.01 FOR GENERAL NOTES.
4 7/8"
A
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
UNDERSIDE OF
EXISTING DECK
FIRE RESISTANT SEALANT,
BOTH SIDES
EXISTING CEILING SYSTEM
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
3 5/8" 20 GAUGE METAL
STUDS AT 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
** ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR
TO CONSTRUCTION WORK STARTING IN EACH OF PHASE OF WORK.
DO NOT DRILL INTO
EXISTING FLOOR
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
KEY PLAN
PROJECT AREA - WING 4B
4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:5
P
M
BID DOCUMENTS
7/17/2024
INFECTION CONTROL RISK
ASSESSMENT
G2.00
UPDATE WING 4B
KZJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
1. SEE SHEET G-100 FOR PHASING PLANS AND DESCRIPTIONS.
2. SEE PHASING PLANS FOR TEMPORARY CONSTRUCTION BARRIER LOCATIONS AS
IT RELATES TO ICRA.
3. WORK REQUIRED BY INFECTION CONTROL SHALL BE PERFORMED FOR EACH
PHASE OF THE PROJECT.
4. ALL APPLICABLE PERMITS AND COR APPROVALS SHALL BE COMPLETED PRIOR TO
BEGINNING ANY WORK FOR EACH PHASE. PERMITS INCLUDE ICRA, INTERIM LIFE
SAFETY MEASURES, ABOVE CEILING FIRE / SMOKE WALL, UTILITY, FIRE ALARM
SYSTEM, MEDICAL GASES AND CONFINED SPACES.
5. THE GENERAL CONTRACTOR SHALL OBTAIN THE ICRA,ISLM, PCRA FORMS PRIOR
TO WORK STARTING FROM THE COR AND VA SAFETY FOR EACH WORK AREA
AND/OR PHASE OF WORK. SEE SPECIFICATIONS FOR ICRA AND PCRA EXAMPLE
BLANK FORMS.
6. REFER TO SHEET G2.00 FOR ICRA TEMPORARY WALLS A AND B.
SHEET SPECIFIC NOTES:
GENERAL NOTES:
1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
1/2" = 1'-0"
CROSS SECTION 'A'
1/2" = 1'-0"
INTERIOR ELEVATION
1. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED
PRIOR TO BEGINNING OTHER WORK.
2. ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE
LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT
SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE
TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH
AREA OR PHASE OF WORK.
3. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF
THE FLOOR.
4. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA
SAFETY GROUP.
5. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND
WHEN FIRE ALARM OR SPRINKLER SYSTEMS ARE IMPAIRED MORE THAN 4 HOURS IN
A 24 HOUR PERIOD.
6. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7),
WHETHER OCCUPIED OR NOT, THROUGHOUT DURATION OF PROJECT USING HEPA
EQUIPPED AIR FILTRATION UNITS.
7. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
8. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE
MEDICAL CENTER; NO HVAC RETURN OR EXHAUST SHALL PASS INTO THE AREAS
OUTSIDE THE CONSTRUCTION AREA.
9. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY
DO NOT EXIT THROUGH THE CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS
INTO THE CONSTRUCTION AREA THAT READ: "CONSTRUCTION AREA -DO NOT
ENTER". THIS INCLUDES ALL LIFE SAFETY DEVICES FOR TEMPORARY CHANGE TO
EMERGENCY SERVICES.
10. THE CONTRACTOR SHALL MEET WITH VA SAFETY FOR EACH PHASE AREA, PRIOR TO
BEGINNING WORK, TO REVIEW CORRECT EXIT SIGNAGE FOR CHANGES IF
NECESSARY. IF EXIT SIGNS MUST BE MOVED OR TAKEN OUT OF SERVICE, THE EXIT
SIGNS MUST BE COVERED FULLY SO AS TO NOT BE VISIBLE FROM ANY ANGLE.
11. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT
WORK PERMIT ON SITE.
12. WHERE REQUIRED, TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE THEY REMAIN
EFFECTIVE. TACKY MATS SHALL NOT BE PROVIDED AT AREAS INSIDE PATIENT
AREAS.
13. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT
CONTAMINATION OF EXISTING DUCT SYSTEMS.
14. OBTAIN INFECTION CONTROL PERMIT FROM VA PRIOR TO BEGINNING WORK.
15. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT
CONTAMINATION OF EXISTING DUCT SYSTEM.
16. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLASTIC, TO SEAL AREA FROM
NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT BEFORE CONSTRUCTION BEGINS.
17. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION
AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE
CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE
FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC
SYSTEM. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS
PERFORMED.
18. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS
APPROPRIATELY AND IMMEDIATELY TO MAINTAIN FIRE RATING DUST PROTECTION
AND NEGATIVE AIR PRESSURE.
19. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE
ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BE VACUUMED
WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK
SITE (VA DOES NOT PROVIDE).
A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.
B. DIRECT ACCESS TO OUT THROUGH ANTEROOM (EXIT/ENTRANCE)
20. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED
AND INSPECTION BY VA SAFETY PERSONNEL, INFECTION CONTROL GROUP, AND
COR.
21. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION. CONTAIN CONSTRUCTION WASTE
BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
22. FOLLOW FARGO VA FACE MASK POLICY.
INFECTION CONTROL NOTES -
CLASS IV CONSTRUCTION:
1-HR TEMPORARY WALL TYPES
* ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK. ALL MONITORS, CONSTRUCTION SIGNS, LOG SHEETS, AND INSPECTION SHEET SHALL BE PLACED ON THE INSIDE OF TEMPORARY WALL/ROOM AWAY FROM PATIENTS.
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.01 FOR GENERAL NOTES.
STORAGE
4B-55A
LAUNDRY
4B-55
STAIRWELL #14
S14-4
1 BED
4B-57
TOILET
4B-57A
TOILET
4B-59A
1 BED
4B-59
TOILET
4B-63A
1 BED
4B-63
DINING /
ACTIVITIES
4B-65
CORRIDOR
4B-C5
1 BED
4B-58
TOILET
4B-58A
TOILET
4B-60A
1 BED
4B-60
SOILED
4B-62
ANTE
4B-64
TOILET
4B-64B
SECLUSION
4B-64A
NURSE STATION
4B-70
TOILET
4B-70A
NURSE LOUNGE
4B-70B
1 BED
4B-72
TOILET
4B-72A
TOILET
4B-74A
1 BED
4B-74
1 BED
4B-76
TOILET
4B-76A
1 BED
4B-75
TOILET
4B-75A
TOILET
4B-73A
1 BED
4B-73
STAIRWELL #15
S15-4
MECH/ELEC
4B-71
CLEAN
4B-49
SOILED
4B-47
CORRIDOR
4B-C4
C O
R R
ID
O
R
B
-C
NURSE MANAGER
4B-45
EXAM ROOM
4B-43
ACTIVITY / DINING
ROOM
4B-40
SALLY PORT
4B-C2
NUTRITION
4B-42
PSYCH RES
4B-44
PSYCH OFFICE
4B-46
REPORT
4B-48
HAC
4B-50
STORAGE
4B-66
NOURISH.
4B-67
CORRIDOR
4B-C1
B
-5
B
-5
B
-6
B
-5
B
-6
B
-7
4B-73A
B
-7
B
-7 A
B
-7
B
-7
4B-74A
4B-72A
B
-7
TRAVEL DISTANCE = 98' - 0"
T R
A V
E L
D
IS
T A
N C
E
PROVIDED CLEAR DOOR WIDTH (INCHES)
MAX OCCUPANT LOAD CAPACITY (NO. OF PEOPLE)
EXIT DOOR TAG
LINE TYPES FOR MEANS OF EGRESS:
TD #
TRAVEL DISTANCE
EXIT DISCHARGE
WALL RATING LEGEND:
1 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
2 HOUR FIRE BARRIER
LIFE SAFETY SYMBOLS:
SMOKE RESISTIVE HAZARDOUS ROOM
ENCLOSURE
SHEET LEGEND:
LIMITS OF PROJECT/CONSTRUCTION
UNDER THIS CONTRACT
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
KEY PLAN
PROJECT AREA - WING 4B
4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:0
P
M
BID DOCUMENTS
7/17/2024
LIFE SAFETY PLAN
G3.00
UPDATE WING 4B
KZJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
GENERAL NOTES:
1/8" = 1'-0"
LIFE SAFETY PLAN - WING 4B
DW
Micro
UP
DN
DN
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.01 FOR GENERAL NOTES.
STORAGE
4B-55A
LAUNDRY
4B-55
STAIRWELL #14
S14-4
1 BED
4B-57
TOILET
4B-57A
TOILET
4B-59A
1 BED
4B-59
TOILET
4B-63A
1 BED
4B-63
DINING /
ACTIVITIES
4B-65
CORRIDOR
4B-C5
1 BED
4B-58
TOILET
4B-58A
TOILET
4B-60A
1 BED
4B-60
SOILED
4B-62
ANTE
4B-64
TOILET
4B-64B
SECLUSION
4B-64A
NURSE STATION
4B-70
TOILET
4B-70A
NURSE LOUNGE
4B-70B
1 BED
4B-72
TOILET
4B-72A
TOILET
4B-74A
1 BED
4B-74
1 BED
4B-76
TOILET
4B-76A
1 BED
4B-75
TOILET
4B-75A
TOILET
4B-73A
1 BED
4B-73
STAIRWELL #15
S15-4
MECH/ELEC
4B-71
CLEAN
4B-49
SOILED
4B-47
CORRIDOR
4B-C4
CORRIDOR
4B-C3
NURSE MANAGER
4B-45
EXAM ROOM
4B-43
ACTIVITY / DINING
ROOM
4B-40
SALLY PORT
4B-C2
NUTRITION
4B-42
PSYCH RES
4B-44
PSYCH OFFICE
4B-46
REPORT
4B-48
HAC
4B-50
STORAGE
4B-66
NOURISH.
4B-67
CORRIDOR
4B-C1
02-06
02-31
02-30
02-01 02-45
02-15
02-15
02-85
02-85
02-85
02-92
02-61
02-61
02-93
02-94
02-31
02-30 02-30
02-30
02-30
02-11
02-11
02-11
02-22
02-02
02-11
02-14
02-99
02-02
02-11
02-22
02-16
02-14
02-75
02-75
02-16
02-11
02-02
02-22
02-75
02-30
02-11
02-16
02-02
02-22
02-01 02-14
02-90
02-14
02-11
02-45
02-91 02-1402-14
02-11
02-11
02-11
02-99
02-10
02-10
02-10
02-11
02-13
02-90
02-91
02-13
02-13
02-13
02-17
02-16
02-10
02-10
02-13
02-99
02-13
02-92 02-70
02-1702-17
02-1402-14
02-85
02-99
02-99
02-13
02-22
02-16
02-02
02-75
02-30
02-1302-16
02-22
02-02
02-75
02-01 02-01
02-16 02-17
02-75
02-22
02-02
02-01
02-13
02-16
02-30
02-02
02-22
02-30
02-13
02-16
02-75
02-22
02-16
02-13
02-02
02-75
02-70
02-01
02-30
02-70 02-13
02-99
02-99
02-99
02-99
02-10
02-12
02-11
02-17
02-16 02-0102-01
02-11
02-02
02-22
02-16
02-75 02-75
02-16
02-01 02-1102-01
02-18
02-60
02-60
02-60
02-60
02-60 02-60
02-60
02-6002-60 02-60
02-62
02-62
02-61
02-61 02-62
02-62
02-7002-70
02-9502-95
02-41 02-41
02-41
02-4202-41
02-43
02-43
02-43
02-4302-43
02-04 02-04
02-04
02-04
02-06
02-04
02-18
02-18
02-18
02-18
02-04
02-06
02-18 02-18
02-04
02-15
02-4102-41
02-41
02-41
02-42
02-96
02-42
02-93
WALL RATING LEGEND:
1 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
2 HOUR FIRE BARRIER
SHEET LEGEND:
LIMITS OF PROJECT/CONSTRUCTION
UNDER THIS CONTRACT
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
KEY PLAN
PROJECT AREA - WING 4B
4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:4
P
M
BID DOCUMENTS
7/17/2024
DEMOLITION PLAN
AD1.00
UPDATE WING 4B
KZ, TBJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
GENERAL NOTES:KEYNOTES:
02-01 REMOVE EXISTING DOOR LATCH AND LOCK, ALL OTHER DOOR
HARDWARE TO REMAIN
02-02 REMOVE EXISTING VINYL/VELCRO SSPD DOOR
02-04 REMOVE EXISTING COVER TO HINGE AT NON-OPERABLE LEAF
OF EXISTING DOOR. PREP FOR NEW ANTI-LIGATURE COVER
PLATE. SEE DOOR SCHEDULE FOR NEW HARDWARE.
02-06 REMOVE EXISTING EXPANSION PLATE COVER, SALVAGE FOR
RE-INSTALLATION
02-10 REMOVE EXISTING CARPET
02-11 REMOVE EXISTING SHEET FLOORING
02-12 EXISTING CERAMIC FLOOR TILE AND WALL TILE TO REMAIN
02-13 REMOVE EXISTING VCT FLOORING
02-14 REMOVE EXISTING CORNER GUARD
02-15 REMOVE EXISTING WOOD SHELF
02-16 REMOVE EXISTING CRASH RAIL
02-17 REMOVE EXISTING HANDRAIL
02-18 EXISTING HAND PAINTED SIGNAGE TO REMAIN AT PAINTED
WALLS. FILL AND PRIME OVER EXISTING.
02-22 REMOVE EXISTING PATIENT ROOM SINK AND BASE SHROUD,
SALVAGE SINK AND SHROUD FOR RE-INSTALLATION
02-30 REMOVE EXISTING 10"X10" FLUSH ACCESS PANEL
02-31 REMOVE EXISTING 22"X22" FLUSH ACCESS PANEL
02-41 EXISTING WALL CABINETS TO BE REMOVED AND SALVAGE FOR
INSTALLATION BY THE GC.
02-42 EXISTING BASE CABINETS AND COUNTERTOPS TO REMAIN.
02-43 REMOVE EXISTING COUNTERTOP AND SALVAGE FOR
REINSTALL BY GC. WALL TRACK TO REMAIN.
02-45 REMOVE AND SALVAGE EXISTING LOCKERS
02-60 REMOVE EXISTING BOLTED DOWN PATIENT BED
02-61 REMOVE EXISTING BOLTED DOWN DINING TABLE
02-62 REMOVE EXISTING PATIENT DINING CHAIRS
02-70 REMOVE EXISTING VINYL WALL COVERING, PATCH AND REPAIR
GYPSUM BOARD WHERE PAPER IS DAMAGED
02-75 EXISTING RESINOUS FLOOR AT PATIENT BEDROOM TOILETS
TO REMAIN
02-85 EXISTING TERAZZO FLOORING INLAY AT BASE TO REMAIN
02-90 EXISTING WHITE BOARD TO REMAIN. CONTRACTOR TO
PROTECT AND PAINT AROUND EXISTING WHITEBOARD
COATING
02-91 EXISTING TV TO REMAIN, CONTRACTOR TO PROTECT AND
PAINT AROUND EXISTING TV
02-92 EXISTING MOBILE SHELVES, RELOCATED BY VA
02-93 EXISTING WALL MOUNTED SHELVES TO REMAIN
02-94 EXISTING LOCKED CABINET, RELOCATED BY VA
02-95 EXISTING WASHER AND DRYER, TO BE RELOCATED BY VA.
02-96 EXISTING KITCHEN APPLIANCES TO BE RELOCATED BY THE VA
02-99 NO WORK IN THIS ROOM EXISTING FINISHES TO REMAIN, DOOR
HARDWARE TO REMAIN
SHEET SPECIFIC NOTES:
1/8" = 1'-0"
DEMOLITION PLAN - WING 4B
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND
VERIFY EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL INSPECT AND
FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING
ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING,
OR PATCHING. VISITS MUST BE COORDINATED AND PRE-APPROVED WITH PROJECT
COR AND NURSE MANAGER.
2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION AND INTENT. THE
CONTRACTOR SHALL COORDINATE DEMOLITION WITH NEW CONSTRUCTION TO
ENSURE QUALITY OF FINAL PRODUCT.
3. DASHED LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING:
CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR
SUSPENDED EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS
AND GRILLES ETC.; FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET,
RESILIENT TILE, SHEET VINYL AND ACCESS DOORS.
4. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION BETWEEN ALL TRADES.
NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.
5. REFER TO PHASING SHEET FOR PROJECT PHASING AND SEQUENCE OF WORK. ALL
DEMOLITION AND REMODEL WORK MUST BE CLOSELY COORDINATED WITH THE
COR.
6. THE GENERAL CONTRACTOR SHALL INSPECT AND FIELD VERIFY EXISTING
CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING ELEMENTS SUBJECT TO
DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING OR PATCHING.
7. MATERIAL PRODUCT FROM DEMOLITION SHALL BECOME THE PROPERTY AND
RESPONSIBILITY OF THE CONTRACTOR WITH THE EXCEPTION OF SPECIFIED ITEMS
DESIGNATED EITHER IN THE PLANS OR VERBALLY REQUESTED BY THE (COR) TO BE
RETAINED BY THE VA.
8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE DISPOSED OF LAWFULLY.
9. DEMOLITION MATERIALS SHALL BE REMOVED FROM SITE ON A DAILY BASIS.
COORDINATE WITH THE COR THE IDENTIFICATION AND TRANSFER OF ANY ITEMS
THAT NEED TO BE SALVAGED.
10. VERIFY LOCATION OF EXISTING UTILITY LINES PRIOR TO STARTING DEMOLITION.
MAY NOT BE LIMITED TO UTILITIES SHOWN ON ARCHITECTURAL, MECHANICAL,
PLUMBING, AND ELECTRICAL PLANS. REFER TO THE THESE DRAWINGS FOR
ADDITIONAL INFORMATION.
11. UPON ENCOUNTERING UNFORESEEN CONDITIONS DURING REMODEL WORK, THE
CONTRACTOR SHALL NOTIFY THE COR BEFORE PROCEEDING.
12. COORDINATE DEMOLITION SHOWN ON THIS SHEET WITH DEMOLITION SHOWN ON
MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS. CREATE PENETRATIONS
AS REQUIRED FOR NEW CONSTRUCTION ON MECHANICAL AND ELECTRICAL
DRAWINGS.
13. THE CONTRACTOR SHALL PROTECT EXISTING CONSTRUCTION TO REMAIN. DAMAGE
TO EXISTING CONSTRUCTION SHALL BE REPAIRED TO EXISTING OR BETTER
CONDITION.
14. ERECT AND MAINTAIN TEMPORARY PARTITIONS AND ENCLOSURES TO PREVENT
THE TRANSMISSION OF DUST, ODOR, AND NOISE.
15. PROVIDE TEMPORARY MECHANICAL EXHAUST SYSTEMS TO MAINTAIN A NEGATIVE
PRESSURE WITHIN DEMOLITION ZONES.
16. CONTRACTOR SHALL PROVIDE TEMPORARY SEAL AT ALL DOOR AND WALL
OPENINGS AT PERIMETER WALLS DURING DEMOLITION WORK TO PROTECT
ADJACENT AREAS FROM DUST INTRUSION.
17. SOLID SHADED (GRAY) REGIONS DEPICT EXISTING CONSTRUCTION TO REMAIN OR
ITEMS/AREAS OUTSIDE OF SCOPE.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR MOVING/RELOCATING ALL
FURNISHINGS, FURNITURE, AND NON PERMANENTLY ATTACHED EQUIPMENT PRIOR
TO COMMENCEMENT OF DEMOLITION. CONTRACTOR SHALL COORDINATE WITH
COR ON LOCATION OF STORED FURNISHINGS.
19. CAP/ABANDON ALL UTILITIES NOT REMOVED TO MAKE ROOM FOR NEW
CONSTRUCTION AS REQUIRED. COORDINATE WITH PROPOSED NEW
CONSTRUCTION CONDITIONS.
20. ALL INFILL AND PATCHWORK SHALL MATCH ADJACENT SURFACES IN FINISH AND
TEXTURE. ITEMS TO INCLUDE, BUT NOT LIMITED TO, WALLS, CEILINGS, AND
FLOORING. MATCH NEW ADJACENT FINISHES WHERE PRESENT. SEE ROOM FINISH
SCHEDULE.
21. DEMOLITION PLANS SHOW EXISTING ROOM NAMES AND NUMBERS. EXISTING ROOM
SIGNS ARE PAINTED ON WALL. SEE INTERIOR SHEETS AND SPECIFICATIONS FOR
PROCEDURE TO MATCH EXISTING.
22. REMOVE ALL EXISTING WALL MOUNTED ROOM ACCESSORIES, TOILET
ACCESSORIES, CEILING EQUIPMENT COVER AND PLATE, AND ELECTRICAL AND
DATE COVER PLATES FOR PAINTING AND REINSTALL.
23. REMOVE ALL WALL ARTWORK AND SALVAGE TO OWNER.
24. REMOVE ALL WALL MOUNTED ROOM ACCESSORIES (CHART FILES, WHITE BOARDS,
CLOCKS, TACK BOARDS, GLOVE BOXES HOLDERS, FIRE EXTINGUISHERS, SHARPS
CONTAINERS, ETC...) SHALL BE REMOVED, SALVAGED, AND REINSTALLED BY THE
GENERAL CONTRACTOR.
25. WORK THAT RESULTS IN NOISE AND VIBRATION MUST BE COORDINATED WITH
ADJACENT AREAS WITHIN THE HOSPITAL PRIOR TO WORK. WORK HOURS WILL BE
WEEK DAYS DURING BUSINESS HOURS OR WEEKENDS.
26. CONTRACTOR SHALL COORDINATE WITH THE VA FOR ALL VA EQUIPMENT ITEMS
NOT INDICATED ON THIS SHEET THAT IS TO BE RELOCATED BY VA PRIOR TO
DEMOLITION WORK.
27. WALL MOUNTED PERSONAL ITEMS LOCATED IN OFFICES, BREAK ROOM, AND NURSE
STATION SHALL BE REMOVED BY VA.
28. VA WILL REMOVE ALL APPLIANCES.
N
ABBREVIATION LEGEND:
V/V: VA PROVIDED, VA INSTALLED
V/C: VA PROVIDED, CONTRACTOR INSTALLED
C/C: CONTRACTOR PROVIDED, CONTRACTOR INSTALLED
STAIRWELL #14
S14-4
1 BED
4B-57
TOILET
4B-57A
TOILET
4B-59A
1 BED
4B-59
TOILET
4B-63A
1 BED
4B-63
DINING /
ACTIVITIES
4B-65
CORRIDOR
4B-C5
1 BED
4B-58
TOILET
4B-58A
TOILET
4B-60A
1 BED
4B-60
SOILED
4B-62
ANTE
4B-64
TOILET
4B-64B
SECLUSION
4B-64A
NURSE STATION
4B-70
TOILET
4B-70A
NURSE LOUNGE
4B-70B
1 BED
4B-72
TOILET
4B-72A
TOILET
4B-74A
1 BED
4B-74
1 BED
4B-76
TOILET
4B-76A
1 BED
4B-75
TOILET
4B-75A
TOILET
4B-73A
1 BED
4B-73
STAIRWELL #15
S15-4
MECH/ELEC
4B-71
CLEAN
4B-49
SOILED
4B-47
CORRIDOR
4B-C4
CORRIDOR
4B-C3
NURSE MANAGER
4B-45
EXAM ROOM
4B-43
ACTIVITY / DINING
ROOM
4B-40
SALLY PORT
4B-C2
NUTRITION
4B-42
PSYCH RES
4B-44
PSYCH OFFICE
4B-46
REPORT
4B-48
HAC
4B-50
STORAGE
4B-66
NOURISH.
4B-67
CORRIDOR
4B-C1
STORAGE
4B-55A
LAUNDRY
4B-55
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0" 02-52
02-52
02-52
02-52
02-52
7' - 11"
02-31
02-32
02-32
02-31
02-31
02-32
02-31
02-32
02-32 02-32 02-32
02-31
02-32
02-31
02-32
02-32
02-32
02-31
02-3202-32 02-31
02-32
02-32
02-31
02-3202-32
02-32
02-31
02-32
02-31
02-31
02-32
02-52
02-52 02-52
02-52
02-52
02-52
8' - 0"
8' - 0"
8' - 0"
8' - 0"
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
2. SEE SHEET G0.01 FOR GENERAL NOTES.
WALL RATING LEGEND:
1 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
2 HOUR FIRE BARRIER
SHEET LEGEND:
DEMOLISH ACT CEILING SYSTEM
AREA OF WORK NOT IN THE SCOPE. EXISTING TO REMAIN
LIMITS OF PROJECT/CONSTRUCTION UNDER THIS CONTRACT
EXISTING BULKHEAD TO REMAIN UNLESS
OTHERWISE NOTED
CEILING HEIGHT
DEMOLISH 16"X16" FLUSH ACCESS PANEL, HINGE SIDE TO
MATCH EXISTING LOCATION FOR NEW ACCESS PANELS.
VERIFY IN THE FIELD.
DEMOLISH 22"X22" FLUSH ACCESS PANEL, HINGE SIDE TO
MATCH EXISTING LOCATION FOR NEW ACCESS PANELS.
VERIFY IN THE FIELD.
EXISTING GYPSUM BOARD CEILING/SOFFIT
TO REMAIN UNLESS OTHERWISE NOTED
EXISTING 2'X4' LIGHT FIXTURE TO REMAIN, SEE
ELECTRICAL DRAWINGS
EXISTING 2'X2' ACT CEILING SYSTEM TO
REMAIN UNLESS OTHERWISE NOTED
EXISTING SUPPLY DIFFUSER, SEE MECHANICAL DRAWINGS
HEIGHT
EXISTING RETURN GRILLE, SEE MECHANICAL DRAWINGS
EXISTING RADIANT PANEL, SEE MECHANICAL DRAWINGS
N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
KEY PLAN
PROJECT AREA - WING 4B
4F PROJECT NUMBER: 19.2481.A22
/1
/2
:1
:4
P
M
BID DOCUMENTS
7/17/2024
DEMOLITION REFLECTED CEILING
PLAN
AD1.10
UPDATE WING 4B
KZ, TBJL
2101 ELM STREET
FARGO, NORTH DAKOTA 58102
437-23-103
1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - WING 4B
GENERAL NOTES:KEYNOTES:
02-31 REMOVE EXISTING 22"X22" FLUSH ACCESS PANEL
02-32 REMOVE EXISTING 16"X16" FLUSH ACCESS PANEL
02-52 EXISTING ACT TO REMAIN SHEET SPECIFIC NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND
VERIFY EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL INSPECT AND
FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING
ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING, OR
PATCHING. VISITS MUST BE COORDINATED AND PRE-APPROVED WITH PROJECT COR
AND NURSE MANAGER.
2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION AND INTENT. THE
CONTRACTOR SHALL COORDINATE DEMOLITION WITH NEW CONSTRUCTION TO
ENSURE QUALITY OF FINAL PRODUCT.
3. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING:
INTERIOR PARTITIONS (REMOVE TO STRUCTURE); CEILINGS, INCLUDING CEILING
SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED EQUIPMENT,
SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.; FLOOR
FINISHES (TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .