Attachment C Construction Drawings - 38 pages.pdf

PDF 20 MB Posted

Attached to
Y1DA--437-23-103 Update Wing 4B Federal contract opportunity
Solicitation number
36C26325B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:2

P

M

BID DOCUMENTS

7/17/2024

COVER SHEET

G0.00

UPDATE WING 4B

KZJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

UPDATE WING 4B

FARGO VA HEALTH CARE SYSTEM

DEPARTMENT OF VETERAN'S AFFAIRS

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

PROJECT NO. 437-23-103

VA

U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION

# POUND OR NUMBER

& AND

@ AT

AB ANCHOR BOLT

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

AFF ABOVE FINISH FLOOR

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AISI AMERICAN IRON AND STEEL INSTITUTE

ALUM ALUMINUM

ANOD ANODIZED

ASD ALTERNATE STRESS DESIGN

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AWS AMERICAN WELDING SOCIETY

BD BOARD

BLK BLOCK

BM BEAM

B.O. BOTTOM OF

BOT BOTTOM

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BLDG BUILDING

BYND BEYOND

CAB CABINET

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CPT CARPET TILE

CRSI CONCRETE REINFORCING STEEL INSTITUTE

DBL DOUBLE

DEMO DEMOLISH OR DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DIR DIRECTION

DN DOWN

DR DOOR

DWG DRAWING

EA EACH

EE EACH END

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR OR ELEVATION

EQ EQUAL

ES EACH SIDE

EXIST EXISTING

FD FLOOR DRAIN OR FIRE DEPARTMENT

FIN FINISH

FIXT FIXTURE

FLR FLOOR

F.O. FACE OF

FT FOOT OR FEET

GA GAUGE

GR GRADE

GYP GYPSUM

HDR HEADER

HEF HORIZONTAL EACH FACE

HI HIGH

HM HOLLOW METAL

HOR HORIZONTAL

HP HIGH POINT

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

ICBO INTERNATIONAL CONFERENCE OF BUILDING

OFFICIALS

ID INSIDE DIAMETER

ILO IN LIEU OF

IN INCH

INCL INCLUDE

INSUL INSULATED OR INSULATION

INT INTERIOR

JT JOINT

K KIP (1000 POUNDS)

LP LOW POINT

LVL LEVEL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURED

MIN MINIMUM

MTL METAL

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OZ OUNCE

ABBREVIATIONS

P PAINT

PL PLATE

PLUMB PLUMBING

PLY PLYWOOD

PNL PANEL

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PT POINT

PR PAIR

PROP PROPERTY

R RADIUS

RBR RUBBER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RE RIGHT END

REF REFERENCE

REQD REQUIRED

RET RETURN

RM ROOM

R.O. ROUGH OPENING

SDI STEEL DECK INSTITUTE

SECT SECTION

SHT SHEET

SIM SIMILAR

SOG SLAB ON GRADE

SPEC SPECIFIED OR SPECIFICATION

SPK SPRINKLER OR SPEAKER

SQ SQUARE

SSTL STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIFF STIFFENER

STL STEEL

STRUCT STRUCTURE OR STRUCTURAL

SUP SUPPORT

SYM SYMMETRICAL

T&B TOP AND BOTTOM

TBD TO BE DETERMINED

TEMP TEMPERATURE

THK THICK OR THICKNESS

THRD THREADED

T.O. TOP OF

T.O.C TOP OF CONCRETE

T.O.F TOP OF FRAMING

T.O.S TOP OF STEEL/STUD

T.O.W TOP OF WALL

TYP TYPICAL

U/S UNDERSIDE

UNO UNLESS NOTED OTHERWISE

US UNDERSIDE

VB VAPOR BARRIER

VERT VERTICAL

VIF VERIFY IN FIELD

W/ WITH

WD WOOD

WDW WINDOW

WSF WELDED SHEET FLOORING

Room name

1t

VIEW NAME

1/8" = 1'-0"1 DRAWING TITLE

SCALE

BUILDING SECTION

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

WALL SECTION

DETAIL CUT

A101

DETAIL CALLOUT

A101

A101

A101

A101

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

INTERIOR ELEVATION

DRAWING NUMBER

DIRECTION OF SIGHT

SHEET NUMBER

ROOM TAG

ROOM NAME

ROOM NUMBER

KEYNOTE TAG

5-04 KEYNOTE DESIGNATION

1 DOOR TAG

DOOR NUMBER

PARTITION TAG

WALL DESIGNATION

WINDOW TAG

WINDOW DESIGNATION

ELEVATION MARKER

HEIGHT

NORTH ARROW

TRUE NORTH

PLAN NORTH

ARCHITECTURAL SYMBOLS

M3A

STEEL/METAL STUD

WOOD (ROUGH) BLOCKING OR SHIM

CONCRETE

PLAN AND SECTION

WOOD (ROUGH)

2'X2' ACT CEILING SYSTEM WITH HOLD

DOWN CLIPS

GYPSUM BOARD

CEILING

CONCRETE

ELEVATION

CENTER LINE

LINE SYMBOLS

GRID LINE

PROPERTY LINE

CUT LINE

BATT INSULATION

WOOD SUBSTRATE

MATERIAL LEGEND

FLOORING

DEMO LINE

AREA OF WORK NOT IN THE SCOPE.

EXISTING TO REMAIN

EXISTING 2'X2' ACT CEILING SYSTEM TO REMAIN

UNLESS OTHERWISE NOTED

EXISTING GYPSUM BOARD

CEILING/SOFFIT TO REMAIN UNLESS

OTHERWISE NOTED

2'X2' SECURITY METAL CEILINGS

DEMOLISH ACT CEILING SYSTEM

CPT-1 - CARPET TILE

EXISTING - TO REMAIN AS-IS

WSF-1 - WELDED SEAM FLOORING, WOOD PATTERN,

VERTICAL GRAIN

WSF-2 - WELDED SEAM FLOORING, LINEN PATTERN

WSF-1 - WELDED SEAM FLOORING, WOOD PATTERN,

HORIZONTAL GRAIN

LEGEND NOTES

1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE

PERTINENT TO THE CONDITIONS ON THIS SET OF DRAWINGS TO THE

EXTENT APPLICABLE.

2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY APPEAR IN THIS

SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF

SYMBOLS SHOWN ON THIS SHEET.

V.A. SYMBOLS

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE RESISTIVE RATED LINE, 4 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

V V ITEM - VA SUPPLIED AND INSTALLED

VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED

A

COLUMN GRID

DIMENSION LINE

NORTH ARROW

CL CENTER LINE

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:4

P

M

BID DOCUMENTS

7/17/2024

SHEET INDEX, ABBREVIATIONS,

SYMBOLS, LEGENDS AND GENERAL

NOTES

G0.01

UPDATE WING 4B

KZJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

SHEET INDEX

GENERAL

G0.00 COVER SHEET

G0.01 SHEET INDEX, ABBREVIATIONS, SYMBOLS, LEGENDS AND GENERAL NOTES

G0.02 LOCATION MAP AND CONTRACTOR STAGING

G1.00 PHASING PLAN

G2.00 INFECTION CONTROL RISK ASSESSMENT

G3.00 LIFE SAFETY PLAN

ARCHITECTURAL

AD1.00 DEMOLITION PLAN

AD1.10 DEMOLITION REFLECTED CEILING PLAN

A1.00 FLOOR PLAN

A1.10 REFLECTED CEILING PLAN

A5.00 ROOM FINISH SCHEDULE

A5.10 FLOOR AND WALL FINISH PLAN

A5.20 INTERIOR ELEVATIONS

A5.21 INTERIOR ELEVATIONS AND CASEWORK DETAILS

A5.30 WALL PROTECTION PLAN AND DETAILS

A5.40 SIGNAGE PLAN, SCHEDULE AND DETAILS

A6.00 DOOR SCHEDULE, ELEVATIONS AND DETAILS

MECHANICAL

M0.00 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

MD1.01 HVAC DEMOLITION PLAN

M1.01 NEW HVAC PLAN

M2.00 MECHANICAL DETAILS AND SCHEDULES

PLUMBING

P0.00 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P1.01 PLUMBING REMODEL PLAN

ELECTRICAL

E0.00 ELECTRICAL LEGENDS AND ABBREVIATIONS

E0.01 ELECTRICAL SCHEDULES

E0.02 DOOR ACCESS CONTROL DETAILS AND SEQUENCES

E0.03 ELECTRICAL DETAILS AND SCHEMATIC DIAGRAMS

E0.04 ELECTRICAL CONSTRUCTION PHASING PLAN

ED1.00 POWER DEMOLITION PLAN

ED2.00 LIGHTING DEMOLITION PLAN

ED3.00 SPECIAL SYSTEMS DEMOLITION PLAN

E1.00 POWER PLAN - NEW CONSTRUCTION

E2.00 LIGHTING PLAN - NEW CONSTRUCTION

E3.00 SPECIAL SYSTEMS PLAN - NEW CONSTRUCTION

FAD1.00 FIRE ALARM DEMOLITION PLAN

FA1.00 FIRE ALARM PLAN - NEW CONSTRUCTION

FIRE PROTECTION

FD1.01 FIRE PROTECTION DEMOLITION PLAN

FP1.01 NEW FIRE PROTECTION PLAN

GENERAL NOTES:

1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, AND ORDINANCES.

2. THE CONTRACTOR SHALL PERFORM ALL TESTING AND INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO

DEMONSTRATE A COMPLETE AND SATISFACTORY INSTALLATION.

3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND MATERIALS NOTED TO REMAIN, AND SHALL BE

RESPONSIBLE FOR DAMAGE TO THE SAME RESULTING FROM WORK UNDER THIS CONTRACT. THE

CONTRACTOR SHALL RESTORE DAMAGED EXISTING BUILDING MATERIALS TO THEIR ORIGINAL CONDITION.

4. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO

COMMENCING CONSTRUCTION. CONTRACTOR SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER

REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES.

5. CONTRACTOR SHALL COORDINATE ALL WORK AND SHOP DRAWINGS WITH OTHER TRADES.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL WORK. CONTRACTOR SHALL ANTICIPATE

AREAS WHERE THE INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WILL BE RESTRICTED, CONGESTED, OR DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION BETWEEN ALL TRADES.

7. SUB-CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL MECHANICAL AND ELECTRICAL ITEMS WITH THE

GENERAL CONTRACTOR. CONTRACTOR SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER

REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO INSTALLATION AND/OR FABRICATION.

8. ALL ANGLES ON PLANS ARE 45- OR 90-DEGREES, UNLESS NOTED OTHERWISE. CURVED ELEMENTS ARE

LOCATED AS DIMENSIONED.

9. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS EXISTING.

10. SEE LIFE SAFETY PLAN FOR LOCATIONS OF FIRE- AND SMOKE-RATED PARTITIONS.

11. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR INSTALLATION OF WALL-MOUNTED CABINETS, TOILET ACCESSORIES, WALL STOPS, AND MISCELLANEOUS ITEMS.

12. ALL CONTRACTORS WORKING WITHIN THE CONSTRUCTION LIMITS MUST PARTICIPATE IN AN HOUR LONG

ORIENTATION PROVIDED BY THE COR.

13. ALL CONTRACTORS MAY BE SUBJECT TO A TOOL AND MATERIAL CHECK PRIOR TO AND IMMEDIATELY AFTER

LEAVING THE CONSTRUCTION LIMITS.

14. ALL CONSTRUCTION ACTIVITIES WHICH ARE CONSIDERED BY OSHA TO BE "HOT WORK" SHALL ABIDE BY THE

FARGO VA HOT WORK PERMITTING POLICY. HOT WORK MAY BE INSPECTED AT ANY TIME.

15. CONTRACTOR SHALL COORDINATE A BEHIND THE WALL INSPECTION WITH THE OWNER PRIOR TO

REPLACING ANY FINISHES WHICH MAY OBSTRUCT FROM PLAIN SIGHT WORK THAT HAS BEEN COMPLETED.

B O

TT

O

M O

F D

I K E

S

LO

PE

MC

MC

UND

UND

AFGE

AFGE

AFGE

AFGE

RO EOM

HCHV

C P

C P

C P

C P

C P

C P

C P

C P

V A

N V

A N

R

MC

R

R R

19th AVE. N.

21st AVE. N.

E L M

S T

R E

E T

E L M

S T

R E

E T

BLDG. NO.

1 MEDICAL CENTER

3 ADMINISTRATION OFFICE

8 FLAGPOLE

9 MEDICAL CENTER

10 BOILER PLANT

11 MAINTENANCE GARAGE

12 WAREHOUSE

13 LAUNDRY

30 ADMINISTRATION OFFICE

39 HIGH VOLTAGE SWITCHGEAR BLDG

42 UND SCHOOL OF MEDICINE

46 MEDICAL CENTER

MC- MOTORCYCLE PARKING

CP- CAR/VAN POOL PARKING

- HANDICAPPED PARKING

40 VBA REGIONAL OFFICE

41 OXYGEN STORAGE TANK

43 PICNIC SHELTER AND PATIO

44 XCEL ENERGY BLDG (NATURAL GAS)

20 GATE WELL

50 COLD STORAGE BUILDING

51 HRMS

52 ADMINISTRATION OFFICE

53 HAZMAT STORAGE BUILDING

54 PANDEMIC FLU STORAGE BUILDING

56 CHILLER PLANT

R- RESERVED PARKING

UND- UNIVERSITY OF NORTH DAKOTA

AFGE- AMERICAN FEDERATION GOVERNMENT EMPLOYEE

RO EOM- REGIONAL OFFICE EMPLOYEE OF THE MONTH

HCHV- HEALTH CARE HOMELESS VETERANS

NFFE- NATIONAL FEDERATION FEDERAL EMPLOYEE

R E D

R

IV

E R

O F T

H E N

O R

T H

30W 30E

12 13

CITY

LIFT

STATION

(STORM

SEWER)

MAIN HOSPITAL

BUILDING

1-9-46

8 3

PROJECT AREA -

WING 4B

SHARED

CONTRACTOR

STAGING

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.01 FOR GENERAL NOTES.

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

KEY PLAN

PROJECT AREA - WING 4B

4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:4

P

M

BID DOCUMENTS

7/17/2024

LOCATION MAP AND CONTRACTOR

STAGING

G0.02

UPDATE WING 4B

KZJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

LOCATION MAP

GENERAL NOTES:

N

R

REF.

DW

REF.

DW

R

REF.

PHASE 1

PHASE 2

PHASING LEGEND:

PHASE 3

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.01 FOR GENERAL NOTES.

STORAGE

4B-55A

LAUNDRY

4B-55

STAIRWELL #14

S14-4

1 BED

4B-57

TOILET

4B-57A

TOILET

4B-59A

1 BED

4B-59

TOILET

4B-63A

1 BED

4B-63

DINING /

ACTIVITIES

4B-65

CORRIDOR

4B-C5

1 BED

4B-58

TOILET

4B-58A

TOILET

4B-60A

1 BED

4B-60

SOILED

4B-62

ANTE

4B-64

TOILET

4B-64B

SECLUSION

4B-64A

NURSE STATION

4B-70

CORRIDOR

4B-C3

ACTIVITY / DINING

ROOM

4B-40

SALLY PORT

4B-C2

NUTRITION

4B-42

PSYCH RES

4B-44

PSYCH OFFICE

4B-46

REPORT

4B-48

HAC

4B-50

STORAGE

4B-66

NOURISH.

4B-67

CORRIDOR

4B-C1

TEMPORARY CONSTRUCTION BARRIER,

LOCATION TO BE COORDINATED WITH

COR AND WING 4B TO ALLOW NEEDED

ACCESS THROUGH CORRIDOR FOR

PATIENT, STAFF, RAPID RESPONSE

TEAM AND GURNEY/EQUIPMENT, ETC.

CONTRACTOR ACCESS FOR PHASE 3

CONSTRUCTION ANTE ROOM

A

CORRIDOR

4B-C4

A

1HR TEMPORARY CONSTRUCTION PARTITION - WALL TYPE A. SECURE WALL

TO FLOOR AND SURFACES THAT MEETS FIRE RATED ASSEMBLY

REQUIREMENTS AND FIRE TAPED AND SEALED. CONTRACTOR SHALL NOT

DRILL ANY HOLES INTO FLOOR TO SECURE TEMPORARY CONSTRUCTION

PARTITIONS. SEE SHEET G2.00 FOR WALL TYPE A.

TEMP. CONSTRUCTION BARRIER:

WALL RATING LEGEND:

1 HOUR FIRE BARRIER

1 HOUR SMOKE BARRIER

2 HOUR FIRE BARRIER

STORAGE

4B-55A

LAUNDRY

4B-55

STAIRWELL #14

S14-4

1 BED

4B-57

TOILET

4B-57A

TOILET

4B-59A

1 BED

4B-59

TOILET

4B-63A

1 BED

4B-63 DINING /

ACTIVITIES

4B-65

CORRIDOR

4B-C5

1 BED

4B-58

TOILET

4B-58A

TOILET

4B-60A

1 BED

4B-60

SOILED

4B-62

ANTE

4B-64

TOILET

4B-64B

SECLUSION

4B-64A

NURSE STATION

4B-70

CORRIDOR

4B-C4

REPORT

4B-48

HAC

4B-50

STORAGE

4B-66

NOURISH.

4B-67

B

-5

B

-5

B

-6

B

-5

B

-6

A

T4B-C2.1

A

CONTRACTOR ACCESS

FOR PHASE 1

CONSTRUCTION ANTE ROOM

TEMPORARY

SALLYPORT

T4B-C2A

TEMPORARY CONSTRUCTION BARRIER IN NURSES STATION

WILL REQUIRE SPECIAL COORDINATION DUE TO SPLITTING IT

IN HALF. COORDINATE WITH VA COR AND WING 4B.

NURSE STATION

4B-70

TOILET

4B-70A

NURSE LOUNGE

4B-70B

1 BED

4B-72

TOILET

4B-72A

TOILET

4B-74A

1 BED

4B-74

1 BED

4B-76

TOILET

4B-76A

1 BED

4B-75

TOILET

4B-75A

TOILET

4B-73A

1 BED

4B-73STAIRWELL #15

S15-4

MECH/ELEC

4B-71

CLEAN

4B-49

SOILED

4B-47

CORRIDOR

4B-C4

CORRIDOR

4B-C3

NURSE MANAGER

4B-45

EXAM ROOM

4B-43

ACTIVITY / DINING

ROOM

4B-40 SALLY PORT

4B-C2

NUTRITION

4B-42

PSYCH RES

4B-44

PSYCH OFFICE

4B-46

REPORT

4B-48

HAC

4B-50

CORRIDOR

4B-C1

TEMPORARY

SALLYPORT

T4B-C2

A

A

TEMPORARY SALLY PORT

WILL BE USED WHEN WORK

ON EXISTING SALLY PORT

ELECTRICAL AND VIDEO

SECURITY SYSTEM IS BEING

WORKED ON.

TEMPORARY

CONSTRUCTION

BARRIER IN NURSES

STATION WILL REQUIRE

SPECIAL

COORDINATION DUE TO

SPLITTING IT IN HALF.

COORDINATE WITH VA

COR AND WING 4B.

TEMPORARY CONSTRUCTION

BARRIER, LOCATION TO BE

COORDINATED WITH COR AND

WING 4B TO ALLOW NEEDED

ACCESS THROUGH CORRIDOR FOR

PATIENT, STAFF, RAPID RESPONSE

TEAM AND GURNEY/EQUIPMENT,

ETC.

T4B-C2.1

A

CONTRACTOR ACCESS

FOR PHASE 2

CONSTRUCTION ANTE ROOM

A

SHEET LEGEND:

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT

AREA OF WORK NOT IN THE SCOPE.

EXISTING TO REMAIN

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

KEY PLAN

PROJECT AREA - WING 4B

4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:5

P

M

BID DOCUMENTS

7/17/2024

PHASING PLAN

G1.00

UPDATE WING 4B

KZJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

GENERAL NOTES:

1/8" = 1'-0"

PHASING PLAN - WING 4B - PHASE 3

PHASING NOTES:

1. THE CONTRACTOR SHALL ACCOMPLISH THE WORK FOR EACH PHASE WITH MINIMAL INTERRUPTIONS AND AGITATION OF PATIENTS. IF PATIENTS BECOME AGITATED, WORK WILL BE SUSPENDED AND MAY

START AGAIN WITH APPROVAL OF THE CO,CS, COR OR THE NURSE MANAGER.

2. THE GENERAL CONTRACTOR SHALL OBTAIN THE ICRA AND ILSM FORMS FROM THE VA SAFETY FOR EACH WORK AREA AND/OR PHASE OF WORK.

3. THE PROVIDED PHASING PLAN AND NOTES ARE GENERAL IN NATURE BUT REFLECT THE VA REQUIREMENTS FOR THE PROJECT. THE GENERAL CONTRACTOR SHALL PROVIDE THE FINAL PHASING PLAN AND

CPM SCHEDULE, PROCURE THE VA’S AGREEMENT OF THOSE PLANS, AND BE RESPONSIBLE FOR RECOGNIZING AND SCHEDULING ALL ASPECTS OF THE WORK WITH THE VA. ALL PHASES SHALL BE APPROVED BY THE VA/COR BEFORE COMMENCEMENT OF WORK AND BE UPDATED AS WORK PROCEEDS. THE VA MUST BE NOTIFIED IN WRITING OF ANY UNFORESEEN DELAYS.

4. THE MEDICAL CENTER MUST MAINTAIN ITS OPERATION 24 HOURS A DAY 7 DAYS A WEEK. THEREFORE, ANY INTERRUPTION IN SERVICE MUST BE SCHEDULED AND COORDINATED WITH THE COR TO ENSURE THAT NO LAPSES IN OPERATION OCCUR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A WORK PLAN AND SCHEDULE DETAILING, AT A MINIMUM, THE PROCEDURES TO BE EMPLOYED, THE EQUIPMENT AND MATERIALS TO BE USED, THE INTERIM LIFE SAFETY MEASURE TO BE USED DURING THE WORK, AND A SCHEDULE DEFINING THE DURATION OF THE WORK WITH MILESTONE SUBTASKS. THE WORK TO BE OUTLINED SHALL BE COORDINATED WITH VA COR TO PROTECT PATIENT SAFETY FOR ALL PHASES OF WORK.

5. CONTRACTOR SHALL FURNISH THE COR WITH A SCHEDULE OF APPROXIMATE PHASING DATES ON WHICH THE CONTRACTOR INTENDS TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF THE BUILDING OR PORTION THEREOF. THE VA WILL REVIEW THE PROJECT WORK DATES FOR APPROVAL AND NOTICE OF WORK. IF PROPOSED DATES DO NOT WORK, THE VA SHALL PROVIDE DATES FOR ACCOMPLISHMENT OF WORK IN SPECIFIC AREA OF THE PROJECT. IN ADDITION, THE CONTRACTOR SHALL NOTIFY THE COR TWO WEEKS IN ADVANCE OF COMPLETION OF WORK IN SPECIFIC AREA OR PHASE.

6. CONTRACTOR'S SCHEDULE HAS TO INCLUDE VA MOVE TIME.

7. THE PROJECT DURATION HAS 90 DAYS INCLUDED IN THE BEGINNING OF THE JOB FOR THE GENERAL CONTRACTOR AND SUBCONTRACTORS TO COORDINATE WITH THE VA FOR ID BADGES. BACKGROUND

CHECKS, ETC. WILL NEED TO BE COMPLETED FOR ID BADGING. NO CONTRACTOR SHALL BE ABLE TO BE ON A JOB SITE WITHOUT THE OFFICIAL ID BADGE. TRAINING IS REQUIRED FOR ALL CONTRACTORS WHO

WISH TO ACCESS THE SITE.

8. REMODEL WING 4B – PHASING SCHEDULE STANDARD WORK HOURS FOR THE FARGO VA MEDICAL CENTER ARE MONDAY–FRIDAY, 8:00 A.M. TO 4:00 P.M. AFTER HOURS WORK MAY BE REQUIRED BY THE CONTRACTOR PENDING NOISE, VIBRATION OR OTHER CONSTRUCTION IMPACTS THAT WOULD LIMIT CARE TO PATIENTS.

9. ANY CONTRACTOR WORKING ON SITE SHALL CHECK IN AND OUT OF WING 4B WITH THE CHARGE NURSE AND WILL CREATE AN INVENTORY SHEET FOR ANYTHING BROUGHT ONTO WING 4B. CONTRACTORS SHALL ONLY BRING WHAT IS ACTUALLY NEEDED SINCE EACH ITEM NEEDS TO BE ACCOUNTED FOR WHETHER INSTALLED BY CONTRACTOR OR BEING TAKEN OFF THE SITE WHEN WORK IS DONE. THE INVENTORY SHEET SHALL BE CHECKED AGAINST THE INVENTORY SHEET GENERATED WHEN THE CONTRACTOR ENTERED THE SITE. EVERYTHING SHALL BE ACCOUNTED FOR BEING BROUGHT OFF SITE OR

INSTALLED DOWN TO INDIVIDUAL SCREWS.

10. IF THE GENERAL CONTRACTOR NEEDS TO ACCESS ANY AREA OUTSIDE OF THE PHASE WHERE THE STAIRWELL CANNOT BE ACCESSED TO THE PHASE AND NEEDS TO BE IN AN AREA WHERE PATIENTS ARE PRESENT, FOR THESE SITUATIONS THE CONTRACTOR WILL NEED TO ACCESS THROUGH THE MAIN SALLY PORT DOORS OF WING 4B AND SHALL GO THROUGH ALL THE PROCEDURES, CHECKS, TRAINING, AND

INVENTORY SHEETS TO ACCESS WORK.

11. CONTRACTOR SHALL NOT DRILL ANY HOLES INTO FLOOR TO SECURE TEMPORARY CONSTRUCTION PARTITIONS.

PRE-CONSTRUCTION PHASING ACTIVITIES:

• IT IS THE INTENT THAT THE MENTAL HEALTH DEPARTMENT SHALL STAY OPERATIONAL DURING THE COURSE OF THIS CONSTRUCTION PROJECT. ESTABLISH CONTRACTOR STAGING AREA IN COORDINATION

WITH THE COR ON STATION.

• SUBMIT PROJECT SCHEDULE TO THE COR. IDENTIFY ALL TRADES THAT WILL BE NECESSARY TO COMPLETE DEMOLITION EFFICIENTLY AND CONCURRENTLY.

• INSTALL TEMPORARY ONE-HOUR FIRE RATED CONSTRUCTION BARRIERS TO SEPARATE AREAS OF CONSTRUCTION ACTIVITY FROM ADJACENT AREAS OF THE LOCKED WARD THAT WILL REMAIN OCCUPIED

AND OPERATIONAL.

• ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK PROOF, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL

INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK.

• INSTALL HEPA FILTERS AND SEAL PROJECT BOUNDARY TO ENSURE NEGATIVE AIR PRESSURE AS PER INFECTION CONTROL REQUIREMENTS. OBTAIN FROM THE VA A PRE-CONSTRUCTION RISK ASSESSMENT

AS PER VA REQUIREMENTS.

• PROTECT ALL ITEMS AND EQUIPMENT NOTED TO REMAIN AS NECESSARY. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE EXISTING CONDITION AND REPAIR ANY DAMAGE TO PRE-

CONSTRUCTION CONDITION PRIOR TO PROJECT COMPLETION.

PHASE 1

• THE GENERAL CONTRACTOR SHALL USE STAIRWELL #14 FOR ENTERING AND LEAVING THE PROJECT WORK AREA FOR PHASE 1. THIS INCLUDES REMOVING DEMOLITION MATERIALS AND TRANSPORTING NEW

MATERIALS TO THE PHASE 1 WORK AREA.

• CONSTRUCT TEMPORARY SALLY PORT WITH ALL ELECTRICAL AND SECURITY MEASURES AND HARDWARE. COODINATE WITH FARGO VA.

• AT THE NURSE STATION, THE CONTRACTOR SHALL WORK WITH THE VA COR TO DETERMINE WORK AREA SIZE AND LOCATION OF THE CONSTRUCTION BARRIER.

• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 1.

• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION DESIGNATED BY THE COR (ON-SITE). IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RELOCATE SALVAGED

ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION CONDITION.

• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR DEMOLITION.

• PERFORM DEMOLITION OF AREAS WITHIN PHASING AREA IN OCCUPIED WORK AREA. COORDINATE TIME OF DEMOLITION WITH THE COR.

• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF FINISH FLOORING SEALANT.

• INSTALL NEW ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.

• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR INSTALLED ITEMS INDICATED IN THE DOCUMENTS

• COMPLETE FINISH AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING AS NECESSARY.

• TURN THE NEWLY REMODELED SPACE OVER TO THE WING 4B.

1/8" = 1'-0"

ENLARGED PLAN - WING 4B - PHASE 1

1/8" = 1'-0"

ENLARGED PLAN - WING 4B - PHASE 2

PHASE 2

• THE GENERAL CONTRACTOR SHALL USE STAIRWELL #15 FOR ENTERING AND LEAVING THE PROJECT WORK AREA FOR PHASE 2. THIS INCLUDES REMOVING DEMOLITION MATERIALS AND TRANSPORTING NEW

MATERIALS TO THE PHASE 2 WORK AREA.

• AT THE NURSE STATION, THE CONTRACTOR SHALL WORK WITH THE VA COR TO DETERMINE WORK AREA SIZE AND LOCATION OF THE CONSTRUCTION BARRIER.

• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 2.

• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION DESIGNATED BY THE COR (ON-SITE).

• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION CONDITION.

• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR DEMOLITION.

• PERFORM DEMOLITION OF AREAS OUTSIDE OF PHASING AREA IN OCCUPIED WORK AREA. COORDINATE TIME OF DEMOLITION WITH COR.

• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF FINISH FLOORING SEALANT.

• INSTALL NEW ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.

• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR INSTALLED ITEMS INDICATED IN THE DOCUMENTS.

• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING AS NECESSARY.

• COMPLETE DEMO AND FINISHES INSTALLATION IN CORRIDOR 4B-C1 OUTSIDE OF LOCKED WARD SALLY PORT AT THE END OF PHASE 2.

• REMOVE TEMPORARY SALLY PORT AT THE END OF PHASE 2.

• TURN THE NEWLY REMODELED SPACE OVER TO THE FARGO VA WING 4B.

N N

N

PHASE 3

• THE GENERAL CONTRACTOR SHALL USE STAIRWELL #14 FOR ENTERING AND LEAVING THE PROJECT WORK AREA FOR PHASE 3. THIS INCLUDES REMOVING DEMOLITION MATERIALS AND TRANSPORTING NEW

MATERIALS TO THE PHASE 3 WORK AREA.

• PERFORM DEMOLITION WORK IDENTIFIED IN PHASE 3.

• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION DESIGNATED BY THE COR (ON-SITE).

• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO PREVENT DAMAGE TO THEIR PRE-CONSTRUCTION CONDITION.

• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR DEMOLITION.

• PERFORM DEMOLITION OF AREAS OUTSIDE OF PHASING AREA IN OCCUPIED WORK AREA. COORDINATE TIME OF DEMOLITION WITH COR.

• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF FINISH FLOORING SEALANT.

• INSTALL NEW ITEMS AS SHOWN IN THE CONSTRUCTION DOCUMENTS.

• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR INSTALLED ITEMS INDICATED IN THE DOCUMENTS.

• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING AS NECESSARY.

• COMPLETE DEMO AND FINISHES INSTALLATION IN CORRIDOR 4B-C1 OUTSIDE OF LOCKED WARD SALLY PORT AT THE END OF PHASE 3.

• TURN THE NEWLY REMODELED SPACE OVER TO THE FARGO VA WING 4B.

SECURITY NOTE: ALL CONTRACTOR

STAFF IS REQUIRED TO CHECK IN

AND OUT WITH THE CHARGE NURSE

DAILY AND ENTER AND EXIT

THROUGH THE MAIN CORRIDOR

SALLY PORT. CONTRACTOR WILL

ALSO BE REQUIRED TO PROVIDE AN

ONGOING INVENTORY OF ALL

MATERIALS AND EQUIPMENT

BROUGHT INTO AND OUT OF THE

CONSTRUCTION ZONE. THIS

INVENTORY CONTROL WILL BE

REQUIRED TO BE IN WRITTEN FORM

AND GIVEN TO THE CHARGE NURSE

IN ORDER TO MAINTAIN

CONSISTENT VIGILANT INVENTORY

OF ANY ITEM USED FOR THE

PURPOSES OF THIS PROJECT.

COVER WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(ILSM MAY REQUIRE MORE

THAN ONE).

1-HR FIRE RATED

LOCKED DOOR AND

HARDWARE.

(CONSTRUCTION SITES

MUST REMAIN SECURE

AT ALL TIMES.

FIRE PULL

STATION WITH

AUDIO / VISUAL

(ONLY IF EXISTING)

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

AS NECESSARY TO

MAINTAIN CLEANLINESS).

NO STICKY MAT ON

PATIENT SIDE OF ROOM.

PROVIDE OTHER MEANS

OF DUST CONTROL IN

COORDINATION WITH VA.

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE

TO PUBLIC

G2.00

RE-CIRCULATING HEPA

NEGATIVE AIR UNIT

* ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK.

3' - 0"

V .I

.F

E X

IS

T

IN

G

W A

L L

V .I

.F

E X

IS

T

IN

G

W A

L L

RE-CIRCULATING

HEPA NEGATIVE

AIR UNIT

FINISHED FLOORING TO BE KEPT CLEAN.

FLOORS NOT BEING REPLACED MUST BE

PROTECTED. COVER WITH ROSIN PAPER / FIRE

RATED PLYWOOD

* ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR

TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK.

A P

P R

O X

A .F

.F

POST ICRA, ILSM,

FIRE INSPECTION

SHEETS VISIBLE TO

PUBLIC

1-HR FIRE RATED LOCKED DOOR AND

HARDWARE. DOORS MUST ALSO

MAINTAIN A SECURED 1-HR

TEMPORARY CONSTRUCTION BARRIER.

NEGATIVE PRESSURE

LOG WITH HOURLY

CHECKED AND SIGNITURE

ELECTRONIC NEGATIVE AIR

MONITORING STATION WITH

ALARM. MUST MAINTAIN AT

LEAST -0.01" WC NEGATIVE

PRESSURE TO OCCUPIED AREA.

CONSTRUCTION SIGN

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.01 FOR GENERAL NOTES.

4 7/8"

A

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

UNDERSIDE OF

EXISTING DECK

FIRE RESISTANT SEALANT,

BOTH SIDES

EXISTING CEILING SYSTEM

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

3 5/8" 20 GAUGE METAL

STUDS AT 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

** ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR

TO CONSTRUCTION WORK STARTING IN EACH OF PHASE OF WORK.

DO NOT DRILL INTO

EXISTING FLOOR

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

KEY PLAN

PROJECT AREA - WING 4B

4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:5

P

M

BID DOCUMENTS

7/17/2024

INFECTION CONTROL RISK

ASSESSMENT

G2.00

UPDATE WING 4B

KZJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

1. SEE SHEET G-100 FOR PHASING PLANS AND DESCRIPTIONS.

2. SEE PHASING PLANS FOR TEMPORARY CONSTRUCTION BARRIER LOCATIONS AS

IT RELATES TO ICRA.

3. WORK REQUIRED BY INFECTION CONTROL SHALL BE PERFORMED FOR EACH

PHASE OF THE PROJECT.

4. ALL APPLICABLE PERMITS AND COR APPROVALS SHALL BE COMPLETED PRIOR TO

BEGINNING ANY WORK FOR EACH PHASE. PERMITS INCLUDE ICRA, INTERIM LIFE

SAFETY MEASURES, ABOVE CEILING FIRE / SMOKE WALL, UTILITY, FIRE ALARM

SYSTEM, MEDICAL GASES AND CONFINED SPACES.

5. THE GENERAL CONTRACTOR SHALL OBTAIN THE ICRA,ISLM, PCRA FORMS PRIOR

TO WORK STARTING FROM THE COR AND VA SAFETY FOR EACH WORK AREA

AND/OR PHASE OF WORK. SEE SPECIFICATIONS FOR ICRA AND PCRA EXAMPLE

BLANK FORMS.

6. REFER TO SHEET G2.00 FOR ICRA TEMPORARY WALLS A AND B.

SHEET SPECIFIC NOTES:

GENERAL NOTES:

1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

1/2" = 1'-0"

CROSS SECTION 'A'

1/2" = 1'-0"

INTERIOR ELEVATION

1. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED

PRIOR TO BEGINNING OTHER WORK.

2. ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE

LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT

SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE

TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH

AREA OR PHASE OF WORK.

3. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF

THE FLOOR.

4. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA

SAFETY GROUP.

5. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND

WHEN FIRE ALARM OR SPRINKLER SYSTEMS ARE IMPAIRED MORE THAN 4 HOURS IN

A 24 HOUR PERIOD.

6. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7),

WHETHER OCCUPIED OR NOT, THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

7. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

8. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE

MEDICAL CENTER; NO HVAC RETURN OR EXHAUST SHALL PASS INTO THE AREAS

OUTSIDE THE CONSTRUCTION AREA.

9. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY

DO NOT EXIT THROUGH THE CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS

INTO THE CONSTRUCTION AREA THAT READ: "CONSTRUCTION AREA -DO NOT

ENTER". THIS INCLUDES ALL LIFE SAFETY DEVICES FOR TEMPORARY CHANGE TO

EMERGENCY SERVICES.

10. THE CONTRACTOR SHALL MEET WITH VA SAFETY FOR EACH PHASE AREA, PRIOR TO

BEGINNING WORK, TO REVIEW CORRECT EXIT SIGNAGE FOR CHANGES IF

NECESSARY. IF EXIT SIGNS MUST BE MOVED OR TAKEN OUT OF SERVICE, THE EXIT

SIGNS MUST BE COVERED FULLY SO AS TO NOT BE VISIBLE FROM ANY ANGLE.

11. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT

WORK PERMIT ON SITE.

12. WHERE REQUIRED, TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE THEY REMAIN

EFFECTIVE. TACKY MATS SHALL NOT BE PROVIDED AT AREAS INSIDE PATIENT

AREAS.

13. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEMS.

14. OBTAIN INFECTION CONTROL PERMIT FROM VA PRIOR TO BEGINNING WORK.

15. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

16. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLASTIC, TO SEAL AREA FROM

NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT BEFORE CONSTRUCTION BEGINS.

17. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE

CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE

FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC

SYSTEM. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS

PERFORMED.

18. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS

APPROPRIATELY AND IMMEDIATELY TO MAINTAIN FIRE RATING DUST PROTECTION

AND NEGATIVE AIR PRESSURE.

19. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE

ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BE VACUUMED

WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR

CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK

SITE (VA DOES NOT PROVIDE).

A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.

B. DIRECT ACCESS TO OUT THROUGH ANTEROOM (EXIT/ENTRANCE)

20. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED

AND INSPECTION BY VA SAFETY PERSONNEL, INFECTION CONTROL GROUP, AND

COR.

21. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION. CONTAIN CONSTRUCTION WASTE

BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT

RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

22. FOLLOW FARGO VA FACE MASK POLICY.

INFECTION CONTROL NOTES -

CLASS IV CONSTRUCTION:

1-HR TEMPORARY WALL TYPES

* ALL TEMPORARY CONSTRUCTION PARTITIONS AND DOOR HARDWARE TO BE LIGATURE RESISTANT, PICK RESISTANT, AND DAMAGE RESISTANT ON THE PATIENT SIDE OF TEMPORARY PARTITION. THE VA SHALL INSPECT AND APPROVE TEMPORARY PARTITIONS PRIOR TO CONSTRUCTION WORK STARTING IN EACH AREA OR PHASE OF WORK. ALL MONITORS, CONSTRUCTION SIGNS, LOG SHEETS, AND INSPECTION SHEET SHALL BE PLACED ON THE INSIDE OF TEMPORARY WALL/ROOM AWAY FROM PATIENTS.

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.01 FOR GENERAL NOTES.

STORAGE

4B-55A

LAUNDRY

4B-55

STAIRWELL #14

S14-4

1 BED

4B-57

TOILET

4B-57A

TOILET

4B-59A

1 BED

4B-59

TOILET

4B-63A

1 BED

4B-63

DINING /

ACTIVITIES

4B-65

CORRIDOR

4B-C5

1 BED

4B-58

TOILET

4B-58A

TOILET

4B-60A

1 BED

4B-60

SOILED

4B-62

ANTE

4B-64

TOILET

4B-64B

SECLUSION

4B-64A

NURSE STATION

4B-70

TOILET

4B-70A

NURSE LOUNGE

4B-70B

1 BED

4B-72

TOILET

4B-72A

TOILET

4B-74A

1 BED

4B-74

1 BED

4B-76

TOILET

4B-76A

1 BED

4B-75

TOILET

4B-75A

TOILET

4B-73A

1 BED

4B-73

STAIRWELL #15

S15-4

MECH/ELEC

4B-71

CLEAN

4B-49

SOILED

4B-47

CORRIDOR

4B-C4

C O

R R

ID

O

R

B

-C

NURSE MANAGER

4B-45

EXAM ROOM

4B-43

ACTIVITY / DINING

ROOM

4B-40

SALLY PORT

4B-C2

NUTRITION

4B-42

PSYCH RES

4B-44

PSYCH OFFICE

4B-46

REPORT

4B-48

HAC

4B-50

STORAGE

4B-66

NOURISH.

4B-67

CORRIDOR

4B-C1

B

-5

B

-5

B

-6

B

-5

B

-6

B

-7

4B-73A

B

-7

B

-7 A

B

-7

B

-7

4B-74A

4B-72A

B

-7

TRAVEL DISTANCE = 98' - 0"

T R

A V

E L

D

IS

T A

N C

E

PROVIDED CLEAR DOOR WIDTH (INCHES)

MAX OCCUPANT LOAD CAPACITY (NO. OF PEOPLE)

EXIT DOOR TAG

LINE TYPES FOR MEANS OF EGRESS:

TD #

TRAVEL DISTANCE

EXIT DISCHARGE

WALL RATING LEGEND:

1 HOUR FIRE BARRIER

1 HOUR SMOKE BARRIER

2 HOUR FIRE BARRIER

LIFE SAFETY SYMBOLS:

SMOKE RESISTIVE HAZARDOUS ROOM

ENCLOSURE

SHEET LEGEND:

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT

AREA OF WORK NOT IN THE SCOPE.

EXISTING TO REMAIN

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

KEY PLAN

PROJECT AREA - WING 4B

4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:0

P

M

BID DOCUMENTS

7/17/2024

LIFE SAFETY PLAN

G3.00

UPDATE WING 4B

KZJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

GENERAL NOTES:

1/8" = 1'-0"

LIFE SAFETY PLAN - WING 4B

DW

Micro

UP

DN

DN

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.01 FOR GENERAL NOTES.

STORAGE

4B-55A

LAUNDRY

4B-55

STAIRWELL #14

S14-4

1 BED

4B-57

TOILET

4B-57A

TOILET

4B-59A

1 BED

4B-59

TOILET

4B-63A

1 BED

4B-63

DINING /

ACTIVITIES

4B-65

CORRIDOR

4B-C5

1 BED

4B-58

TOILET

4B-58A

TOILET

4B-60A

1 BED

4B-60

SOILED

4B-62

ANTE

4B-64

TOILET

4B-64B

SECLUSION

4B-64A

NURSE STATION

4B-70

TOILET

4B-70A

NURSE LOUNGE

4B-70B

1 BED

4B-72

TOILET

4B-72A

TOILET

4B-74A

1 BED

4B-74

1 BED

4B-76

TOILET

4B-76A

1 BED

4B-75

TOILET

4B-75A

TOILET

4B-73A

1 BED

4B-73

STAIRWELL #15

S15-4

MECH/ELEC

4B-71

CLEAN

4B-49

SOILED

4B-47

CORRIDOR

4B-C4

CORRIDOR

4B-C3

NURSE MANAGER

4B-45

EXAM ROOM

4B-43

ACTIVITY / DINING

ROOM

4B-40

SALLY PORT

4B-C2

NUTRITION

4B-42

PSYCH RES

4B-44

PSYCH OFFICE

4B-46

REPORT

4B-48

HAC

4B-50

STORAGE

4B-66

NOURISH.

4B-67

CORRIDOR

4B-C1

02-06

02-31

02-30

02-01 02-45

02-15

02-15

02-85

02-85

02-85

02-92

02-61

02-61

02-93

02-94

02-31

02-30 02-30

02-30

02-30

02-11

02-11

02-11

02-22

02-02

02-11

02-14

02-99

02-02

02-11

02-22

02-16

02-14

02-75

02-75

02-16

02-11

02-02

02-22

02-75

02-30

02-11

02-16

02-02

02-22

02-01 02-14

02-90

02-14

02-11

02-45

02-91 02-1402-14

02-11

02-11

02-11

02-99

02-10

02-10

02-10

02-11

02-13

02-90

02-91

02-13

02-13

02-13

02-17

02-16

02-10

02-10

02-13

02-99

02-13

02-92 02-70

02-1702-17

02-1402-14

02-85

02-99

02-99

02-13

02-22

02-16

02-02

02-75

02-30

02-1302-16

02-22

02-02

02-75

02-01 02-01

02-16 02-17

02-75

02-22

02-02

02-01

02-13

02-16

02-30

02-02

02-22

02-30

02-13

02-16

02-75

02-22

02-16

02-13

02-02

02-75

02-70

02-01

02-30

02-70 02-13

02-99

02-99

02-99

02-99

02-10

02-12

02-11

02-17

02-16 02-0102-01

02-11

02-02

02-22

02-16

02-75 02-75

02-16

02-01 02-1102-01

02-18

02-60

02-60

02-60

02-60

02-60 02-60

02-60

02-6002-60 02-60

02-62

02-62

02-61

02-61 02-62

02-62

02-7002-70

02-9502-95

02-41 02-41

02-41

02-4202-41

02-43

02-43

02-43

02-4302-43

02-04 02-04

02-04

02-04

02-06

02-04

02-18

02-18

02-18

02-18

02-04

02-06

02-18 02-18

02-04

02-15

02-4102-41

02-41

02-41

02-42

02-96

02-42

02-93

WALL RATING LEGEND:

1 HOUR FIRE BARRIER

1 HOUR SMOKE BARRIER

2 HOUR FIRE BARRIER

SHEET LEGEND:

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT

AREA OF WORK NOT IN THE SCOPE.

EXISTING TO REMAIN

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

KEY PLAN

PROJECT AREA - WING 4B

4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:4

P

M

BID DOCUMENTS

7/17/2024

DEMOLITION PLAN

AD1.00

UPDATE WING 4B

KZ, TBJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

GENERAL NOTES:KEYNOTES:

02-01 REMOVE EXISTING DOOR LATCH AND LOCK, ALL OTHER DOOR

HARDWARE TO REMAIN

02-02 REMOVE EXISTING VINYL/VELCRO SSPD DOOR

02-04 REMOVE EXISTING COVER TO HINGE AT NON-OPERABLE LEAF

OF EXISTING DOOR. PREP FOR NEW ANTI-LIGATURE COVER

PLATE. SEE DOOR SCHEDULE FOR NEW HARDWARE.

02-06 REMOVE EXISTING EXPANSION PLATE COVER, SALVAGE FOR

RE-INSTALLATION

02-10 REMOVE EXISTING CARPET

02-11 REMOVE EXISTING SHEET FLOORING

02-12 EXISTING CERAMIC FLOOR TILE AND WALL TILE TO REMAIN

02-13 REMOVE EXISTING VCT FLOORING

02-14 REMOVE EXISTING CORNER GUARD

02-15 REMOVE EXISTING WOOD SHELF

02-16 REMOVE EXISTING CRASH RAIL

02-17 REMOVE EXISTING HANDRAIL

02-18 EXISTING HAND PAINTED SIGNAGE TO REMAIN AT PAINTED

WALLS. FILL AND PRIME OVER EXISTING.

02-22 REMOVE EXISTING PATIENT ROOM SINK AND BASE SHROUD,

SALVAGE SINK AND SHROUD FOR RE-INSTALLATION

02-30 REMOVE EXISTING 10"X10" FLUSH ACCESS PANEL

02-31 REMOVE EXISTING 22"X22" FLUSH ACCESS PANEL

02-41 EXISTING WALL CABINETS TO BE REMOVED AND SALVAGE FOR

INSTALLATION BY THE GC.

02-42 EXISTING BASE CABINETS AND COUNTERTOPS TO REMAIN.

02-43 REMOVE EXISTING COUNTERTOP AND SALVAGE FOR

REINSTALL BY GC. WALL TRACK TO REMAIN.

02-45 REMOVE AND SALVAGE EXISTING LOCKERS

02-60 REMOVE EXISTING BOLTED DOWN PATIENT BED

02-61 REMOVE EXISTING BOLTED DOWN DINING TABLE

02-62 REMOVE EXISTING PATIENT DINING CHAIRS

02-70 REMOVE EXISTING VINYL WALL COVERING, PATCH AND REPAIR

GYPSUM BOARD WHERE PAPER IS DAMAGED

02-75 EXISTING RESINOUS FLOOR AT PATIENT BEDROOM TOILETS

TO REMAIN

02-85 EXISTING TERAZZO FLOORING INLAY AT BASE TO REMAIN

02-90 EXISTING WHITE BOARD TO REMAIN. CONTRACTOR TO

PROTECT AND PAINT AROUND EXISTING WHITEBOARD

COATING

02-91 EXISTING TV TO REMAIN, CONTRACTOR TO PROTECT AND

PAINT AROUND EXISTING TV

02-92 EXISTING MOBILE SHELVES, RELOCATED BY VA

02-93 EXISTING WALL MOUNTED SHELVES TO REMAIN

02-94 EXISTING LOCKED CABINET, RELOCATED BY VA

02-95 EXISTING WASHER AND DRYER, TO BE RELOCATED BY VA.

02-96 EXISTING KITCHEN APPLIANCES TO BE RELOCATED BY THE VA

02-99 NO WORK IN THIS ROOM EXISTING FINISHES TO REMAIN, DOOR

HARDWARE TO REMAIN

SHEET SPECIFIC NOTES:

1/8" = 1'-0"

DEMOLITION PLAN - WING 4B

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND

VERIFY EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL INSPECT AND

FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING

ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING,

OR PATCHING. VISITS MUST BE COORDINATED AND PRE-APPROVED WITH PROJECT

COR AND NURSE MANAGER.

2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION AND INTENT. THE

CONTRACTOR SHALL COORDINATE DEMOLITION WITH NEW CONSTRUCTION TO

ENSURE QUALITY OF FINAL PRODUCT.

3. DASHED LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING:

CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR

SUSPENDED EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS

AND GRILLES ETC.; FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET,

RESILIENT TILE, SHEET VINYL AND ACCESS DOORS.

4. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION BETWEEN ALL TRADES.

NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES.

5. REFER TO PHASING SHEET FOR PROJECT PHASING AND SEQUENCE OF WORK. ALL

DEMOLITION AND REMODEL WORK MUST BE CLOSELY COORDINATED WITH THE

COR.

6. THE GENERAL CONTRACTOR SHALL INSPECT AND FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING ELEMENTS SUBJECT TO

DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING OR PATCHING.

7. MATERIAL PRODUCT FROM DEMOLITION SHALL BECOME THE PROPERTY AND

RESPONSIBILITY OF THE CONTRACTOR WITH THE EXCEPTION OF SPECIFIED ITEMS

DESIGNATED EITHER IN THE PLANS OR VERBALLY REQUESTED BY THE (COR) TO BE

RETAINED BY THE VA.

8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND SHALL BE DISPOSED OF LAWFULLY.

9. DEMOLITION MATERIALS SHALL BE REMOVED FROM SITE ON A DAILY BASIS.

COORDINATE WITH THE COR THE IDENTIFICATION AND TRANSFER OF ANY ITEMS

THAT NEED TO BE SALVAGED.

10. VERIFY LOCATION OF EXISTING UTILITY LINES PRIOR TO STARTING DEMOLITION.

MAY NOT BE LIMITED TO UTILITIES SHOWN ON ARCHITECTURAL, MECHANICAL,

PLUMBING, AND ELECTRICAL PLANS. REFER TO THE THESE DRAWINGS FOR

ADDITIONAL INFORMATION.

11. UPON ENCOUNTERING UNFORESEEN CONDITIONS DURING REMODEL WORK, THE

CONTRACTOR SHALL NOTIFY THE COR BEFORE PROCEEDING.

12. COORDINATE DEMOLITION SHOWN ON THIS SHEET WITH DEMOLITION SHOWN ON

MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS. CREATE PENETRATIONS

AS REQUIRED FOR NEW CONSTRUCTION ON MECHANICAL AND ELECTRICAL

DRAWINGS.

13. THE CONTRACTOR SHALL PROTECT EXISTING CONSTRUCTION TO REMAIN. DAMAGE

TO EXISTING CONSTRUCTION SHALL BE REPAIRED TO EXISTING OR BETTER

CONDITION.

14. ERECT AND MAINTAIN TEMPORARY PARTITIONS AND ENCLOSURES TO PREVENT

THE TRANSMISSION OF DUST, ODOR, AND NOISE.

15. PROVIDE TEMPORARY MECHANICAL EXHAUST SYSTEMS TO MAINTAIN A NEGATIVE

PRESSURE WITHIN DEMOLITION ZONES.

16. CONTRACTOR SHALL PROVIDE TEMPORARY SEAL AT ALL DOOR AND WALL

OPENINGS AT PERIMETER WALLS DURING DEMOLITION WORK TO PROTECT

ADJACENT AREAS FROM DUST INTRUSION.

17. SOLID SHADED (GRAY) REGIONS DEPICT EXISTING CONSTRUCTION TO REMAIN OR

ITEMS/AREAS OUTSIDE OF SCOPE.

18. CONTRACTOR SHALL BE RESPONSIBLE FOR MOVING/RELOCATING ALL

FURNISHINGS, FURNITURE, AND NON PERMANENTLY ATTACHED EQUIPMENT PRIOR

TO COMMENCEMENT OF DEMOLITION. CONTRACTOR SHALL COORDINATE WITH

COR ON LOCATION OF STORED FURNISHINGS.

19. CAP/ABANDON ALL UTILITIES NOT REMOVED TO MAKE ROOM FOR NEW

CONSTRUCTION AS REQUIRED. COORDINATE WITH PROPOSED NEW

CONSTRUCTION CONDITIONS.

20. ALL INFILL AND PATCHWORK SHALL MATCH ADJACENT SURFACES IN FINISH AND

TEXTURE. ITEMS TO INCLUDE, BUT NOT LIMITED TO, WALLS, CEILINGS, AND

FLOORING. MATCH NEW ADJACENT FINISHES WHERE PRESENT. SEE ROOM FINISH

SCHEDULE.

21. DEMOLITION PLANS SHOW EXISTING ROOM NAMES AND NUMBERS. EXISTING ROOM

SIGNS ARE PAINTED ON WALL. SEE INTERIOR SHEETS AND SPECIFICATIONS FOR

PROCEDURE TO MATCH EXISTING.

22. REMOVE ALL EXISTING WALL MOUNTED ROOM ACCESSORIES, TOILET

ACCESSORIES, CEILING EQUIPMENT COVER AND PLATE, AND ELECTRICAL AND

DATE COVER PLATES FOR PAINTING AND REINSTALL.

23. REMOVE ALL WALL ARTWORK AND SALVAGE TO OWNER.

24. REMOVE ALL WALL MOUNTED ROOM ACCESSORIES (CHART FILES, WHITE BOARDS,

CLOCKS, TACK BOARDS, GLOVE BOXES HOLDERS, FIRE EXTINGUISHERS, SHARPS

CONTAINERS, ETC...) SHALL BE REMOVED, SALVAGED, AND REINSTALLED BY THE

GENERAL CONTRACTOR.

25. WORK THAT RESULTS IN NOISE AND VIBRATION MUST BE COORDINATED WITH

ADJACENT AREAS WITHIN THE HOSPITAL PRIOR TO WORK. WORK HOURS WILL BE

WEEK DAYS DURING BUSINESS HOURS OR WEEKENDS.

26. CONTRACTOR SHALL COORDINATE WITH THE VA FOR ALL VA EQUIPMENT ITEMS

NOT INDICATED ON THIS SHEET THAT IS TO BE RELOCATED BY VA PRIOR TO

DEMOLITION WORK.

27. WALL MOUNTED PERSONAL ITEMS LOCATED IN OFFICES, BREAK ROOM, AND NURSE

STATION SHALL BE REMOVED BY VA.

28. VA WILL REMOVE ALL APPLIANCES.

N

ABBREVIATION LEGEND:

V/V: VA PROVIDED, VA INSTALLED

V/C: VA PROVIDED, CONTRACTOR INSTALLED

C/C: CONTRACTOR PROVIDED, CONTRACTOR INSTALLED

STAIRWELL #14

S14-4

1 BED

4B-57

TOILET

4B-57A

TOILET

4B-59A

1 BED

4B-59

TOILET

4B-63A

1 BED

4B-63

DINING /

ACTIVITIES

4B-65

CORRIDOR

4B-C5

1 BED

4B-58

TOILET

4B-58A

TOILET

4B-60A

1 BED

4B-60

SOILED

4B-62

ANTE

4B-64

TOILET

4B-64B

SECLUSION

4B-64A

NURSE STATION

4B-70

TOILET

4B-70A

NURSE LOUNGE

4B-70B

1 BED

4B-72

TOILET

4B-72A

TOILET

4B-74A

1 BED

4B-74

1 BED

4B-76

TOILET

4B-76A

1 BED

4B-75

TOILET

4B-75A

TOILET

4B-73A

1 BED

4B-73

STAIRWELL #15

S15-4

MECH/ELEC

4B-71

CLEAN

4B-49

SOILED

4B-47

CORRIDOR

4B-C4

CORRIDOR

4B-C3

NURSE MANAGER

4B-45

EXAM ROOM

4B-43

ACTIVITY / DINING

ROOM

4B-40

SALLY PORT

4B-C2

NUTRITION

4B-42

PSYCH RES

4B-44

PSYCH OFFICE

4B-46

REPORT

4B-48

HAC

4B-50

STORAGE

4B-66

NOURISH.

4B-67

CORRIDOR

4B-C1

STORAGE

4B-55A

LAUNDRY

4B-55

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0" 02-52

02-52

02-52

02-52

02-52

7' - 11"

02-31

02-32

02-32

02-31

02-31

02-32

02-31

02-32

02-32 02-32 02-32

02-31

02-32

02-31

02-32

02-32

02-32

02-31

02-3202-32 02-31

02-32

02-32

02-31

02-3202-32

02-32

02-31

02-32

02-31

02-31

02-32

02-52

02-52 02-52

02-52

02-52

02-52

8' - 0"

8' - 0"

8' - 0"

8' - 0"

1. SHEET SIZE FOR PROPER SCALE IS 30X42.

2. SEE SHEET G0.01 FOR GENERAL NOTES.

WALL RATING LEGEND:

1 HOUR FIRE BARRIER

1 HOUR SMOKE BARRIER

2 HOUR FIRE BARRIER

SHEET LEGEND:

DEMOLISH ACT CEILING SYSTEM

AREA OF WORK NOT IN THE SCOPE. EXISTING TO REMAIN

LIMITS OF PROJECT/CONSTRUCTION UNDER THIS CONTRACT

EXISTING BULKHEAD TO REMAIN UNLESS

OTHERWISE NOTED

CEILING HEIGHT

DEMOLISH 16"X16" FLUSH ACCESS PANEL, HINGE SIDE TO

MATCH EXISTING LOCATION FOR NEW ACCESS PANELS.

VERIFY IN THE FIELD.

DEMOLISH 22"X22" FLUSH ACCESS PANEL, HINGE SIDE TO

MATCH EXISTING LOCATION FOR NEW ACCESS PANELS.

VERIFY IN THE FIELD.

EXISTING GYPSUM BOARD CEILING/SOFFIT

TO REMAIN UNLESS OTHERWISE NOTED

EXISTING 2'X4' LIGHT FIXTURE TO REMAIN, SEE

ELECTRICAL DRAWINGS

EXISTING 2'X2' ACT CEILING SYSTEM TO

REMAIN UNLESS OTHERWISE NOTED

EXISTING SUPPLY DIFFUSER, SEE MECHANICAL DRAWINGS

HEIGHT

EXISTING RETURN GRILLE, SEE MECHANICAL DRAWINGS

EXISTING RADIANT PANEL, SEE MECHANICAL DRAWINGS

N

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

KEY PLAN

PROJECT AREA - WING 4B

4F PROJECT NUMBER: 19.2481.A22

/1

/2

:1

:4

P

M

BID DOCUMENTS

7/17/2024

DEMOLITION REFLECTED CEILING

PLAN

AD1.10

UPDATE WING 4B

KZ, TBJL

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

437-23-103

1/8" = 1'-0"

DEMOLITION REFLECTED CEILING PLAN - WING 4B

GENERAL NOTES:KEYNOTES:

02-31 REMOVE EXISTING 22"X22" FLUSH ACCESS PANEL

02-32 REMOVE EXISTING 16"X16" FLUSH ACCESS PANEL

02-52 EXISTING ACT TO REMAIN SHEET SPECIFIC NOTES:

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE PROJECT AND

VERIFY EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL INSPECT AND

FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK, INCLUDING

ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT DURING DEMOLITION, CUTTING, OR

PATCHING. VISITS MUST BE COORDINATED AND PRE-APPROVED WITH PROJECT COR

AND NURSE MANAGER.

2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION AND INTENT. THE

CONTRACTOR SHALL COORDINATE DEMOLITION WITH NEW CONSTRUCTION TO

ENSURE QUALITY OF FINAL PRODUCT.

3. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING:

INTERIOR PARTITIONS (REMOVE TO STRUCTURE); CEILINGS, INCLUDING CEILING

SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED EQUIPMENT,

SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.; FLOOR

FINISHES (TO…

This is the start of the file's text. The full file is on GovTribe.