ATTACHMENT_B_v2 _ final.docx

DOCX document 64 KB Posted

Attached to
7D20--Abacus Visual Playbook Builder and Automation Orchestrator (VA-26-00041469)
Solicitation number
36C10B26Q0286
Issued by

About this file

This is Attachment B to a federal contract solicitation detailing the professional services requirements for hyperconverged infrastructure (HCI) and S3 object storage configuration supporting the Abacus Visual Playbook Builder and Automation Orchestrator platform at the Department of Veterans Affairs Veterans Health Administration (VHA) Veterans Integrated Service Network 23 (VISN 23).

The HCI Vendor Professional Services shall procure, install, and configure hyperconverged infrastructure hardware including HCI nodes, cluster manager, dedicated management console, and S3-compatible object storage. Hardware procurement is government-funded and must be delivered by Month 3, with physical installation (unboxing, rack mounting, cabling, power-on verification) completed by Month 4. The contractor must perform cluster initialization, configure storage containers for OpenShift, establish HCI Cluster Manager and Management Console with HTTPS access via government-provided FQDNs and internally CA-signed TLS certificates, configure Active Directory authentication, and deploy S3-compatible storage with versioning enabled on the "abacus-playbook-assets" bucket. The HCI Vendor shall create eight site-scoped local user accounts on the government's existing Prism Central for Ansible Automation Platform VM provisioning across eight physical sites (Fort Meade, Fargo, Sioux Falls, Saint Cloud, Minneapolis, Omaha, Iowa City, Central Iowa). S3 access control requires two local users: "abacus-assets-writer" with read/write permissions for the Abacus Ingress Uploader and "aap-assets-reader" with read-only permissions for Red Hat AAP. Software licenses shall use evaluation or trial versions during development (Months 1-12) with production licenses activating only upon successful Final Acceptance at Month 12. All infrastructure must be operational and accessible by Month 5, with complete documentation, credential inventory, and secure credential delivery to the Primary Contractor, Red Hat, and Government by Month 5 handoff.

View the file

Other files

File Type Posted
36C10B26Q0286 0003.docx DOCX document
RFI Follow-up _ Questions Answers_final.pdf PDF
36C10B26Q0286 0002.docx DOCX document
36C10B26Q0286_1.docx DOCX document
RFI_Statement of Objectives_v1.3_final.docx DOCX document
ATTACHMENT_A_v2 _ final.docx DOCX document
36C10B26Q0286.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

Hyperconverged Infrastructure (HCI) Vendor and S3 Object Storage PROFESSIONAL SERVICES REQUIREMENTS

Infrastructure and S3 Object Storage Configuration for:

Abacus Visual Playbook Builder and Automation Orchestrator

Department of Veterans Affairs Veterans Health Administration (VHA) Veterans Integrated Service Network 23 (VISN 23) Healthcare Technology Management / Biomedical Engineering

Project Context The HCI Vendor provides the hyperconverged infrastructure for the Abacus platform. This includes:

Layer
Components
Hardware
HCI nodes (racked, cabled, powered)
Cluster
HCI Cluster Manager with storage
Management
Dedicated HCI Management Console instance
Storage
S3-compatible Object Storage for automation assets

Three systems interact with HCI and S3 infrastructure:

System
Interaction
Red Hat OpenShift
Runs on AAP approved/validated HCI cluster
Abacus
Uploads automation assets to S3 bucket
AAP (Ansible Automation Platform)
Generates presigned URLs for asset downloads; may also execute VM provisioning workflows if Contractor selects AAP-based approach
Windows Workstations
Download assets via presigned URLs
VM Provisioning Component
Provisions VMs on existing VISN 23 Nutanix infrastructure (implementation at Contractor discretion per L14)Comment by Minetti, Christopher: Not to beat a dead horse, but other brands can do this right?

HCI Vendor’s role is infrastructure provider only. Application logic is handled by other parties.

Architecture Overview The following diagram illustrates the HCI infrastructure stack:

HYPERCONVERGED INFRASTRUCTURE (HCI) STACK

HCI Management Console (Dedicated) FQDN: hci.abacus.<domain>.com (TLS, internal CA-signed) Purpose: Centralized HCI management for Abacus cluster and hosts OpenShift + Abacus

| Manages v

HCI Cluster ManagerCluster (Abacus Cluster) Nodes: [Quantity TBD based on sizing] Purpose: Hyperconverged infrastructure for OpenShift + Abacus Storage: Containers configured for OpenShift CSI

| Hosts v

S3-Compatible Storage – S3 Store: "abacus-S3-store" FQDN: S3.abacus.<domain>.com (TLS, internal CA-signed) Bucket: abacus-playbook-assets Purpose: Automation assets (installers, config files) Structure: assets/{card-uuid}.zip, assets/{card-uuid}.manifest Versioning: Enabled

Data Flow:

Abacus Ingress ---- Writes ----> Bucket AAP ---- Generates presigned URLs ----> Windows Workstations download

Hardware Procurement and Installation Hardware Procurement

ID
Requirement
What It Enables
NX-HW1
Government shall fund procurement of hyperconverged infrastructure hardware through this contract
Capital expense covered by Government; hardware is contract deliverable
NX-HW2
Contractor shall coordinate hardware ordering with HCI Vendor, including Bill of Materials validation and delivery logistics
Single point of coordination; Government not burdened with vendor logistics
NX-HW3
Hardware specifications shall be sized to support OpenShift Container Platform and Abacus workloads as defined in Category AF (Scale and Concurrency)
Right-sized infrastructure; avoids over-provisioning or capacity constraints
NX-HW4
Hardware shall be delivered to Government datacenter by Month 3 milestone per contract schedule
Aligns with AE3; allows time for installation before Month 5 cluster online milestone

Physical Installation

ID
Requirement
What It Enables
NX-HW5
HCI Vendor Professional Services shall perform physical rack installation of all hardware components
Validated installation by certified personnel; preserves hardware warranty and support eligibility
NX-HW6
Physical installation includes: unboxing, rack mounting, cabling (power and network), and initial power-on verification
Complete physical deployment; hardware ready for HCI cluster creation
NX-HW7
HCI Vendor shall coordinate installation schedule with Government datacenter operations
Minimizes disruption; ensures datacenter staff availability for access and escorts
NX-HW8
HCI Vendor shall provide installation documentation including rack elevation diagrams, cable labeling scheme, and as-built network port assignments
Government maintains accurate datacenter records; supports future maintenance

Government Network Preparation

ID
Requirement
What It Enables
NX-HW9
Government shall ensure top-of-rack (ToR) switches are installed, configured, and ready to accept HCI node connections prior to physical installation date
Network infrastructure prerequisite; HCI Vendor cannot complete installation without network readiness
NX-HW10
Government shall provide VLAN assignments, IP address allocations, and gateway information for HCI management network, storage network, and VM networks
Network configuration inputs required for Foundation process
NX-HW11
Government shall ensure sufficient rack space, power capacity, and cooling for HCI hardware prior to delivery
Physical infrastructure prerequisites

HCI Cluster Manager Configuration HCI Cluster Manager Formation

ID
Requirement
What It Enables
NX-PE1
HCI Vendor Professional Services shall perform cluster initialization process to initialize all nodes and form a single HCI cluster
Transforms bare hardware into operational hyperconverged cluster
NX-PE2
Cluster initialization process includes: imaging nodes with HCI Node Operating System, configuring storage controller, network settings, and cluster creation
Complete software initialization; cluster ready for workloads
NX-PE3
Cluster shall be named according to Government naming convention (name to be provided during implementation)
Consistent naming; aligns with Government IT asset management
NX-PE4
HCI Cluster Manager shall be configured with redundancy factor appropriate for node count
Data protection; cluster survives node failures
NX-PE5
HCI Vendor shall configure storage containers for OpenShift workloads per Red Hat OpenShift on HCI validated design
Storage ready for OpenShift CSI integration

HCI Cluster Manager Access Configuration

ID
Requirement
What It Enables
NX-PE6
HCI Cluster Manager web console shall be accessible via HTTPS on Government-provided FQDN
Secure management access; human-readable URL
NX-PE7
TLS certificate for HCI Cluster Manager shall be provided by Government (internal CA-signed) and applied by HCI Vendor during configuration
Secure access without browser warnings; aligns with Government PKI
NX-PE8
HCI Vendor shall configure HCI Cluster Manager for Active Directory authentication using Government-provided service account and AD group mappings
Centralized identity; role-based access control
NX-PE9
HCI Vendor shall document local administrator credentials and deliver securely to Government
Break-glass access; disaster recovery capability

Cluster Validation

ID
Requirement
What It Enables
NX-PE10
HCI Vendor shall perform cluster health validation and remediate any warnings or failures before handoff
Verified healthy cluster; issues resolved before production use
NX-PE11
HCI Vendor shall provide cluster configuration documentation including: node inventory, network configuration, storage container layout, and NCC health report
Government maintains configuration baseline; supports future troubleshooting

HCI Management Console Deployment HCI Management Console Installation

ID
Requirement
What It Enables
NX-PC1
HCI Vendor Professional Services shall deploy a dedicated HCI Management Console instance for Abacus cluster management
Centralized multi-cluster management capability; required for S3-Compatible Storage
NX-PC2
HCI Management Console shall be deployed on the Abacus HCI Cluster (not shared with other Government HCI environments)
Dedicated management plane; isolation from other Government HCI environments
NX-PC3
HCI Management Console deployment size shall be appropriate for single-cluster management
Right-sized deployment; avoids over-provisioning
NX-PC4
HCI Management Console shall be registered with the Abacus HCI Cluster Manager
Enables centralized management features

HCI Management Console Access Configuration

ID
Requirement
What It Enables
NX-PC5
HCI Management Console web console shall be accessible via HTTPS on Government-provided FQDN (e.g., cluster.abacus.<domain>.com)
Secure management access; human-readable URL
NX-PC6
TLS certificate for HCI Management Console shall be provided by Government (internal CA-signed) and applied by HCI vendor during configuration
Secure access without browser warnings; aligns with Government PKI
NX-PC7
HCI Vendor shall configure HCI Management Console for Active Directory authentication using Government-provided service account and AD group mappings
Centralized identity; role-based access control
NX-PC8
HCI Vendor shall document local administrator credentials and deliver securely to Government
Break-glass access; disaster recovery capability

HCI Management Console Validation

ID
Requirement
What It Enables
NX-PC9
HCI Vendor shall verify HCI Management Console health and successful cluster registration before proceeding to S3 storage deployment
Validated management plane; prerequisite for S3 storage
NX-PC10
HCI Management Console shall be operational and accessible by Month 5 milestone
Aligns with AE4; enables Objects activation and OpenShift deployment

Existing Prism Central Configuration The Government operates an existing Prism Central instance that manages the eight (8) physical site Prism Element clusters. AAP requires credentials to this existing Prism Central for VM provisioning via the nutanix.ncp collection. Comment by Minetti, Christopher: Or equivalent?

ID
Requirement
What It Enables
NX-PC11
HCI Vendor Professional Services shall create eight (8) local user accounts on the Government's existing Prism Central for AAP automation use. Each account shall have RBAC permissions scoped to a single physical site's Prism Element cluster (Fort Meade, Fargo, Sioux Falls, Saint Cloud, Minneapolis, Omaha, Iowa City, Central Iowa). Account naming convention shall be coordinated with the Contractor.
Site-scoped VM provisioning credentials for AAP
NX-PC12
HCI Vendor shall generate access credentials for each local user account and deliver them securely to the Contractor.
Contractor can configure AAP with site-scoped Nutanix accessComment by Minetti, Christopher: Can this be made generic as well?
NX-PC13
HCI Vendor shall document the RBAC configuration applied to each account, including which Prism Element cluster each account can access.
Government maintains configuration records; supports troubleshooting

Note: This configuration is performed on the Government's existing Prism Central

S3-Compatible Storage Configuration S3-Compatible Storage Infrastructure

ID
Requirement
What It Enables
NX-OBJ1
S3-Compatible Storage activated on Abacus cluster
S3-compatible storage available for platform use
NX-OBJ2
S3-Compatible Storageconfigured with ”right-sized” workers and load balancer configuration
Sufficient capacity and redundancy for workload
NX-OBJ3
FQDN configured for S3-Compatible Storage endpoint (e.g., s3.abacus.<domain>.com)
Human-readable, DNS-resolvable endpoint; enables TLS with proper certificate
NX-OBJ4
TLS certificate applied to S3-Compatible Storage endpoint, signed by Government's internal CA, with FQDN in subject/SAN
Secure HTTPS access; presigned URLs trusted by target workstations
NX-OBJ5
Single DNS A record points to primary load balancer; secondary LB available for manual failover if available
Simplified DNS; documented failover path without round-robin complexity

Bucket Configuration

ID
Requirement
What It Enables
NX-OBJ6
Bucket created: abacus-playbook-assets
Storage for automation assets (installers, config files, manifests)
NX-OBJ7
Versioning enabled on abacus-playbook-assets bucket
Multiple versions of same asset tracked; supports rollback and audit

Access Control

ID
Requirement
What It Enables
NX-OBJ8
All S3 access uses local HCI Vendor users (not Active Directory)
Eliminates AD service account password rotation burden; per-bucket isolation
NX-OBJ9
Local user abacus-assets-writer created with read/write access to abacus-playbook-assets
Abacus Ingress Uploader can store uploaded assets
NX-OBJ10
Local user aap-assets-reader created with read-only access to abacus-playbook-assets
AAP can generate presigned download URLs without write capability
NX-OBJ11
Access/secret keys generated for each local user and delivered securely to appropriate party
Each system has credentials scoped to its required access

Local User Summary:

User Name
Bucket
Permissions
Credential Recipient
abacus-assets-writer
abacus-playbook-assets
Read + Write
Primary Contractor (Abacus)
aap-assets-reader
abacus-playbook-assets
Read only
Red Hat (AAP)

TLS Certificate Requirements Certificate Overview

Component
FQDN Pattern
Certificate Purpose
HCI Cluster Manager
cluster.abacus.<domain>.com
Cluster management console
HCI Management Console
management.abacus.<domain>.com
Centralized management console
S3-Compatible Storage
s3.abacus.<domain>.com
S3 API endpoint; presigned URLs

Certificate Specifications

Attribute
Requirement
Certificate Type
X.509, signed by Government's internal CA
Key Usage
Server authentication
Subject/SAN
Must include the component's FQDN
Validity
Per Government certificate policy (typically 1-2 years)

Certificate Requirements

ID
Requirement
What It Enables
NX-TLS1
All TLS certificates shall be signed by Government's internal Certificate Authority
Certificates trusted by Government systems without external CA dependency
NX-TLS2
Certificates shall include FQDN in both Subject Common Name and Subject Alternative Name (SAN)
Proper certificate validation by clients
NX-TLS3
Government shall provide certificates to HCI Vendor prior to component configuration
HCI Vendor can apply certificates during initial setup (not post-hoc)
NX-TLS4
HCI Vendor shall apply TLS certificates to HCI Cluster Manager, HCI Management Console, and S3-Compatible Storage
Secure HTTPS access to all management interfaces and APIs
NX-TLS5
HCI Vendor shall verify certificate installation by confirming HTTPS access without certificate warnings from a Government workstation
Validated certificate chain; confirms CA trust is properly configured

Why FQDN matters for presigned URLs:

AAP generates presigned URLs that embed the hostname. If AAP connects via FQDN, the presigned URLs contain that FQDN. Target workstations trust the internal CA (installed during onboarding), so downloads succeed. Using an IP address or self-signed certificate would cause TLS trust failures on workstations.

Certificate Responsibility Model

Task
Responsible Party
Certificate request and issuance
Government PKI Team
DNS A record creation
Government Network Team
Certificate application to HCI components
HCI Vendor Professional Services
Certificate renewal (post-deployment)
Government (HCI Vendor provides guidance)

License Activation Timing License Deferral Requirements

ID
Requirement
What It Enables
NX-LIC1
HCI vendor software licenses shall not activate or begin subscription term until successful completion of Final Acceptance milestone (Month 12)
Government receives full license term value; development period does not consume production entitlements
NX-LIC2
HCI Vendor shall provide evaluation, trial, or development licenses during the period of performance (Months 1-12) at no additional cost to the Government
Infrastructure operational for development without consuming production license term
NX-LIC3
If evaluation licenses are unavailable for specific HCI vendor components, Contractor shall coordinate with HCI Vendor to propose alternative approach (e.g., deferred invoicing) and obtain Contracting Officer approval
Flexibility for edge cases while maintaining Government cost protection
NX-LIC4
Contractor shall not invoice Government for HCI vendor production licenses until Final Acceptance is successfully completed
Invoice timing aligned with license activation
NX-LIC5
HCI Vendor (or Contractor coordinating with HCI Vendor) shall provide license activation schedule documenting: activation date, term length, renewal date, and license quantities for each component
Clear record for Government renewal planning

License Scope

Component
License Type
Activation Trigger
HCI Node Operating System
Per-node
Final Acceptance (Month 12)
S3-Compatible Storage
Capacity-based
Final Acceptance (Month 12)

Note: Exact license SKUs and quantities will be determined during hardware sizing. This section establishes the timing policy, not the specific license inventory.

Integration Points Integration with Red Hat (AAP) Presigned URL Workflow:

AAP Controller --> S3 API: Generate presigned URL --> S3-Compatible Storage API --> Returns: HTTPS URL with signature --> AAP Controller AAP Controller --> URL provided to Windows workstation Windows Workstation --> HTTPS download --> S3-Compatible Storage

HCI Vendor provides to Red Hat:

- S3-Compatible API FQDN

- aap-assets-reader credentials

Red Hat provides to HCI vendor:

- Nothing required

Integration with Primary Contractor (Abacus) Data Flow:

Abacus Ingress Uploader ---- Writes ----> abacus-playbook-assets bucket

HCI Vendor provides to Contractor:

- S3-Compatible API FQDN

- abacus-assets-writer credentials (for Ingress Uploader)

- HCI Management Console API endpoint

Contractor provides to HCI Vendor:

- Nothing required

Integration with Target Workstations Download Flow:

Windows Workstation ---- HTTPS (presigned URL) ----> abacus-playbook-assets

Critical requirement: The S3-Compatible endpoint must use an FQDN with a TLS certificate signed by the internal CA. Workstations will have this CA in their trust store (installed during onboarding via separate Git-based workflow). If the certificate is not trusted, asset downloads will fail.

Day 0 Implementation Checklist Phase 1: Pre-Delivery Preparation

#
Task
Responsible
Dependency
Target
1
Confirm datacenter readiness (rack space, power, cooling)
Government
None
Pre-Month 4
2
Confirm ToR switch readiness and provide network configuration
Government
None
Pre-Month 4
3
Provide VLAN assignments, IP allocations, gateway info
Government
None
Pre-Month 4
4
Provide FQDNs for HCI Cluster Manager, Management Console, and S3-Compatible storage
Government
None
Pre-Month 4
5
Create DNS A records for all FQDNs
Government
FQDNs defined
Pre-Month 5
6
Issue TLS certificates HCI Cluster Manager, Management Console, and S3-Compatible endpoint
Government PKI
FQDNs defined
Pre-Month 5
7
Provide AD service account and group mappings
Government
None
Pre-Month 5

Phase 2: Hardware Delivery and Installation

#
Task
Responsible
Dependency
Target
8
Deliver hardware to Government datacenter
HCI Vendor
NX-HW4
Month 4
9
Perform physical rack installation
HCI vVndor
Hardware delivered
Month 4
10
Complete cabling (power and network)
HCI Vendor
Rack installation
Month 4
11
Perform power-on verification
HCI Vendor
Cabling complete
Month 4
12
Deliver installation documentation
HCI Vendor
Installation complete
Month 4

Phase 3: HCI Cluster Manager

#
Task
Responsible
Dependency
Target
13
Perform cluster initialization process
HCI Vendor
Physical installation
Month 5
14
Configure storage containers for OpenShift
HCI Vendor
Foundation complete
Month 5
15
Apply TLS certificate to HCI Cluster Manager
HCI Vendor
Certificate provided
Month 5
16
Configure AD authentication for HCI Cluster Manager
HCI Vendor
AD info provided
Month 5
17
Perform HCI cluster health validation
HCI Vendor
Cluster configured
Month 5
18
Document and deliver HCI Cluster Management admin credentials
HCI Vendor
Cluster configured
Month 5

Phase 4: HCI Management Console

#
Task
Responsible
Dependency
Target
19
Deploy HCI Management Console on cluster
HCI Vendor
PE operational
Month 5
20
Register cluster with HCI Management Console
HCI Vendor
PC deployed
Month 5
21
Apply TLS certificate to HCI Management Console
HCI Vendor
Certificate provided
Month 5
22
Configure AD authentication for HCI Management Console
HCI Vendor
AD info provided
Month 5
23
Verify HCI Management Consolehealth
HCI Vendor
PC configured
Month 5
24
Document and deliver HCI Management Console local admin credentials
HCI Vendor
PC configured
Month 5

Phase 5: S3-Compatible Storage

#
Task
Responsible
Dependency
Target
25
Activate S3-Compatible Storage on HCI Management Console
HCI Vendor
HCI cluster operational
Month 5
26
Create S3-Compatible storage with FQDN endpoint
HCI Vendor
S3 storage activated, DNS ready
Month 5
27
Apply TLS certificate to S3-Compatible endpoint
HCI Vendor
Certificate provided
Month 5
28
Verify HTTPS access to S3-Compatible endpoint
HCI Vendor
TLS applied
Month 5
29
Create bucket: abacus-playbook-assets
HCI Vendor
Object Store created
Month 5
30
Enable versioning on bucket
HCI Vendor
Bucket created
Month 5
31
Create local user: abacus-assets-writer
HCI Vendor
Bucket created
Month 5
32
Create local user: aap-assets-reader
HCI Vendor
Bucket created
Month 5
33
Configure bucket policies per access matrix
HCI Vendor
Users created
Month 5
34
Generate access/secret keys
HCI Vendor
Policies configured
Month 5

Phase 6: Handoff

#
Task
Responsible
Dependency
Target
35
Deliver configuration documentation
HCI Vendor
All phases complete
Month 5
36
Deliver credential inventory to Government
HCI Vendor
All phases complete
Month 5
37
Deliver S3-Compatible FQDN and CA cert to Red Hat
HCI Vendor
TLS verified
Month 5
38
Deliver aap-assets-reader credentials to Red Hat
HCI Vendor
Keys generated
Month 5
39
Deliver S3-Compatible FQDN to Primary Contractor
HCI Vendor
TLS verified
Month 5
40
Deliver abacus-assets-writer credentials to Contractor
HCI Vendor
Keys generated
Month 5
41
Government acknowledges infrastructure handoff
Government
Documentation delivered
Month 5

Coordination Requirements

From
To
Information Exchanged
When
Government
HCI Vendor
Datacenter readiness confirmation
Pre-Month 4
Government
HCI Vendor
Network configuration (VLANs, IPs, gateways)
Pre-Month 4
Government
HCI Vendor
FQDNs for Cluster Manager, Management Console, and S3-Compatible Storage
Pre-Month 4
Government
HCI Vendor
TLS certificates for Cluster Manager, Management Console, and S3-Compatible Storage
Pre-Month 5
Government
HCI Vendor
AD service account and group mappings
Pre-Month 5
HCI Vendor
Government
Hardware delivery schedule
Month 4
HCI Vendor
Government
Installation completion confirmation
Month 4
HCI Vendor
Government
Configuration documentation and credentials
Month 5
HCI Vendor
Red Hat
S3-Compatible Storage FQDN, internal CA certificate, aap-assets-reader credentials
Month 5
HCI Vendor
Primary Contractor
S3-Compatible Storage FQDN, abacus-assets-writer credentials, HCI Management Console API endpoint
Month 5
Primary Contractor
HCI Vendor
License activation authorization
Month 12

What HCI Vendor Does NOT Own

Task
Owner
Datacenter preparation (rack space, power, cooling)
Government Facilities
Top-of-rack switch installation and configuration
Government Network Team
DNS A record creation for all FQDNs
Government Network Team
TLS certificate issuance
Government PKI Team
Active Directory service account creation
Government Identity Team
OpenShift installation on HCI cluster
Red Hat Professional Services
AAP installation and configuration
Red Hat Professional Services
Abacus application development and deployment
Primary Contractor
Understanding Ansible, WinRM, or Windows automation
Red Hat / Primary Contractor
Certificate renewal post-deployment
Government (HCI Vendor provides guidance)
License procurement funding
Government (via contract)
License activation timing coordination
Primary Contractor
Certificate management and workstation onboarding workflows
Red Hat (via Git repository)

HCI Vendor Deliverables Summary Infrastructure Deliverables

#
Deliverable
Description
1
Hardware
Hyperconverged infrastructure nodes, racked and cabled
2
HCI Cluster Manager
Operational cluster with storage containers configured for OpenShift
3
HCI Management Console
Dedicated management instance registered with cluster
4
S3-Compatible Storage
S3-Compatible Storage with FQDN endpoint and TLS certificate
5
S3 Bucket
abacus-playbook-assets bucket with versioning enabled

Access Deliverables

#
Deliverable
Recipient
6
HCI Cluster Manager local admin credentials
Government
7
HCI Management Management Console local admin credentials
Government
8
abacus-assets-writer S3 credentials
Primary Contractor (for Abacus)
9
aap-assets-reader S3 credentials
Red Hat (for AAP)
10
HCI Management Console API credentials (8, site-scoped)
Primary Contractor (for AAP)

Documentation Deliverables

#
Deliverable
Description
11
Rack elevation diagram
Physical hardware placement
12
Network port assignments
As-built cabling documentation
13
Cluster configuration document
Node inventory, network config, storage layout
14
HCI health report
Cluster validation results
15
Credential inventory
Secure handoff of all generated credentials
16
License activation schedule
Dates, terms, and renewal information