ATTACHMENT B- STATEMENT OF WORK (SOW).pdf
PDF 244 KB Posted
- Attached to
- Combined Synopsis Solicitation 951700-23-R-0235 WATERPROOFING OF ADMIN AND TX BUILDING IN KUWAIT
- Solicitation number
- 951700-23-R-0235
- Issued by
-
US Agency for Global Media
About this file
This document is a Statement of Work for a federal contract solicitation to waterproof the administration and transmission buildings at the US Agency for Global Media facility in Kuwait. The project scope includes spray application of an elastomeric waterproofing sealant to the pre-engineered metal roofing in an 11-step process, with a minimum 12-15 year warranty. The estimated project duration is four months from preparatory meetings through completion of the waterproofing work. The contractor will be responsible for site surveys, protecting existing electrical systems, submitting product data for approval, daily cleaning and site restoration, waste disposal, and providing a qualified on-site supervisor and project schedule. The related federal contract opportunity is solicitation number 951700-23-R-0235 issued by the US Agency for Global Media to waterproof the buildings in Kuwait.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The project calls for the water proofing of Admin & TX Building.
The following is included in the work's scope:
Entire roof of pre-engineered metal building is to be coated and sealed with an elastomeric spray-applied water proofing sealant. The product shall be GAF topcoat, or approved equal product is to be applied in accordance with metal building and product manufacturer’s recommendations and requirements to ensure complete coverage and seal of the roof surface.
The material should be suitable for use in hot climatic conditions. Coating should provide excellent weather and UV resistant. Recommended make or origin of the product is from US, Germany, UK, France, Spain & Australia. Process to be similar to:
• Step 1- Tighten and/or replace existing fasteners,
• Step 2- Pressure wash roof,
• Step 3. Install crickets to divert water and complete other necessary sheet metal repairs,
• Step 4- Prime rusty areas with topcoat MP-300 or approved equal at 1 gallon per square,
• Step 5- Treat horizontal seams with 150mm wide band of topcoat flashing liquid fabric or approved equal at 5 gallons per 125 lineal feet,
• Step 6- Treat vertical seams with bead of topcoat flashing grade or approved equal at 5 gallons per 125 lineal feet,
• Step 7- Treat all roof penetrations and Rake edges with topcoat flashing grade or approved equal embedded in 150mm topcoat flashing fabric or approved equal at 5 gallons per 125 lineal feet,
• Step 8- Encapsulate exposed fasteners with topcoat flashing grade or approved equal,
• Step 9- Quality assurance representative to perform inspection,
• Step 10- Apply base coat of topcoat membrane or approved equal at 1.5 gallons per square,
• Step 11- Apply finish coat of topcoat membrane or approved equal at 1.75 gallons per square. Color to match existing or be approved by contracting officer.
• System shall have a minimum 12 to 15-year guaranty.
ATTACHMENT B- STATEMENT OF WORK (SOW)
Solicitation 951700-23-R-0235
Waterproofing of the Admin and TX building at the USAGM Transmitting station in Kuwait.
Estimated Project Duration:
First phase: Preparatory Meeting, Documentation work & submittal– 1Month
Second phase: Delivery of material to Site – 2 Month
Third phase: Water Proofing of Roof – 30 Days
Total: 4 Months
Site visit: 08/24/2023 at 8:00AM
Contractor’s Responsibility
1. It is the contractor’s responsibility to verify the exact dimensions and measurements during the site survey.
2. The worksite area has electrical piping/cabling. The contractor must verify all electrical piping/cabling before star�ng the ac�vi�es and shall be responsible for any damages to electrical/ network cabling.
3. Product data/catalogue shall be submited for review and approval.
4. Any damages caused to the adjacent loca�ons, areas, or items (Equipment, Doors, building, etc.) has to be restored to their original condi�ons by the contractor
5. General cleaning on a daily basis and final cleaning on comple�on as appropriate
6. The contractor shall identify a Site Supervisor who shall be responsible for the overall management of the project. The Site Supervisor shall speak in English.
7. The workforce should be fully vaccinated and wear face masks at all times.
8. The contractor shall ensure the work site is cleaned and item restored at the end of each day.
9. The work site shall always be kept clean and clear of obstructions as the surrounding area shall be in use, and the work should pose the least impact upon the general day to day use of the property.
10. Waste disposal is contractor’s responsibility.
11. Contractor shall submit final As-built drawing.
12. The contractor must have at least five years of experience in Civil & MEP works.
13. During the project construction phase, a qualified supervisor of that particular discipline should be present on site.
14. A 2-Year warranty is needed for the Washroom Renovation & Refurbishment of the Guard House project.
15. Technical Proposal & project schedule shall be submitted.