Attachment B- Statement of Work.pdf
PDF 957 KB Posted
- Attached to
- Integral Fuel Tank Repair
- Solicitation number
- 70Z03825QL0000144
About this file
This Statement of Work (SOW) details the repair services for HC-144 integral fuel tanks for the United States Coast Guard (USCG). The scope covers a one-time purchase for repair services of the HC-144 aircraft fuel tanks, including sealant removal, non-destructive testing, surface preparation, and re-sealing. The contractor is responsible for all necessary functions including tooling, manuals, test equipment, parts, materials, engineering services, management, maintenance, documentation, and preservation.
The contract requires the contractor to be ISO 9000 compliant and have experience repairing aircraft fuel tanks for the Coast Guard. Specific tasks include removing and reapplying sealant at various wing stations, performing leak checks, installing components, and utilizing specific technical references like AFTO and CGTO manuals. The work involves detailed procedures for center and outer wing fuel tank areas, with quality assurance checks throughout the process. The contractor must provide all parts, labor, and equipment, and will be required to warranty the work for 90 days after government acceptance. Key documents referenced include AFTO 1-1-3 and various CGTO manuals for aircraft fuel systems and structural repair.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A- SOLICITATION BUY -Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .