Attachment B Specifications~7.pdf
PDF 225 KB Posted
- Solicitation number
- S-R34750-00013516
- Issued by
- Washington County, Barlow City, Oregon
About this file
This is a Special Provisions document for highway construction issued by the Oregon Department of Transportation for the I-84 Echo Salt Shed Fencing Project located on the Old Oregon Trail Highway in Umatilla County, scheduled for May 2025. The project scope consists of three primary work elements: removal of existing Type 1 fencing, construction of CL-6R chain link security fencing, and installation of chain link fence gates. The work is governed by the 2024 edition of the Oregon Standard Specifications for Construction as modified by these special provisions. A mandatory pre-work conference must be scheduled between the contractor and the State Project Manager at a mutually agreed upon time, with work commencing within ten working days of the conference following issuance of the Notice to Proceed. A pre-bid conference is not required; however, bidders are solely responsible for inspecting the project sites prior to submission and cannot claim grounds for charges to the State beyond the bid price based on failure to conduct site inspection.
The document addresses specific technical and procedural requirements across five primary sections: Quality of Materials, Mobilization, Environmental Protection, Removal of Structures and Obstructions, and Fences specifications. Material certification requirements are included for Federal-aid projects, requiring completion of origin certificates as furnished by the Engineer. No specific contract pricing, award amounts, or renewal terms are detailed in this special provisions document. This is classified as a State Project with applicable specifications managed under standard Oregon Department of Transportation procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mats Towels Lease RFQ 2025 Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
FOR HIGHWAY CONSTRUCTION
OREGON DEPARTMENT OF TRANSPORTATION
SALEM, OREGON
FENCING
I-84: ECHO SALT SHED FENCING PROJECT
OLD OREGON TRAIL HIGHWAY
UMATILLA COUNTY
MAY 2025
ATTACHMENT B SPECIFICATIONS
I84: Echo Salt Shed Fencing Project
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
WORK TO BE DONE
SECTION 00165 - QUALITY OF MATERIALS
SECTION 00210 - MOBILIZATION
SECTION 00290 - ENVIRONMENTAL PROTECTION
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 01050 - FENCES
OREGON DEPARTMENT OF TRANSPORTATION
FOR
Fencing I-84: Echo Salt Shed Fencing Project
Old Oregon Trail Highway Umatilla County
PROFESSIONAL OF RECORD CERTIFICATION:
Seal w/signature I certify the Special Provision Section(s) listed below are applicable to the design for the subject project for fencing elements. Modified Special Provisions were prepared by me or under my supervision.
Sections 00165, 00310 and 01050
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
2025.04.07 11:34:18 -07'00'
SPS_M25027, I-84: Echo Salt Shed Fencing Project, Contract, May 2025 1
WORK TO BE DONE
The Work to be done under this Contract consists of the following:
1. Remove existing Type 1 fencing as shown or directed.
2. Construct CL-6R chain link security fencing.
3. Install chain link fence gates.
Perform additional and Incidental Work as called for by the Specifications and Plans.
APPLICABLE SPECIFICATIONS
The Specifications that are applicable to the Work on this Project is the 2024 edition of the "Oregon Standard Specifications for Construction", as modified by these Special Provisions.
All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.
CLASS OF PROJECT
This is a State Project.
COORDINATION WITH STATE PROJECT MANAGER
The Contractor shall meet with the State Project Manager for a pre-work conference at a time mutually agreed upon. Work shall commence within ten working days of this meeting, providing the Notice to Proceed has been issued. A pre-bid conference will not be required.
Bidders are solely responsible for inspecting the sites prior to bidding. In no event shall failure to inspect the site constitute grounds for charges to the State more than the bid price.
I-84: Echo Salt Shed Fencing Project
SPS_M25027, I-84: Echo Salt Shed Fencing Project, Contract, May 2025 2
SECTION 00165 - QUALITY OF MATERIALS
Comply with Section 00165 of the Standard Specifications modified as follows:
00165.35(e) Certificate of Origin of Construction Materials – Replace this subsection, except for the subsection number and title, with the following:
When a certificate of material origin for construction materials is specified, complete the form furnished by the Engineer as required by 00160.20(d) for Federal-aid projects.
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications.
SECTION 01050 - FENCES
Comply with Section 01050 of the Standard Specifications.
***END SPECIAL PROVISIONS***