Attachment B - Specifications~3.docx
DOCX document 34 KB Posted
- Attached to
- MIM Interstate 5 Mp 69-76 Grinding and Paving
- Solicitation number
- S-73000-00013025
- Issued by
- Jackson County, Oregon
About this file
This document is a Project Specifications file from the Oregon Department of Transportation (ODOT) for a highway pavement preservation project on Interstate 5 in Josephine County. The project involves inlay pavement preservation two inches deep at various locations along Pacific Highway between mileposts 69-76, with work to be completed by May 15, 2025. The project will include grinding and paving specific sections of southbound and northbound I-5, including full lane and wheel rut paving in designated areas. Specific work locations include multiple segments between mileposts 69-76, with precise lane and rut specifications outlined in the document.
The project will utilize PG76-22ER grade asphalt cement and requires extensive testing protocols, including sampling and testing for each 1,000 tons of placement. The contractor is responsible for traffic control, utility coordination, and environmental protection, with nightly lane closures permitted between 7:00 PM and 7:00 AM from Sunday night through Friday morning. Estimated quantities are provided for bidding purposes, with ODOT reserving the right to adjust quantities, add, or delete work items as needed. The project will follow ODOT's 2024 Standard Specifications for Highway Construction and comply with specific traffic control and environmental protection requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00013025 ITB.docx | DOCX document | |
| 00013025 ITB~1.docx | DOCX document | |
| Advertisement for ITB Hwy 26 Sani Rehab.pdf | ||
| ATT C Bid Pricing Form~2.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION OF WORK
Pacific Hwy Interstate 5 MP 69-76 Grinding and Paving Pacific Highway Josephine County
WORK TO BE DONE
Work to be done under this Contract consists of the following:
· Inlay Pavement preservation two inches deep various locations.
· Work to be completed by 5-15-2025
It is the contractor’s responsibility to determine utility or facility conflicts and contact and coordinate with the appropriate utility company or government agency. All utility involvement shall be considered incidental to the project and no separate payment will be made.
Project Manager Adam O. Stallsworth Oregon Department of Transportation Region 3 District 8 100 Antelope Road White City, Oregon.
541-890-2620
ESTIMATED QUANTITIES: All quantities are estimated and are for bidding purposes only. The Oregon Department of Transportation (ODOT) reserves the right to adjust quantities; add or delete items of work as needed.
Additional Specifications
Comply with the “State of Oregon Standard Conditions for Public Improvement Contracts.” Supplemental specifications which are applicable to the work on this project are the Oregon Department of Transportation’s Standard Specifications for Highway Construction 2024, or as modified by the Special Provisions. https://www.oregon.gov/odot/Business/Specs/2024_STANDARD_SPECIFICATIONS.pdf
NOTE: The “State of Oregon Standard Conditions for Public Improvement Contracts” take precedence over all other specifications. (http://www.oregon.gov/ODOT/HWY/SPECS/index.shtml)
Temporary Work Zone Traffic Control:
All traffic control devices and measures shall comply with the 2009 Manual on Uniform Traffic Control Devices (http://mutcd.fhwa.dot.gov/) and ODOT Standard Drawings (http://www.odot.state.or.us/techserv/roadway/specs/home.htm).
SPECIAL PROVISIONS
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
00220.02(a) General Requirements - Add the following bullet(s) to the end of the bullet list:
When paving operations create an abrupt edge, protect traffic by installing signing according to the "Divided Highway or Freeway One Lane Closure" detail shown on the Standard Drawings.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the Pacific Highway Interstate 5 Highway I-5 when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
Single Lane Closures – One Traffic Lane in each direction on the Pacific Highway, Interstate 5 may be closed during the following times:
Nightly Sunday night through Friday morning between 7:00pm and 7:00am.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan ‑ Replace this subsection with the following subsection:
00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs –
(a) Traffic Control Plan - Submit one of the following, 5 Calendar Days before the preconstruction conference:
(1) Agency Traffic Control Plan ‑ If the Contractor intends to use the Agency TCP without modification, a written notification indicating that the Agency TCP will be used without modification.
(2) Contractor-Modified Traffic Control Plan ‑ The Contractor may request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor. Do not use a modified TCP, or a TCP developed by the Contractor, unless approved by the Engineer. Use the Agency TCP unless a modified TCP, or a TCP developed by the Contractor is accepted.
The Engineer is not obligated to consider any modified Agency TCP or a TCP developed by the Contractor. The Agency will not be liable to the Contractor for failure to accept or act upon any request for a modified Agency TCP or a TCP developed by the Contractor.
To conserve time and funds, the Contractor may first submit a written request for a preliminary review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time impacts. The Engineer will, within a reasonable time, respond to the Contractor in writing whether or not the request would be considered by the Agency.
If requesting a Contractor-modified Agency TCP, or a TCP developed by the Contractor, at a minimum the request shall meet all requirements of the Contract documents and comply with the Project transportation management plan (TMP). Provide the following information:
Stamped Working Drawings according to 00150.35 that include the proposed TCP showing all TCM and quantities of TCD.
A TPAR plan that includes:
Details and features used to provide pedestrian accessibility.
Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
Temporary alternate facilities or detour routes for pedestrian traffic.
Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
Proposed order and duration of the TCM.
A detailed temporary striping plan.
If the Contractor’s request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor is approved in whole or in part, acceptance will be made by a Change Order.
The Engineer will establish prices that represent a fair measure of the value of Work to be added, changed, or deleted as a result of any accepted modifications to the Agency TCP or an accepted TCP developed by the Contractor.
Once a TCP has been accepted by the Engineer, any additional modifications must be submitted by the Contractor for Agency review following the procedure described above. The Engineer is not obligated to consider additional modifications to a previously approved TCP.
(b) Tourist-Oriented Directional and Business Logo Signs ‑ Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:
(1) No Signs ‑ If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or
(2) Signs ‑ Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.
00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:
Providing, surfacing, maintaining, removing, and restoring the TPAR.
To be accompanied by Standard Drawings:
| TM800 | Tables, Abrupt Edge and PCMS Details |
| TM810 | Temporary Pavement Markers |
| TM820 | Temporary Barricades |
| TM821, TM822 | Temporary Sign Supports |
| TM830 | Temporary Concrete Barrier & Rumble Strip Details |
| TM831, TM832, TM833 | Temporary Impact Attenuators |
| TM860, TM861, TM862 | Freeway Sections |
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications.
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL
Comply with Section 00620 of the Standard Specifications modified as follows:
00620.43 Maintenance Under Traffic - Replace this subsection, except for the subsection number and title, with the following:
Traffic is not allowed on the cold planed surface. Before opening the area to traffic, pave the surface according to (00744.51)(00745.51).
SECTION 00735 - EMULSIFIED ASPHALT CONCRETE PAVEMENT
Comply with Section 00735 of the Standard Specifications modified as follows:
00735.42 Preparation of Underlying Surfaces – Add the following paragraph to the end of this subsection:
Remove existing pavement markers, recessed markers, and pavement legends before paving. Remove pavement lines, bars, and pavement legends as shown or directed and according to 00225.45.
SECTION 00744 - ASPHALT CONCRETE PAVEMENT
Comply with Section 00744 of the Standard Specifications modified as follows:
00744.11(a) Asphalt Cement - Add the following to the end of this subsection:
Provide PG76-22ER grade asphalt cement for this Project.
00744.16 Sampling and Testing - Replace this subsection, except for the subsection number and title, with the following:
For each 1,000 Tons of placement, have a CAT I perform a minimum of one of each of the following test methods as modified in the MFTP:
Asphalt Content - AASHTO T 308 with ODOT TM 323 determined Calibration Factor Gradation - AASHTO T 30 Mix Moisture - AASHTO T 329 Maximum Specific Gravity - AASHTO T 209 Field Compacted Gyratory Specimens - ODOT TM 326
When less than 1,000 Tons of mix is placed in a Day, perform a minimum of one series of tests per Day. Provide test results to the Engineer by the middle of the following work shift. The Engineer may waive the requirement for any of AASHTO T 308, AASHTO T 30, AASHTO T 329, and ODOT TM 326 on a daily basis. The Engineer may waive the requirement for AASHTO T 209 when less than 500 Tons of ACP is placed in a single work shift.
Provide samples or split samples to the Engineer when requested.
00744.17 Acceptance - Replace this subsection, except for the subsection number and title, with the following:
If the test result for each mix gradation constituent, asphalt content, and density measurement is within the specification limits, the material will be accepted. If the asphalt content, one or more gradation constituents, or the density measurement are not within the specification limits, the material that is not within the specification limits will be accepted according to 00150.25.
00744.41 Mixing Temperature - Replace the table with the following:
| Temperature, °F | ||
| Type | Maximum | Minimum Behind |
| at Mixer | Paver | |
| HMAC | 350 | 240 |
| WMAC | 350 | 215 |
00744.44(a)(2) Wearing Course ‑ Replace the paragraph that begins "Construct longitudinal joints …" with the following paragraph:
Construct longitudinal joints six inches from permanent lane markings, or as shown or directed.
00744.44(b) Drop-Offs - Replace the bullet that begins “Provide warning signs and markings…” with the following bullet:
Provide warning signs and markings according to Sections 00221, 00222, 00224 and 00225 where abrupt or sloped edge drop-offs greater than 1 inch in height occur.
00744.49 Compaction - Replace the paragraph that begins "Determine compliance with…" with the following paragraph:
Determine compliance with density Specifications by random testing of the compacted surface with calibrated nuclear gauges. Determine the density by averaging QC tests performed by a CDT with the nuclear gauge operated in the backscatter mode according to AASHTO T 355 at one random location for each 100 Tons of asphalt concrete placed, but take no less than 10 tests each shift. Do not locate the center of a density test less than 1 foot from the Panel edge. Calculate MAMD according to ODOT TM 305. The Engineer may waive compaction testing requirements when less than 500 Tons of ACP is placed in a single work shift.
Add the following subsection:
00744.51 Opening Sections to Traffic - Schedule work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
SECTION 00865 - LONGITUDINAL PAVEMENT MARKINGS - DURABLE
Comply with Section 0865 of the Standard Specifications.
Additional Special Provisions
Asphalt testing can be modified after consultation with the Project Manager.
ODOT reserves the right to perform traffic control on this project as needed or as a cost reduction to the work.
Wheel Rut Paving 4 feet in width.
SECTION 1
Southbound I-5
| 70.3-70.2 |
| Full Lane |
| 70.6-70.7 |
| Full Lane |
| 70.78-70.8 |
| Full Lane |
| 70.85-70.9 |
| Full Lane |
| 70.6 - 70.3 |
| RH Rut |
| 70-69.9 |
| RH Rut |
| 69.9-69 |
| RH Rut |
Northbound I-5
| 74.2-74.5 |
| B Lane |
| 74.5-74.6 |
| RH Rut |
SECTION 2
Paving Area MP 69-76
Northbound I-5
| 73.5-700' |
| LH wheel rut. |
| 74.6-300' |
| A&B lane |