Attachment B - Specifications.pdf
PDF 267 KB Posted
- Attached to
- High-Frequency Dual-Channel Signal Synthesizer
- Solicitation number
- NB6750302601962
About this file
This is a Requirements/Specification Document for procurement of a High-Frequency Dual-Channel Signal Synthesizer by the National Institute of Standards and Technology (NIST), Communications Technology Laboratory, Spectrum Technology and Research Division. The procurement includes three items: (1) one Stable and Phase Coherent Two-channel RF Synthesizer with phase coherency between channels; (2) one Synthesizer Enhancement Options Packet with high-frequency and high-power capabilities; and (3) one Instrumentation Rack Mount compatible with standard scientific racks. Delivery shall be completed no later than 15 weeks after release of order to NIST-Boulder, Mail Stop 675.03, 325 Broadway, Boulder, Colorado 80305.
The Synthesizer Enhancement Options Packet must meet specific technical requirements including: minimum operating frequency of 50 MHz or lower and maximum of 40 GHz or higher; maximum output power of ≥13 dBm from 50 MHz to 40 GHz; low single-sideband phase noise specifications ranging from -154 dBc/Hz at 50 MHz to -100 dBc/Hz at 40 GHz; low harmonics of <-30 dB for frequencies between 50 MHz and 25 GHz; non-harmonics spurs ≤-50 dBc across the full frequency range; and USB and GPIB connector ports for communication interface. Electronic delivery shall include software and electronic manuals. Warranty coverage requires one year of labor and parts for the Two-channel RF Synthesizer and three years of labor and parts for the Enhancement Options Packet and Rack Mount. Vendors must possess an active Export Control Classification Number (ECCN) and a Unique Entity Identification Number (UEI) registered as "Active" on SAM.gov at the time of award. Inspection and acceptance will occur on-site with acceptance expected within 7 business days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C - Provisions and Clauses1.pdf | ||
| Attachment C - Provisions and Clauses.pdf | ||
| Attachment A - NB6750302601962-RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: High-Frequency Dual-Channel Signal Synthesizer
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Spectrum Technology and Research Division Shared Spectrum Metrology Group (675.03)
General Statement of Need:
Accurate noise characterization is critical for amplifiers and transistors. A new wide band millimeter wave (mmWave) digital correlator measuring noise parameters based on a wave model was recently developed that covers 4 GHz segment of the Ka band. Ka band has been primarily used for high-capacity satellite communications, 5G/6G networks, and radar applications. It provides wide bandwidth supporting high-speed data transfer and allowing compact receivers. To down convert the mmWave signal, the key item is a stand-alone, high-performance and stable radio-frequency dual-channel (or multi-channel) signal synthesizer providing both precision magnitude and coherent phase as the local oscillators.
Item Specifications and Quantities:
Item 1: Stable and Phase Coherent Two-channel RF Synthesizer Quantity: 1 EACH Specifications: 1.1 Phase coherency between channels
Item 2: Synthesizer Enhancement Options Packet Quantity: 1 EACH Specifications: High-Frequency and High-Power
2.1.1 Minimum operating frequency 50 MHz or lower and
maximum operating frequency 40 GHz or higher
2.1.2 Max output power >=13 dBm from 50 MHz to 40 GHz
Low SSB phase Noise (10 dBm output power, offset by 1MHz)
2.2.1 fc = 50 MHz, <= -154dBc/Hz
2.2.2 fc = 1 GHz, <= -131 dBc/Hz
2.2.3 fc = 6 GHz, <= -119 dBc/Hz
2.2.4 fc =12 GHz, <=-115 dBc/Hz
2.2.5 fc =24 GHz, <=-106 dBc/Hz
2.2.6 fc =40 GHz, <=-100 dBc/Hz Low Harmonics
(2nd and 3rd harmonics when output power set to 10 dBm)
2.3.1 50 MHz < f ≤ 25.0 GHz, <-30 dB Non-Harmonics Spurs (Output power set to 10 dBm)
2.4.1 <=-50 dBc in the full frequency range Communication Interface
2.5.1 USB and GPIB connector ports
Item 3: Instrumentation Rack Mount Quantity: 1 EACH Specifications: 2.1 Compatible with standard scientific rack
Vendor Requirements
1. Possess at time of award/contracting an Export Control Classification Number (ECCN).
2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).
Procurement Support Information and Ancillary Services:
Section Requirements/Specifications
Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
Mail Stop: 675.03 325 Broadway Boulder, CO 80305
☐ [Alternate Shipping Address] Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.]
☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
15 Weeks After Release of Order ☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☐ N/A
[Enter Electronic Media Requirements by Item.]
☒ Software ☒ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Extended Warranty Required Warranty Length: 1 to 3 years What is included?
☒ Labor ☒ Parts ☐ Travel ☐ Cost and Liability for Returns
☒ Other 1-Year Stable and Phase Coherent Two-channel RF Synthesizer 3-Years Synthesizer Enhancement Option Packet Instrumentation Rack Mount
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .