Attachment B - SP-POL-CMP-INSPECT-FY25-DUG.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- W9128F25Q0010
About this file
This document appears to be Attachment B - SP-POL-CMP-INSPECT-FY25-DUG.xlsx, which contains details about the federal contract opportunity W9128F25Q0010 for API 653 External inspections at Dugway Proving Grounds, UT on Tanks 4056, 4057, 5660 & 5661. The solicitation is being conducted by the U.S. Army Corps of Engineers Engineering District Omaha on behalf of DLA-Energy. The attachment provides specifications on the tank capacities, dimensions, fuel types, and inspection requirements for each tank. It indicates that the tanks do not require ultrasonic testing, roundness surveys, certified strapping charts, or IFR seal replacement. The manway sizes and quantities are also detailed. This appears to be a supporting document to the overall solicitation, which requires the contractor to conduct all inspections in accordance with applicable laws, standards, and regulations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PO 11 DUG
| Attachment B - PO 11 SP-POL-CMP-INSPECT-FY25-DUG (Tanks 4056, 4057, 5660, and 5661) | |||||||||||||||
| SITE CODE | INSTALLATION | STATE / COUNTRY | INSPECTION TYPE | FACILITY NUMBER | LOCAL ID # | FUEL TYPE | TANK CAPACITY (GA) | TANK DIAMETER (FT) | TANK LENGTH / HEIGHT (FT) | UT (Yes/No) | ROUNDNESS SURVEY Req. (Yes/No) | CERTIFIED STRAPPING CHART Req. (Yes/No) | REPLACE IFR SEAL (Yes/No) | Gallons Remaining will need to be disposed of | # Manways & Sizes |
| DUG | Dugway Proving Ground | Utah/USA | External | 4056 | Jet-A | 25,000 | 14'0" | 22'0" | No | No | NA | NA | NA | One 3ft-9.5 inch (45.5 inches) manway per tank. | |
| DUG | Dugway Proving Ground | Utah/USA | External | 4057 | Jet-A | 25,000 | 14'0" | 22'0" | No | No | NA | NA | NA | One 3ft-9.5 inch (45.5 inches) manway per tank. | |
| DUG | Dugway Proving Ground | Utah/USA | External | 5660 | Diesel, Clear (DS1/2) | 125,000 | 25'0" | 36'0" | No | No | NA | NA | NA | Two manways per tank. One located on the east and west sides of each tank. Each manway is 36 inches. | |
| DUG | Dugway Proving Ground | Utah/USA | External | 5661 | Diesel, dyed (FL2) | 125,000 | 25'0" | 36'0" | No | No | NA | NA | NA | Two manways per tank. One located on the east and west sides of each tank. Each manway is 36 inches. |
File details come from the government source that posted it. Updated .