Attachment B SOW.docx
DOCX document 52 KB Posted
- Attached to
- Snow Removal, Ottawa National Forest Federal contract opportunity
- Solicitation number
- 12444624Q0001
- Issued by
- Department of Agriculture Forest Service
About this file
This statement of work outlines snow removal requirements for three sites managed by the USDA Forest Service Ottawa National Forest. The contractor will be responsible for plowing the Ontonagon Ranger District office when snow reaches six inches or more by 6:30 a.m. each day Monday through Friday, excluding holidays. At the Mass City warehouse, plowing will be conducted as needed when in the vicinity. The Bergland Heritage Site requires plowing when snow reaches ten inches to ensure emergency vehicle access. All three sites will require removal of accumulated snowbanks by loader or tractor as needed. The contractor must repair any lawn damage from plowing activities before May 10th and carry liability insurance. Quotes should include hourly equipment rates. No other terms are specified in the statement of work or associated federal contract opportunity solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12444624Q0001 0002.pdf | ||
| Attachment E Maps Photos.pdf | ||
| 12444624Q0001 0001.pdf | ||
| Attachment D Submission Package Rev 1.docx | DOCX document | |
| 12444624Q0001 Snow Removal RFQ.pdf | ||
| Attachment A Schedule of Items.docx | DOCX document | |
| Attachment C Wage Determination.pdf | ||
| Attachment D Submission Package.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 3 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
| 8.0 Security Requirements | 4 |
| 9.0 Data Rights | 4 |
| 10.0 Section 508 – Electronic and Information Technology Standards | 4 |
| Attachment | 4 |
Project Ottawa NF, Ontonagon - Bergland – Mass City admin. site snowplowing
General Information
1.0 Scope of Work
Snow plowing/removal at the Ontonagon RD office, the Bergland heritage site, and the Mass City warehouse.
2.0 Background
Snow plowing of driveways/parking areas and snow removal when the snowbanks become significant.
Contractor Requirements
3.0 Technical Requirements / Tasks
Ontonagon Ranger District – 1209 Rockland Road, Ontonagon, MI 49953
· Plowing will be completed by 6:30 a.m. Eastern Time, Monday through Friday, excluding legal holidays, when snow accumulation is six (6”) inches or more.
· Payments will be based on actual on-site plowing time. Travel time to the site is not included. End loader/tractor may be required to remove snowbanks mid-season, depending on accumulation of snow.
· Contractor is responsible for lawn repairs caused from snow plowing (i.e. removal of gravel pushed on lawn, sod turned up, seeding and mulching areas of exposed soil). Contractor is required to make repairs in the spring, before May 10th, at their own cost.
· Proof of liability insurance is required.
· Quotes submitted must include type of equipment and cost per hour.
Mass City warehouse – 1390 M-26, Mass City, MI 49948
· The site will be plowed as needed determined by contractor checks while already in the vacinity. Access to garage doors to be cleared of snow buildup from County plowing activities.
· Payments will be based on actual on-site plowing time. Travel time to the site is not included. End loader/tractor may be required to remove snowbanks mid-season, depending on accumulation of snow.
· Contractor is responsible for lawn repairs caused from snow plowing (i.e. removal of gravel pushed on lawn, sod turned up, seeding and mulching areas of exposed soil). Contractor is required to make repairs in the spring, before May 10th, at their own cost.
· Proof of liability insurance is required.
· Quotes submitted must include type of equipment and cost per hour.
Bergland Site – 691 W M-28, Bergland, MI 49910
· The site will be plowed when snow accumulation is ten (10”) inches or greater, providing sufficient access for emergency vehicles (fire trucks, etc.) is the primary objective for this site.
· Payments will be based on actual on-site plowing time. Travel time to the site is not included. End loader/tractor may be required to remove snowbanks mid-season, depending on accumulation of snow.
· Contractor is responsible for lawn repairs caused from snow plowing (i.e. removal of gravel pushed on lawn, sod turned up, seeding and mulching areas of exposed soil). Contractor is required to make repairs in the spring, before May 10th, at their own cost.
· Proof of liability insurance is required.
4.0 Government Furnished
NONE
5.0 Deliverables / Schedule
NONE
6.0 Travel
NONE
7.0 Contractor’s Key Personnel
NONE
8.0 Security Requirements
NONE
9.0 Data Rights
NONE
10.0 Section 508 – Electronic and Information Technology Standards
NONE
Attachment image1.png
File details come from the government source that posted it. Updated .