Attachment B Solution Requirements.xlsx

XLSX spreadsheet 54 KB Posted

Attached to
Virtual Machine Infrastructure
Solicitation number
InfoSys-2025-001
Issued by
Gilpin County, Colorado

About this file

Attachment B Solution Requirements.xlsx is a technical specification document for Grand County Government of Colorado's Virtual Machine Infrastructure (VMI) procurement. The county is seeking proposals for a new VMI platform to replace its current on-premise environment located in Hot Sulphur Springs and Granby, with proposals due by July 1, 2025, and a planned contract award on January 1, 2026. The project timeline includes vendor information collection through June 1, 2025, proposal review by September 1, 2025, and phased deployments in Hot Sulphur Springs (by July 1, 2026) and Granby (Q4 2026), with full project closure anticipated in Q4 2026.

The technical requirements specify a comprehensive VMI solution demanding specific hardware and software capabilities, including support for multiple hypervisors, high-availability architecture, and robust infrastructure specifications. The primary site requirements include 176GHz vCPU, 1.5TB RAM, 50TB storage, support for 60+ VMs, and energy-efficient hardware. Key additional requirements include direct vendor support, all-inclusive licensing, Active Directory integration, backup compatibility with Veeam and Exagrid, centralized management, performance analytics, and a migration pathway that accommodates potential growth over a 5-year period. The county's current infrastructure uses VMware vSAN, Dell PowerEdge, Exagrid, and Veeam solutions, and seeks a modern, scalable, resilient, and operationally uncomplicated replacement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements Exhibit A

Attachment B: 2025 Virtual Machine Infrastructure Solution Requirements
Rating ValueDescription
SUPSupported as delivered "out-of-the-box"
MODSupported via modifications (screen configurations, reports, GUI tailoring, etc.)
3RDSupported via a third party solution
FUTWill be supported in a future release
NSNot supported
#RequirementRatingAdditional Comments
1.00Industry Common Hypervisor
1.01VMware ESXi, Microsoft Hyper-V, KVM, Xen, AHV, etc.Which one(s)?
2.00Resilience (Dual Site)
2.01Highly Available/Clustered architecture
2.02Hardware Redundancy. PSU, NIC, RAID, etc.
2.03Ability to failover with remote site over VPN or direct fiber.
3.00Hardware Minimum Specifications (Primary Site)
3.01vCPU ≥ 176GHz
3.02RAM ≥ 1.5TB
3.03DISK ≥ 50TB (IOPS up to 3,412)
3.04iSCSI Capable (Jumbo Frames)
3.05Copper Ethernet up to 10Gbps
3.0612U or less of rack consumption.
3.07Energy efficient hardware.
3.08Support for 60+ VMs. (Windows, Ubuntu, and OVF)
3.09Ability to manage and allocate GPU resources to virtual machines
4.00Hardware Minimum Specifications (DR Site)
4.01Sized to accommodate 1/2 of the primary site workload.
4.02Rapid scalability. One week target node delivery.
5.00Software: Licensing and Support
5.01Direct to platform vendor support.
5.02All inclusive licensing with clear itemization for addon components.
5.03Documented inventory of licensed components and keys.
5.04Documented support and account manager contacts.
6.00Hardware: Licensing and Support
6.01Direct to platform vendor support.
6.02Documented inventory of support contacts and warranties.
7.00Additional Components
7.0110Gbps switching to support core networking.
7.02Capability of adding encryption at rest functionality to the datastores.
7.03Integrates with Active Directory
7.04Compatibility with Microsoft SQL Server and Failover Clustering at the VM level
8.00Deployment Services
8.01Bid to include on-site installation, validation, and ad-hoc training.
9.00Manageability
9.01Proposed solution should allow for management flexibility such as hardware/firmware updating across nodes without interruption of production services.
9.02Scheduling and QoS for workloads and maintenance windows.
9.03Centralized management and monitoring of distributed resources and workloads.
9.04Analytics for resource usage and performance over time.
9.05Automated Alerting and Reporting. Proactive phone home support allowed.
9.06vMotion or comparable functionality.
10.00Backup Integration
10.01Integrates with Veeam Enterprise BDR and Exagrid
10.02Hypervisor level integration for backups
11.00Expansion and Lifecycle
11.01Proposal should provide a pathway for cost effective scaling and expansion of resources.
11.02Proposal should provide a pathway for seamless replacement of aged hardware.
11.03Proposal should be sized to accommodate light growth over a period of 5 years.
12.00Migration Capable
12.01Uses common methods and protocols to allow for migration and upgrade of hardware components.
13.00Remote Site Recoverability
13.01Ability to schedule snapshot or workload transfer to remote DR site.
13.02Bandwidth recommendations based on provided storage specs.
14.00Training and Knowledge Transfer
14.01Comprehensive knowledge transfer and shadowing during primary site deployment.
14.02Provide guidance that will help us deploy the remote DR site VMI with minimal assistance.
14.03Demonstration of Knowledge Base and support system.
14.04Training course cost breakdown and schedules.

File details come from the government source that posted it. Updated .