July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel MUSKIE
Spec. Ref.
| 4.1 |
| Hauling, Blocking and Launching |
| 6.01 |
| Hull High Pressure Wash and Visual Inspection |
| 6.02 |
| Hull Appendage Leak Test |
| 6.03 |
| Underwater Hull Coating Inspection |
| Option |
| 6.04 |
| Repair Underwater Hull Coating |
| Option |
| 6.05 |
| Remove Existing Deck Coating and Replace with New Non-Skid Coating |
| 7.02 |
| Inspect Rudders, Bearings and Seals |
| 7.03 |
| Inspect Propulsion Shafts |
| 7.04 |
| Renew Propulsion Shaft Seals |
| Option |
| 7.05 |
| Renew Shaft Bearings |
| 7.06 |
| Inspect, Clean, and Refurbish Propellers |
| 7.07 |
| Inspect Bow Thruster |
| 8.01 |
| Open, Clean and Inspect Tanks |
| 8.02 |
| Load Test Lifting Gear |
| Option |
| 8.03 |
| Install Vibration Dampening Material in Lazarette |
| Option |
| 8.04 |
| Strengthen Steering Cylinder Mounting |
| Option |
| 8.05 |
| Reinforce Structure Around Prop Tunnels |
| Option |
| 8.06 |
| Replace Watertight Door in Bulkhead at Frame 22 |
| Option |
| 8.07 |
| Upgrade Navigation Electronics |
| Option |
| 8.08 |
| Install Marport net monitoring system |
| Option |
| *8.09 |
| Inspect and Repair Hydraulic Tank |
| Option |
| *8.10 |
| Replace Hydraulic Tank |
| Option |
| 8.11 |
| Modify Draft Marks, Name and Port of Registry References |
| Option |
| 8.12 |
| Modify Diesel Fuel Piping |
| Option |
| 8.13 |
| Replace Main Engine Exhaust Silencers |
| Option |
| 8.14 |
| Replace Insulation on Exhaust Piping |
| Option |
| 8.15 |
| Install Isolation Valve for Hydraulic Cooler Overboard |
| Option |
| 8.16 |
| Install Seachest for Flow-Through Ferrybox System |
| Option |
| 8.17 |
| Install Flow-Through Ferrybox System |
| Option |
| 8.18 |
| Remove Unused Transducers |
| Option |
| 8.19 |
| Install Engine Room Egress Hatch |
| Option |
| 8.20 |
| Install New Ceiling System |
| Option |
| 8.21 |
| Clean All Bilge Surfaces |
| Option |
| 8.22 |
| Open and Inspect A-frame Hinge |
| Option |
| 8.23 |
| Modify Bench in Pilothouse |
| Option |
| 8.24 |
| Modify Back Deck Load Handling Arrangement |
| Option |
| 8.25 |
| Modify Winch Control System |
| Option |
| 8.26 |
| Repair Existing Fire Alarm and Tank Monitoring System |
| Option |
| 8.27 |
| Replace Air Conditioning System |
TOTAL
*Provide price for both 8.09 and 8.10 for evaluation purposes; government would order one item or the other (not both) depending on vessel condition and availability of funds.
LABOR RATES
Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:
Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing
Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:
Planning Quality Assurance Testing Engineering Design Lofting
| G14PS00428 |
| Attachment D Schedule of Pricing |
Amendment 0002