Attachment B, Scans, Project #23-04-80-01.pdf

PDF 2 MB Posted

Attached to
Kellerton Erosion Control, Grand River Wildlife Unit, Ringgold County
Solicitation number
23-04-80-01
Issued by
Scott County, Iowa

About this file

This is a set of construction documents from the Iowa Department of Natural Resources for an erosion control project at Kellerton WMA in Ringgold County, Iowa (Project #23-04-80-01). The project involves addressing head-cut tunnel formation from gully erosion through grading and installing erosion control measures at six sites. Key components include installation of Flexamat FR Rolls (6 EA), Flexamat installation (2880 SF), grading (1500 CY), mulch sock installation (6 EA of 20' length), seeding and mulching (1 LS), and obtaining an NPDES permit. The project documents include detailed plan sheets showing site locations, typical installation details, and seeding requirements.

The project requires contractors to verify locations with DNR inspectors, conform to applicable codes, and follow Iowa Statewide Urban Design Specifications (SUDAS). The construction area includes specific grading requirements to create flow paths with less than 5% slope leading to Flexamat installations. Native seed mix and buffer plantings are required for disturbed areas, with specific Equisetum species plantings along centerlines. The project includes access from 258th Street and requires contractors to handle disposal of excess materials and maintain erosion control features throughout construction.

View the file

Other files

File Type Posted
Standard Contract, Project #23-04-80-01.pdf PDF
1288991-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER:

DATE:

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, SU

ITE

, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

A.01

C O

V

ER

S

HE

ET

DRAWN BY

H.D

KE

LL

ER

TO

N W

M A

KE

LL

ER

TO

N E

RO

SI

O N

C O

N

TR

O L

FO

R:

RI

N

G G

O

LD

C O

UN

TY

AUGUST 30, 2024

23-04-80-01

KELLERTON EROSION CONTROL

SHEET INDEX

IOWA DEPARTMENT OF NATURAL RESOURCES

CONSTRUCTION DOCUMENTS

FOR

KELLERTON WMA

KELLERTON EROSION CONTROL

RINGGOLD COUNTY, IOWA

PROJECT #23-04-80-01

DIRECTORY

CONSTRUCTION INSPECTOR

IOWA DEPARTMENT OF NATURAL RESOURCES

6200 PARK AVE, SUITE 200

DES MOINES, IA 50321

T.J. HERRICK

515-250-3715 tj.herrick@dnr.iowa.gov

A.1 A.2 C.1 D.1 D.2

COVER SHEET

OVERALL PROJECT MAP

ESTIMATED QUANTITIES AND GENERAL NOTES

PLAN AND PROFILE

SEEDING PLAN

PROJECT MANAGER

IOWA DEPARTMENT OF NATURAL RESOURCES

6200 Park Ave.

DES MOINES, IA 50321

Zach Gunsolley, P.E.

515-250-3713 zach.gunsolley@dnr.iowa.gov

WMA LOCATION MAP

AutoCAD SHX Text Match Exisiting Grade

AutoCAD SHX Text Grade at 2%

AutoCAD SHX Text THIS PROJECT INCLUDES addressing head-cuts formed from gully erosion by grading and shaping exiting surface to a point overlaid with erosion resistant material (Flexamat) CONSTRUCTION PER IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS).

AutoCAD SHX Text

COMPANY

AutoCAD SHX Text

ADDRESS

AutoCAD SHX Text

CITY,STATE,ZIP

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

FAX

AutoCAD SHX Text

EMAIL

AutoCAD SHX Text

CONTACT

AutoCAD SHX Text

COMPANY

AutoCAD SHX Text

ADDRESS

AutoCAD SHX Text

CITY,STATE,ZIP

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

FAX

AutoCAD SHX Text

EMAIL

AutoCAD SHX Text

CONTACT

AutoCAD SHX Text

RINGGOLD COUNTY

AutoCAD SHX Text Project Location

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, SU

ITE

, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

AUGUST 30, 2024

A.02

O V

ER

A

LL

P

RO

JE

C T

M A

P

KE

LL

ER

TO

N W

M A

23-04-80-01DRAWN BY

H.D

KE

LL

ER

TO

N E

RO

SI

O N

C O

N

TR

O L

FO

R:

RI

N

G G

O

LD

C O

UN

TY

OVERALL PROJECT MAPSCALE: 1" = 200'

0' 200' 400' NORTH

AutoCAD SHX Text

TYP LIMITS OF CONSTRUCTION (LOC)

AutoCAD SHX Text TYP Flexamat (16' x 30' mat)

AutoCAD SHX Text TYP Centerline of Grading

AutoCAD SHX Text Site 1

AutoCAD SHX Text Site 2

AutoCAD SHX Text Site 3

AutoCAD SHX Text Site 4

AutoCAD SHX Text Site 5

AutoCAD SHX Text Site 6

AutoCAD SHX Text Access to Project Area

AutoCAD SHX Text 258th St.

County Rd. P64

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, SU

ITE

, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

AUGUST 30, 2024

C.01

Q

UA

N

TIT

IE

S

A N

D G

EN

ER

A L

N O

TE

S

KE

LL

ER

TO

N W

M A

23-04-80-01DRAWN BY

H.D

KE

LL

ER

TO

N E

RO

SI

O N

C O

N

TR

O L

FO

R:

RI

N

G G

O

LD

C O

UN

TY

AutoCAD SHX Text A. The contractor shall notify the following two weeks prior to construction: The contractor shall notify the following two weeks prior to construction: 1. District Inspector: Zach Gunsolley, P.E. (515)-250-3713 B. The contractor shall verify actual locations and elevations with the D.N.R Inspector. The contractor shall verify actual locations and elevations with the D.N.R Inspector. C. All work shall conform to and be performed in accordance with all applicable codes and ordinances. All work shall conform to and be performed in accordance with all applicable codes and ordinances. D. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to the start of work. Failure to visit the project site shall not relieve the actual job conditions prior to the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specifications, special provisions and the contractor from performing the work in accordance to the plans, specifications, special provisions and contract. contract. E. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the D.N.R Inspector of any discrepancies, omissions and/or conflicts prior to proceeding with the work. the D.N.R Inspector of any discrepancies, omissions and/or conflicts prior to proceeding with the work. F. The contractor is responsible for disposal for excess material (excavated material The contractor is responsible for disposal for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed, unless payment for overhaul will be allowed for material hauled to these sites. No material shall be placed, unless specifically stated in the plans or approved by the D.N.R Inspector. G. The contractor shall not disturb desirable grass areas and desirable trees outside construction limits. The The contractor shall not disturb desirable grass areas and desirable trees outside construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the D.N.R Inspector. materials. Storage, parking and service areas will be subject to the approval of the D.N.R Inspector. H. The contractor is expected to have materials, equipment and labor available on a daily basis to install and The contractor is expected to have materials, equipment and labor available on a daily basis to install and maintain erosion control features on the project, if needed. maintain erosion control features on the project, if needed. I. The contractor shall be responsible for any damage to existing facilities resulting from their negligence, The contractor shall be responsible for any damage to existing facilities resulting from their negligence, or that of a subcontractor, and said repairs shall be approved by the owner. or that of a subcontractor, and said repairs shall be approved by the owner. J. All work shall be per Iowa Statewide Urban Design and Specifications (SUDAS). Manuals can be viewed online at All work shall be per Iowa Statewide Urban Design and Specifications (SUDAS). Manuals can be viewed online at www.iowasudas.org. K. Construciton Survey to be completed by Iowa D.N.R. with 2-week minimum notice. Construciton Survey to be completed by Iowa D.N.R. with 2-week minimum notice.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

ITEM

ESTIMATED PROJECT QUANTITIES

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, SU

ITE

, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

AUGUST 30, 2024

D.01

TY

P.

P

LA

N A

N D

P

RO

FI

LE

KE

LL

ER

TO

N W

M A

23-04-80-01DRAWN BY

H.D

KE

LL

ER

TO

N E

RO

SI

O N

C O

N

TR

O L

FO

R:

RI

N

G G

O

LD

C O

UN

TY

NOT TO SCALE

TYP. PLAN AND PROFILE

AutoCAD SHX Text Flexamat Match Existing Grade

AutoCAD SHX Text

LOC

AutoCAD SHX Text Grade from LOC with goal to create flow path to Flexamat of < 5%

AutoCAD SHX Text Fill from grading

AutoCAD SHX Text Start of Headcut

AutoCAD SHX Text Existing Ground

AutoCAD SHX Text Flexamat (Installed per manufacture's specs)

AutoCAD SHX Text Match Existing Grade

AutoCAD SHX Text Finish Grade < 5%

AutoCAD SHX Text Flexamat (Installed per manufacture's specs)

AutoCAD SHX Text Finish Grade <5%%%

AutoCAD SHX Text 8" Mulch Sock 20' Length Installed parallel to channel Downstream of Disturbed Soil

Mulch Sock

NO. DATE

BY REVISION

DRAWN BY:

CHK'D BY:

IO

W

A D

EP

A

RT

M

EN

T

O F

N A

TU

RA

L

RE

SO

UR

C

ES

EN

G

IN

EE

RI

NG

SE

RV

IC

ES

P

AR

K

AV

E, SU

ITE

, D

ES

M O

IN

ES

, IA

C O

NS

UL

TA

NT

NO

NE

SHEET No:

AUGUST 30, 2024

D.02

TY

P

SE

ED

IN

G

M A

P

FO

R A

LL

SI

TE

S

KE

LL

ER

TO

N W

M A

23-04-80-01DRAWN BY

H.D

KE

LL

ER

TO

N E

RO

SI

O N

C O

N

TR

O L

FO

R:

RI

N

G G

O

LD

C O

UN

TY

TYP. SEEDING MAPSCALE: 1" = 40'

0' 40' 80' NORTH

AutoCAD SHX Text

TYP SEEDING W/IN LOC

AutoCAD SHX Text

BUFFER CENTERLINE 10' WITH EQUISETUM SP.

NATIVE SEED MIX OVER ALL DISTURBED AREAS

Sheets and Views
23-04-80-01 KELLERTON EROSION CONTROL-1 - COVER
23-04-80-01 KELLERTON EROSION CONTROL-2 - OVERALL PLAN
23-04-80-01 KELLERTON EROSION CONTROL-3 - NOTES
23-04-80-01 KELLERTON EROSION CONTROL-4 - PLAN & PROFILE
23-04-80-01 KELLERTON EROSION CONTROL-5 - Seeding

File details come from the government source that posted it. Updated .