Attachment B Project No_ 4.pdf

PDF 194 KB Posted

Attached to
Sidewalk Design Services
Solicitation number
PE-66869-NONST-2025-000000021
Issued by
Dekalb County, Georgia

About this file

This document is a Request for Proposal (RFP) from the City of Stonecrest, Georgia, specifically RFP-0010-25 for Sidewalk Design Services for Project No. 4 on Iris Drive. The project involves designing a 1,300-foot sidewalk, with the proposal requiring comprehensive design deliverables including construction plans, specifications, scope of work, engineering cost estimates, GDOT encroachment permits, and utility coordination. Bidders are required to provide pricing for each deliverable, with all prices to remain valid for 120 days after bid opening.

The pricing proposal form mandates that costs must include all expenses such as labor, equipment, supplies, tools, transportation, overhead, administrative costs, and potential sub-consultant fees. The document emphasizes that prices must be stated specifically in dollars and cents, not as percentage increases, and warns that any deviation from the provided Attachment "B" Price Proposal Form (such as leaving spaces blank or creating an alternative version) will result in the bid being deemed non-responsive. Bidders must complete the form with their company details, authorized signature, and acknowledge compliance with all solicitation terms and conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-1

RFP-0010-25

Sidewalk Design Services

PROJECT NO. 4 – IRIS DRIVE

ATTACHMENT “B”

PROJECT NO. 4

IRIS DRIVE

PRICE PROPOSAL FORM

ALL PRICES SHALL REMAIN VALID FOR ONE HUNDRED AND TWENTY (120)

DAYS AFTER BID OPENING.

RFP NO.: RFP-0010-25, Sidewalk Design Services

Prices shall contain all costs to include labor, equipment, supplies, tools, transportation, overhead, general and administrative, incidental expenses, operating margin and sub consultant costs (if any).

The price(s) will apply for the entire term of the agreement. The price(s) provided must be stated specifically in dollars and cents, NOT a percentage increase. If a “0” (zero) is entered, then that is the fee that the Proposer will receive if awarded this agreement. If a space is left blank, or a space is marked N/A, or the Department’s Attachment “B” - Price Proposal Form is not utilized by the Bidder, the bid shall be considered non-responsive.

• Do Not Re-Create, Modify or Replace the Department’s Attachment “B” – Price Proposal Form with your own version.

ACKNOWLEDGEMENT: I certify that I have read and agree to abide by all terms and conditions of this solicitation and that I am authorized to sign for the bidder. I certify that the Price Proposal submitted is made in conformance with all requirements of the solicitation. In submitting a response, the proposer acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions.

Company Name: ____________________________________________________

FEID #: ________________________________________________________

Address: _______________________________________________________

Authorized Signature: _________________________________

Printed / Typed: ____________________________ Title: _______________________________

E-mail: _______________________________________

Date: _________________ Phone: _________________Fax: __________________

B-2

RFP-0010-25

Sidewalk Design Services

PROJECT NO. 4 – IRIS DRIVE

This section of the Proposal should contain all pricing information related to performing design services as described in this Request for Proposal (RFP).

Costs shall include staffing rates, all required equipment, tools, machines, software, and out-of-pocket expenses as defined in the Scope of Services. Expenses are considered job overhead costs and are not billable.

IRIS DRIVE SIDEWALK DESIGN PROJECT: Sidewalk Length – 1300 ft

DELIVERABLES

TOTAL COST

1. Construction Plans for Bid (Including plan views, profile views, cross sections, erosion control details, utility plans, and construction details

2. Specifications

3. Scope of Work of Bid

4. Engineering Cost Estimate

5. GDOT Encroachment Permit (where applicable)

6. Utility Coordination before and during construction

TOTAL COST:

ATTACHMENT “B”
PROJECT NO. 4
IRIS DRIVE
PRICE PROPOSAL FORM

File details come from the government source that posted it. Updated .