Attachment_B_Price_Schedule_.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Air Emissions and Stack Testing Services
Solicitation number
RFP 8942
Issued by
Florida

About this file

This is a Price Schedule (Attachment B) for Air Emissions and Stack Testing Services procured by Orlando Utilities Commission (OUC) in Florida under PR 8942. The schedule itemizes pricing for testing services across three OUC facilities: Stanton Energy Center, Indian River Plant, and Osceola Generating Station (OGS). Service categories include unit-specific testing for natural gas and oil-fired equipment, dust collectors, combined cycle burners with and without duct burners, mobilization costs to each facility, and hourly labor rates for team leads, technicians, and administrative staff. The contract is structured for a five-year term, with firm pricing for the initial three-year base period and the option for escalated rates in years four and five based on CPI or other approved regional index data. The schedule also references specific EPA test methods required for compliance testing, including methods for particulate matter, sulfur dioxide, nitrogen oxides, carbon monoxide, mercury, formaldehyde, and other regulated emissions.

All unit pricing must be comprehensive and include labor, travel time, materials, equipment rental, consumables, tools, overhead, and profit necessary to perform the required tasks. Hourly labor rates are only applicable for additional work that is ordered and approved by OUC. The pricing schedule reflects the scope of work encompassing Annual Compliance Testing, Relative Accuracy Test Audits (RATA), MATS particulate testing, visible emissions testing, unit-specific pollutant testing, 40 CFR Part 75 Appendix E testing, and all associated reporting and submittals required under federal regulations and facility air permits. The document includes internal notes indicating that natural gas testing for certain units need not be priced separately and that separate pricing lines for gas and oil operations may be required for specific equipment.

View the file

Other files

File Type Posted
RFP_8942-_Air_Emissions_&_Stack_Testing_Services.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Simple

ATTACHMENT 'B' – PR 8942 - PRICE SCHEDULE
CategoryItemAnnual Price Years 1-3Annual Price Years 4-5
Stanton Energy CenterUnit 1$ - 0$ - 0
Stanton Energy CenterUnit 2$ - 0$ - 0
Stanton Energy CenterDust Collectors$ - 0$ - 0
Stanton Energy CenterUnit CCB – NG$ - 0$ - 0
Stanton Energy Center

tc={881660EA-00E0-4468-B317-2A64C0B3154B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

This is part of the NG testing, no need to price separatelyUnit CCB – NG + Duct Burner$ - 0$ - 0
Stanton Energy CenterUnit CCB – Oil$ - 0$ - 0
Sub Total$ - 0$ - 0
Indian River PlantCTA$ - 0$ - 0
Indian River PlantCTB$ - 0$ - 0
Indian River PlantCTC$ - 0$ - 0
Indian River PlantCTD$ - 0$ - 0
Indian River PlantAppendix E – CTC$ - 0$ - 0
Indian River PlantAppendix E – CTD$ - 0$ - 0
Sub Total$ - 0$ - 0

OGS CT1

tc={DB35AF92-90AB-4CAA-A0AE-6322CB376B98}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Need separate lines for Gas and Oil

$ - 0$ - 0
OGSCT2$ - 0$ - 0
OGSCT3$ - 0$ - 0
Sub Total$ - 0$ - 0
MobilizationStanton$ - 0$ - 0
MobilizationIndian River$ - 0$ - 0
MobilizationOsceola$ - 0$ - 0
Sub Total$ - 0$ - 0
Hourly RatesTeam Lead$ - 0$ - 0
Hourly RatesTechnician$ - 0$ - 0
Hourly RatesAdministrative$ - 0$ - 0
Sub Total$ - 0$ - 0
TOTAL Annual Cost:$ - 0$ - 0
Total Cost Years 1-3$ - 0$ - 0
Total Cost Years 4-5$ - 0$ - 0
The unit pricing shall be held firm for the initial three (3) Year contract base period. After the base period, the Supplier may propose escalated rates for OUC to review and approve. These escalations must be based on CPI or other approved regional index data. The unit pricing shall include all labor, travel time, material, equipment rental, consumable, tools, overhead and profit, etc. required to perform the task

tc={DFB3E37F-0BBA-48CC-AF94-5897AE3256E0}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

I would like to get a 5 year contract if possible tc={881660EA-00E0-4468-B317-2A64C0B3154B}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

This is part of the NG testing, no need to price separately The hourly man-hour rates shall only be charged for additional work ordered and approved by OUC.

This is part of the NG testing, no need to price separately

Need separate lines for Gas and Oil

I would like to get a 5 year contract if possible

Itemized pricing

EPA Test MethodDescriptionCost
1-4Traverse Points, Velocity and Flow Rate, Gas Analysis, and Moisture Content
3AGas Analysis for the Determination of Emission Rate Correction Factor or Excess Air
5, 5B, modified 5, or 0010Method for Determining Particulate Matter Emissions (All PM is assumed to be PM10.)
6, 6A, 6B or 6CDetermination of Sulfur Dioxide Emissions from Stationary Sources
7, 7A, 7C, 7D or 7EDetermination of Nitrogen Oxides Emissions from Stationary Sources
8, 8A or CTM-013Determination of Sulfuric Acid Mist Emissions
9Visual Determination of the Opacity of Emissions from Stationary Sources
10Determination of Carbon Monoxide Emissions from Stationary Sources
{Note: The method shall be based on a continuous sampling train.}
12Determination of Lead Emissions
13A, 13BDetermination of Fluoride Emissions
17Determination of In-Stack Particulate Matter (PM) Emissions
18Determination of VOC Emissions
25, 25A, 25BMethod for Determining Gaseous Organic Concentrations (Flame Ionization)
CTM-027 or 320Procedure for Collection and Analysis of Ammonia in Stationary Source. This is an EPA conditional test method. The minimum detection limit shall be 1 ppm. Measurement of Vapor Phase Organic and Inorganic Emissions by Extractive Fourier Transform Infrared (FTIR) Spectroscopy
320Formaldehyde. Measurement of Vapor Phase Organic and Inorganic Emissions by Extractive Fourier Transform Infrared (FTIR) Spectroscopy
29, 101A or 30BDetermination of Hg Emissions
104Determination of Be Emissions
108Determination of Hg Emissions
Mobilization to Stanton Energy Center
Mobilization to Indian River Plant
Mobilization to Osceola Generating Station
Team lead or equivalent hourly rate
Testing Technician or equivalent hourly rate
Administrative staff or equivalent hourly rate