ATTACHMENT_B_Old_Spell-Construction_Plans-7-14-26.pdf
PDF 35 MB Posted
- Attached to
- Old Spell Road Improvements - Phase 2
- Solicitation number
- 2027-02
- Issued by
- Dillon County, South Carolina
About this file
This document comprises construction plans for the Old Spell Road Improvements Phase 2 project in Dorchester County, South Carolina, prepared by Davis & Floyd, Inc., a licensed professional engineering firm. The project involves the improvement of Old Spell Road, a county-maintained roadway in Dorchester County, with construction limits extending from Station 33+95.58 to Station 62+00.00, encompassing approximately 2.8 miles of roadway work. The project includes pavement improvements, drainage infrastructure installation and replacement, erosion control measures, right-of-way adjustments, and utility coordination. The construction plans consist of 41 sheets total, including detailed plan and profile sheets, typical sections, cross-sections, property strip maps, right-of-way data, general construction notes, and erosion control specifications. Key drainage components include multiple pipe installations (ranging from 15-inch to 29-inch diameter RCP), catch basin construction, and outfall structures. The plans indicate a design speed of 45 miles per hour with typical pavement sections incorporating H/M asphalt concrete courses at varying thicknesses depending on location within the project limits. Contractors must coordinate with utility owners, particularly referencing Palmetto Utility Protection Services, Inc. (PUPS), and contact the South Carolina 811 system prior to beginning excavation work.
The construction plans mandate strict adherence to South Carolina Department of Transportation (SCDOT) Standard Specifications for Highway Construction (2025 Edition), SCDOT Standard Drawings for Road Construction, and MUTCD 2009 Edition traffic control standards. Comprehensive erosion and sediment control requirements are detailed, including silt fence installation, sediment tubes, riprap placement, and temporary stabilization measures, with mandatory inspections required at minimum weekly intervals. The contractor is responsible for all costs associated with utility relocation, abandonments, dewatering operations, and site restoration, including temporary seeding and permanent stabilization. Environmental compliance includes NPDES permit adherence and coordination with the Office of Coastal Resource Management (OCRM) for pre-construction conferences. The project specifies detailed driveway construction, pavement saw-cutting at connections to existing roadways, and restoration of all disturbed areas with appropriate vegetation based on soil conditions and seasonal seeding schedules. Special provisions address concrete truck washout procedures, construction signage placement, traffic control plans, and equipment storage restrictions within 15 feet of the travel way edge.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S.C.
ROAD NAME
TOTAL SHEETS 41
GEORGETOWN COUNTY
NET LENGTH OF OUTFALL
1" = 2640'
3 DAYS BEFORE DIGGING IN
SOUTH CAROLINA
CALL 811
ALL UTILITIES MAY NOT BE A MEMBER OF PUPS.
PALMETTO UTILITY PROTECTION SERVICES, INC. (PUPS)
.................. 0.000
12042.14
80°35'15.59"W
................. 0.531
................. 0.531
............... 0.531
................. 0.000
(8
C H
A R
L E
S T
O N
S C
W
M O
N T
A G
U E
A V
E N
U E
OLD SPELL RDDORCHESTER
DORCHESTER COUNTY
PLAN OF PROPOSED IMPROVEMENTS FOR OLD SPELL ROAD
33°8'7.50"N
1.35
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
SHEETS
TOTAL
NO.
SHEET
NO.
ROUTE
SHEETS
TOTAL
NO.
SHEET
NO.
ROUTE
D&F PROJECT NO.
FOR CONSTRUCTION :
DATE
PROJECT ENGINEER
CONSULTANT -
FIRM
CONSULTING ENGINEERING
INDEX OF SHEETS
SHEET TOTALSSHEET # DESCRIPTION
LAYOUT
RAILROAD INVOLVEMENT?
YES / NO
provided by:
Hydrology and NPDES Design
Approximate Location of Roadway is:
Longitude
Latitude
NPDES PERMIT INFORMATION
NPDES Disturbed
Area = Acres
Davis & Floyd
NET LENGTH OF PROJECT
LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY MILES
MILES
MILES
MILES
MILES
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
CONSTRUCTION.
EDITION), AND BOOK OF STANDARD DRAWINGS FOR ROAD
STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (2025
CONFORM WITH SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
NOTE: ALL WORKMANSHIP AND MATERIAL ON THIS PROJECT TO
D01-D07
X1 - X20
EC01
06-9
05A-05C
04A
DETAIL SHEETS
CROSS SECTIONS
EROSION CONTROL SHEET
PLAN AND PROFILE SHEETS
REFERENCE SHEETS
GENERAL CONSTRUCTION NOTES
PROPERTY STRIP MAP
RIGHT-OF-WAY DATA SHEET
TYPICAL SECTIONS
SUMMARY OF ESTIMATED QUANTITIES
TITLE SHEET
BEGIN
END
S-49
QUAKER RD
u s
H
Y
S
STA. 62+00.00
STA. 33+95.58
OLD SPELL ROAD
PROJECT LIMITS FOR
asmyre Text Box 6/18/2026 asmyre Stamp
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
CONSTRUCTION PLANS
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n
O ld S p e ll R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r
O ld S p e ll S
H E E T
S u m m a r y o f
E s ti m a te d Q u a n ti ti e s .d g n
P D
F .p lt c fg
O ld
S p e ll .t b l
.8 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
REV. NO. BY DATE DESCRIPTION OF REVISION
DESIGNED BY CHECKED BYDRAWN BY
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
PRELIMINARY ROW PLANS
SUMMARY OF ESTIMATED QUANTITIES
N.T.S.
asmyre Text Box 7/14/2026
MPH FROM STA. TO STA.
EXCEPTIONS TO DESIGN SPEED
OLD SPELL ROAD DESIGN SPEED
10'10'
48:1 48:1
3 3
10.5' 10.5'
4'
50' R/W
8" GRADED AGGREGATE BASE COURSE
TYPICAL SECTION
2 PRIME COAT
H/M ASPHALT CONCRETE SURFACE COURSE TYPE C (200#/SY)
STA. 35+52.76 TO STA. 61+50.00
TYPICAL SECTION
2:1
H/M ASPHALT CONCRETE BASE COURSE TYPE B (450#/SY)
H/M ASPHALT CONCRETE INTERMEDIATE COURSE TYPE B (440#/SY)
H/M ASPHALT CONCRETE SURFACE COURSE TYPE B (220#/SY)
WITHIN THE SCDOT R/W USE THE FOLLOWING PAVEMENT DESIGN
OLD SPELL ROAD
TYPICAL SECTIONS
2:1 2:1
2:1
2'
SHOWN
VARIES 4'
2'
SHOWN
VARIES
6'6'
10'10'
48:1 48:1
3 3
13.5' 13.5'
50' R/W
STA. 33+95.58 TO STA. 35+52.76
TYPICAL SECTION
10:110:1
GUTTER
VALLEY
3'
GUTTER
VALLEY
3'1' 1'
25 62+00.0033+95.58
N.T.S.
GROUND
EXISTING GRADE
POINT OF
GROUND
EXISTING
PAVEMENT LEGEND
CL
GROUND
EXISTING GRADE
POINT OF
GROUND
EXISTING
12:1 12:1
12:112:1
10'10'
48:1
3 3
10.5' 10.5'
4'
50' R/W
STA. 61+50.00 TO STA. 62+00.00
TYPICAL SECTION
2:1 2:1
2'
SHOWN
VARIES
6'
GROUND
EXISTING GRADE
POINT OF
GROUND
EXISTING
CL
12:1 12:1
SHOWN 4'
VARIES
48:1*
INFORMATION
CROSS SECTIONS FOR ADDITIONAL
STA. 60+50.00 TO STA. 61+00.00 RT. SEE
STA. 60+50.00 TO STA. 61+50.00 LT AND
* INSTALL 1 FT FLAT BOTTOM DITCH FROM
TRANSITION TO REMOVE CROWN.
TO STA. 62+00.00 FOR SUPERELEVATION
4) PAVEMENT SLOPES VARY STA. 61+50.00
SHEET 06 FOR MORE INFORMATION
STA. 33+95.58 TO STA. 34+49.22. SEE
3) MILL AND REPAVE EXISTING PAVEMENT
SECTIONS
SPECIAL DITCH SECTIONS TO TYPICAL DITCH
2) PROVIDE UNIFORM TRANSITION FROM
STA. 61+00.00
STA. 55+50.00, AND STA. 57+50.00 TO
STA. 39+00.00, STA. 50+00.00 TO
OLD SPELL RD. RT STA. 35+17.00 TO
STA. 62+00.00
STA. 55+50.00 AND STA. 56+50.00 TO
OLD SPELL RD. LT STA. 49+00.00 TO
1) CONSTRUCT SPECIAL DITCH:
NOTES:
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
RIGHT-OF-WAY DATA SHEET
N.T.S.
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
SC GRID
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
EXISTING 25' EASEMENT
STA. 67+32.45
ROADWAY R/W
END PROPOSED
TMS# 070-00-00-145.000
ZUELKE ALLEN & MARLENE (JTROS)
TMS# 070-00-00-148.000
BURNS DONTE
TMS# 070-00-00-105.000
SPELL DELANO R & JEAN R
TMS# 070-00-00-146.000
SPEED WILLIAM E JR & MALYNDA
TMS# 070-00-00-138.000
GARCIA DIEGO ARMANDO
TMS# 070-00-00-176.000
& DANIELLE P
REEVE GABRIEL S 1
EXISTING 25' EASEMENT
DRAINAGE EASEMENT
EXISTING 30'
IN
G R
E S
G
R E
S
E M
E N
T
IN
G R
E
R E
S
E M
E N
T
3A
3B
3C
10 12 13
TMS# 070-00-00-070.000
& DANIEL S
REEVE LORI L
TMS# 070-00-00-137.000
& ET AL
NEWHALL KATHY J
TMS# 070-00-00-144.000
& BRENDA D
NEWHALL ARIC J
NEW TRANS. R/W
NEW TRANS. R/W
BEGIN NEW TRANS. R/W STA. 34+64.09
END EXISTING 25' EASEMENT.
BEGIN NEW TRANS. R/W STA. 37+02.75
END EXISTING 25' EASEMENT.
NEW
' R /W
NEW
' R /W
NEW
' R /W
NEW 25' R/
W
NEW 25' R/
W
NEW 25' R/WNEW 25' R/W
25.00
+41.77
25.00
+41.77
25.00
+49.78
25.00
+49.78
(575' R)
NEW TRANS. R/W
(625' R)
NEW TRANS. R/W
25.00
+90.33
23.50
+90.33
NEW TRANS. R/W
NEW TRANS. R/W
23.67
+42.65
26.25
+45.43
(62 5' R
)NEW
TRANS
. R/ W
(57 5' R
)NEW
TRANS
. R/ W
25.00
+60.60
25.00
+60.60
25.00
+20.67
25.00
+20.67
25.09
+10.60
24.90
+09.69
NEW TRANS. R/W
NEW TRANS. R/W
22.99
+53.18
24.00
+11.17 28.32
+65.06
21.90
+68.66
(475
' R)NEW T
RANS. R
/W
(52 5' R
/W)NEW T
RANS.
R/W
STA. 66+94.83
ROADWAY R/W
END PROPOSED
NEW 25' R/WNEW 25' R/W
NEW TRANS. R/W
NEW TRANS. R/W
25.00
+96.66
25.00
+96.66
D&F PROJECT NO.
S.C.
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
DGN.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E
OLD SPELL ROAD
SALES TAX AUTHORITY
PROPERTY STRIP MAP
OLD SPELL ROAD
SCALE 1" = 120'
4A
STATE COUNTY
SHEETS
TOTAL
NO.
SHEET
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
0 120 240 360 480
339'
1,253'
35 40
` OLD SPELL ROAD
` OLD SPELL ROAD
TMS# 070-00-00-124.000
BLACK MARGARET S
TMS# 070-00-00-056.000
SIMMONS HERBERT JESSENS
TMS# 070-00-00-160.000
JENKINS DOROTHY MAE
asmyre Text Box 5/26/2026
GENERAL CONSTRUCTION NOTES:
CONDITIONS IF NECESSARY.
THE ENGINEER RESERVES THE RIGHT TO ADJUST THE LOCATION OF ALL PROPOSED IMPROVEMENTS TO MEET FIELD
ANY COSTS ASSOCIATED WITH REMOVING EXISTING PIPE SHALL BE INCLUDED IN THE COST OF PLACING NEW PIPE.
INFORMATION SHOWN ON THE DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE EXACT LOCATION OF ALL UTILITIES
OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF THE UTILITIES
THE LOCATIONS OF EXISTING UTILITIES AND STORM DRAINAGE FACILITIES SHOWN ON THE PLANS ARE PROVIDED FOR THE CONVENIENCE
CONSTRUCTION (LATEST EDITION), SCDOT TRAFFIC SIGNAL SPECIFICATIONS, AND THE MUTCD, 2009 EDITION.
STANDARD DRAWINGS FOR ROAD CONSTRUCTION (LATEST EDITION), SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY
THE CONTRACTOR MUST PERFORM ALL WORK IN ACCORDANCE WITH THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
BARRELS, CONES, AND/OR TYPE 2 BARRICADES IN ACCORDANCE WITH THE 2009 MUTCD.
BEFORE STARTING ANY WORK ON THE PROJECT. THIS PLAN SHALL INCLUDE DETAILS CONCERNING PLACEMENT OF REFLECTORIZED
THE CONTRACTOR SHALL PROVIDE A DETAILED TRAFFIC CONTROL PLAN TO THE RESIDENT CONSTRUCTION MANAGER FOR APPROVAL
TO THE OWNER.
REPAIR OR COORDINATE WITH UTILITY OWNERS TO REPAIR ANY DAMAGES DUE TO CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST
THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, STORM DRAINS, UTILITIES AND OTHER FACILITIES TO REMAIN AND SHALL
MANAGER FOR APPROVAL PRIOR TO COMMENCING ANY WORK ON THE PROJECT.
THE CONTRACTOR SHALL PROVIDE A DETAILED CONTRACTOR'S EROSION CONTROL PLAN TO THE RESIDENT CONSTRUCTION
ARE CLASS B UNLESS OTHERWISE STATED.
AND DITCHES. THE CONTRACTOR SHALL ROUTINELY INSPECT AND MAINTAIN THESE DEVICES. ALL CHECK DAMS AND RIPRAP SHOWN
SOLIDS AND/OR CHEMICAL SOLUTIONS OFF-SITE, AND TO PREVENT EXCESSIVE SILTATION OF EXISTING DRAINAGE PIPES, CULVERTS, THE CONTRACTOR SHALL IMPLEMENT EROSION AND SEDIMENT CONTROL MEASURES TO PREVENT THE TRANSFER OF SUSPENDED
RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN PERMISSION TO STORE EQUIPMENT ON ADJACENT PROPERTIES.
THE CONTRACTOR SHALL NOT STORE ANY MATERIALS OR EQUIPMENT WITHIN 15 FT OF THE EDGE OF TRAVEL WAY. IT IS THE
BE MODIFIED PER DIRECTION OF THE ENGINEER TO FIT FIELD CONDITIONS.
PAVE ALL DRIVEWAYS TO R/W LINE. UNLESS THE DRIVEWAY IS LABELED, THE STANDARD DRIVEWAY RADIUS IS 10'. THIS MAY
PIPE OR STRUCTURES ACCORDINGLY.
ANY COSTS ASSOCIATED WITH ABANDONING PIPES OR STRUCTURES SHALL BE INCLUDED IN THE COST OF PLACING NEW
GENERAL CONSTRUCTION NOTES
COOPERATE WITH THE UTILITY DURING RELOCATION OPERATIONS.
CONFIRM THAT THE PROPER COORDINATION WITH THE VARIOUS UTILITY OWNERS HAS BEEN PERFORMED. THE CONTRACTOR SHALL
BEFORE CONSTRUCTION. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
APPLY ONLY AT THE POINTS DESIGNATED BY A TEST HOLE. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED.
THE LOCATION OF UTILITIES SHOWN IN THE PLANS SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS
INSTALLATIONS ARE COMPLETE.
FINAL SURFACE COURSE ON ALL ROADWAYS SHALL NOT BE PLACED UNTIL ALL DRAINAGE AND CURB AND GUTTER
PIPE SLOPE FROM CENTER OF BOX TO CENTER OF BOX. FIELD ADJUSTMENTS OF THE ACTUAL PIPE LENGTHS MAY BE NECESSARY.
PIPE LENGTHS THAT ARE SHOWN ON THE PLANS ARE ROUNDED TO THE NEAREST 4' INCREMENT AND CALCULATED ALONG THE
BE UTILIZED:
WHERE STORM PIPES AND STRUCTURES ARE IDENTIFIED TO BE ABANDONED IN PLACE, THE FOLLOWING PROCEDURES SHALL
ITEM BEING CONSTRUCTED.
UTILITIES OR TO MINIMIZE TRENCH WIDTH AS REQUIRED. PAYMENT FOR SUCH MEASURES IS INCLUDED IN THE BID PRICE FOR THE
THE CONTRACTOR SHALL PROVIDE ALL SHEETING, SHORING, AND BRACING REQUIRED TO PROTECT ADJACENT STRUCTURES AND
TEMPORARY ASPHALT IF NEEDED.
FILL STRUCTURE WITH FLOWABLE FILL TO BOTTOM OF PAVEMENT SECTION.
PLUG PIPE OPENINGS WITH BRICK AND GROUT.
STRUCTURES: REMOVE RIM/COVER AND CONE OR TOP SLAB.
PIPES: PLUG END(S) WITH BRICK AND GROUT.
UNLESS WORK IS TO RESUME IN THAT AREA IN LESS THAN 21 DAYS.
ALL DISTURBED AREAS SHALL BE SEEDED AFTER GRADING IS COMPLETE OR WITHIN 7 DAYS AFTER WORK STOPS IN AN AREA
ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION
STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION
OBTAIN THE ENGINEER'S CLARIFICATION BEFORE COMMENCING CONSTRUCTION.
THAT MAY AFFECT CONSTRUCTION. SHOULD DISCREPANCIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TO
THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS SHOWN ON THE PLANS AND REVIEW ALL FIELD CONDITIONS
CONTRACTOR IS TO PAVE DRIVEWAY APRONS TO RIGHT-OF-WAY LIMITS. 3.
WHERE APPLICABLE.
CONTRACTOR IS TO SAW-CUT CONNECTIONS TO EXISTING ROADWAYS AND/OR DRIVEWAYS 2.
IS RESPONSIBLE FOR REPLACING THE SIGN.
IF A SIGN MARKED TO BE RELOCATED IS DAMAGED BY THE CONTRACTOR, THE CONTRACTOR1.
NOTE:
DEWATERING IS REQUIRED. ONCE APPROVED AN ADDITIONAL COPY OF THE PLAN SHOULD BE PROVIDED TO THE COUNTY.
TO THE RESIDENT CONSTRUCTION ENGINEER AND OCRM FOR APPROVAL PRIOR TO ANY WORK BEING PERFORMED WHERE
SCDHEC OR OCRM REGULATIONS OR AS APPROVED BY THE ENGINEER. A PLAN FOR DEWATERING SHALL BE SUBMITTED
OR PROPERTY. DISCHARGED WATER FROM ALL DEWATERING OPERATIONS SHALL BE FILTERED IN ACCORDANCE WITH
BE DISPOSED OF WITHOUT UNDUE INTERFERENCE WITH OTHER WORK OR DAMAGE TO PAVEMENTS AND OTHER SURFACES
ACCUMULATION OF SURFACE AND GROUND WATER IN EXCAVATED AREAS. ALL OF THE WATER PUMPED OR DRAINED SHALL
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN PROPER DEWATERING PROCEDURES TO PREVENT THE FLOW AND
N.T.S.
CONSTRUCTION
PROVIDE TEMPORARY ROAD CLOSURE SIGNAGE FOR PIPE CROSSING
ADVANCE OF THE ROAD CLOSURE TO INSTALL THE PIPE CROSSINGS.
THE CONTRACTOR SHALL NOTIFY PROPERTY OWNERS WITH SUFFICIENT
GEOTEXTILE FABRIC
COMPACTION)*
(95% MAX. DRY DENSITY
STRUCTURAL BACKFILL
AT TIME OF CONSTRUCTION. USE NO. 57 STONE IN PLACE OF SAND.
* DO NOT USE SAND FILL WITHIN 2 VERTICAL FEET OF WATER LEVEL
BEGINNING 12" BELOW PIPE
24" MINIMUM THICKNESS
PIPE BEDDING (NO. 57 STONE)
DETAILS
SEE TYPICAL SHEETS FOR
PAVEMENT DESIGN
(NOT TO SCALE)
CROSSLINE PIPE INSTALLATION TYPICAL SECTION
* SEE PLANS FOR LOCATIONS OF CROSSLINE PIPES
* GEOTEXTILE FABRIC TO BE INCLUDED IN QUANTITY FOR #57 STONE
PRACTICES ARE BEING IMPLEMENTED. INSPECT WASHOUT SUMP REGULARLY AND REMOVE LIQUIDS AND SEDIMENT AS NEEDED.
SITE. MONITORING SHALL OCCUR THROUGHOUT THE DURATION TO THE CONSTRUCTION PROJECT TO ENSURE APPROPRIATE
WASHED INTO CONCRETE PUMPER TRUCKS AND DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OFF
SHALL BE PUMPED BACK INTO CONCRETE MIXER TRUCK. CONCRETE WASHOUT FROM CONCRETE PUMPER BINS SHALL BE
THAN 50-FEET AWAY FROM A STORM DRAIN, OPEN DITCH, OR RECEIVING WATER. EXCESS CONCRETE IN CONCRETE PUMP BIN
AND THEN DISPOSED OF AS SOLID WASTE, OR A LOCATION WHICH IS NOT SUBJECT TO SURFACE WATER RUNOFF AND MORE
DESIGNATED AREA THAT WILL LATER BE BACK FILLED, AN AREA WHERE THE CONCRETE WASH CAN HARDEN, BE BROKEN UP, PAVEMENT THAT CARRIES STORM WATER RUNOFF. THE WASHOUT FROM A CONCRETE TRUCK SHALL BE DISPOSED OF INTO A
DO NOT DISPOSE OF TRUCK WASHOUT WATER BY DUMPING INTO A SANITARY SEWER, STORM DRAIN, OR ONTO SOIL OR
CONCRETE TRUCK WASHOUT:
SEE SCDOT STANDARD DRAWING 605-010-01.
THE PLACEMENT OF THE SIGNS. FOR ADDITIONAL INFORMATION AND REQUIREMENTS FOR PERMANENT CONSTRUCTION SIGNS, SHOULD BE USED IN PLACEMENT OF THE SIGNS, NO SIGHTLINES FROM ROADWAYS OR DRIVEWAYS SHOULD BE AFFECTED BY
CONSTRUCTION SIGN SETS SHALL BE PLACED AT BEGINNING AND END OF CONSTRUCTION ON OLD SPELL RD. DISCRETION
PERMANENT CONSTRUCTION SIGNS:
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
0 50 100 150 200
` OLD SPELL ROAD
SCALE 1"= 50'
REFERENCE SHEET
S
E E
T
B M
A T
C H
L
IN
T
A . 5
+5
.0
05A
CONTROL POINTS
BENCHMARKS
NORTHING EASTING OFFSET STATION ELEVATION
BM #1
BM #1 NAIL IN UTILITY POLE 474521.4125 2126132.5177 17.28' LT 39+18.18 89.68
CP #1
CP #2
CP #3 CP #4
CP #5
CP #6
CP #7
NORTHING EASTING OFFSET STATION
CP #1 474061.6538 2126189.9276 10.40' LT 34+54.91NAIL
CP #2 474263.7613 2126170.8026 36+57.89NAIL 7.35' LT
CP #3 474455.8603 2126164.5913 38+49.52NAIL 7.45' RT
CP #4 474697.6690 2126128.0029 40+89.91NAIL 22.00' RT
CP #5 474838.2275 2126039.5174 42+51.84NAIL 17.00' RT
CP #6 474991.6129 2125960.4247 44+22.53NAIL 42.50' RT
CP #7 475112.3897 1215841.9314 45+89.79NAIL 16.97' RT
SC GRID
CP #8
CP #8 NAIL 475446.7034 2125640.1333 13.70' LT 49+81.78
OLD_SPELL_RD6
OLD_SPELL_RD7
P C
.5
P T
.6
P C
.6
P T
.3
UP
C UP
CA
UP
UP
CA
UP
UP
UP
UP
CA
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
0 50 100 150 200
SCALE 1"= 50'
REFERENCE SHEET
S
E E
T
A M
A T
C H
L
A . 4
+5
.0
05B
CONTROL POINTS
NORTHING EASTING OFFSET STATION
CP #9 475697.7855 2125605.1133 52+34.16NAIL 8.76' RT
CP #10 475842.0496 2125543.1998 53+88.66NAIL
CP #11 476205.0778 2125488.1276 57+50.26NAIL 24.81' LT
CP #12 476423.0788 2125560.6581 59+74.13NAIL 17.95' LT
` OLD SPELL ROAD
CP #9
CP #10
19.08' LT
CP #11
CP #12
SC GRID
P C
.1
P T
.3
P C
.6
P T
.3
P C
.5
P T
.5
OLD_SPELL_RD8
OLD_SPELL_RD9
OLD_SPELL_RD10
UPUP
UP
UP
UP
UP
UP
UP
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
REFERENCE SHEET
05C
SCALE N.T.S.
Course from PT OLD_SPELL_RD8 to PC OLD_SPELL_RD9 N 24° 23' 21.50" E Dist 659.3000
Chord Bear = N 5° 41' 17.70" E Ahead = N 24° 23' 21.50" E Back = N 13° 00' 46.09" W C.C. N 476,139.7843 E 2,126,096.4419 P.T. Station 59+37.36 N 476,382.1768 E 2,125,561.8253 P.C. Station 55+54.18 N 476,007.6102 E 2,125,524.5161 Mid. Ord. = 30.9910 Long Chord = 376.4201 External = 32.7184 Radius = 587.0000 Length = 383.1877 Tangent = 198.7006 Degree = 9° 45' 38.81" Delta = 37° 24' 07.59" (RT) P.I. Station 57+52.88 N 476,201.2081 E 2,125,479.7750 Curve OLD_SPELL_RD8 Curve Data
Course from PT OLD_SPELL_RD7 to PC OLD_SPELL_RD8 N 13° 00' 46.09" W Dist 563.8449
Chord Bear = N 24° 23' 37.85" W Ahead = N 13° 00' 46.09" W Back = N 35° 46' 29.61" W C.C. N 475,645.1351 E 2,126,460.1618 P.T. Station 49+90.33 N 475,458.2450 E 2,125,651.4764 P.C. Station 46+60.60 N 475,159.9153 E 2,125,786.7661 Mid. Ord. = 16.3207 Long Chord = 327.5728 External = 16.6481 Radius = 830.0000 Length = 329.7369 Tangent = 167.0716 Degree = 6° 54' 11.18" Delta = 22° 45' 43.52" (RT) P.I. Station 48+27.67 N 475,295.4638 E 2,125,689.0957 Curve OLD_SPELL_RD7 Curve Data
Course from PT OLD_SPELL_RD6 to PC OLD_SPELL_RD7 N 35° 46' 29.61" W Dist 439.9221
Chord Bear = N 21° 01' 15.55" W Ahead = N 35° 46' 29.61" W Back = N 6° 16' 01.49" W C.C. N 474,466.8514 E 2,125,577.4365 P.T. Station 42+20.67 N 474,802.9976 E 2,126,043.9456 P.C. Station 39+24.54 N 474,529.6202 E 2,126,149.0002 Mid. Ord. = 18.9586 Long Chord = 292.8680 External = 19.6050 Radius = 575.0000 Length = 296.1299 Tangent = 151.4268 Degree = 9° 57' 52.14" Delta = 29° 30' 28.12" (LT) P.I. Station 40+75.97 N 474,680.1420 E 2,126,132.4700 Curve OLD_SPELL_RD6 Curve Data
Course from 405254 to PC OLD_SPELL_RD6 N 6° 16' 01.49" W Dist 663.8726
Point 405254 N 473,869.7151 E 2,126,221.4707 Sta 32+60.67
Course from PT OLD_SPELL_RD10 to PC OLD_SPELL_RD11 N 24° 20' 44.09" E Dist 417.6949
Chord Bear = N 25° 33' 05.20" E Ahead = N 24° 20' 44.09" E Back = N 26° 45' 26.32" E C.C. N 477,297.1120 E 2,125,432.1917 P.T. Station 67+17.58 N 477,090.9924 E 2,125,887.7295 P.C. Station 66+96.54 N 477,072.0058 E 2,125,878.6525 Mid. Ord. = 0.1107 Long Chord = 21.0448 External = 0.1108 Radius = 500.0000 Length = 21.0463 Tangent = 10.5247 Degree = 11° 27' 32.96" Delta = 2° 24' 42.23" (LT) P.I. Station 67+07.06 N 477,081.4036 E 2,125,883.3908 Curve OLD_SPELL_RD10 Curve Data
Course from PT OLD_SPELL_RD9 to PC OLD_SPELL_RD10 N 26° 45' 26.32" E Dist 79.2069
Chord Bear = N 25° 34' 23.91" E Ahead = N 26° 45' 26.32" E Back = N 24° 23' 21.50" E C.C. N 476,776.1741 E 2,126,289.4533 P.T. Station 66+17.33 N 477,001.2803 E 2,125,842.9926 P.C. Station 65+96.66 N 476,982.6413 E 2,125,834.0729 Mid. Ord. = 0.1068 Long Chord = 20.6633 External = 0.1068 Radius = 500.0000 Length = 20.6647 Tangent = 10.3338 Degree = 11° 27' 32.96" Delta = 2° 22' 04.82" (RT) P.I. Station 66+07.00 N 476,992.0530 E 2,125,838.3401 Curve OLD_SPELL_RD9 Curve Data
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
These discharges are to be routed through appropriate BMPs (sediment basin, filter bag, etc.).
15. Minimize the discharge of pollutants from dewatering of trenches and excavated areas.
EC1
EROSION CONTROL NOTES
SEE SHEETS D1-D5 FOR EROSION CONTROL DETAILS
N.T.S.
CONCRETE TRUCK WASHOUT
-Inspect washout sump regularly and remove liquids and sediment as needed.
to ensure appropriate practices are being implemented.
-Monitor employees and subcontractors throughout the duration of the construction project
Inspection and Maintenance:
and discharged into designated washout area or properly disposed offsite.
-Concrete washout from concrete pumper bins can be washed into concrete pumper trucks
-Pump excess concrete in concrete pump bin back into concrete mixer truck.
away from a storm drain, open ditch, or receiving water.
- A location which is not subject to surface water runoff, and more than 50-feet of as solid waste.
- An area where the concrete wash can harden, be broken up, and then disposed
- A designated area that will later be backfilled: a slurry pit
-The washout from a concrete truck should be disposed of into:
or onto soil or pavement taht carries storm water runoff.
-Do not dispose of truck washout water by dumping into a sanitary sewer, storm drain occur the following BMPs should be used.
Concrete trucks should not typically be washed on site. However, if this does need to
1. If necessary, slopes which exceed eight (8) feet should be stabilized with synthetic or vegetative mats, in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed until the slope is brought to grade.
2. Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than fourteen (14) days after work has ceased, except as stated below:
*Where stabilization by the 14th day is precluded by snow cover or frozen ground conditions stabilization measures must be initiated as soon as practicable.
*Where construction activity on a portion of the site is temporarily ceased, and earth disturbing activities will be resumed within 14 days, temporary stabilization measures do not have to be initiated on that portion of the site.
4. Provide silt fence and or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas shall be cleaned, graded, and stabilized immediately after the utility installation. Fill, cover, and temporary seeding at the end of each day are recommended. If water is encountered while trenching, the water should be filtered to remove any sediments before being pumped back into any waters of the state.
5. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized.
6. The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from the construction area and the generation of dust.
The contractor shall daily remove mud/soil from pavement, as may be required.
7. Residential subdivisions require erosion control features for infrastructure as well as for individual lot construction. Individual property owners shall follow these plans during construction or obtain approval of an individual plan in accordance with S.C. REG. 72-300 ET SEQ. and SCR100000.
8. Temporary diversion berms and or ditches will be provided as needed during construction to protect work areas from upslope runoff and or to divert sediment laden water to appropriate traps or stable outlets.
9. All waters of the state (WOS), including wetlands, are to be flagged or otherwise clearly marked in the field. A double row of silt fence is to be installed in all areas where a 50-foot buffer can't be maintained between the disturbed area and all WOS. A 10-foot buffer should be maintained between the last row of silt fence and all WOS..
potential for impact (such as stockpiles of freshly treated lumber) and construction chemicals that could be exposed to storm water must be prevented from being a pollutant source in storm water discharges.
modification required to correct the BMP within 48 hours of identification.
or incorrectly installed, the Permittee must address the necessary replacement or
If periodic inspection or other information indicates that a BMP has been inappropriately
3. All sediment and erosion control devices shall be inspected once every calendar week.
10. Litter, construction debris, oils, fuels, and building products with significant
13. Minimize soil compaction and, unless infeasible, preserve topsoil.
the date that final stabilization is reached.
business hours, from the date of commencement of construction activities to at the construction site or a nearby location easily accessible during normal
11. A copy of the SWPPP, inspections records, and rainfall data must be retained not resume for a period of 7 calendar days.
where land-disturbing activities have permanently or temporarily ceased, and will
12. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) basin or alternative control that provides equivalent or better treatment prior to discharge.
wash water, and other wash waters. Wash waters must be treated in a sediment
14. Minimize the discharge of pollutants from equipment and vehicle washing, wheel
*Soaps or solvents used in vehicle and equipment washing.
*Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and and other construction materials;
*Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds
*Wastewater from washout of concrete, unless managed by an appropriate control;
16. The following discharges from sites are prohibited:
areas of the construction site.
once every calendar week and must be conducted until final stabilization is reached on all
17. After construction activities begin, inspections must be conducted at a minimum of at least alternative BMPs must be implemented as soon as reasonably possible.
the next storm event is impracticable, the situation must be documented in the SWPPP and be completed before the next storm event whenever practicable. If implementation before the requirements of this permit and/or SC's Water Quality Standards, implementation must
18. If existing BMPs need to be modified or if additional BMPs are necessary to comply with has approved otherwise.
that disturb 10 acres or more this conference must be held on-site unless the Department
On-Site SWPPP prior to the implementation of construction activities. For non-linear projects
19. A Pre-Construction Conference must be held for each construction site with an approved
OCRM STANDARD NOTES
SEEDING INSTALLATION
washout which occurs shall be regraded and reseeded until good sod is established.
G. Slopes shall be protected against washouts by an approved method. Any over the entire area seeded.
shall be done if and when necessary until a good, healthy, uniform growth is established
F. All seeded areas shall be watered and maintained in good condition. Reseeding considered on a case-by-case basis as approved by the Engineer.
tack the mulch, unless otherwise shown on the plans. Mechanical tacking will be per acre. Asphalt emulsion shall be applied uniformly at a rate of 300 GAL per acre to
All seeded areas shall be mulched with clean small-grain straw at a rate of 1•to 2 tons
SCDOT Standard Specifications for Highway Construction (Edition 2007).
applied, depending on the period of year, at the rates indicated in Section 810 of the raked into the surface. Lightly roll the surface and water with fine spray. Seed shall be
E. Immediately following this preparation the seed shall be uniformly applied and lightly
D. Fertilizer shall be uniformly spread and disked or roto-tilled to a depth of at least 4 IN.
stones larger than 2 IN shall be removed.
C. The subgrade of all areas to be seeded shall be raked and all rubbish, sticks, roots, and too wet to rake easily, when it is in a frozen condition, or too dry.
B. No seeding should be undertaken in windy or unfavorable weather, when the ground is
A. Seed all disturbed areas of construction (excluding riprap lined ditches).
SEQUENCE OF CONSTRUCTION
D. A recommended sequence of construction follows:
9. Remove sediment controls 30 days after all disturbed areas have stabilized.
seven (7) days.
8. Clean out temporary sediment control as needed; check controls every
7. Stabilize all remaining areas.
particular erosion control device has been stabilized.
6. Erosion controls may be removed after the area contributing flow to that driveways as long as possible.
progress to limit disruption to traffic. Schedule work to maintain access to all
5. Proceed with construction. Limit disturbed areas to areas with work in possible (within 7 calendar days).
4. Install protection around inlets and stabilize disturbed areas as soon as controls.
3. Construct new drainage appurtenances within the areas protected by perimeter
2. Construct perimeter controls.
control silt fence, hay bales, and temporary sediment traps.
1. Clear and grub only areas necessary for perimeter erosion and sediment install BMP's per the SCDOT Standard Drawings for Erosion Control.
4. Adhere by all of the OCRM Standard Notes listed on the right of this sheet and directed by the Engineer.
3. A temporary rock filter dam or sediment tube shall be used as ditch checks as shall be washed down as necessary to prevent tracking of silt offsite.
where construction vehicles access public non-construction areas. Vehicles
2. Stabilized Graveled Construction Entrances shall be used at locations construction.
1. Silt Fences shall be used to prevent silt from leaving the limits of
C. Install sediment erosion controls as follows:
(843)238-4528 prior to commencing construction activities.
B. Contact the office of Ocean and Coastal Resource Management (OCRM) at
A. Obtain all permits.
D&F PROJECT NO.
DORCHESTER 12042.14
AMS
JMS
DORCHESTER COUNTY
ROAD NAME
OLD SPELL ROAD
SALES TAX AUTHORITY
OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STATE COUNTY
S.C.
SHEETS
TOTAL
NO.
SHEET
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
DGN.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E asmyre Text Box 5/26/2026
E E
T
M A T
C H
L
A . 4
1+ .0
ASPHALT PAVEMENT
TIE TO EXISTING
STA. 33+95.58
BEGIN CONSTRUCTION
ASPHALT PAVEMENT
150 SY EXISTING
MILL AND REPAVE
OUTFALL FLUME
REMOVE EXISTING
BEYOND C/L
RELOCATE FENCE
BEYOND C/L
RELOCATE FENCE
BEYOND C/L
RELOCATE FENCE
3' VALLEY GUTTER
OUTFALL FLUME
REMOVE EXISTING
AT 15:1
TO PAVED SHOULDER
3' VALLEY GUTTER
TRANSITION FROM
45' TAPER
AT 15:1
TO PAVED SHOULDER
3' VALLEY GUTTER
TRANSITION FROM
45' TAPER
SC GRID
OLD_SPELL_RD6
` OLD SPELL ROAD
38 39
P C
.5
UP
C UP
CA
UP
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
DGN.
S.C.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E
12042.14
SCALE 1"= 30' HOR. 1" = 5' VER.
AMS
P R
O P
O S
E D
E X
IS
T
IN
G
DORCHESTER COUNTY
SALES TAX AUTHORITY
OLD SPELL ROAD
PLAN AND PROFILE
DORCHESTER OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
JMS
COUNTY D&F PROJECT NO.
SHEETS
TOTAL
NO.
SHEET
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
0 30 12060 90
ROAD NAMESTATE
33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+0033+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+0033+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+0033+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+0033+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
VPI = 34+80.00
Elev. 83.10
(-) 1.19% (+) 0.67%
120' V.C.
VPI = 38+67.60
Elev. 85.69
(+) 0.67% (+) 0.40%
50' V.C.
.0
V
P C
E le v
.8
.0
V
P T
E le v
.5
.6
V
P C
E le v
.5
.6
V
P T
E le v
.7
.1
1ASPHALT PAVEMENT
TIE TO EXISTING
STA. 33+95.58
BEGIN CONSTRUCTION
33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
Elev. = 80.96
Elev. = 83.36
Elev. = 83.68 Elev. = 84.28
1.
1.
1.
1.
1.
.0
.2
.5
.7
.9
.1
.2
.3
.6
.9
.2
SPECIAL DITCH RIGHT
SPECIAL DITCH RIGHT ELEVATIONS
EXISTING VPI = 35+17.00 RT.
VPI = 38+50.00 RT.
VPI = 38+44.22 RT.
VPI = 39+00.00 RT.
.9
(+) 0.84%
(+) 0.84%
VPI = 37+74.22 RT.
Elev. = 83.13
(+) 0.33% (+) 5.5
4% (+) 1.20%
.2
.0
.7
.5
.4
.3
.4
.5
.7
.9
.0
.2
.4
.5
.7
.9
.0
.2
.4
.5
.7
.8
.9
.0
.1
.2
.3
.4
.5
.6
.7
(+) 0.40%
E X
IS
T . 3
D R
A
IN
A
S
E M
E N
T
E A S
E M
E N
T
E X
IS
T . 3
D R
A
IN
A G E
3A
NEW TRANS. EASEMENT
EXISTING 25' EASEMENT=
= NEW TRANS. EASEMENT
EXISTING 25' EASEMENT
NEW TRANS. R/W
23.61' LT
STA. 34+64.09
TRANS. R/W
BEGIN NEW
25' EASEMENT.
END EXISTING
26.42' RT
STA. 37+02.75
25' R/W
BEGIN PROPOSED
25' EASEMENT.
END EXISTING
NEW TRANS. R/W
22.99
+53.18
24.00
+11.17 28.32
+65.06
NEW TRANS. R/W NEW TRANS. R/W
NEW
TRANS.
R/ W (47
5' R
NEW T
RANS.
R/W ( ' R/
W)
21.90
+68.66
DURING CONSTRUCTION.
PROPOSED DRIVEWAY LOCATION
CONTRACTOR SHALL CONFIRM
DURING CONSTRUCTION.
PROPOSED DRIVEWAY LOCATION
CONTRACTOR SHALL CONFIRM
YELLOW CENTERLINE
PLACE 4" DOUBLE
INV. OUT = 83.13
INV. IN = 83.36
PLACE 70 LF 15" RCP
INV. OUT = 80.13
INV. IN = 81.00
PLACE 20 LF 24" RCP
INV. OUT = 79.90
INV. IN = 80.13
PLACE 28 LF 24" RCP
INV. OUT = 80.86
INV. IN = 80.96
PLACE 20 LF 15" RCP
INV. OUT = 80.00
INV. IN = 80.86
PLACE 60 LF 15" RCP
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 18 SY
PLACE 14 TONS RIPRAP
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 18 SY
PLACE 14 TONS RIPRAP
INV. OUT = 79.10
INV. IN = 79.30
WITH 60 LF 29"x45" CLASS III RCP
REPLACE EXIST. PIPE
WITH DRIVEWAY LOCATION
ADJUST PIPE LOCATION
INV. OUT = 83.30
INV. IN = 83.49
PLACE 28 LF 15" RCP
WITH DRIVEWAY LOCATION
ADJUST PIPE LOCATION
INV. OUT = 84.53
INV. IN = 84.65
PLACE 28 LF 15" RCP
INFORMATION
SEE SHEET D7 FOR MORE
FILTER (WEIGHTED)
INSTALL 15 LF TYPE F
TOP ELEV. = 83.74
STA. 34+96.93
CONSTRUCT TYPE 9 CB
INFORMATION
SEE SHEET D7 FOR MORE
FILTER (WEIGHTED)
INSTALL 15 LF TYPE F
TOP ELEV. = 83.74
STA. 34+96.93
CONSTRUCT TYPE 9 CB
SHOULDERS.
AND BACKSLOPES. APPLY HECP TYPE 1 TO
APPLY TRM TYPE 1 TO DITCH FORESLOPES
NOTE:
C/L
C/L
18'F
18'F
17'F 18'F
24'F
21'C
20'F
21'C
22'C
20'C
22'C
21'C
23'C
21'C
23'C
20'C
22'C
21'C 20'C
21'C
20'C
21'C
19'C
20'C
21'C
18'C
19'C
18'C
19'C
18'C
19' C
SEDIMENT TUBE (TYP.)
PLACE 10 LF
SILT FENCE
PLACE 165 LF
SILT FENCE
PLACE 105 LF
asmyre Text Box 6/18/2026
E E
T
M A
T C
H L
A . 4
1+ .0
` OLD SPELL ROAD
S
E E
T
M A T
C H
L
A . 4
+4
.0
C/L
BEYOND C/L
RELOCATE FENCE
S C
G R
ID
OLD_SPELL_RD7
OLD_SPELL_RD6
P T
.6
7 43
P C
.6
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
DGN.
S.C.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E
12042.14
SCALE 1"= 30' HOR. 1" = 5' VER.
AMS
P R
O P
O S
E D
E X
IS
T
IN
G
DORCHESTER COUNTY
SALES TAX AUTHORITY
OLD SPELL ROAD
PLAN AND PROFILE
DORCHESTER OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
JMS
COUNTY D&F PROJECT NO.
SHEETS
TOTAL
NO.
SHEET
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
0 30 12060 90
ROAD NAMESTATE
E A S E
M E
N T
E X
IS
T . 3
' D
R A
IN
A G E
E A S E
M E
N T
E X
IS
T . 3
' D
R A
IN
A G E
3B
3C
NEW 25' R/W
NEW TRANS. R/W
24.90
+09.69 25.00
+20.67
25.00
+60.60
26.25
+05.49
NEW TRANS. R/W
NEW TRANS. R/W (625' R)
NEW TRANS. R/W (575' R)23.67
+08.28
25.00
+60.60
NEW TRANS. R/W
NEW 25' R/W
NEW 25' R/WNEW 25' R/W
25.09
+10.60 25.00
+20.67
NEW TRANS. R/W
(475' R)
NEW TRANS. R/W
R/W (525' R)
NEW TRANS.
42+00 43+00 44+00 45+00 46+00 47+00 48+0042+00 43+00 44+00 45+00 46+00 47+00 48+0042+00 43+00 44+00 45+00 46+00 47+00 48+0042+00 43+00 44+00 45+00 46+00 47+00 48+0042+00 43+00 44+00 45+00 46+00 47+00 48+00
VPI = 43+39.13
Elev. 87.57
(+) 0.40% (+) 1.22%
50' V.C.
.1
V
P C
E le v
.4
.1
V
P T
E le v
.8
42+00 43+00 44+00 45+00 46+00 47+00 48+00
.8
.9
.0
.1
.2
.3
.4
.5
.7
.0
.3
.6
.9
.2
.5
.8
.1
.4
.7
.0
.3
.6
.9
.2
.5
.8
.2
.5
EXISTING
PROPOSED
(+) 1.22%
ELEVATIONS
SPECIAL DITCH LEFT
UP
CA
UP
UP
DURING CONSTRUCTION.
PROPOSED DRIVEWAY LOCATION
CONTRACTOR SHALL CONFIRM
DURING CONSTRUCTION.
PROPOSED DRIVEWAY LOCATION
CONTRACTOR SHALL CONFIRM
15' R
15' R
LOCATION DURING CONSTRUCTION.
CONTRACTOR SHALL CONFIRM DRIVEWAY
EXISTING DRIVEWAY NOT SURVEYED.
APPROX. LOCATION FOR 25' WIDE DRIVEWAY.
YELLOW CENTERLINE
PLACE 4" DOUBLE
19'C
19'C
19'C
19'C
19'C
19'C
19'C
20'C
19'C
19'C
19'C
19'C
18'C
19'C
18'C
18'C
19'C
18'C
20'C
18'C
19'C
19'C
21'C
20'C
22'C
21'C
20'C
20'C
(TYP)
SEDIMENT TUBE
PLACE 10 LF
ROW SILT FENCE
PLACE 250 LF DOUBLE
OUTFALL DITCH
RE-GRADE 80 LF EXISTING
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 9 SY
PLACE 7 TONS RIPRAP
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 9 SY
PLACE 7 TONS RIPRAP
INV. OUT = 82.61
INV. IN = 82.81
WITH 48 LF (2) 24" CLASS IV RCP
REPLACE EXIST. PIPE
WITH DRIVEWAY LOCATION
ADJUST PIPE LOCATION
INV. OUT = 85.64
INV. IN = 85.86
PLACE 52 LF 15" RCP
WITH DRIVEWAY LOCATION
ADJUST PIPE LOCATION
INV. OUT = 85.70
INV. IN = 85.81
PLACE 28 LF 15" RCP
WITH DRIVEWAY LOCATION
ADJUST PIPE LOCATION
INV. OUT = 85.91
INV. IN = 86.07
PLACE 28 LF 15" RCP
SHOULDERS.
AND BACKSLOPES. APPLY HECP TYPE 1 TO
APPLY TRM TYPE 1 TO DITCH FORESLOPES
NOTE:
asmyre Text Box 6/18/2026
E E
T
M A
T C
H L
A . 4
+4
.0
S
E E
T
M A
T C
H L
A . 5
+8
.0
` OLD SPELL ROAD
C/L
S P
O T
T
D
O
R
R
A
IL
SC GRID
OLD_SPELL_RD7
P T
.3
51 52
UPUP
UP
UP
CA
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
DGN.
S.C.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E
12042.14
SCALE 1"= 30' HOR. 1" = 5' VER.
AMS
P R
O P
O S
E D
E X
IS
T
IN
G
DORCHESTER COUNTY
SALES TAX AUTHORITY
OLD SPELL ROAD
PLAN AND PROFILE
DORCHESTER OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
JMS
COUNTY D&F PROJECT NO.
SHEETS
TOTAL
NO.
SHEET
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
0 30 12060 90
ROAD NAMESTATE
IN
G R
E
R E
S
E M
E N
T
IN
G R
E
R E
S
E M
E N
T
7 8
NEW TRANS. R/W (625' R
26.25
+45.43
25.00
+90.33
NEW TRANS. R/W
NEW 25' R/W NEW 25' R/W
NEW 25' R/WNEW 25' R/W
23.67
+42.65
25.00
+90.33
NEW TRANS. R/W
NEW TRANS R/W (575' R)
49+00 50+00 51+00 52+00 53+00 54+0049+00 50+00 51+00 52+00 53+00 54+0049+00 50+00 51+00 52+00 53+00 54+0049+00 50+00 51+00 52+00 53+00 54+0049+00 50+00 51+00 52+00 53+00 54+00
VPI = 50+05.19
Elev. 95.70
(+) 1.22% (-) 0.10%
100' V.C.
VPI = 52+35.81
Elev. 95.47
(-) 0.10% (+) 0.15%
50' V.C.
.1
V
P C
E le v
.0
.1
V
P T
E le v
.6
.8
V
P C
E le v
.4
.8
V
P T
E le v
.5
49+00 50+00 51+00 52+00 53+00 54+00
.8
.1
.4
.7
.0
.3
.5
.6
.6
.6
.6
.5
.5
.5
.5
.4
.4
.5
.5
.6
.6
.6
.7
.7
.7
.8
.6
.6
.6
.6
1ELEVATIONS
SPECIAL DITCH LEFT
ELEVATIONS
SPECIAL DITCH RIGHT
.0
.8
.6
.5
.3
.2
.0
1.
1.
.0
.3
.5
.7
.9
.1
.3
.6
.5
.5
.5
.5
.4
.4
.4
.4
.5
.7
.8
.0
.1
.3
.4
.6
.7
1.
1.
1.
.2
.0
1.
.6
(-) 0.10%
Elev. = 92.69
VPI = 49+00.00 LT.
SPECIAL DITCH LEFT
Elev. = 93.00
VPI = 50+00.00 RT
SPECIAL DITCH RIGHT
(-) 0.63%
.0
(-) 0.10% (-) 0.72%
(-) 0.63%
VPI = 51+50.00 LT.
Elev. = 92.44
VPI = 51+80.30 RT.
Elev. = 91.86
EXISTING
PROPOSED
(-) 0.30% (+) 0.39%
(+) 4 .14% (+) 0.62%
(+) 0.87%
VPI = 52+50.00 LT.
Elev. = 92.40
VPI = 52+36.00 LT.
Elev. = 91.82
VPI = 52+72.48 RT.
Elev. = 91.85
VPI = 52+35.00 RT.
Elev. = 91.70
(+) 0.87%
(+) 0.62%
25'R
+3 .8
25'R
+6 .8
20'
YELLOW CENTERLINE
PLACE 4" DOUBLE
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 9 SY
PLACE 7 TONS RIPRAP
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 9 SY
PLACE 7 TONS RIPRAP
INV. OUT = 91.71
INV. IN = 91.82
WITH 40 LF 24"x38" CLASS III RCP
REPLACE EXIST. PIPE
SHOULDERS.
AND BACKSLOPES. APPLY HECP TYPE 1 TO
APPLY TRM TYPE 1 TO DITCH FORESLOPES
NOTE:
21'C
20'C
22'C
20'C
23'C
19'C
25'C
24'C
25'C
25'C
25'C
25'C
24'C
25'C
25'C
23'C
24'C
22'C
23'C
22'C
23'C
22'C
23'C
22'C
SEDIMENT TUBE (TYP)
PLACE 10 LF
ROW SILT FENCE
PLACE 195 LF DOUBLE
asmyre Text Box 6/18/2026
E E
T
M A T
C H
L
A . 5
+8
.0
` OLD SPELL ROAD
C/L
SC GRID
OLD_SPELL_RD8
P C
.18
P T
.3
UP
UP
UP
UP
REV. NO. DATE DESCRIPTION OF REVISIONBY
R/W
CHK.
DATE
DATE
DATE
DGN.
S.C.
(8
C H
A R
L E
S T
O N
S C
M O
N T
A G
E N
U E
12042.14
SCALE 1"= 30' HOR. 1" = 5' VER.
AMS
P R
O P
O S
E D
E X
IS
T
IN
G
DORCHESTER COUNTY
SALES TAX AUTHORITY
OLD SPELL ROAD
PLAN AND PROFILE
DORCHESTER OLD SPELL ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
JMS
COUNTY D&F PROJECT NO.
SHEETS
TOTAL
NO.
SHEET
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
0 30 12060 90
ROAD NAMESTATE
NEW
' R /W
25.00
+49.78
NEW
TRANS
. R/ W (62
5' R
NEW TRANS. R/W (625' R)
25.00
+41.77
NEW 25' R/W
NEW 25' R/W
NEW 25' R/W
NEW 25' R/W
25.00
+41.77
NEW TRANS. R/W (575' R)
25.00
+49.78
NEW
TRANS
. R/ W (57
5' R
NEW
' R /W
55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+0055+00 56+00 57+00 58+00 59+00 60+00 61+00 62+0055+00 56+00 57+00 58+00 59+00 60+00 61+00 62+0055+00 56+00 57+00 58+00 59+00 60+00 61+00 62+0055+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00
VPI = 55+57.27
Elev. 95.94
(+) 0.15% (-) 1.09%
100' V.C.
.2
V
P C
E le v
.8
.2
V
P T
E le v
.4
55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00
.8
.8
.8
.6
.4
.2
.9
.6
.3
.1
.8
.5
.2
.0
.7
.4
.2
.9
.6
.3
.1
.8
.5
.2
.0
.7
.4
.2
.9
.3
.9
.4
1.
1.
1.
.5
.8
.1
.4
.1
1.
.5
.7
.9
.2
.2
.3
.3
.3
.3
.4
.4
.4
.4
LEFT ELEVATIONS
SPECIAL DITCH
RIGHT ELEVATIONS
SPECIAL DITCH
.8
.0
.2
.9
.1
.2
.2
Elev. = 94.26
VPI = 55+50.00 LT. & RT.
SPECIAL DITCH LEFT
VPI = 56+50.00 LT.
Elev. = 93.39
.3
(-) 1.87%
VPI = 57+50.00 RT.
Elev. = 92.12
SPECIAL DITCH RIGHT
(-) 1.87%
(-) 3.13%
Elev. = 90.59
VPI = 58+00.00 LT.
(-) 3.13%
(-) 2.87%
Elev. = 88.13
(+) 0.16%
Elev. = 88.29
(+) 1.57% (+) 0.10%
VPI = 58+85.75 LT.
VPI = 58+81.55 RT.
VPI = 59+00.00 RT.
Elev. = 88.00
EXISTING
PROPOSED
(+) 0.16%
(+) 0.10% (-) 0.74%
Elev. = 88.34
DIRT ROAD
TIE TO EXISTING
STA. 62+00.00
END CONSTRUCTION
(-) 1.09%
.3
.1
.1
.1
.2
.2
.2
.2
.3
.3
.1
.9
.7
.6
(+) 0.62%
(+) 0.87%
.6
.9
VPI = 61+00.00 LT. STA. 61+00.00
END SPECIAL DITCH RT
TIE TO EXIST. DITCH
STA. 62+00.00
END SPECIAL DITCH LT
STA. 61+00.00 LT. AND RT.
BEGIN 100' TAPER
.3
.2 ' 8 .3
.1
TIE TO EXISTING ROAD
STA. 62+00.00
END CONSTRUCTION
8 10
YELLOW CENTERLINE
PLACE 4" DOUBLE
'C
21' C
'C
'C
19'C
'C
19'C
21'C
21'C
16'F 17'F
20'C
22'C
24'C
24'C
25'C
25'C
24'C
23'C
22'C
21'C
19'C
19'C
19'C
18'C
17'C
17'C
14'F
SEDIMENT TUBE (TYP)
PLACE 10 LF
(TYP)
SEDIMENT TUBE
PLACE 10 LF
PROPOSED DITCH
DITCH AND TIE TO
RETAIN EXIST.
PROPOSED DITCH
DITCHES AND TIE TO
RETAIN EXIST.
SILT FENCE
PLACE 280 LF
ROW OF SILT FENCE
PLACE 140 LF SECOND
ROW SILT FENCE
PLACE 150 LF DOUBLE
SILT FENCE
PLACE 100 LF
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 9 SY
PLACE 7 TONS RIPRAP
FABRIC
OF GEOTEXTILE FILTER
CLASS B AND 9 SY
PLACE 7 TONS RIPRAP
INV. OUT = 91.20
INV. IN = 91.92
PLACE 40 LF 15" RCP
DRIVEWAY PIPE
REMOVE EXISTING
INV. OUT = 88.00
INV. IN = 88.13
WITH 44 LF 24"x38" CLASS III RCP
REPLACE EXIST. PIPE
DITCH
TIE TO EXISTING
SHOULDERS.
AND BACKSLOPES. APPLY HECP TYPE 1 TO
APPLY TRM TYPE 1 TO DITCH FORESLOPES
NOTE:
asmyre Text Box 6/18/2026
P L O T T E
D
:3
:5
P
M F
IL
N
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
OUTH
CAROLIN
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
DAVIS &
No. C00538
STATE
S.C. DORCHESTER
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X1
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.0
.0
2.08% 2.08%10:112:1 12:110:1
E X
IS
T . R
W
E X
IS
T . R
W
.7
.7
2.08% 2.08%12:1 10:1 10:1 12:1
2:1
E X
IS
T . R
W
E X
IS
T . R
W
.5
.5
2.08% 2.08%
30.3:1 12:1 10:1 10:1 12:1
E X
IS
T . R
W
E X
IS
T . R
W
80 80
85 85
75 75
34+00.00
80 80
85 85
75 75
34+25.00
85 85
90 90
80 80
34+50.00
STA. 33+95.58
BEGIN CONSTRUCTION
asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X2
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.3
2.08% 2.08% 12:1 10:1 10:1 12:1
E X
IS
T . R
W
E X
IS
T . R
W
.5
2.08%12:1
2:1 2:1 8
.0
2.08%
2:1 2:18 1.
12:1
N
W
N
W
.9
2.08%12:1
2:1 2:1
.3
2.08% 12:1 2:1 2:18
1.
N
W
N
W
85 85
90 90
80 80
35+00.00
85 85
90 90
80 80
35+50.00
85 85
90 90
80 80
36+00.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X3
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.2
2.08%12:1
2:1 2:1 8
.7
2.08% 12:1 2:1
2:18 .0
N
W
N
W
.4
.5
2.08%12:1
2:1 2:1 8
.0
2.08% 12:1 2:1
2:18 .5
N
W
N
W
.8
.9
2.08%12:1
2:1 2:1
.3
2.08% 12:1 2:1
2:18 .9
N
W
N
W
85 85
90 90
80 80
36+50.00
85 85
90 90
80 80
37+00.00
85 85
90 90
80 80
37+50.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X4
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.2
2.08%12:1
2:1 2:1 8
.7
2.08% 12:1 30:1
2:1 8 .7
2:1 2:18
.2
N
W
N
W
.2
.5
2.08%12:1
2:1 2:1 8
.0
2.08% 12:1 2:1
2:18 .6
N
W
N
W
.3
.8
2.08%12:1
2:1 2:1
.2
2.08% 12:1 2:1
2:18 .2
8N
W
N
W
85 85
90 90
80 80
38+00.00
85 85
90 90
80 80
38+50.00
85 85
90 90
80 80
39+00.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X5
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.6
.0
2.08%12:1
2:1 2:1
.4
2.08% 12:1 2:1
2:1
.4
8N
W
N
W
.9
.2
2.08%12:1
2:1 2:1 8
.6
2.08% 12:1 2:1 2:1
.6
N
W
N
W
.4
2.08%12:1
2:1 2:1
.8
2.08% 12:1 2:1 2:1
.8
8N
W
N
W
85 85
90 90
80 80 39+50.00
85 85
90 90
95 95
80 80 40+00.00
85 85
90 90
80 80 40+50.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X6
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.1
.6
2.08%12:1
2:1 2:1
.0
2.08% 12:1 2:1 2:1
.0
N
W
N
W
.0
D R
A
IN
A
S
E M
E
.8
2.08%12:1
2:1 2:1
.2
2.08% 12:12:1
.2
2:1 2:1
.2
8N
W
N
W
.0
2.08%12:1
2:1 2:1
.4
2.08% 12:1 2:1 2:1
.4
N
W
N
W
85 85
90 90
80 80 41+00.00
85 85
90 90
95 95
80 80
41+50.00
90 90
85 85
42+00.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X7
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.2
2.08%12:1
2:1 2:1
.6
2.08% 12:1 2:1 2:1
.6
N
W
N
W
.4
2.08%12:1
2:1 2:1
.8
2.08% 12:1 2:1
2:1
.8
N
W
N
W
.7
2.08%12:1
2:1 2:1
.1
2.08% 12:1 2:1 2:1
.1 8N
W
N
W
90 90
85 85
42+50.00
90 90
95 95
85 85
43+00.00
90 90
95 95
85 85
43+50.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X8
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.3
2.08%12:1
2:1 2:1
.7
2.08% 12:1 2:1 2:1
.7
N
W
N
W
.9
2.08%12:1
2:1 2:1
.3
2.08% 12:1 2:1 2:1
.3
N
W
N
W
.5
2.08%12:1
2:1 2:1
.0
2.08% 12:1 2:1 2:1
.0
N
W
N
W
90 90
95 95
85 85
44+00.00
90 90
95 95
85 85
44+50.00
90 90
95 95
85 85
45+00.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
X9
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.1
2.08%12:1
2:1 2:1
.6
2.08% 12:1 2:1 2:1
.6
N
W
N
W
.7
2.08%12:1
2:1 2:1 8
.2
2.08% 12:1 2:1 2:1
.2
2N
W
N
W
1.
2.08%12:1
2:1 2:1
.8
2.08% 12:1 2:1 2:1
.8
3N
W
N
W
90 90
95 95
85 85
45+50.00
90 90
95 95
85 85
46+00.00
90 90
95 95
85 85
46+50.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
X10
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
2.08%12:1
2:1 2:1 9
.4
2.08% 12:1 2:1
2:1
.4
N
W
N
W
1.
.5
2.08%12:1
2:1
2:1 9 1.
2.08% 12:1 2:1
2:19 1.
N
W
N
W
.2
2.08%12:1
2:1 2:1
1.
2.08% 12:1 2:1
2:1
1.
N
W
N
W
90 90
95 95
100 100
85 85 47+00.00
95 95
100 100
90 90
47+50.00
95 95
100 100
90 90
48+00.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
X11
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.3
.8
2.08%12:1
2:1 2:1 9
.2
2.08% 12:1 2:1
2:1
.2
N
W
N
W
.4
2.08%12:1
2:1
2:1 9 .6
2.08% 12:1 2:1
2:1
.8
N
W
N
W
.0
2.08%12:1
2:1 2:1 9
.6
2.08% 12:1 2:1 2:1
.4
9N
W
N
W
95 95
100 100
90 90
48+50.00
95 95
100 100
90 90
49+00.00
95 95
100 100
90 90
49+50.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
P
M F
M E
G J ob s E ve n \1 -1 \O ld
S p el l R oa d \P r od u c ti on \T r a n s p or ta ti on \X
S C \1 -O ld
S p el l-
X P L .d g n
C E
R T I F I
C A
TE OF AUTHO
R I
Z A
T I O
N
FLOYD, INC.
COUNTY D&F PROJECT NO. ROAD NAME
NO.
SHEET
SHEETS
TOTAL
102030405060 706050403020100
102030405060 706050403020100
12042.14 OLD SPELL RD
X12
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
.5
2.08% 2.08% 12:1
2:1 2:1
.0
SPOTTED HORSE TRAIL
INTERSECTIONN
W
N
W
.6
2.08%12:1
2:1 2:1 9
.5
4 2.08% 12:1
2:1 2:19 .6
N
W
N
W
.1 .6
2.08%12:1
2:1 2:1 9
.4
9 2.08% 12:1
2:1 2:19 .3
N
W
N
W
95 95
100 100
90 90
50+00.00
95 95
100 100
90 90
50+50.00
95 95
100 100
90 90
51+00.00 asmyre Text Box 5/26/2026
O T T E
D
:3
:5
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .