This document is an Attachment B Specifications document for USFS Hiawatha WZ Recreation Site Vault Pumping Contract, detailing comprehensive vault toilet pumping services for the West Zone Hiawatha National Forest in Michigan. The contract requires a contractor to provide on-call toilet pumping services, including equipment, labor, transportation, and waste disposal for 58 different vault toilet locations across various recreational sites, with pumping frequencies ranging from once per year to once every other year.

Key technical specifications include using a 4-inch suction hose, pressure washer system, EPA-approved disinfectants, and specific pumping procedures for different vault access points (risers or back hatches). The contractor must complete service within 72 hours of notification, generally between 8 AM and 5 PM, with provisions for emergency pumping. Vault sizes range from 50 to 1000 gallons, and GPS coordinates are provided for each location. The contract emphasizes thorough cleaning, debris removal, disinfection, and proper waste disposal in compliance with state and federal regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B - Specifications

USFS Hiawatha WZ Recreation Site Vault Pumping Contract Specifications

SECTION C • DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1 GENERAL SPECIFICATIONS

C.1-1 Scope of Contract Contractor shall furnish, on a call when needed basis, toilet pumping services which includes all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, wash down, recharge, cleanup, disinfect, and dispose of all waste products removed from the toilets, in accordance with the following contract specifications and in accordance with State and Federal regulations.

C.1-2 Description. Dates and Location The number of days and exact dates on which services will be required cannot be pre-determined.

The location of the work sites, access to the sites, and other information pertinent to each area is contained in the various Attachments: Maps, Location & Frequencies, Vault Locations List.

C.1-3 Scheduling Work The Government Contracting Officers Representative (COR) will notify the Contractor of the required servicing. This initial notification may be by phone, FAX, or other means. The Contractor must complete the required servicing within 72 hours (not including Saturday or Sunday) after the initial notification. Generally, servicing shall be between the hours of 8 A.M.

and 5 P.M.

Occasional emergency pumping may be required and may be outside the 8 A.M. and 5 P.M.

constraint. Response time for any emergency will be by mutual agreement between both parties.

C.1-4 Definitions

1. Sewage liquid, semi-liquid, and solid waste matter.

2. Debris all other refuse found in vault toilets, to include but not limited to items such as the following:

Cans, bottles, logs, clothing, plastic bags and containers, metal products, waste food products, cardboard and paper products, whole rolls of toilet paper, toilet paper dispensers, tools, diapers and sanitary napkins, miscellaneous trash, etc.

C.1-5 Prework Conference Prior to the start of work, a meeting will be scheduled by the Contracting Officer to be attended by the Contractor, The Contracting Officer, the Contracting Officer's Representative (COR), and other Forest Service personnel who may be involved in the administration of this contract. The meeting will be held at a time and place mutually agreeable to the Contractor and Contracting Officer. The purpose of this meeting is to thoroughly discuss the schedule of work, work performance requirements, approved waste disposal sites, contract terms, and to familiarize both parties with the responsibilities of each under the terms of this contract.

C.1-6 Contractor's Representative Prior to the start of work, the Contractor shall designate in writing a person to act for him/her during his/her absence from any work site and shall specify the scope of their authority.

C.1-7 Minimum Pumping Request Guarantee As a minimum, each service call will guarantee one of the following:

Three units to be serviced.

C,2 TECHNICAL SPECIFICATIONS

C.2-1 Equipment The Contractor shall furnish all toilet pumping equipment, tank truck (a truck that can reverse the suction process and create a pressure force is preferred so that the inevitable clogged lines can be more easily cleaned, but is not required), water truck, tools, approved disinfectant, and other equipment and supplies necessary to perform work in accordance with these specifications. A 4-inch (minimum size) suction hose and attachment couplings shall be utilized to accomplish all pumping requirements.

The length of hose must be long enough to accomplish the required pumping. (Contractor may preview sites by contacting the COR to determine accessibility)

Some type of pressure washer system is required to wash the side and end walls of the vault after pumping and may be necessary to dilute solidified waste in the bottom of a flat-bottomed vault and to wash the last portion of waste down a sloped bottomed vault.

Some suggested tools are: Two 6 foot long clam rakes with 6 inch long tines (the tines shall be completely dulled or rounded on the ends to prevent the tines from injuring the pumper or his/her helpers and from puncturing any rubber or synthetic liners that may be present in the vault), a long handled grabber, plastic bags to haul away all the miscellaneous debris (see C.1- 4), brushes designed for cleaning up the spilled waste, and containers to mix the cleaning and disinfecting solutions in.

All disinfecting solutions shall be approved by the EPA.

All equipment shall be in full accordance with any local and State County Regulations.

C.2-2 Pumping Procedures When an Outside Manhole is Available As long as the outside pump out access is in excess of 20 inches in diameter (or 20 inches square) the Contractor shall not be allowed to remove the vault contents through the toilet riser.

If the dimension is less than 20 Inches, then there may be items in the vault that were thrown into the vault through the toilet riser which is 16 inches by 20 inches and those items may not be removable through the outside manhole of a lesser dimension.

After removing the manhole cover, use the clam rakes or long handled grabber to remove as much of the debris as possible before trying to pump out the waste. This procedure will help stir up the contents of the vault and break up the dense concentration of waste typically located just under the toilet riser (the impact zone). By removing most or all the debris before pumping, the Contractor will find that the 4-inch hose will not clog so often, and the liquid portion of the contents will not be removed before the thicker solids are removed.

ALL DEBRIS REMOVED FROM THE VAULT SHALL BE PLACED INTO A LEAK PROOF

CONTAINER SO THAT NO CONTAMINATION TO THE SURROUNDING GROUND WILL

RESULT.

If the bottom of the vault is flat, then the waste shall be removed down to within 4-5 inches of the bottom. At this point the 4-inch hose will begin to suck air (vortexing) and further removal will be slow.

At this time remove any further debris that was not removed during the initial raking and removal.

Using a pressure washer system, wash down the interior walls of the vault before the clinging debris has a chance to dry. If at this time, there is a heavy concentration of solids on the bottom of the vault, use the pressure washer system to break up and dilute the solids and then pump this diluted waste down again until the suction hose begins to suck too much air to make further pumping practical.

Pre-charge the vault with clean fresh water so that there is 12-18 inches of water covering the bottom under the toilet riser. Deodorize the remaining vault contents.

If the bottom of the vault is sloped (all vaults should be sloped a minimum of 1 in per ft), then pump the waste down (at the deep end) to where the hose begins to suck air. Remove any remaining debris and then go inside the building with the pressure washer system and wash the remaining waste down the sloped bottom. Wash down the vault walls from inside the building or from the outside manhole, whichever is easier. Now pump out the remaining waste and the water that was just added by the pressure washer until the suction hose begins to suck too much air to make further pumping practical.

Pre-charge the vault with clean fresh water so that there is 12-18 inches of water covering the bottom under the toilet riser. Deodorize the remaining vault contents.

Thoroughly clean and disinfect all contaminated areas resulting from the pumping process.

Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover, back into the vault if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for fly’s, a potential health risk and an odor problem. This problem should be avoided.

Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not interfered with. If there is not an airtight seal, the Contractor shall notify the COR.

C.2-3 Pumping Through the Toilet Riser When There Is No Outside Manhole Remove the debris and pump in accordance with C.2-2. Extra care shall be taken to prevent waste spillage onto the toilet riser, interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be protected from damage and the toilet paper shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.

During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) and will become an attractant for fly’s, a possible health risk for barefoot persons and an odor problem.

Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, the Contractor shall notify the COR. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.

Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

C.2-4 Offsite Disposal of Sewage and Debris The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payments of all fees.

Disposal shall conform to all Federal, State, and local laws and ordinances. COR shall approve all disposal sites before pumping begins.

The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

C.2-5 Conduct of Personnel The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreational areas while engaged in the performance of the contract.

Due to the nature of the duties under the contract, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public, or is otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment, or any Government-owned property.

C.2-6 Resource Damage Any damage or defacement that occurs to government property or land resources during the Contractor's operations shall be repaired at the Contractor's expense to its original condition.

Onsite inspection will be made by the COR prior to the acceptance of work.

Vault Details

Site Name Vault ID Number

Vault Access Point

Estimated Times

Pumped Per Year

Vault Size in

Gallons

GPS Location

West North

Camp Cook 1 Back Hatch:

Cement Lid

Once every other year 750 86.5815902 46.0394739

Carr Lake 2 Back Hatch:

Cement Lid

Once every other year 500 86.5078086 46.077737

Chicago S2 3 Back Hatch:

Cement Lid 1x per year 500 86.6047224 46.0437514

Chicago S3&4 4 Riser 3x per year 50 86.60222 46.0419621 Cookson Lake 5 Riser 1x per year 500 86.5610227 46.195253 Council Lake 6 Riser 1x per year 500 86.646515 46.241891 East Lake S1 7 Riser 3x per year 50 86.4152693 46.1793638

East Lake S2 8 Back Hatch:

Cement Lid 1x per year 500 86.4109005 46.1806304

Goose Neck S1 9

Back Hatch:

Cement Lid 1x per year 500 86.5505 46.0720462

Goose Neck S3 10

Riser 3x per year 50 86.5449994 46.0722836 Iron Jaw Lake 11 Riser 2x per year 50 86.5479791 46.171199

Jackpine S1 12 Back Hatch:

Cement Lid 1x per year 500 86.5215581 46.1140849

Jackpine S2 13 Riser 2x per year 50 86.5249499 46.1158581

Leg Lake S1 14 Back Hatch:

Cement Lid 1x per year 500 86.4865373 46.1283971

Little Bass Lake 15

Back Hatch:

Cement Lid

Once every other year 500 86.4499868 46.1629848

Lyman S3 16 Back Hatch:

Cement Lid 1x per year 500 86.530196 46.0697271

Lyman S4 17 Back Hatch:

Cement Lid 1x per year 500 86.5290649 46.0714414

Lyman S5 18 Back Hatch:

Cement Lid 1x per year 500 86.527536 46.0728322

Lyman S8 19 Back Hatch:

Cement Lid 1x per year 500 86.5341937 46.0723521

Lyman S9 20 Riser 2x per year 50 86.5355718 46.0724909

Mowe Lake 21 Back Hatch:

Cement Lid 1x per year 500 86.5770711 46.1447688

Steuben Lake S1 22

Back Hatch:

Cement Lid

Once every other year 500 86.4259746 46.1963809

Steuben Lake S2 23

Back Hatch:

Cement Lid

Once every other year 500 86.4289644 46.1999436

Swan Lake S1 24 Riser 3x per year 50 86.5790443 46.1649949

Swan Lake S2 25

Back Hatch:

Cement Lid 1x per year

500 86.5744016 46.1626933 Swan Lake S3&4 26

Back Hatch:

Cement Lid 1x per year 500 86.5731013 46.1622419

Triangle Lake S1 27

Back Hatch:

Cement Lid 1x per year 500 86.4978245 46.1660494

Tom's Cabin 28 Back Hatch:

Metal Lid 1x per year 500 86.5893352 46.1589126 McKeever Cabin 29

Riser 1x per year 750 86.59927 46.2162222

Baldy Lake 30 Back Hatch:

Cement Lid

Once every other year 500 86.6538033 46.2125558

Fish Lake BL 31 Riser 1x per year 500 86.63563 46.229634

Haymeadow 32 Back Hatch:

Cement Lid 1x per year 500 86.8568975 46.0212019

Au Train Loop Left 33

Back Hatch:

Metal Lid:

Yale Lock

1x per year 1000 86.86727579 46.41902192

Au Train Loop Right 34

Back Hatch:

Metal Lid:

Yale Lock

1x per year 1000 86.86727579 46.41902192

Hovey Lake L 35 Back Hatch:

Cement Lid

Once every other year 750 86.70100459 46.29223699

Hovey Lake R 36 Back Hatch:

Cement Lid

Once every other year 750 86.70122726 46.29236058

Indian River Pine Point 37

Back Hatch:

Cement Lid 1x per year 500 86.57872851 46.18819669

Indian River Boulder Point 38

Riser 1x per year 500 86.57422739 46.19040842

McComb Lake 39 Back Hatch:

Cement Lid

Once every other year 500 86.65494 46.1905398

Oak Wood TH Sites 40

Riser 1x per year 500 86.70150079 46.28762599

Peninsula Point Left 41

Back Hatch:

Metal Lid:

Yale Lock

1x per year 1000 86.9664196 45.6685103

Peninsula Point Right 42

Back Hatch:

Metal Lid:

Yale Lock

1x per year 1000 86.9663308 45.6685286

BDNGI S TH 43

Back Hatch:

Cement Lid 1x per year 500 86.9188502 45.9323048

BDNGI M TH 44

Back Hatch:

Metal Lid:

Yale Lock

Once every other year 500 86.798053 46.333174

Big Island Wilderness TH 45

Riser Once every other year 500

86.5526606 46.2377901

Bruno's Run/Moccasin Lake TH 46

Back Hatch:

Cement Lid Once every other year 750 86.6163929 46.2374874

Brown Stone

BL 47

Back Hatch:

Metal Lid:

Yale Lock

1x per year 500 86.88573683 46.44706687

Moss Lake TH 48 Back Hatch:

Cement Lid 1x per year 500 86.6893011 45.9434534

Ogontz BL 49 Back Hatch:

Cement Lid 1x per year 1000 86.7870923 45.8321615

PMR West TH / Tommy Page 50

Back Hatch:

Cement Lid 1x per year 500 86.5912 46.18216

PMR Middle

TH 51

Back Hatch:

Metal Lid:

Yale Lock

1x per year 500 86.5174 46.157746

PMR East TH 52 Back Hatch:

Cement Lid

Once every other year 750 86.49072 46.1833979

Rapid River Ski

TH 53

Back Hatch:

Metal Lid

Once every other year 1000 86.97452 46.0151645

Williams Landing 54

Back Hatch 1x per year 1000

86.6722306 46.4517637

Murray Bay 55 Back Hatch 1x per year 500 86.6556147 46.4718047 Trout West 56 Back Hatch 1x per year 500 86.6457235 46.4842330 Trout East 57 Riser 1x per year 500 86.6282125 46.4773120 Juniper Flats 58 Riser 1x per year 500 86.6846870 46.4864584

***End of Document***

File details come from the government source that posted it. Updated .