ATTACHMENT_B.pdf
PDF 2 MB Posted
- Attached to
- C24K0382 District Facilities Management Program, Fire Suppression System Services, McClellan Facility
- Solicitation number
- 0000033146
- Issued by
- El Dorado County, Nevada County, Placer County, Sacramento County, San Joaquin County, Solano County, Sutter County, Yolo County, Sutter Creek City, El Dorado Hills CDP, Placerville City, San Joaquin City, Nevada City, Sacramento City, Sutter CDP, West Sacramento City, Yolo CDP, California
About this file
This document is a detailed Scope of Work for a state contract with the California Department of Parks and Recreation (DPR) to provide Fire Suppression System Services at the McClellan Facility in McClellan, CA. The contract term is December 15, 2024 through December 16, 2027, with two optional one-year extensions. The contractor will perform quarterly inspections, quarterly maintenance, annual inspections and testing, and 5-year inspections and testing on the facility's fire sprinkler systems, in compliance with NFPA 25 standards. The contractor must have a C-16 Fire Protection Contractor license and comply with all state regulations.
The contract pricing is detailed in an attached Bid Form, with line items for the various inspection and maintenance services. There are no funds included in the contract for miscellaneous repairs, which would be handled separately through the state procurement process. The contract includes Disabled Veteran Business Enterprise (DVBE) participation requirements, as well as prompt payment provisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C24K0382_IFB_Bid.Instruction_Fire_Supression.pdf | ||
| ATTACHMENT_A.pdf | ||
| C24K0382_IFB.solicitation.lettter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. The term of this Agreement is:
SAM
PLE
SAMPLE
Contractor's Name: TBD Agreement Number: C24K0382 Page: 1 of 1
SCOPE OF WORK
State Agency: Contractor:
Section/Unit: Section/Unit:
Attention: Attention:
Address: Address:
City/State/Zip Code: McClellan CA 95652 City/State/Zip Code:
Phone: Phone:
Fax: Fax:
E-mail Address: E-mail Address:
DPR 603 (Rev. 2/2011)(Excel 2/10/2011)
1. Contractor agrees to provide to the Department of Parks and Recreation (DPR) Fire Suppression System Services
Department of Parks and Recreation
2. The services shall be performed at:
4940 Lang Ave, McClellan CA 95652
3. The services shall be provided during:
Wednesday - Friday 7:30 AM - 3:30 PM, any other days or times must be approved by the project manager, this will also exclude weekends, all State and Federal Holidays
4. The project representatives during the term of this Agreement will be:
4940 Lang Ave ehab.fahim@parks.ca.gov
District Facilities Management Ehab Fahim
EXHIBIT A
(Standard Agreement) services as described herein:
The Contractor hereby proposes to provide all services, parts and materials, or equipment, travel and mileage costs, reports necessary to provide Fire Suppression System Services Services consist of quarterly inspections, quarterly maintenance, as well as annual inspections, testing and 5-year inspections and testing on this facilities Fire Sprinkler Systems. All according to Exhibit A, Attachment I, Detailed Scope of Work.
The Contractor shall coordinate any and all activities with a State Representative located at the McClellan Facility, 4940 Lang Ave, McClellan, CA 95652.
C24K0382 District Facilities Management Program
McClellan Facility
State of California, Department of Parks and Recreation Exhibit A, Attachment I Detailed Scope of Work
1.0 Project Background
The California Department of Parks and Recreation (DPR) purchased the McClellan Facility in December of 2023 and is currently seeking a qualified contractor to provide all labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to perform Fire Suppression System Services to the McClellan facility. Contractor agrees to provide quarterly inspections, quarterly maintenance, as well as annual inspections, testing and 5-year inspections and testing on this facilities Fire Sprinkler Systems.
2.0 Detailed Scope of Work
A. Location:
Services to be performed at the DPR, McClellan Facility, located at 4940 Lang Avenue, McClellan, CA 95652.
B. Term of Contract:
The contract term shall be December 15, 2024, or upon DGS/OLS approval, whichever is later, through December 16, 2027, or 36 months (3-years) from DGS/ OLS approval, whichever is later. 2 (two), 1 (one) year contract extensions at the same rates identified in the Service Contracts Bid Form are available to be added to this agreement via amendment upon mutual consent from DPR and the Contractor.
C. License Requirement:
California State License Board license: C-16, Fire Protection Contractor, California State
Fire Marshal Weekly Fire Pump Test Certificate, Section 905, Title 19, CCR and are employed by a Type L Licensed Company/Concern and Maintain UL certification of “fire extinguishing system(s) identified in Health and Safety Code Section 13195.
D. General
Fire Sprinkler Inspection/Testing/Maintenance:
a. Maintain UL certification of “fire extinguishing system(s) identified in Health and
Safety Code Section 13195, and shall incorporate by reference NFPA 25, Inspection, Testing, and Maintenance of Water-Based Fire Protection System (2013 edition)
District Facilities Management Program
McClellan Facility
b. Test and inspect fire system devices annually, including functional tests. Quarterly inspections to be performed on flow switch on riser, per NFPA 25.
c. Per NFPA 25, Annual and Quarterly Maintenance, Summary of Sprinkler System
Inspection, Testing and Maintenance.
d. Per NFPA 25, Quarterly, Annual Maintenance, Summary of Standpipe and Hose
Systems Inspection, Testing and Maintenance.
e. Per NFPA 25 and California Title #19, Perform five (5) year fire sprinkler inspection and testing including back flush of the existing Fire Department connection(s) (FDC), when FDC check valve(s) are accessible and internal pipe/valve inspections (face and clapper gasket and fire riser gauge costs, when necessary, shall be included)
f. Testing to be scheduled in advance with on-site contact. Test results to be provided to the DPR Area on-site contact and sent to DPR Facilities Coordinator to the following address: 4940 Lang Avenue, McClellan Park, CA 95652, Documentation to include make, model, and serial number of equipment.
g. Provide preventative maintenance service to include checking the fire extinguishing system, sensors and the back-up battery if applicable.
h. Contractor shall be in compliance and accountable to the laws and regulations for
Automatic Extinguishing Systems by the Department of Forestry and Fire Protection, Office of the State Fire Marshal Fire Engineering Division
i. Contractor will be required to contact the Area office at least one (1) week in advance to schedule an appointment to perform the quarterly and/or annual maintenance service(s).
E. Miscellaneous Repairs
There is no funding in this contract for miscellaneous repairs. If, during routine maintenance, the need for repair of state-owned equipment is discovered, the Contractor may provide a detailed proposal; however, no repair or replacement can be charged to this contract. The DPR will seek proposals according to state contracting or purchasing codes at which time the Contractor may participate in the process.
Contractor's Name:
Agreement Number:
Page: 1 2
BUDGET DETAIL AND PAYMENT PROVISIONS
1. Invoicing and Payment
A. For services satisfactorily rendered, and upon receipt and approval of the invoices, the State agrees to compensate the Contractor for actual expenditures incurred in accordance with the rates specified in
, marked Exhibit B, Attachment 1, which is attached hereto and made a part of this Agreement.
B. Invoices shall include the Agreement Number and shall be submitted in triplicate not more frequently than monthly in arrears to:
2. Budget Contingency Clause
A. It is mutually agreed that if the Budget Act of the current year and/or any subsequent years covered under this Agreement does not appropriate sufficient funds for the program, this Agreement shall be of no further force and effect. In this event, the State shall have no liability to pay any funds whatsoever to Contractor or to furnish any other considerations under this Agreement and Contractor shall not be obligated to perform any provisions of this Agreement.
B. If funding for any fiscal year is reduced or deleted by the Budget Act for purposes of this program, the State shall have the option to either cancel this Agreement with no liability occurring to the State, or offer an agreement amendment to Contractor to reflect the reduced amount.
3. Prompt Payment Clause
Payment will be made in accordance with, and within the time specified in, Government Code Chapter 4.5, commencing with Section 927.
4. Timely Submission of Final Invoice
A. A final undisputed invoice shall be submitted for payment no more than ninety (90) calendar days following expiration or termination date of this Agreement, unless a later or alternate deadline is agreed to in writing by the project representative. Said invoice should be clearly marked "Final Invoice," thus indicating that all payment obligations of the State under this Agreement have ceased and that no further payments are due or outstanding.
B. The State may, at its discretion, choose not to honor any delinquent final invoice if the Contractor fails to obtain prior written State approval of an alternate final invoice submission deadline. Written State approval shall be sought from the project representative prior to the expiration or termination date of this Agreement.
DPR 604 (Rev. 12/2021)(Excel 12/28/2021)
TBD
C24K0382
Service Contract Bid Form
EXHIBIT B
(Standard Agreement) of
Ehab Fahim Office Building Manager II
4940 Lang Ave McClellan CA 95652 ehab.fahim@parks.ca.gov
Page: 2 2
BUDGET DETAIL AND PAYMENT PROVISIONS
5 Disabled Veterans Participation Goals
A.
B.
C.
DPR 604 (Rev. 12/2021)(Excel 12/28/2021)
TBD
C24K0382
Upon completion of an awarded contract in which a commitment to achieve a DVBE goal was made, the prime contractor that entered into a subcontract with a DVBE is required to complete and submit form STD.
817 within 60 days to certify payment information to the awarding department, in accordance with Military and Veterans Code (M&VC) Section 999.5.
For contracts awarded on or after January 1, 2021, pursuant to M&VC Section 999.7, the State shall withhold ten thousand dollars ($10,000) from the final payment, or the full final payment if less than ten thousand dollars ($10,000), until the prime contractor complies with the certification requirements of M&VC Section
999.5. Prime contractors that fail to comply with the certification requirements shall be given notice and allowed to cure the defect. If after 15 calendar days but not more than 30 calendar days from the date of the notice, the prime contractor fails to comply with the certification requirements, the State shall permanently deduct ten thoursand dollars ($10,000) from the final payment, or the full payment if less than ten thousand dollars ($10,000). The withholding applies to all contracts with a DVBE subcontractor.
Notwithstanding any other law, an awarding department shall not withhold more than the amount specified on the final payment of any disabled veteran business enterprise contract for the purposes of ensuring compliance with the certification requirements of M&VC 999.5.
EXHIBIT B
(Standard Agreement) of
DPR 940B (Rev. 5/2011)(Excel 5/5/2011)
State of California - Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
SERVICE CONTRACTS BID FORM
DATE
UNIT
PROJECT
Fire Suppression Services
BID OPENING
FIRM NAME FAX NO.
ADDRESS CITY/STATE/ZIP CODE
STATUS OF BUSINESS (check appropriate box.)
Individual.
Corporation. State in which incorporated:
Partnership. Full names of partners:
DEPARTMENT OF PARKS AND RECREATION
TITLE
DATE
BIDDER'S PRINTED NAME
LICENSE CLASSIFICATION ARE YOU CLAIMING PREFERENCE AS A SMALL BUSINESS?
NoYes. Small Business Certification No.
THE STATE RESERVES THE RIGHT TO WAIVE ANY IRREGULARITY IN ANY BID OR TO REJECT ANY OR ALL BIDS.
The undersigned hereby proposes to furnish services, materials, or equipment, or to perform all work required in accordance with the bid documents for the foregoing titled project, and such addenda thereto as may be issued prior to bid opening date.
Nondiscrimination Compliance Statement The prospective contractor's signature affixed hereon and dated shall constitute a certification under penalty of perjury under the laws of the State of California that the bidder has, unless exempted, complied with the nondiscrimination program requirements of Government Code Section 12990 and Title 2, California Code of Regulations Section 8103.
Disabled Veteran Business Enterprise Participation In accordance with Public Contract Code Section 10115, the Department of Parks and Recreation has established criteria to implement the disabled veteran business enterprise (DVBE) program goal which bidder must meet; provided, however, the DVBE participation requirement is included herein and made part of the bid documents. (See DVBE Notice included in solicitation for details.)
Small Business Preference A five percent preference will be granted to any bidder currently certified by the Department of General Services as a California Small Business. (See Small Business Notice included in solicitation for details.)
Exhibit B, Attachment 1
PHONE NO.
BIDDER'S SIGNATURE (Signature)
FEDERAL EMPLOYER ID NO.
CONTRACT NUMBER
C24K0382
The undersigned is duly authorized to submit this bid on behalf of the company.
McClellan Facility
11/14/2024
SA
MP
LE
ITEM
NO.
ESTIMATED
QUANTITY
UNIT OF
MEASURE
ITEM
**Prices are to include all additional fees, licenses and taxes.
Unit Price (Price Per Unit of Measure)
Total (Estimated Quantity X Unit Price)
1. 12 Quarterly All labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to provide Fire Sprinkler Quarterly Inspections at McClellan Facility all according to Exhibit A, Attachment I, Detailed Scope of Work.
2. 12 Quarterly All labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to provide Fire Sprinkler Quarterly Maintenance at McClellan Facility all according to Exhibit A, Attachment I, Detailed Scope of Work.
3. 3 Annually All labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to provide Annual Fire Sprinkler Maintenance at the McClellan Facility all according to Exhibit A, Attachment I, Detailed Scope of Work.
4. 3 Annually All labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to provide scheduled Fire Sprinkler Annual Inspection/Testing at the McClellan Facility all according to Exhibit A, Attachment I, Detailed Scope of Work.
5. 1 Each All labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to provide scheduled Fire Sprinkler 5-year Inspection and Testing at the McClellan Facility all according to Exhibit A, Attachment I, Detailed Scope of Work.
1) The above quantities are estimates only and are given as a basis for comparison of bids, No guarantee is made or implied as the to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.
3) Please do not alter, modify, or change the bid proposal sheet. Any alterations, modifications, or changes to this bid proposal sheet will be grounds to reject bid.
4) Each line item must be bid. Pease do not leave any unit price column blank, or this bid proposal sheet will be deemed non-responsive
Total This Proposal >
CONTRACTOR’S NAME (Please Print): CONTRACT NO.
STATE OF CALIFORNIA • DEPARTMENT OF PARKS AND RECREATION
BID PROPOSAL
Cost Breakdown Exhibit B, Attachment I
SAM
PLE
Page: 1 5
SPECIAL TERMS AND CONDITIONS
1. Insurance Requirements
A. Policy
B. Coverage (Additional coverage beyond the following, when required, shall be identified through an attachment to this exhibit.)
C. Endorsements (The following must appear on the Endorsement Page.)
D. Contractor’s Additional Responsibilities
DPR 605S (Rev. 7/2024)(Excel 7/24/2024)
EXHIBIT D — SERVICES
(Standard Agreement) of
When Contractor submits a signed agreement to State, Contractor shall furnish to State a Certificate(s) of Insurance and endorsements in compliance with the following requirements:
Additional Insured: That the State of California, its officers, agents, employees and servants are included as additional insured, but only insofar as the operations under this agreement are concerned. The endorsements are to be provided for the general liability and motor vehicle liability policies.
Waiver of Subrogation: When work is performed on State-owned or controlled property the Workers' Compensation and Employers' Liability policy shall be endorsed with a waiver of subrogation endorsement in favor of the State. This endorsement shall also be provided.
The Certificate of Insurance shall: (a) be in a form acceptable to State; (b) be written by an insurer acceptable to State; (c) be maintained at Contractor’s sole expense; (d) be in full force for the complete term of the agreement; (e) be primary, and not in excess to any insurance carried by State; (f) be furnished to State within fifteen (15) days, upon request.
General Liability Insurance: Contractor shall procure commercial general liability insurance covering liability arising out of premises operations, products/completed operations, independent contractors, personal/advertising injury and liability assumed under an insured contract with limits not less than $1,000,000 each occurrence, $2,000,000 general aggregate and $2,000,000 products/completed operations aggregate. Said policy shall apply separately to each insured against whom any claim is made or suit is brought subject to Contractor’s limits of liability.
Motor Vehicle Liability Insurance: Contractor shall maintain motor vehicle liability insurance with limits not less than $1,000,000 combined single limit each accident. Such insurance shall cover liability arising out of an accident involving a motor vehicle in use by Contractor, including, but not limited to, Contractor owned, hired, and non-owned motor vehicles.
Worker’s Compensation and Employer’s Liability Insurance: Contractor shall maintain statutory worker’s compensation and employer’s liability insurance for all of Contractor’s employees who will be engaged in the performance of work on the property, including special coverage extensions where applicable.
Contractor is responsible for any deductible or self-insured retention contained within the insurance program.
Contractor shall notify the State within ten (10) days of contractor receiving a notice of cancellation or non-renewal of insurance policies required in this agreement.
SAMPLE
TBD
Page: 2 5
E. Insurance Companies
F. State Remedies
2. Licenses and Permits
DPR 605S (Rev. 7/2024) of
Contractor shall be an individual or firm licensed to do business in California and shall obtain at its expense all license(s) and permit(s) required by law for accomplishing any work required in connection with this agreement.
If Contractor is located within the State of California, a business license from the city/county in which it is headquartered is necessary; however, if Contractor is a corporation, a copy of the incorporation documents/letter from the Secretary of State’s Office can be submitted. If Contractor is located outside the State of California, Contractor shall submit to State a copy of the business license or incorporation papers for the respective state showing that the company is in good standing within that state.
In the event, any license(s) and/or permit(s) expire at any time during the term of this agreement, Contractor agrees to provide State with a copy of the renewed license(s) and/or permit(s) within 30 days following the expiration date. In the event Contractor fails to keep in effect at all times all required license(s) and permit(s), State may, in addition to any other remedies it may have, terminate this agreement upon occurrence of such event.
EXHIBIT D — SERVICES
(Standard Agreement)
Contractor shall ensure that all subcontractors procure insurance meeting the requirements of these provisions.
Upon State’s request, Contractor shall provide copies of its Worker’s Compensation and Employer’s Liability Insurance.
Concurrent with the execution of this agreement, Contractor shall provide to State evidence that the insurance required to be carried by these provisions, including any endorsement affecting the additional insured status, is in full force and effect and that premiums therefore have been paid. At State’s discretion, such evidence shall be the appropriate ACORD Form (Certificate of Insurance) or a certified copy of the original policy, including all endorsements.
Upon notification by State of receipt of a notice of cancellation, expiration, or any reduction in coverage, or if the insurer commences proceeding or has proceeding commenced against it, indicating the insurer is insolvent, Contractor shall provide to State evidence of replacement policy at least ten (10) working days prior to the effective date of such cancellation, expiration, or reduction in coverage.
Insurance companies issuing any of the policies required by these provisions shall have a rating classification of “A-” or better and a financial size category rating of “vii” or better according to the latest edition of the A.M. Best Key Rating Guide. Any other rating classification requires State approval.
All insurance companies issuing any of the policies required by these provisions shall be licensed to do business in the State of California.
Should Contractor fail to keep the insurance required to be carried by these provisions in full force and effect at all times, State may in addition to any other remedies State has, terminate this agreement immediately and all payments due or that become due will be withheld until notice is received by State that such insurance has been restored or replaced to full force and effect and that the premiums therefore have been paid to cover a period of time satisfactory to State.
SAM
PLE
Page: 3 5
3. Disputes
4. Termination for Convenience
5. Force Majeure
6. Forced, Convict, and Indentured Labor
7. Potential Subcontractors
DPR 605S (Rev. 7/2024)
EXHIBIT D — SERVICES
(Standard Agreement) of
Except for defaults of subcontractors, neither party shall be responsible for delays or failures in performance resulting from acts beyond the control of the offending party. Such acts shall include but shall not be limited to acts of God, fire, flood, earthquake, other natural disaster, nuclear accident, strike, lockout, riot, freight embargo, public regulated utility, or governmental statutes or regulations superimposed after the fact. If a delay or failure in performance by Contractor arises out of a default of its subcontractor, and if such default of its subcontractor, arises out of causes beyond the control of both Contractor and subcontractor, and without the fault or negligence of either of them, Contractor shall not be liable for damages of such delay or failure, unless the supplies or services to be furnished by subcontractor were obtainable from other sources in sufficient time to permit Contractor to meet the required performance schedule.
Unless otherwise provided in this agreement, any dispute concerning a question of fact arising under this agreement which cannot be resolved informally shall be decided by the following two-step procedures.
Contractor must provide written notice of the particulars of such disputes to the Project Manager or his/her duly appointed representative. The Project Manager must respond in writing within ten (10) working days of receipt of the written notice of dispute. Should Contractor disagree with the Project Manager’s decision, Contractor may appeal to the second level. Pending the decision on appeal, Contractor shall proceed diligently with the performance of this agreement in accordance with the Project Manager’s decision. The second level appeal must indicate why the Project Manager’s decision is unacceptable, attaching to it Contractor’s original statement of the dispute with supporting documents, along with a copy of the Project Manager’s response. The second level appeal shall be sent to the Deputy Director of Administrative Services or his/her duly appointed representative.
The second level appeal must be filed within fifteen (15) working days of receipt of the Project Manager’s decision. Failure to submit an appeal within the period specified shall constitute a waiver of all such right to an adjustment of this agreement. The Deputy Director or designee shall meet with Contractor to review the issues raised. A written decision signed by the Deputy Director or designee shall be returned to Contractor within fifteen
(15) working days of the receipt of the appeal.
State reserves the right to terminate this agreement subject to 30 days written notice to Contractor. Contractor may submit a written request to terminate this agreement only if State should substantially fail to perform its responsibilities as provided herein.
No foreign-made equipment, materials, or supplies furnished to State pursuant to this agreement may be produced in whole or in part by forced labor, convict labor, or indentured labor. By submitting a bid to State or accepting a purchase order, Contractor agrees to comply with this provision of this agreement.
Nothing contained in this agreement or otherwise, shall create any contractual relation between State and any subcontractors, and no subcontract shall relieve Contractor of its responsibilities and obligations hereunder.
Contractor agrees to be as fully responsible to State for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by any of them as it is for the acts and omissions of persons
SAM
PLE
Page: 4 5
7. Potential Subcontractors (CONTINUED)
8.
9. Priority Hiring Considerations for Contracts with a Value of $200,000
10. Intellectual Property
11. Generative Artificial Intelligence
DPR 605S (Rev. 7/2024) of
Excise Tax (Solely applicable to certain specified goods or articles manufactured or produced in the Philippines for domestic sale or consumption or for any other disposition and to things imported in to the Philippines.)
The State of California is exempt from federal excise taxes, and no payment will be made for any taxes levied on employees' wages. The State will pay for any applicable State of California or local sales or use taxes on the services rendered or equipment or parts supplied pursuant to this agreement. California may pay any applicable sales and use tax imposed by another state.
If the resulting agreement will have a total value of $200,000 or more, Contractor is hereby advised that it will be obligated to give priority consideration in filling vacancies in positions funded by the resulting agreement to qualified recipients of aid under Welfare and Institutions Code Section 11200. This requirement shall not interfere with or require a violation of a collective bargaining agreement, a federal affirmative action obligation for hiring disabled veterans of the Vietnam era, or nondiscrimination compliance laws of California and does not require the employment of unqualified recipients of aid.
directly employed by Contractor. Contractor's obligation to pay its subcontractors is an independent obligation from State's obligation to make payments to Contractor. As a result, State shall have no obligation to pay or to enforce the payment of any moneys to any subcontractor.
EXHIBIT D — SERVICES
(Standard Agreement)
Any works developed during and/or pursuant to this agreement by Contractor, including all related copyrights and other proprietary rights therein, as may now exist and/or which hereafter come into existence, shall belong to State upon creation, and shall continue in State’s exclusive ownership upon termination of this agreement. Contractor further intends and agrees to assign to State all right, title and interest in and to such materials as well as all related copyrights and other proprietary rights therein.
Contractor agrees to cooperate with State and to execute any document or documents that may be found to be necessary to give the foregoing provisions full force and effect, including but not limited to, an assignment of copyright.
Contractor agrees not to incorporate into or make the works developed, dependent upon any original works of authorship or Intellectual Property Rights of third parties without first (a) obtaining State’s prior written permission, and
(b) granting to or obtaining for State a nonexclusive, royalty-free, paid-up, irrevocable, perpetual, world-wide license, to use, reproduce, sell, modify, publicly and privately display and distribute, for any purpose whatsoever, any such prior works.
During the term of the contract, Contractor must notify the State in writing if their services or any work under this contract includes, or makes available, any previously unreported GenAI technology, including GenAI from third parties or subcontractors. Contractor shall immediately complete the GenAI Reporting and Factsheet (STD 1000) to notify the State of any new or previously unreported GenAI technology.
At the direction of the State, Contractor shall discontinue the use of any new or previously undisclosed GenAI technology that materially impacts functionality, risk or contract performance, until use of such GenAI technology has been approved by the State.
SAM
PLE
Page: 5 5
11. Generative Artificial Intelligence (CONTINUED)
12. Executive Order N-6-22 – Russia Sanctions
DPR 605S (Rev. 7/2024) of
EXHIBIT D — SERVICES
(Standard Agreement)
Failure to disclose GenAI use to the State and submit the GenAI Reporting and Factsheet (STD 1000) may be considered a breach of the contract by the State at its sole discretion and the State may consider such failure to disclose GenAI and/or failure to submit the GenAI Reporting and Factsheet (STD 1000) as grounds for the immediate termination of the contract. The State is entitled to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
The State reserves the right to amend the contract, without additional cost, to incorporate GenAI Special Provisions into the contract at its sole discretion and/or terminate any contract that presents an unacceptable level of risk to the State.
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The State shall provide Contractor advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the State.
SA
MP
LE
File details come from the government source that posted it. Updated .