This document is the Technical Provisions of the Specifications for the RESTORE Florida Connecting Coastal Waters Money Bayou project. The project consists of rehabilitating low water crossings (LWCs), which involves excavation, grading, and placement of geotextile fabric, coarse aggregate, and rock. The base bid includes 13 LWCs, with 10 bid alternates for additional LWCs. Key requirements include mobilization and demobilization, performance and payment bonds, surveys, and LWC construction. Excavated materials are to be placed in designated spoil disposal areas. The contractor is required to perform pre-construction and as-built surveys, and the government will conduct hold point inspections. Pricing is based on a contract unit price per linear foot of LWC construction. The project is set-aside for HUBZone small businesses located in or principally engaged in business in Florida or the Gulf Coast states. Bids are due by August 22, 2024, with a bid opening on the same date.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESTORE FLORIDA CONNECTING COASTAL WATERS: MONEY BAYOU
TECHNICAL PROVISIONS
TP-i
Table of Contents
I. GENERAL
1 PROJECT DESCRIPTION
2 SUMMARY OF THE WORK
3 SCOPE
4 PHYSICAL DATA
5 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
6 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS
7 SURVEYS
II. MATERIALS AND EXECUTION
8 LOW WATER CROSSING CONSTRUCTION
9 ROADWAY EXCAVATION AND PLACEMENT
10 GEOTEXTILE FABRIC, COARSE AGGREGATE AND ROCK
11 GOVERNMENT HOLD POINT AND FINAL INSPECTIONS
12 EROSION CONTROL MEASURES
13 WORK AREA
14 CONSTRUCTION ACCESS
15 STAGING AND LAYDOWN AREAS
16 MISPLACED MATERIAL, PLANT MACHINERY, EQUIPMENT, OR
APPLIANCE
17 FINAL CLEAN-UP
18 SCHEDULE OF DELIVERABLES
TP-ii
List of Appendices
Appendix A – Geotechnical Report Appendix B – Florida Department of Transportation (FDOT) References
TP-1
I. GENERAL
1 PROJECT DESCRIPTION
Money Bayou is located in Port St Joe, Florida on St. Joseph Bay State Buffer Preserve property north and east of State Road 30A. The Project consists of rehabilitating low water crossings (LWCs), which involves excavation and grading of the existing roadways and/or trails and placement of geotextile fabric, coarse aggregate and rock. Any excess spoil material that is excavated will be placed within the designated spoil disposal areas within the Project Construction Site.
2 SUMMARY OF THE WORK
The base bid shall consist of the following LWCs: 29, 33, 15c, 15a, 15b, 5, 6, 12, 34, 45, 35, 44, and 36.
The Base Bid includes the following items in accordance with the Contract Documents:
• Mobilization and Demobilization;
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
Bid Alternate Number 1-LWC 43, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 1 provided the awarded Base Bid including this Bid Alternate Number 1 is within funding limitations.
Bid Alternate Number 2-LWC 24, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 2 provided the awarded Base Bid including this Bid Alternate Number 2 is within funding limitations.
TP-2
Bid Alternate Number 3-LWC 49, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 3 provided the awarded Base Bid including this Bid Alternate Number 3 is within funding limitations.
Bid Alternate Number 4-LWC 42, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 4 provided the awarded Base Bid including this Bid Alternate Number 4 is within funding limitations.
Bid Alternate Number 5-LWC 41, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 5 provided the awarded Base Bid including this Bid Alternate Number 5 is within funding limitations.
Bid Alternate Number 6-LWC 37, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 6 provided the awarded Base Bid including this Bid Alternate Number 6 is within funding limitations.
Bid Alternate Number 7-LWC 38, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
TP-3
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 7 provided the awarded Base Bid including this Bid Alternate Number 7 is within funding limitations.
Bid Alternate Number 8-LWC 39, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 8 provided the awarded Base Bid including this Bid Alternate Number 8 is within funding limitations.
Bid Alternate Number 9-LWC 40, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 9 provided the awarded Base Bid including this Bid Alternate Number 9 is within funding limitations.
Bid Alternate Number 10-LWC 52, if awarded, includes the following items in accordance with the Contract Documents:
• Performance and Payment Bonds;
• Surveys; and
• Low Water Crossing Construction.
It is the intent of the GOVERNMENT to award this Bid Alternate Number 10 provided the awarded Base Bid including this Bid Alternate Number 10 is within funding limitations.
3 SCOPE
The CONTRACTOR shall provide all labor, materials, tools, equipment, plant, supplies, superintendence, submittals, incidentals, and services necessary or required to fully complete the Work for “RESTORE Florida Connecting Coastal Waters - Money Bayou” in accordance with these Specifications and shown on the Plans. Major tasks associated with this Work include the items described in Paragraph I-2 of these Technical Provisions of the Specifications.
TP-4
4 PHYSICAL DATA
Information and data furnished or referred to in the Contract Documents are furnished for the CONTRACTOR'S information. However, it is expressly understood that the GOVERNMENT will not be responsible for any interpretation or conclusion drawn there from by the CONTRACTOR.
Likewise, the GOVERNMENT will not be responsible for any information provided to the CONTRACTOR by any information agency or other party.
The physical conditions of the Project Construction Site indicated in the Contract Documents are the results of site investigations conducted using topographic surveys, cultural resources surveys, and sediment sampling. While the GOVERNMENT’S topographic survey, cultural resources surveys and sediment samples are representative of surface or subsurface conditions at their specific locations and vertical reaches, variations in the characteristics of the surface or subsurface materials are possible and should be expected. Interpretations as shown in the Plans between sampling points are estimates of expected average conditions in these areas and are provided for the convenience and use by the CONTRACTOR but should not be taken as the actual conditions at each point beyond the sampling points. Should any questions or discrepancies arise, the CONTRACTOR shall report conditions to the GOVERNMENT immediately. A copy of the geotechnical report is included in Appendix A of these Technical Provisions of the Specifications.
4.1 Weather Conditions:
The Project Construction Site generally has a mild subtropical climate and may be affected by tropical storms and hurricanes primarily from June through November and by stormy and/or rainy weather, including severe thunderstorms, during any time of the year. The CONTRACTOR shall be responsible for obtaining information concerning rain and wind conditions that could influence safety and construction operations prior to making a bid. A list of publications containing climatological and meteorological observations and data for the Project Construction Site is provided below. Other publications or information sources are available in addition to the following:
Local Climatological Data: Monthly Summary published by the National Oceanic and Atmospheric Administration (NOAA), Asheville, NC. Subscription price and ordering information is available from the National Climatic Data Center, Federal Building, Asheville, NC 22801. This publication gives hourly wind speed and direction observations. The Annual Summary gives a summary of the observations for the period of record.
Summary of Synoptic Meteorological Observations: North American Coastal Marine Areas Atlantic and Gulf Coasts. Produced by the National Weather Service, U.S. Department of Commerce. Distributed by the National Technical Information Service, U.S. Department of Commerce.
4.2 Access to the Project Construction Site:
Land access to the Project Construction Site will be provided by the property owner via State Road 30A.
TP-5
5 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
5.1 General:
Mobilization and demobilization includes all costs necessary to prepare and move personnel, equipment, materials, supplies and incidentals to and from the Project Construction Site, establish facilities necessary for the Work, improve and maintain the staging area(s) as deemed necessary by CONTRACTOR (including coordination with property owners), and any other preconstruction expenses necessary to perform the Work and any post-construction Work including but not limited to final Project Construction Site cleanup. All costs connected with mobilization and demobilization will be paid for at the Contract Lump Sum Price for Mobilization/Demobilization (Line Item 0001, Base Bid). Material costs for items listed or subsidiary to the major Work items listed on the Schedule of Prices shall not be included under mobilization and demobilization.
5.2 Arbitrary Mobilization by CONTRACTOR:
GOVERNMENT shall pay for only one (1) mobilization and demobilization effort.
Under no circumstances will the CONTRACTOR demobilize from the Project Construction Site without the written consent of the GOVERNMENT, unless one (1) or more of the following occurs: all Work is completed and accepted by the GOVERNMENT, weather conditions require movement from the Project Construction Site, a condition exists that threatens the safety and welfare of personnel or threatens equipment, and/or the time frame provided for the Work in the Contract has expired without amendment by the GOVERNMENT through a Change Order, or the State or Federal Permits have expired.
5.3 Ratio of Mobilization (60%) and Demobilization (40%) Effort:
Sixty percent (60%) of the mobilization/demobilization Contract Lump Sum Price will be paid to CONTRACTOR upon complete mobilization to the Project Construction Site. The remaining forty percent (40%) will be paid to CONTRACTOR upon final acceptance of the Work and completion of Final Clean-up.
5.4 Justification of Costs:
In the event the GOVERNMENT considers that the cost for mobilization does not bear a reasonable relation to the cost of the entire Work in this Contract, the GOVERNMENT may require the CONTRACTOR to produce cost data to justify this portion of the bid. Failure to justify such price to the satisfaction of the GOVERNMENT will result in payment of estimated mobilization costs, as determined by the GOVERNMENT at the completion of mobilization, and payment of the remainder of this item in the final payment under this Contract.
5.5 Payment Requests:
The CONTRACTOR may apply for payment for Mobilization on the monthly Application of Payment upon excavation and grading of the first low water crossing.
Demobilization effort will be included in the final Application of Payment for Work under this Contract.
TP-6
6 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS
All costs connected with obtaining performance and payment bonds for the Work will be paid for at the Contract Lump Sum Price for Performance and Payment Bonds (Line Item 0002, Base Bid), and (Line Items 0100, 0200, 0300, 0400, 0500, 0600, 0700, 0800, 0900 and 1000, Bid Alternate Numbers One through Ten). The CONTRACTOR may apply for one hundred percent (100%) payment of this item following written approval by the GOVERNMENT of the Schedule of Prices.
7 SURVEYS
7.1 General:
This Work consists of conducting Pre-Construction and As-Built Surveys to ensure that the low water crossings are installed as specified in the Contract Documents.
7.2 Reference and Control:
Survey data shall reference the North American Datum of 1983 (NAD 83), Florida North Zone, U. S. Survey Feet, and the North American Vertical Datum of 1988 (NAVD 88) using Geoid 12B, U. S. Survey Feet. Horizontal and vertical control shall be established using primary national geodetic survey (NGS monuments) shown on the General Notes sheet in the Plans.
7.3 Survey Monumentation:
Permanent markers or survey monuments shall not be disturbed, damaged, or destroyed by the CONTRACTOR. Disturbed, damaged, or destroyed survey monuments will be replaced by the GOVERNMENT, at their discretion, and the expense of replacement will be deducted from any amounts due, or to become due, to the CONTRACTOR. The CONTRACTOR may install temporary benchmarks at any location within the Project Construction Site as necessary to perform the Work. All temporary benchmarks shall be repaired and resurveyed if disturbed or damaged during construction. Any temporary benchmarks, monuments, or other control points utilized by the Contractor shall be resurveyed before construction with an updated elevation and recorded and reported to Florida Department of Environmental Protection (FDEP).
7.4 Survey Requirements:
Surveys shall utilize conventional real-time kinematic (RTK) surveying methods or an appropriate global navigation satellite system (GNSS) or global positioning system (GPS) Real Time Network such as the Gulfnet Virtual Real-time Network (VRS).
Topographic survey equipment shall have a minimum vertical and positional accuracy of one-tenth (0.1) of a foot.
7.5 Pre-Construction Surveys:
The Pre-Construction Survey shall be used to verify the existing conditions at the Project Construction Site. The Pre-Construction Survey data will be used to update the Plans (i.e. adjust quantities of excavation and placement and modify the layout of the Work) as deemed necessary by the GOVERNMENT. The Pre-Construction Survey shall be performed prior to excavation and placement of material within sixty (60) Days of the start of the roadway excavation and placement activities. The CONTRACTOR
TP-7
shall provide the Pre-Construction Survey data to the GOVERNMENT within five (5) Days after collection of the Pre-Construction Survey data. A minimum of five (5) working Days and a maximum of ten (10) working Days will be required to update the Plans upon receipt of the Pre-Construction Survey data.
The Pre-Construction Survey shall show the existing topography in plan and profile using markers, spot elevations, coordinates, contours, lines and grades. The CONTRACTOR shall survey the centerline of each low water crossing shown on the Plans and designated spoil disposal areas the CONTRACTOR intends to utilize, collecting points every ten feet (10’). A sufficient number of survey points shall be taken along each line to ensure adequate description of topographic features, such as the slope breaks, and intersections of the roadway with excavated low water crossings, intersection designated spoil disposal areas and adjacent grades, with a maximum elevation difference of six inches (6”) between adjacent points. The Pre-Construction Surveys shall extend at least fifty feet (50’) past the extents of the low water crossing and designated spoil disposal areas. The product shall be a continuous line representing the full extents of the project area along the transect line.
7.6 As-Built Surveys:
As-Built Surveys shall be performed in order to verify the following elevations:
1) Top of low water crossing and designated spoil disposal areas post excavation; and
2) Top of 6” – 8” Rock Apron post installation.
The As-Built surveys shall be performed along the same transect lines and following the same guidelines as the Pre-Construction Survey. The CONTRACTOR shall provide the As-Built Survey data to the GOVERNMENT within five (5) Days after collection of the As-Built Survey data. As the As-Built surveys are approved by the GOVERNMENT they will be considered As-Built Surveys for inclusion in the as-built drawings.
7.7 Survey Submittals:
All survey work shall be documented with copies electronically submitted to the GOVERNMNENT. Additional information to be provided to the GOVERNMENT shall include any corrections and field notes.
Survey Data: The CONTRACTOR shall electronically submit the digital copies of the survey data to the GOVERNMENT. The survey data shall be provided as an ASCII comma delimited file in point number, point description, northing coordinate, easting coordinate, elevation, and a description (PNEZD) format. The CONTRACTOR shall submit survey field notes to accompany each survey.
Survey Drawings: The CONTRACTOR shall electronically submit a digital copy of the survey drawings to the GOVERNMENT. Digital plots shall utilize 11” x 17” borders. Profile plots of the survey data shall be provided in Adobe Acrobat format and formatted to fit 8.5” x 11” paper. Digital copies of the surveys shall be provided in the latest edition of AutoCAD and Adobe Acrobat, or approved equal. The spatial extents of the road removal and low water
TP-8
crossing areas shall also be provided in the form of a GIS shapefile, or Google Earth .kml or .kmz file.
7.8 Ratio of Effort:
Forty percent (40%) of the Contract Lump Sum Price for Surveys (Line Item 0003, Base Bid), and (Line Items 0101, 0201, 0301, 0401, 0501, 0601, 0701, 0801, 0901 and 1001, Bid Alternate Numbers One through Ten) will be paid to the Contractor upon the GOVERNMENT approval of the Pre-Construction Surveys. Sixty percent (60%) will be paid to the CONTRACTOR upon the GOVERNMENT approval of the As-Built Surveys. The ratio of Survey work shall be pro-rated per the number of low water crossings, irrespective of potential differences between the survey needs of different low water crossings.
7.9 Payment Requests:
All costs connected with performing surveys for the Work will be paid for at the Contract Lump Sum Price for Surveys (Line Item 0003, Base Bid), and (Line Items 0101, 0201, 0301, 0401, 0501, 0601, 0701, 0801, 0901 and 1001, Bid Alternate Numbers One through Ten)). The CONTRACTOR may apply for payment for surveys on the monthly and final Application for Payment. The Contractor shall submit Applications for Payment for Surveys after receiving GOVERNMENT approval.
II. MATERIALS AND EXECUTION
8 LOW WATER CROSSING CONSTRUCTION
8.1 General:
Costs associated with the Work, including costs associated with but not limited to the following key Work elements, shall be paid at a price per linear foot. This measurement shall be made along the centerline of the roadway as shown in the plans for each low water crossing.
Roadway Excavation and Placement:
This work consist of LWC layout, staking, excavation of materials, material transport, spoil placement (including grading and compaction), site restoration and repair. All material shall be excavated from within the road removal and low water crossings as specified in the Plans. All materials excavated shall be place within the Project Construction Site limits in designated spoil disposal areas.
The CONTRACTOR shall anticipate encountering fine-grained materials and sands at the Project Construction Site; however, the CONTRACTOR may also encounter other debris. Bidders are expected to examine the geotechnical report in Appendix A of these Technical Provisions of the Specifications, the site of Work and history of similar work in the area and decide for themselves the character of the materials and the measures necessary to perform the Work within the required schedule as well as safeguard their personnel, equipment
TP-9
and the public. Local variations in the subsurface materials are to be expected and, if encountered, will not be considered as being materially different.
Installation of Geotextile Fabric:
This Work consists of supply, shipping, and installation of geotextile fabric as indicated in the Contract Documents. Geotextile fabric not meeting the requirements of these Technical Provisions of the Specifications will be rejected and replaced at the CONTRACTOR expense and at no additional cost to the GOVERNMENT.
Installation of FDOT #1 or FDOT #2 Coarse Aggregate:
This Work consists of supply, shipping, and installation of FDOT #1 or FDOT #2 Coarse Aggregate (approximately one and a half-inch (1.5”) to three and a half-inch (3.5”) diameter) as indicated in the Contract Documents. Coarse aggregate not meeting the requirements of these Technical Provisions of the Specifications will be rejected and replaced at the CONTRACTOR expense and at no additional cost to the GOVERNMENT.
Installation of FDOT #2 to FDOT #5 Coarse Aggregate:
This Work consists of supply, shipping, and installation of FDOT #2 to FDOT #5 Coarse Aggregate (approximately one half-inch (0.5”) to two and a half-inch (2.5”) diameter) as indicated in the Contract Documents. Coarse aggregate not meeting the requirements of these Technical Provisions of the Specifications will be rejected and replaced at the CONTRACTOR expense and at no additional cost to the GOVERNMENT.
Installation of 6”-8” Rock Apron:
This Work consists of supply, shipping, and installation of bedding stone, rubble or cobbles in the six-inch (6”) to eight-inch (8”) with D50 of seven inches (7”) Rock Apron as indicated in the Contract Documents. Aggregate not meeting the requirements of these Technical Provisions of the Specifications will be rejected and replaced at the CONTRACTOR expense and at no additional cost to the GOVERNMENT.
Erosion Control Measures:
This Work consists of, but is not limited to, obtaining a construction stormwater National Pollutant Discharge Elimination System (NPDES) Permit, maintaining compliance with the NPDES Permit, Storm Water Pollution Prevention Plan (SWPPP), and those items of temporary soil erosion and sediment control necessary for the management of construction stormwater discharge quality. The CONTRACTOR shall provide and maintain soil erosion and sediment controls designed to protect the Project Construction Site from soil erosion and adjacent property and waters as required by Federal, State and Local regulations.
Inspection Requirements:
TP-10
Following the completion of low water crossings shall be visually inspected by the GOVERNMENT to evaluate completeness, elevation, and width. The GOVERNMENT reserves the right to require the CONTRACTOR to remove or place additional coarse aggregate and rock to the meet in reasonably close conformity with the thickness and typical cross sections shown on the Plans prior to acceptance of the inspection at the CONTRACTOR expense and at no additional cost to the GOVERNMENT.
8.2 Payment Requests:
The CONTRACTOR may request payment for the Contract Unit Price per linear foot of Low Water Crossing Construction (Line Item 0004, Base Bid), and (Line Items 0102, 0202, 0302, 0402, 0502, 0602, 0702, 0802, 0902 and 1002, Bid Alternate Numbers One through Ten), which payment shall also include all other items of overhead, profit, labor, materials, submittals, equipment, and any other costs incidental to performing the Work. The CONTRACTOR may apply for payment for low water crossing construction on the monthly and final Application for Payment. The Contractor shall submit Applications for Payment for Low Water Crossing Construction after receiving GOVERNMENT approval of a low water crossing. This Work is considered complete when all low water crossings have been approved by the
GOVERNMENT.
9 ROADWAY EXCAVATION AND PLACEMENT
9.1 Scope:
The Work shall cover the excavation, hauling, placement of material, grading, and compaction of the roadway for all low water crossings in accordance with these Technical Provisions of the Specifications and in reasonably close conformity with the thickness and typical cross sections shown on the Plans.
Material shall consist of the excavation of all materials of whatever character encountered in the Work.
Existing roads and road sections that are not identified for excavation and/or grading are to remain in place. The CONTRACTOR shall not remove, damage, or impact these existing roads.
All spoil materials excavated shall be placed at designated spoil disposal areas within the Project Construction Site limits in an appropriate manner and at the expense of the
CONTRACTOR.
To the greatest extent practicable, all excavation and placement of spoil materials shall be performed in a uniform and continuous manner so as to avoid creating multiple holes, valleys, or ridges within the Project Construction Site limits.
Under no circumstances shall spoil material be excavated from outside the designated low water crossing footprints.
Following completion of roadway excavation, grading, and compaction, and during the hold point for that work, the Contractor shall place the geotextile fabric for the Government’s review. The area will be visually inspected by the GOVERNMENT to evaluate completeness, elevation, and width. The GOVERNMENT reserves the right to
TP-11
require the CONTRACTOR to remove or place additional material to meet in reasonably close conformity with the thickness and typical cross sections shown on the Plans prior to acceptance of the hold point inspection at the CONTRACTOR expense and at no additional cost to the GOVERNMENT.
The CONTRACTOR shall maintain and protect the low water crossings to a satisfactory condition at all times until final completion and acceptance of the Work by the
GOVERNMENT.
9.2 Existing Road Repair:
The CONTRACTOR shall repair all existing roads not identified for road removal or low water crossings that were removed, damaged, or impacted during construction activities at no additional cost to the GOVERNMENT. Existing roads not identified for road removal or low water crossing shall be restored to pre-construction conditions prior to final acceptance of the Work at the CONTRACTOR’s expense and at no additional cost to the GOVERNMENT.
9.3 Excavation Limits:
All excavation shall be performed within the limit of excavation to be removed as indicated on the Plans. Areas where additional removal of soft soil within the footprint of the low water crossing is required to facilitate stability of the design, the CONTRACTOR shall immediately identify these areas to the GOVERNMENT prior to performing the excavation.
9.4 Spoil Placement Areas:
All excavated spoil materials shall be placed within the designated spoil placement areas along existing roadways and ditches as indicated on the Plans. These designated spoil placement areas are based on the dimensions of the adjacent low water crossing, the footprint shall be the total low water crossing length and half of the total low water crossing width and begin at low water crossing endpoints unless otherwise directed by the GOVERNMENT. The CONTRACTOR is required to compact the spoil material within the designated spoil placement areas and shall not exceed one and a half feet (1.5’) of thickness.
9.5 Project Layout:
Project inflection points are provided in the Plans for the CONTRACTOR’S information. Prior to the initiation of heavy construction, excavation, or road improvements activities, the CONTRACTOR shall lay out the limits of the road removal and low water crossings. The CONTRACTOR shall also coordinate with utilities, landowners, and leaseholders as required by the Contract Documents to ensure identification, location, and marking of all public and private infrastructure that may occur at the Project Construction Site. The GOVERNMENT will conduct multiple hold point inspections for the completion of project layout as detailed in section 11- Government Hold Point and Final Inspections of these Technical Provisions of the Specifications. Work shall only occur within those sections of the project layout that have been approved following the project layout hold point inspection.
The staking shall be embedded at a depth sufficient to resist the stakes being moved by excavation activities, material placement, or weather. The CONTRACTOR shall be
TP-12
responsible for removing the staking after construction is completed or as directed by the GOVERNMENT. Payment for staking shall be included within Unit Price per linear foot for Low Water Crossing Construction (Line Item 0004, Base Bid), and (Line Items 0102, 0202, 0302, 0402, 0502, 0602, 0702, 0802, 0902 and 1002, Bid Alternate Numbers One through Ten).
9.6 Equipment:
Equipment employed for the Roadway Excavation and Placement Work shall be in satisfactory operating condition, capable of safely and efficiently performing the Work as indicated. Equipment and machinery shall be kept in good condition at all times. Any leaks or deficiencies shall be promptly and properly repaired. The CONTRACTOR is responsible for cleaning any fuel, oil, grease or other spills and reporting these incidents to the GOVERNMENT.
A listing of all equipment and machinery utilized to accomplish the Work shall be submitted as part of 9.8.1-Pre-construction Submittals of these Technical Provisions of the Specifications. The listing shall include year and manufacturer, operational capacities, safety features, operating and licensing requirements for operators, and a description of where and how the item of equipment will be employed in the Work.
9.7 Water Table:
The required excavation and placement work may be at or below the local water table.
The Contractor should account for this in their bid and selection of equipment. Payment for dewatering activities shall be included within Unit Price per linear foot for Low Water Crossing Construction (Line Item 0004, Base Bid), and (Line Items 0102, 0202, 0302, 0402, 0502, 0602, 0702, 0802, 0902 and 1002, Bid Alternate Numbers One through Ten).
9.8 Submittals:
Prior to commencing any Work at the Project Construction Site the
CONTRACTOR shall submit the following:
a. Pre-construction Submittals:
The CONTRACTOR shall submit a roadway removal plan to the GOVERNMENT which shall include the following:
1. Clearly identifies roads to remain in place;
2. Lists equipment and machinery to be used during road removal
Work; and
3. Details on a plan for disposal of all suitable excavated spoil materials.
Within ten (10) Days after completion of Work, the CONTRACTOR shall submit the following:
a. Post-Construction Submittal:
TP-13
1. The CONTRACTOR shall submit documentation that all excavated spoil material has been disposed, and the disposal locations of the excavated spoil material.
9.9 Preservation of Historical, Archeological, and Cultural Resources:
If during Work activities the CONTRACTOR observes items that may have historical, cultural, or archeological value, the CONTRACTOR shall immediately cease all activities that may result in the destruction of these resources and shall prevent their employees and Subcontractors from trespassing on, removing, or otherwise damaging such resources. Such observations shall be reported immediately to the GOVERNMENT so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. The CONTRACTOR shall report any observed unauthorized removal or destruction of such resources by any person to the GOVERNMENT.
9.10 Preservation of Existing Natural Resources:
Equipment operators shall be instructed by the CONTRACTOR with regards to avoiding damage to the water bottoms and existing vegetation within the no-work areas as marked on the Plans during all phases of the Work.
10 GEOTEXTILE FABRIC, COARSE AGGREGATE AND ROCK
10.1 Scope:
The Work shall cover the supply, transport, and installation of geotextile fabric, coarse aggregate and rock in accordance with these Technical Provisions of the Specifications and in reasonably close conformity with the thickness and typical cross sections shown on the Plans.
10.2 Materials
Geotextile Fabric
The geotextile fabric shall be woven and shall meet the general requirements of Type D-1a in Section 985 as described in FDOT References in Appendix B of these Technical Provisions of the Specifications, as listed below.
Property/Test Method Value
In-Situ Soil Percent Passing a No. 200 Sieve <15%
Minimum Permittivity per ASTM D4491 0.7 sec-1
Maximum AOS per ASTM D4751 0.425mm
Minimum Grab Tensile Strength per ASTM D4632 315 lbs
Minimum Puncture Strength per ASTM D6241 618 lbs
TP-14
Minimum Trapezoidal Tear per ASTM D4533 113 lbs
Minimum UV Resistance per AST< D4355 50% @ 500 hrs
Coarse Aggregate and Rock
Coarse Aggregate and rock shall meet the general requirements of Section 901 as described in FDOT References in Appendix B of these Technical Provisions of the Specifications.
Physical composition Limestone or granite Los Angeles Abrasion (FM 1-T 096) Maximum loss of 35% Soundness per AASHTO T104 Maximum loss of 12% Flat or elongated pieces* Maximum 10%
*A flat or elongated particle is defined as one having a ratio between the maximum and the minimum dimensions of a circumscribing prism exceeding five to one.
10.3 Geotextile Fabric:
Geotextile fabrics shall be packaged in a protective covering sufficient to protect the material from temperatures greater than one hundred forty (140) Fahrenheit, sunlight, dirt, and other debris during shipment and storage. The manufacturer’s name, product name, style number, roll dimensions and LOT numbers must be clearly labeled on all packaging The installation site shall be prepared by clearing, grading, and compacting the area as required. All sharp objects, large stones, trees, shrubs and roots shall be removed. When appropriate, soft spots and unsuitable areas are identified during site preparation or compaction. These areas shall be excavated and backfilled with excavated spoil material, which is compacted to a depth such that the area provides equal stability as the adjacent area. The CONTRACTOR shall notify the GOVERNMENT immediately after identifying any such soft spots and shall document their extent when the CONTRACTOR is performing post-excavation surveys as part of CONTRACTOR quality control program.
The geotextile fabric shall be unrolled as smoothly as possible on the prepared subgrade in the direction of the construction traffic. Place the geotextile fabric in the manner and locations as shown in the Plans, in accordance with the manufacturer’s directions, and as specified in these Technical Provisions of the Specifications. Place the geotextile fabric on areas with a uniform slope that are reasonably smooth, free from mounds, windrows, and any debris or projections which might damage the fabric. Loosely lay the material. Do not stretch the geotextile fabric. Replace or repair any geotextile fabric damaged or displaced before or during placement of overlying layers to the satisfaction of the GOVERNMENT and at the CONTRACTOR expense and at no additional expense to the GOVERNMENT.
TP-15
Adjacent geotextile fabric rolls shall be overlapped. Overlaps shall be in accordance with the manufacturer’s recommendations but shall be no less than one foot (1’). To reduce overlaps, the geosynthetic material may be sewn together in accordance with the manufacturer’s recommendations but the sewn overlap shall be no less than eight inches (8”).
The geotextile fabric may be held in place prior to subbase placement by pins, staples, or piles of fill or rock.
The geotextile fabric may be folded or cut to conform to any curvature of the area. A fold or overlap shall be in the direction of construction and held in place as prescribed above.
The GOVERNMENT will conduct a hold point inspection for the grading and excavation of the area. Immediately following the hold point inspection, the CONTRACTOR shall install the geotextile fabric for Government review. Work shall only occur within those sections of the project that have been approved following the geotextile fabric installation hold point inspection.
The CONTRACTOR shall be prepared to cover the geotextile fabric as soon as the hold point inspection is complete to minimize exposure of the geotextile fabric to sunlight.
10.4 Installation of FDOT #1 or FDOT #2 Coarse Aggregate:
The FDOT #1 or FDOT #2 coarse aggregate shall be placed by end dumping onto the geotextile fabric from the edge of the geotextile fabric, or over previously placed subbase aggregate. Direct traffic on the geotextile fabric, along with any sudden stops, starts, or turns on the FDOT #1 or FDOT #2 coarse aggregate by construction equipment, shall be avoided where possible. Using whatever means, the FDOT #1 or FDOT #2 coarse aggregate shall be machine spread from the back dumped pile. A minimum thickness of nine inches (9”) shall be maintained. A smooth drum roller shall be used to compact the FDOT #1 or FDOT #2 coarse aggregate while maintaining vertical tolerances. Any ruts occurring during construction shall be filled with additional FDOT #1 or FDOT #2 coarse aggregate and compacted to the target elevation. The use of vibratory compaction will not be allowed as it may cause damage to the geotextile.
10.5 Damage Repair:
Damaged geotextile fabric, as identified by the GOVERNMENT, shall be repaired immediately at the CONTRACTOR expense and at no additional cost to the GOVERNMENT. The damaged area, plus an additional three feet (3’) around the damaged area, shall be cleared of all coarse aggregate material. This area shall be covered with a geotextile fabric patch extending three feet (3’) beyond the perimeter of the damaged area. The removed coarse aggregate material shall be replaced and compacted to the target elevation.
10.6 Right to Vary the Low Water Crossings:
The GOVERNMENT reserves the right to vary the low water crossings from the lines shown on the Plans or observed at the Project Construction Site in order to avoid any unidentified public or private infrastructure, or to avoid other areas where the GOVERNMENT deems that the Work as shown on the Plans would be detrimental to the natural habitat at no additional cost to the GOVERNMENT.
TP-16
10.7 Equipment:
Equipment employed for the low water crossing Work shall be in satisfactory operating condition, capable of safely and efficiently performing the Work as indicated.
Equipment and machinery shall be kept in good condition at all times.
A listing of all equipment and machinery utilized to accomplish the Work shall be submitted prior to mobilization as part of 10.8.1-Pre-construction Submittals of these Technical Provisions of the Specifications. The listing shall include year and manufacturer, operational capacities, safety features, operating and licensing requirements for operators, and a description of where and how the item of equipment will be employed in the Work. Any leaks or deficiencies shall be promptly and properly repaired. The CONTRACTOR is responsible for cleaning any fuel, oil, grease or other spills and reporting these incidents to the GOVERNMENT.
10.8 Submittals:
10.8.1 Prior to commencing any Work at the Project Construction Site the
CONTRACTOR shall submit the following:
a. Pre-construction Submittals:
The CONTRACTOR shall submit a low water crossing plan to the GOVERNMENT which shall include the following:
1. Clearly identifies roads to remain in place;
2. Proposed product specifications from the manufacturer of any proposed materials; and
3. Lists equipment and machinery to be used during low water crossing Work.
10.8.2 Certified Rock Quantity:
The CONTRACTOR shall provide records of the net weight of coarse aggregate and/or rock transported to the Project Construction Site. The CONTRACTOR shall provide the GOVERNMENT with a weekly cumulative total of all rock by size delivered to the Project Construction Site and a total of all coarse aggregate placed by weight. Signed weight tickets and any other records shall be provided to the GOVERNMENT weekly.
10.8.3 Within ten (10) Days after completion of Work, the CONTRACTOR shall submit the following:
a. Post-construction Submittals:
1. As-Built survey data (see section 7.6-Survey Submittals of these
Technical Provisions of the Specifications); and
2. Documentation of the spatial extents of the low water crossing areas in the form of a GIS shapefile, or Google Earth .kml or .kmz file.
TP-17
11 GOVERNMENT HOLD POINT AND FINAL INSPECTIONS
11.1 Scope:
The GOVERNMENT will perform periodic hold point inspections throughout the project.
11.2 Hold Point Details:
The table below lists the various elements of work that will be inspected during each hold point inspection.
Hold Point No.
Project Layout Excavation, Grading & Compaction
Final Inspection
1 5, 15c, & 24* N/A N/A
2 6, 15b, &52* 5, 15c, & 24* N/A
3 15a, 29, 33, 34, 35, 36, & 49*
6, 15b, & 52* 5, 15c, & 24*
4 12, 42*, 43*, 44, &45 15a, 49*, & 29 6, 15b, 33, 34, 35, 36, & 52*
5 37*, 38*, 39* 40*, & 41*
12 15a, 49*, 29, 42*, 43*, 44, & 45
6 N/A 37 12, 38*, 39* 40*, &
7 N/A N/A 37*
A hold point inspection will not be held for excavation, grading and compaction of LWCs 38*, 39* 40*, 41*, 42*, 43*, 44, & 45. The GOVERNMENT may elect to have those performed individually but will not require the CONTRACTOR to wait for the GOVERNMENT to be on-site for the CONTRACTOR to progress with the next phase of construction.
*A hold point inspection for this LWC shall occur only after the award of the associated Bid Alternative.
12 EROSION CONTROL MEASURES
12.1 Scope:
The CONTRACTOR shall obtain and maintain compliance with a construction stormwater NPDES Permit and implement and maintain effective erosion and sediment controls in accordance with the SWPPP. Means and methods for controlling erosion shall be determined by the CONTRACTOR.
12.2 Inspections and Monitoring:
TP-18
Inspections and monitoring shall be completed by the CONTRACTOR to ensure compliance with NPDES and FDEP Permit regulations.
12.3 Submittal:
The CONTRACTOR shall submit the construction stormwater NPDES Permit and associated SWPPP to the Government prior to commencing activities regulated by the NPDES Permit.
13 WORK AREA
The CONTRACTOR shall accomplish the Work in such a manner so as to minimize disruption to the public. The CONTRACTOR will be required to exclude the public, for safety purposes, from the Work areas in the immediate vicinity of the construction or any other area that may be dangerous to the public. Staging and laydown areas, as applicable, shall be kept neat, orderly, and in a safe manner. Temporary fencing and cautionary signage shall be used by the CONTRACTOR, if necessary, to exclude the public from Work areas and staging and laydown areas. No separate payment will be made for the Work described in this section. All costs associated with compliance with this section shall be incorporated into the Contract Lump Sum Price for Mobilization/Demobilization (Line Item 0001, Base Bid).
14 CONSTRUCTION ACCESS
The CONTRACTOR shall limit construction access to locations approved by the GOVERNMENT. In the event that damage is caused by the CONTRACTOR, the CONTRACTOR shall restore all damage to vegetation, or any other structure or natural feature to pre-construction conditions or better at the cost of the CONTRACTOR. The CONTRACTOR will not receive final payment until all damage is restored to the satisfaction of the GOVERNMENT. No separate payment will be made for the Work described in this section. All costs associated with compliance with this section shall be incorporated into the Contract Lump Sum Price for Mobilization/Demobilization (Line Item 0001, Base Bid).
15 STAGING AND LAYDOWN AREAS
The CONTRACTOR shall stage and laydown operations as needed within the Project Construction Site limits. Staging and laydown areas shall not be located on existing marsh, wetland, or vegetated areas. The CONTRACTOR shall cordon off and/or fence the staging and laydown areas to secure all staging and laydown areas from the public, as necessary. The staging and laydown areas shall be restored to the pre-construction condition upon the completion of the Work at the cost of the CONTRACTOR. No separate payment will be made for the Work described in this section. All costs associated with compliance with this section shall be incorporated into the Contract Lump Sum Price for Mobilization/Demobilization (Line Item 0001, Base Bid).
16 MISPLACED MATERIAL, PLANT MACHINERY, EQUIPMENT, OR APPLIANCE
Should the CONTRACTOR, during the progress of the Work, lose, discard, or misplace any material, plant, machinery, equipment, or appliance, which in the opinion of the GOVERNMENT should be removed, the CONTRACTOR shall recover and remove the same with the utmost dispatch. The CONTRACTOR shall give immediate notice, with description and location of such material, plant, machinery, equipment, or appliance, to the GOVERNMENT. Should the
TP-19
GOVERNMENT discover such material, plant, machinery, equipment, or appliance, the GOVERNMENT may locate through electronic means, and may notify the CONTRACTOR of its location. Removal of the material, plant, machinery, equipment, or appliance shall be the responsibility of the CONTRACTOR and cost of the removal will be paid for by the CONTRACTOR. Should the CONTRACTOR refuse, neglect, or delay compliance with the above requirements, such material, plant, machinery, equipment, or appliance may be removed by the GOVERNMENT, and the cost of such removal may be deducted from any money due or to become due to the CONTRACTOR or may be recovered under the CONTRACTOR’S bond.
17 FINAL CLEAN-UP
Final clean-up shall include the removal of the CONTRACTOR'S plant and all equipment or materials either for disposal or reuse. The CONTRACTOR shall remove all debris, trash, and garbage from the Project Construction Site prior to final acceptance. Plant and/or equipment or materials to be disposed of shall only be disposed of in a manner and at locations approved by the GOVERNMENT. Unless otherwise approved in writing by the GOVERNMENT, the CONTRACTOR is not permitted to abandon any equipment or materials in the Project Construction Site or other areas adjacent to the Project Construction Site. Any stakes or other markers placed by the CONTRACTOR must be removed as a part of the final clean-up. No separate payment will be made for the Work described in this section. All costs associated with compliance with this section shall be incorporated into the Contract Lump Sum Price for Mobilization/Demobilization (Line Item 0001, Base Bid).
18 SCHEDULE OF DELIVERABLES
TASK DELIVERABLE SUBMISSION
TP-7.7.1 Pre-Construction Survey Data Digital copies of the survey data as an ASCII comma delimited file in PNEZD and field notes.
Provide within five (5) Days after collection of the Pre-Construction survey data.
TP-7.7.2 Pre-Construction Survey Drawings
Digital copies of the survey drawings. Provide within five (5) Days after collection of the Pre- Construction survey data.
TP-7.7.1 As-Built Survey Data Digital copies of the survey data as an ASCII comma delimited file in PNEZD and field notes.
Provide within five (5) Days after collection of the As-Built survey data.
TP-7.7.2 As-Built Survey Drawings Digital copies of the survey drawings. Provide within five (5) Days after collection of the As-Built survey data.
TP-9.3 Additional Removal of Soft Soil Within the Footprint of
LWC
Immediately upon discovery.
TP-20
TASK DELIVERABLE SUBMISSION
TP-9.6 Fuel, Oil, Grease, or Other Spills
Immediately upon discovery.
TP-9.8.1 Pre-Construction-Road Removal Plan
Prior to commencing any Work.
TP-9.8.2 Post-Construction-Disposal of Excavated Spoil Materials
Within ten (10) Days after completion of Work.
TP-9.9 Discovery of Historical, Cultural or Archeological Value
Immediate upon discovery.
TP-10.3 Identification of Soft Spots Immediate upon discovery.
TP-10.7 Fuel, Oil, Grease, or Other Spills
Immediate upon discovery.
TP-10.8.1 Pre-Construction-Low Water Crossing Plan
Prior to commencing any Work.
TP-10.8.2 Certified Rock Quantities Weekly.
TP-10.8.3 Post-Construction-Low water Crossing
Within ten (10) Days after completion of Work.
TP-12.3 Construction NPDES Permit and SWPPP
Prior to commencing activities regulated by the NPDES permit.
TP-16 Misplaced Material, Plant Machinery, Equipment, or Appliance
Immediate upon discovery.
TP-21
APPENDIX A
GEOTECHNICAL REPORT
GEOTECHNICAL EXPLORATION
ST. JOE BAY STATE BUFFER PRESERVE
DRAINAGE IMPROVEMENTS
PORT SAINT JOE, GULF COUNTY, FLORIDA
UES PROJECT NO. 2030.2000083.0000
UES REPORT NO. 1808893
PREPARED FOR:
Industrial Economics, Incorporated 2067 Massachusetts Avenue
Cambridge, MA 02140
(617) 833-3493
PREPARED BY:
Universal Engineering Sciences 1712 Airport Road
Panama City, Florida
(850) 215-2060
October 7, 2020
Consultants in: Geotechnical Engineering • Environmental Sciences • Construction Materials Testing • Threshold Inspection Offices in: Orlando • Daytona Beach • Fort Myers • Gainesville • Jacksonville • Ocala • Palm Coast • Rockledge • Sarasota • Miami
St. Augustine • Panama City • Fort Pierce • Leesburg • Tampa • West Palm Beach • Atlanta, GA
UNIVERSAL
ENGINEERING SCIENCES
i
TABLE OF CONTENTS
1.0 PROJECT DESCRIPTION
2.0 PURPOSE
3.0 SITE DESCRIPTION
3.1 SOIL SURVEY
3.2 TOPOGRAPHY
4.0 SCOPE OF SERVICES
5.0 FIELD EXPLORATION
6.0 LABORATORY TESTING
7.0 SUBSURFACE CONDITIONS
7.1 GENERALIZED SOIL PROFILE
8.0 GROUNDWATER CONDITIONS
8.1 EXISTING GROUNDWATER LEVEL
8.2 SEASONAL HIGH GROUNDWATER LEVEL
9.0 BOX CULVERT FOUNDATION RECOMMENDATIONS
9.1 GENERAL
9.2 DESIGN PARAMETERS
9.3 BEARING MATERIAL
9.4 LATERAL EARTH PRESSURES
10.0 DEWATERING AND EXCAVATION CONSIDERATIONS
11.0 CONSTRUCTION RELATED SERVICES
12.0 LIMITATIONS
ii
LIST OF TABLES
Table I: Summary of Published Soil Data Table II: Laboratory Methodologies Table III: Generalized Soil Profile Table IV: Foundation Design Parameters Table V: Recommended Lateral Earth Pressure Parameters
APPENDICES
APPENDIX A
Site Location Map ........................................................................................................ A-1 Boring Location Plan .................................................................................................. A-1
APPENDIX B
Boring Logs ...............................................................................