About this file

This is an Operations Plan document prepared by the Santa Rosa County Environmental Department for concrete and masonry crushing operations at the Central Landfill facility in Milton, Florida, in support of the county's Clean Concrete/Masonry Crushing Services procurement (27-001). The Central Landfill operates on 104 acres under multiple state and federal permits and includes an active Class I Landfill, closed Class I Landfill, Class III Landfill, yard trash processing facility, waste tire collection center, and citizen drop-off center. The county seeks qualified contractors to provide concrete crushing and processing services on an as-needed basis at the facility located at 6337 Da Lisa Road, Milton, Florida. A non-mandatory pre-bid meeting is scheduled for November 19, 2026, at 10:00 a.m. at the landfill site. Questions concerning the request must be submitted through the Santa Rosa County Procurement Portal by 12:00 p.m. on November 24, 2026, and all bids are due by 10:00 a.m. on December 1, 2026, with public opening via Teams. No fixed quantity of crushing services is guaranteed; operations shall occur as needed based on material accumulation and county operational requirements.

The Operations Plan specifies that the contractor shall crush and screen county-designated clean concrete and masonry materials, including concrete, reinforced concrete, masonry, brick, concrete block, asphalt pavement, and natural stone, within a designated four-acre processing area. The contractor is solely responsible for obtaining and maintaining all applicable permits, registrations, and authorizations, including any required FDEP air permits, and for implementing effective dust suppression and stormwater controls during all operations. Finished aggregate remains county property and shall be stockpiled as directed by the Environmental Manager for use in landfill operations or other county projects. The contractor must identify and separate unsuitable or potentially damaging materials, such as embedded reinforcement steel or wire mesh, before processing, and county environmental staff may inspect operations to assess progress and regulatory compliance. Measurement, payable quantities, exclusions, and compensation shall be governed exclusively by the Clean Concrete/Masonry Crushing Services contract. Santa Rosa County encourages participation from all business segments, including small businesses and minority/women-owned enterprises, and reserves the right to reject any or all bids.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SANTA ROSA COUNTY

ENVIRONMENTAL DEPARTMENT

6051 Old Bagdad Highway, Suite 301 | Milton, Florida 32583

Office: 850.981.7135 | Fax: 850.981.7133 | www.santarosa.fl.gov

MICHAEL W. SCHMIDT P.E., Environmental & Public Works Director michaels@santarosa.fl.gov

CENTRAL LANDFILL

CONCRETE AND MASONRY

CRUSHING

OPERATIONS PLAN

SANTA ROSA COUNTY, FLORIDA

Prepared by:

Santa Rosa County Environmental Department 6051 Old Bagdad Highway, Suite 301

Milton, Florida 32583

October 27, 2026

INTRODUCTION

1.1 PERMIT BACKGROUND

Santa Rosa County owns and operates an active Solid Waste Facility known as the Central Landfill, located in Milton, Florida. The facility is managed and operated by the Santa Rosa County Environmental Department under the jurisdiction of multiple State and Federal Permits. The Central Landfill occupies a total area of 104 acres which includes an active Class I Landfill, a closed Class I Landfill (FDEP Permit No.

0000667- 031-SO-01), a Class III Landfill (FDEP Permit No. 0000667-033-SO-T3), a yard trash collection and processing facility, a waste tire collection center (FDEP Permit No. 0000667-034-WT-05), and a citizen’s drop off center.

The facility operates under FDEP Title V Air Operations Permit No. 1130172-010-AV (Facility ID 1130172), which expires July 31, 2029. The permit renewal application is due December 18, 2028. The facility is equipped with a landfill gas collection system that directs collected landfill gas to a blower/flare station.

The facility also has ERP Permit 0358458-002-EM/57, Extension of File No. 0358458-001-EI/57, which expires March 9, 2028, and NPDES Stormwater Permit FLR05H567, with coverage expiring July 19, 2028.

1.2 PURPOSE

The Central Landfill accepts and stockpiles Clean Concrete/Masonry in a designated area on-site. Clean Concrete/Masonry includes concrete, reinforced concrete, masonry, hardened mortar and grout, brick, concrete block, asphalt pavement, loose aggregate, and natural stone. Only materials authorized under the County’s Clean Concrete/Masonry Crushing Services contract shall be processed.

Clean Concrete/Masonry is stockpiled within an approximately four-acre designated processing area at the Central Landfill. Materials may be reused on-site, including for erosion control and road construction, or periodically processed into reusable aggregate. Crushing events occur as needed based on material accumulation and County operational requirements; no fixed quantity is guaranteed.

Incoming Clean Concrete/Masonry may contain embedded reinforcement steel, wire mesh, or other unsuitable materials. County personnel generally inspect incoming loads and separate materials before stockpiling, but the County does not guarantee that stockpiles are free of such materials. The Contractor is responsible for identifying and separating unsuitable or potentially damaging materials before processing, maintaining good housekeeping practices, and providing effective dust control throughout operations. Exceptionally oversized or heavily reinforced structural components may be excluded from processing with approval of the Environmental Manager or designee, in accordance with the Clean Concrete/Masonry Crushing Services contract.

A Site Plan is included as Exhibit A showing the location of the proposed operation.

1.3 OPERATION

The crushing Contractor shall obtain, maintain, and comply with all applicable permits, registrations, authorizations, and notifications for its equipment and operations, including any required FDEP air permit or registration and facility relocation notification. The Contractor is solely responsible for regulatory submissions and deadlines and shall comply with the County’s Clean Concrete/Masonry Crushing Services contract and this Operations Plan.

The Contractor shall crush and screen County-designated Clean Concrete/Masonry at the designated processing area shown in Exhibit A. Finished aggregate shall remain County property and shall be stockpiled as directed by the Environmental Manager or designee for use in landfill operations or other County projects. Crushing services shall be procured and performed in accordance with the County’s Clean Concrete/Masonry Crushing Services contract.

County environmental staff may inspect crushing operations to assess progress, site conditions, and potential impacts to landfill operations, air quality, and stormwater management. The Contractor remains responsible for compliance with applicable environmental and safety requirements and for preventing adverse impacts from its operations. Existing drainage patterns and stormwater controls shall be protected in accordance with applicable County permits.

The Contractor shall implement effective dust suppression during crushing, screening, loading, and stockpiling, in accordance with the County’s Clean Concrete/Masonry Crushing Services contract and applicable air quality and worker safety requirements. The County may suspend operations when dust controls are inadequate, unsafe conditions arise, or apparent regulatory noncompliance is observed.

Operations may resume after appropriate corrective measures are implemented and approved by the Environmental Manager or designee.

Measurement, payable quantities, exclusions, and compensation for crushing services, including any specially authorized alternative measurement for unusual events, shall be governed exclusively by the County’s Clean Concrete/Masonry Crushing Services contract. The Contractor shall not be entitled to additional payment based on this Operations Plan.