This document contains the technical specifications for the Carrington Pits CXT Relocation to Noblett Lake project for the Mark Twain National Forest. The key details are:
The project involves the demolition and removal of the existing toilet building and holding tank at Noblett Lake, preparation of the site for the relocation of the existing Gunnison Single CXT building from Carrington Pits to Noblett Lake, and associated site work including seeding and mulching. The contractor will be responsible for all project management, labor, equipment, and materials to complete the work. The contract duration is 30 calendar days, and performance must begin within 10 days of the Notice to Proceed. Specific requirements include legal disposal of waste, preservation of the existing concrete ramp at Noblett Lake, installation of the CXT building per manufacturer recommendations, backfilling and grading, and seeding and mulching of disturbed areas. Site access, work hours, and cleanup requirements are also detailed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Continuation of SF1449 12444524Q0078.docx | DOCX document | |
| Attachment D - WD 2015-5101.pdf | ||
| Attachment A - Schedule of Items.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARK TWAIN NATIONAL FOREST
CARRINGTON PITS’ CXT RELOCATION
TO NOBLETT LAKE
PROJECT SPECIFICATIONS
USDA – FOREST SERVICE
401 FAIRGROUNDS ROAD
ROLLA, MO 65401
1-18-2024
PAGE LEFT INTENTIONALLY BLANK
TABLE OF CONTENTS
011000 – SUMMARY
012700 – MEASUREMENT AND PAYMENT
012800 – MOBILIZATION
013250 – CONSTRUCTION PROGRESS SCHEDULE
017700 – CLOSEOUT PROCEDURES
329200 – SEEDING AND MULCHING
APPENDIX A – EXISTING CONDITIONS PHOTOS
CARRINGTON PITS’ CXT RELOCATION TO NOBLETT LAKE
SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Identification: Carrington Pits’ CXT Relocation to Noblett Lake
Project Location: This project is located in Callaway and Howell County, Missouri.
1. Carrington Pits:
Lat: 38.822576° Long: -92.042198°
2. Noblett Lake Lat: 36.907498° Long: -92.094717°
B. Owner: Government or Owners refers to the USDA Forest Service
1. Owner’s Representative: The Federal Contracting Officer (CO) and his/her designated representative(S), as named in writing. Contractive Officer (CO) refers to the person assigned by the USDA Forest Service to administer the contract. Soon after Contract award, the Contracting Officer will designate a Contracting Officer’s Representative
(COR).
1.2 SCOPE OF WORK
A. Demolition of Existing Noblett Lake Toilet Building:
1. Contractor to demolish and remove existing toilet building and holding tank located at
Noblett Lake and legally dispose of material offsite. The existing toilet building, and vaults shall become property of the contractor and shall be removed from Government property.
2. Contractor shall pump out any remaining waste in the holding tank prior to disposal and legally dispose of this waste. Upon completion of this pumping, the contractor shall secure the building so that no further use occurs after pumping. It will be the contractor’s responsibility to re-pump the vaults if it is not empty on the day of removal.
3. Contractor shall prepare the location of the demolished toilet building at Noblett Lake for the Gunnison Single CXT building that currently exists at Carrington Pits. This includes any necessary excavation and rock removal.
4. The existing site at Noblett Lake has a concrete ramp up to the toilet building. This ramp shall be preserved by the contractor during demolition. Any damage to the ramp shall be the contractor's responsibility to repair/replace.
SUMMARY 011000 - 2
B. Relocation of Gunnison Single CXT from Carrington Pits to Noblett Lake
1. Contractor shall relocate the Gunnison Single CXT building from Carrington Pits to previously prepared site at Noblett Lake.
2. Contractor shall pump and clean holding tank prior to transportation to new location. The pumped waste shall be legally disposed of. Upon completion of this pumping, the contractor shall secure the building so that no further use occurs after pumping. It will be the contractor’s responsibility to re-pump the vaults if it is not empty on the day of removal.
3. The Gunnison Single CXT building shall be installed at Noblett Lake according to manufacturer’s recommendations.
4. The Gunnison Single CXT building shall be placed as such that the existing concrete ramp aligns with the front of the building’s entrance. If concrete repairs are necessary:
a. Concrete mix shall meet an overall minimum compression strength of 5,000 psi.
b. Top of concrete to match existing top of grade.
c. Minimum concrete thickness shall be 4”.
d. Finish and cure concrete according to FP-14 requirements.
5. After placing the Gunnison Single CXT building at Noblett Lake, the Contractor shall backfill with excavated material or fill material. A minimum settled depth of 4” of topsoil shall be placed over filled and disturbed areas. Grade shall be sloped away from the building. All disturbed areas shall be seeded with native grass seed (See specification 329200 – Seeding and Mulching).
6. Contractor shall backfill the remaining void after the relocation of the Gunnison Single CXT building at Carrington Pits with 1” minus gravel. A minimum settled depth of 4” of topsoil shall be placed on top of the gravel to blend into existing grade. All disturbed areas shall be seeded with native grass seed (See specification 329200 – Seeding and Mulching).
1.3 CONTRACTOR’S USE OF SITE AND PREMISES
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. The Contractor is responsible for the security of the Contractor’s equipment and materials.
2. The Contractor will be responsible for signing, limiting access, and safety of government employees in the area.
3. Keep driveways, loading areas, and entrances serving premises clear and available to
Owner, Owner’s employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
B. Staging and storage areas:
1. Areas for staging operations and storage of materials shall be approved by the COR. The Contractor must request in writing for approval from the COR to stage trailer on site.
SUMMARY 011000 - 3
1.4 WORK RESTRICTIONS
A. On-Site Work Hours: Limit work in all project areas to normal business working hours of 8 a.m.
to 5 p.m., Monday through Friday, unless otherwise indicated or approved by the COR.
1. No work is permitted without written authorization from the CO on Government Holidays or weekends.
B. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Project site is not permitted. Use of any type of marijuana on federal property is illegal.
C. Site Cleanup: Before leaving the Site each day the Contractor shall secure equipment, tools, and materials; pickup and dispose of paper and other debris/work site waste. The Site shall be left in a safe and secure manner with the public protected from work site hazards.
D. Before leaving the Site on Fridays a more complete policing, pickup and securing of the Site shall be performed. The Site shall be left in a neat and orderly manner as determined by the COR with government employees protected from work site related hazards.
1.5 INSPECTION OF THE WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of the work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.6 SAFETY
A. Contractor shall comply with all State and Federal safety regulations during the performance of the work.
1.7 FIELD VERIFICATION
A. Contractor shall field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.8 DISPOSAL OF MATERIAL
A. Contractor shall remove and legally dispose of all debris and waste offsite.
SUMMARY 011000 - 4
1.9 CONTRACT TIME
A. 30 Calendar Days
1.10 NOTICE TO PROCEED
A. Performance of the contract shall begin within ten (10) calendar days after receipt of the Notice to Proceed. The Notice to Proceed will be issued by the Contracting Officer (CO) at the pre-work conference.
END OF SECTION 011000
MEASUREMENT AND PAYMENT 012700 - 1
SECTION 012700 – MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes:
1. Measurement and payment criteria applicable to the work performed.
2. Administrative and procedural requirements necessary to prepare and process Applications for Payment.
3. Defect assessment and non-payment for rejected work.
4. General description of work included under each pay item.
B. Related Requirements:
1. Schedule of Items Form (SOI): The Contractor is required to complete the SOI Form, provided by the Government, as part of their Proposal or Bid.
2. Invoice Processing Platform (IPP) System: All invoices are to be submitted via the electronic IPP System. The Contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in communications from USDA and Treasury. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Ensure your company has registered at https://www.ipp.gov/vendors/enrollmentvendors.htm to establish your account. Offeror must have an established account prior to commencement of work.
1.2 AUTHORITY
A. The Contracting Officer’s Representative (COR) will take all measurements and compute quantities accordingly.
1.3 MEAUREMENT OF QUANTITIES
A. Each: Measured by the number of individual items of work completed.
MEASUREMENT AND PAYMENT 012700 - 2
B. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the Contract, including all necessary materials, equipment, and labor to complete the job. They will not be measured.
1.4 PAYMENT
A. Pay Request Documentation from Contractor: Contractor must submit the following documentation to the CO/COR for review and approval at least seven (7) days prior to requesting a payment via IPP.
1. A completed draft Schedule of Items (SOI) Form for work covered by the pay request, indicating the percent complete for each line item in the SOI.
2. Written Quality Control testing results if applicable to items in the payment request.
B. Payment Includes: Full compensation for all required labor, products, tools, equipment, plant, transportation, services, and incidentals; erection, application, or installation of an item of the Work; overhead and profit.
1. “Incidentals” are to be considered as an additional obligation to the other work required for the item(s). Incidental work is not payable directly but is to be considered included in the contract price for the item(s) of work specified.
2. All work not specifically identified as a separate bid item is “Incidental”.
C. The accepted quantities will be paid for at the contract unit price for each item as shown in the Schedule of Items.
D. Payment will not be made for any of the following:
1. Products or services placed beyond the lines and levels of the required work.
2. Products or services determined as unacceptable before or after placement.
3. Products wasted or disposed of in a manner that is not acceptable.
4. Products remaining on hand after completion of the Work.
5. Loading, hauling, and disposing of rejected products.
MEASUREMENT AND PAYMENT 012700 - 3
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 012700
MEASUREMENT AND PAYMENT 012700 - 4
MOBILIZATION 012800 - 1
SECTION 012800 - MOBILIZATION
PART 1 - GENERAL
1.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
1.2 MEASUREMENT AND PAYMENT
A. Method of Measurement will be by Lump Sum Quantity (LSQ).
B. The maximum Mobilization bid price shall not exceed fifteen percent (15%) of the total base bid contract price or optional bid contract price (not including Mobilization).
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 012800
MOBILIZATION 012800 - 2
SERVICE PROGRESS SCHEDULE 013250 - 1
SECTION 013250 – SERVICE PROGRESS SCHEDULE
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Preliminary Schedule
1.2 SUBMITTALS
a. Submit a comprehensive, fully developed schedule within 5 days of Notice to
Proceed date.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONTENT
A. Preparation: Indicate each significant work activity and the location on the site separately. Identify first workday of each week.
B. Show complete sequence of work activity, with dates for beginning and completion of each element of construction.
C. Identify each item by specification section number.
D. Show accumulated percentage of completion of each item, and total percentage of work completed, as of the first day of each week.
E. Contractor to revise schedule is work is more than one week behind schedule.
END OF SECTION 013250
SERVICE PROGRESS SCHEDULE 013250 - 2
CLOSEOUT PROCEDURES 017700 - 1
SECTION 017700 – CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for Phased Project completion and Final Contract closeout, including, but not limited to, the following: The Government reserves the right to conduct independent tests.
1. Systems Commissioning including Demonstration and Training.
2. Record Documents including Record Drawings and Product Data.
3. Substantial and Final completion procedures.
4. Final cleaning.
5. Securing the system to reduce vandalism and destruction.
1.2 DEFINITIONS
A. Substantial Completion - The point at which the project, or a major phase of the project, is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments.
B. Final Completion – The point at which the project is 100% complete, accepted by the Government and ready for final payment.
1.3 RECORD DOCUMENT SUBMITTALS
A. Record Product Data: Maintain one copy of each Product Data submittal. Note related Change Orders and markup of Record Drawings and Specifications.
1. Mark these documents to show significant variations in actual Work performed in comparison with information submitted. Include variations in products delivered to the site and from the manufacturer’s installation instructions and recommendations.
2. Give particular attention to concealed products and portions of the Work that cannot otherwise be readily determined later by direct observation.
1.4 FINAL ACCEPTANCE PROCEDURES
A. Submittals Prior to Final Completion Inspection and Final Acceptance: Submit the following a minimum of 10 days before scheduling a final inspection for determining Final Completion and Acceptance:
CLOSEOUT PROCEDURES 017700 - 2
1. Submit a final Schedule of Items (SOI) form to reflect the final payment values in accordance with Section 012700 "Measurement and Payment."
2. Submit all remaining Certified Payrolls for the project not previously submitted.
3. Submit completed, signed Contract Release form.
4. Submit a signed copy of the Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Government CO/COR. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
5. Submit all remaining specific warranties, workmanship bonds, maintenance agreements, final certifications and similar documents not previously submitted.
6. Submit all remaining record documents and similar final record information not previously submitted.
7. Deliver tools, spare parts, extra stock and similar items not previously delivered.
8. Complete final clean-up requirements including touch-up painting of marred surfaces, adjustments, lubrication, etc.
B. Final Inspection Procedure: The Government will inspect the Work upon receipt of notice from the Contractor that the Work, including punch list items from earlier inspections, has been completed.
1. Upon completion of inspection, the CO will notify the Contractor of Final Acceptance and Final Payment or will advise the Contractor of Work that it is incomplete or of obligations that have not been fulfilled and are required for Final Acceptance.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage or septic systems.
1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project:
a. Clean Project site of rubbish, waste material, litter, and other foreign substances.
b. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural
CLOSEOUT PROCEDURES 017700 - 3
weathering of exterior surfaces. Restore reflective surfaces to their original condition.
c. Remove labels that are not permanent.
d. Leave Project clean and ready for occupancy.
e. Secure the system to reduce vandalism and destruction.
B. Work Waste Disposal: Comply with waste-disposal requirements in all applicable specification sections and contract clauses. Remove waste materials from the site and dispose of it lawfully.
END OF SECTION 017700
CLOSEOUT PROCEDURES 017700 - 4
CARRINGTON PIT’S CXT RELOCATION TO NOBLETT LAKE
SEEDING AND MULCHING 329200 - 1
SECTION 329200 – SEEDING AND MULCHING
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes site rehabilitation work, including seeding and mulching.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated
B. Product certificates.
1.3 QUALITY ASSURANCE
A. Installer’s Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when planting is in progress.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Seed: Deliver, store and handle materials according to manufacturer’s recommendations.
Materials must be kept dry until ready to use.
PART 2 - PRODUCTS
2.1 SEED
A. Grass Seed: Fresh, clean, dry, new-crop seed complying with ASOA’s “Journal of Seed Technology; Rules for Testing Seeds” for purity and germination tolerances.
B. Grass Seed Mix: Native Seed Mix Native Grass mix will consist of a blend of the following species: Virginia Wild Rye (Elymus virginiana) at 3 lbs/acre, Indian Grass (Sorghastrum nutans) at 3 lbs/acre, and Little Blue Stem (Schizachyrium scoparium) at 2 lbs/acre. This seed mix will be used for the areas of the site around the camp spurs, social core areas and areas disturbed by grading and other work area activities. See drawings for planting areas. Prairie Nursery, 1-800-476-9453 or approved equal.
2.2 PLANTING MATERIALS
A. Topsoil Source: Reuse surface soil on-site and amended topsoil from commercial sources.
Provide topsoil which is fertile, friable, natural loam, surface soil which is reasonably free of
SEEDING AND MULCHING 329200 - 2
subsoil, high clay content, brush, weeds, litter, stumps, rocks and any other material which may be harmful to plant growth. Topsoil shall have a pH range of 5.5 to 7.4.
NOTE: The C.O.R. shall approve the Contractor’s provided soil sample prior to installation and planting
B. Mulches:
1. Straw Mulch: Provide air dry, clean, mildew- and seed-free, and certified weed-free threshed straw of wheat, rye, oats, or barley.
PART 3 - EXECUTION
3.1 PREPARATION
A. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus ½ inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit fine grading to areas that can be planted in the immediate future.
B. Restore areas if eroded or otherwise disturbed after finish grading and before planting.
3.2 SEEDING
A. Scarify existing subsoil and compacted areas prior to spreading topsoil. Prepare subsoil to eliminate uneven areas. Maintain profiles and contours. Make changes in grade gradual. Blend slopes into level areas.
B. Spread organic topsoil at a minimum depth of 4 inches over area to be planted and integrate with the top layer of subsoil to prevent hardpan separation. Rake the surface smooth.
C. Place topsoil during dry weather and on dry, unfrozen subgrade.
D. Remove foreign, non-organic material from topsoil while spreading.
E. Grade topsoil to eliminate rough, low or soft areas and to ensure positive drainage.
F. All seeded areas to receive a settled minimum depth of 4” of topsoil.
G. Remove foreign materials, weeds and undesirable pants and their roots. Remove any contaminated subsoil if present.
H. Prepare seeding areas by removing and/or killing off any unwanted existing vegetation with a glyphosate herbicide, applied only by a state certified applicator no sooner than 2 weeks prior to seed installation. Soils surface should be loose and free of any soil clumps exceeding 1 inch in diameter.
I. Seed shall be installed by means of mechanical and/or hand broadcast methods to ensure even distribution of seeds throughout all designated seeded areas. Native seed mix shall be mixed thoroughly by vendor/supplier at their recommended ratios.
SEEDING AND MULCHING 329200 - 3
J. Apply seed evenly in two intersecting directions. Rake in lightly, then lightly mulch with clean, weed free straw. Seeded areas shall be watered immediately following installation to accelerate cover crop germination.
K. An acceptable quality seed installation is defined as having:
1. No bare spots larger than 1 square foot after substantial germination.
2. No more than 10% of the total area with bare spots larger than 1 square foot.
3. A uniform coverage throughout all seeded areas.
L. Do not perform seeding in windy conditions.
M. Surface layer of soil for seeded areas shall be kept moist throughout gemination period. Mulch the areas with a light covering of clean, chopped straw to retain moisture and use a tackifier to prevent wind damage. If installed in spring, lightly water 4-6 weeks after germination at regular intervals (depending on rainfall), or if an extended drought occurs throughout the summer months.
N. Protect seeded areas from pedestrian traffic or vehicular trespassing with temporary fences, signs, barriers, etc. while seed is germinating. Repair damage resulting from trespass, erosion, settlement, etc. Remove temporary protective devices after final acceptance.
O. Maintain seeded areas immediately after placement until vegetation is well established and exhibits a vigorous growing condition.
P. Control the growth of weeds to the extent possible by using various methods such as line trimming, mowing and selective herbicide use. Apply herbicide in accordance with manufacturer’s instructions. Contractor will be responsible for any damage resulting from improper use of herbicides.
Q. Immediately reseed areas that show bare spots.
END OF SECTION 329200
SEEDING AND MULCHING 329200 - 4
APPENDIX A 1
APPENDIX A – EXISTING CONDITIONS PHOTOS
Photo 1 – Noblett Lake existing vault toilet building front view Photo 2 – Noblett Lake existing vault toilet building back view
APPENDIX A 2
Photo 3 – Noblett Lake existing toilet building side view Photo 4 – Noblett Lake existing toilet building side view
APPENDIX A 3
Photo 4 – Noblett Lake existing vault toilet building concrete ramp to be preserved
Photo 5 – Carrington Pits’ existing Gunnison Single CXT vault toilet build-ing front view
APPENDIX A 4
Photo 6 – Carrington Pits’ existing Gunnison Single CXT vault toilet build-ing back view
Photo 7 – Carrington Pits’ existing Gunnison Single CXT vault toilet build-ing side view
APPENDIX A 5
Photo 8 – Carrington Pits’ existing Gunnison Single CXT vault toilet build-ing side view
APPENDIX A 6
| Combined Specs.pdf |
| 000000 - SPECS COVER AND TOC |
| 011000 - SUMMARY |
| PART 1 - GENERAL |
| 1.1 PROJECT INFORMATION |
| A. Project Identification: Carrington Pits’ CXT Relocation to Noblett Lake |
| Project Location: This project is located in Callaway and Howell County, Missouri. |
| 1. Carrington Pits: |
| Lat: 38.822576 |
| Long: -92.042198 |
| 2. Noblett Lake |
| Lat: 36.907498 |
| Long: -92.094717 |
| B. Owner: Government or Owners refers to the USDA Forest Service |
| 1. Owner’s Representative: The Federal Contracting Officer (CO) and his/her designated representative(S), as named in writing. Contractive Officer (CO) refers to the person assigned by the USDA Forest Service to administer the contract. Soon after Con... |
| 1.2 SCOPE OF WORK |
| A. Demolition of Existing Noblett Lake Toilet Building: |
| 1. Contractor to demolish and remove existing toilet building and holding tank located at Noblett Lake and legally dispose of material offsite. The existing toilet building, and vaults shall become property of the contractor and shall be removed from ... |
| 2. Contractor shall pump out any remaining waste in the holding tank prior to disposal and legally dispose of this waste. Upon completion of this pumping, the contractor shall secure the building so that no further use occurs after pumping. It will be... |
| 3. Contractor shall prepare the location of the demolished toilet building at Noblett Lake for the Gunnison Single CXT building that currently exists at Carrington Pits. This includes any necessary excavation and rock removal. |
| 4. The existing site at Noblett Lake has a concrete ramp up to the toilet building. This ramp shall be preserved by the contractor during demolition. Any damage to the ramp shall be the contractor's responsibility to repair/replace. |
| B. Relocation of Gunnison Single CXT from Carrington Pits to Noblett Lake |
| 1. Contractor shall relocate the Gunnison Single CXT building from Carrington Pits to previously prepared site at Noblett Lake. |
| 2. Contractor shall pump and clean holding tank prior to transportation to new location. The pumped waste shall be legally disposed of. Upon completion of this pumping, the contractor shall secure the building so that no further use occurs after pumpi... |
| 3. The Gunnison Single CXT building shall be installed at Noblett Lake according to manufacturer’s recommendations. |
| 4. The Gunnison Single CXT building shall be placed as such that the existing concrete ramp aligns with the front of the building’s entrance. If concrete repairs are necessary: |
| a. Concrete mix shall meet an overall minimum compression strength of 5,000 psi. |
| b. Top of concrete to match existing top of grade. |
| c. Minimum concrete thickness shall be 4”. |
| d. Finish and cure concrete according to FP-14 requirements. |
| 5. After placing the Gunnison Single CXT building at Noblett Lake, the Contractor shall backfill with excavated material or fill material. A minimum settled depth of 4” of topsoil shall be placed over filled and disturbed areas. Grade shall be sloped ... |
| 6. Contractor shall backfill the remaining void after the relocation of the Gunnison Single CXT building at Carrington Pits with 1” minus gravel. A minimum settled depth of 4” of topsoil shall be placed on top of the gravel to blend into existing grad... |
| 1.3 CONTRACTOR’S USE OF SITE AND PREMISES |
| A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: |
| 1. The Contractor is responsible for the security of the Contractor’s equipment and materials. |
| 2. The Contractor will be responsible for signing, limiting access, and safety of government employees in the area. |
| 3. Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner’s employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. |
| B. Staging and storage areas: |
| 1. Areas for staging operations and storage of materials shall be approved by the COR. The Contractor must request in writing for approval from the COR to stage trailer on site. |
| 1.4 WORK RESTRICTIONS |
| A. On-Site Work Hours: Limit work in all project areas to normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, unless otherwise indicated or approved by the COR. |
| 1. No work is permitted without written authorization from the CO on Government Holidays or weekends. |
| B. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Project site is not permitted. Use of any type of marijuana on federal property is illegal. |
| C. Site Cleanup: Before leaving the Site each day the Contractor shall secure equipment, tools, and materials; pickup and dispose of paper and other debris/construction waste. The Site shall be left in a safe and secure manner with the public protecte... |
| D. Before leaving the Site on Fridays a more complete policing, pickup and securing of the Site shall be performed. The Site shall be left in a neat and orderly manner as determined by the COR with government employees protected from construction rela... |
| 1.5 INSPECTION OF THE WORKSITE |
| A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of the work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure... |
| 1.6 SAFETY |
| A. Contractor shall comply with all State and Federal safety regulations during the performance of the work. |
| 1.7 FIELD VERIFICATION |
| A. Contractor shall field verify all new and existing dimensions affecting the work of this contract before ordering products. |
| 1.8 DISPOSAL OF MATERIAL |
| A. Contractor shall remove and legally dispose of all debris and waste offsite. |
| 1.9 CONTRACT TIME |
| A. 30 Calendar Days |
| 1.10 NOTICE TO PROCEED |
| A. Performance of the contract shall begin within ten (10) calendar days after receipt of the Notice to Proceed. The Notice to Proceed will be issued by the Contracting Officer (CO) at the pre-work conference. |
| 012800 - MOBILIZATION |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment premiums for bonds and insurance f... |
| 1.2 MEASUREMENT AND PAYMENT |
| A. Method of Measurement will be by Lump Sum Quantity (LSQ). |
| B. The maximum Mobilization bid price shall not exceed fifteen percent (15%) of the total base bid contract price or optional bid contract price (not including Mobilization). |
| C. Progress Payments for Mobilization will be in accordance with the following schedule: |
| 1. The cost of premiums paid for performance and payment bonds are considered incidental to Mobilization and will not be paid for separately. Payment for bond premiums will be in accordance with FAR Clause 52.232-5, Payments under Fixed-Price Construc... |
| PART 2 - PRODUCTS (NOT USED) |
| PART 3 - EXECUTION (NOT USED) |
| 013250 - CONSTRUCTION PROGRESS SCHEDULE |
| PART 1 - GENERAL |
| 1.1 SECTION INCLUDES |
| A. Preliminary Schedule |
| 1.2 SUBMITTALS |
| a. Submit a comprehensive, fully developed schedule within 5 days of Notice to Proceed date. |
| PART 2 - PRODUCTS (NOT USED) |
| PART 3 - EXECUTION |
| 3.1 CONTENT |
| A. Preparation: Indicate each significant construction activity and the location on the site separately. Identify first workday of each week. |
| B. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction. |
| C. Identify each item by specification section number. |
| D. Show accumulated percentage of completion of each item, and total percentage of Work completed, as of the first day of each week. |
| E. Contractor to revise schedule is Work is more than one week behind schedule. |
| 017700 - CLOSEOUT PROCEDURES |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes administrative and procedural requirements for Phased Project completion and Final Contract closeout, including, but not limited to, the following: The Government reserves the right to conduct independent tests. |
| 1. Systems Commissioning including Demonstration and Training. |
| 2. Record Documents including Record Drawings and Product Data. |
| 3. Substantial and Final completion procedures. |
| 4. Final cleaning. |
| 5. Securing the system to reduce vandalism and destruction. |
| 1.2 DEFINITIONS |
| A. Substantial Completion - The point at which the project, or a major phase of the project, is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments. |
| B. Final Completion – The point at which the project is 100% complete, accepted by the Government and ready for final payment. |
| 1.3 RECORD DOCUMENT SUBMITTALS |
| A. Record Product Data: Maintain one copy of each Product Data submittal. Note related Change Orders and markup of Record Drawings and Specifications. |
| 1. Mark these documents to show significant variations in actual Work performed in comparison with information submitted. Include variations in products delivered to the site and from the manufacturer’s installation instructions and recommendations. |
| 2. Give particular attention to concealed products and portions of the Work that cannot otherwise be readily determined later by direct observation. |
| 1.4 FINAL ACCEPTANCE PROCEDURES |
| A. Submittals Prior to Final Completion Inspection and Final Acceptance: Submit the following a minimum of 10 days before scheduling a final inspection for determining Final Completion and Acceptance: |
| 1. Submit a final Schedule of Items (SOI) form to reflect the final payment values in accordance with Section 012700 "Measurement and Payment." |
| 2. Submit all remaining Certified Payrolls for the project not previously submitted. |
| 3. Submit completed, signed Contract Release form. |
| 4. Submit a signed copy of the Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Government CO/COR. Certified copy of the list shall state that each item has been completed or otherwise re... |
| 5. Submit all remaining specific warranties, workmanship bonds, maintenance agreements, final certifications and similar documents not previously submitted. |
| 6. Submit all remaining record documents and similar final record information not previously submitted. |
| 7. Deliver tools, spare parts, extra stock and similar items not previously delivered. |
| 8. Complete final clean-up requirements including touch-up painting of marred surfaces, adjustments, lubrication, etc. |
| B. Final Inspection Procedure: The Government will inspect the Work upon receipt of notice from the Contractor that the Work, including punch list items from earlier inspections, has been completed. |
| 1. Upon completion of inspection, the CO will notify the Contractor of Final Acceptance and Final Payment or will advise the Contractor of Work that it is incomplete or of obligations that have not been fulfilled and are required for Final Acceptance. |
| PART 2 - PRODUCTS (NOT USED) |
| PART 3 - EXECUTION |
| 3.1 FINAL CLEANING |
| A. Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. Do not burn waste materials. Do not bury debris or excess materials on... |
| 1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project: |
| a. Clean Project site of rubbish, waste material, litter, and other foreign substances. |
| b. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original cond... |
| c. Remove labels that are not permanent. |
| d. Leave Project clean and ready for occupancy. |
| e. Secure the system to reduce vandalism and destruction. |
B. Construction Waste Disposal: Comply with waste-disposal requirements in all applicable specification sections and contract clauses. Remove waste materials from the site and dispose of it lawfully.
| 329200 - SEEDING AND MULCHING |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. This section includes site rehabilitation work, including seeding and mulching. |
| 1.2 SUBMITTALS |
| A. Product Data: For each type of product indicated |
| B. Product certificates. |
| 1.3 QUALITY ASSURANCE |
| A. Installer’s Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when planting is in progress. |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| A. Seed: Deliver, store and handle materials according to manufacturer’s recommendations. Materials must be kept dry until ready to use. |
| PART 2 - PRODUCTS |
| 2.1 SEED |
| A. Grass Seed: Fresh, clean, dry, new-crop seed complying with ASOA’s “Journal of Seed Technology; Rules for Testing Seeds” for purity and germination tolerances. |
| B. Grass Seed Mix: Native Seed Mix |
| Native Grass mix will consist of a blend of the following species: Virginia Wild Rye (Elymus virginiana) at 3 lbs/acre, Indian Grass (Sorghastrum nutans) at 3 lbs/acre, and Little Blue Stem (Schizachyrium scoparium) at 2 lbs/acre. This seed mix will b... |
| 2.2 PLANTING MATERIALS |
| A. Topsoil Source: Reuse surface soil on-site and amended topsoil from commercial sources. Provide topsoil which is fertile, friable, natural loam, surface soil which is reasonably free of subsoil, high clay content, brush, weeds, litter, stumps, rock... |
| NOTE: The C.O.R. shall approve the Contractor’s provided soil sample prior to installation and planting |
| B. Mulches: |
| 1. Straw Mulch: Provide air dry, clean, mildew- and seed-free, and certified weed-free threshed straw of wheat, rye, oats, or barley. |
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| A. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus ½ inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit fi... |
| B. Restore areas if eroded or otherwise disturbed after finish grading and before planting. |
| 3.2 SEEDING |
| A. Scarify existing subsoil and compacted areas prior to spreading topsoil. Prepare subsoil to eliminate uneven areas. Maintain profiles and contours. Make changes in grade gradual. Blend slopes into level areas. |
| B. Spread organic topsoil at a minimum depth of 4 inches over area to be planted and integrate with the top layer of subsoil to prevent hardpan separation. Rake the surface smooth. |
| C. Place topsoil during dry weather and on dry, unfrozen subgrade. |
| D. Remove foreign, non-organic material from topsoil while spreading. |
| E. Grade topsoil to eliminate rough, low or soft areas and to ensure positive drainage. |
| F. All seeded areas to receive a settled minimum depth of 4” of topsoil. |
| G. Remove foreign materials, weeds and undesirable pants and their roots. Remove any contaminated subsoil if present. |
| H. Prepare seeding areas by removing and/or killing off any unwanted existing vegetation with a glyphosate herbicide, applied only by a state certified applicator no sooner than 2 weeks prior to seed installation. Soils surface should be loose and fre... |
| I. Seed shall be installed by means of mechanical and/or hand broadcast methods to ensure even distribution of seeds throughout all designated seeded areas. Native seed mix shall be mixed thoroughly by vendor/supplier at their recommended ratios. |
| J. Apply seed evenly in two intersecting directions. Rake in lightly, then lightly mulch with clean, weed free straw. Seeded areas shall be watered immediately following installation to accelerate cover crop germination. |
| K. An acceptable quality seed installation is defined as having: |
| 1. No bare spots larger than 1 square foot after substantial germination. |
| 2. No more than 10% of the total area with bare spots larger than 1 square foot. |
| 3. A uniform coverage throughout all seeded areas. |
| L. Do not perform seeding in windy conditions. |
| M. Surface layer of soil for seeded areas shall be kept moist throughout gemination period. Mulch the areas with a light covering of clean, chopped straw to retain moisture and use a tackifier to prevent wind damage. If installed in spring, lightly wa... |
| N. Protect seeded areas from pedestrian traffic or vehicular trespassing with temporary fences, signs, barriers, etc. while seed is germinating. Repair damage resulting from trespass, erosion, settlement, etc. Remove temporary protective devices after... |
| O. Maintain seeded areas immediately after placement until vegetation is well established and exhibits a vigorous growing condition. |
| P. Control the growth of weeds to the extent possible by using various methods such as line trimming, mowing and selective herbicide use. Apply herbicide in accordance with manufacturer’s instructions. Contractor will be responsible for any damage res... |
| Q. Immediately reseed areas that show bare spots. |
END OF SECTION 329200