ATTACHMENT B - Bi Ann Med Volt Testing.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BASE + 4 OYS Federal contract opportunity
- Solicitation number
- 36C25222Q0586
About this file
This document contains an attachment and statement of work for a federal contract to provide electrical distribution system testing and maintenance services. The contractor shall test, inspect, maintain, and calibrate the electrical power distribution system and its components located at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. Services include infrared and ultrasound testing, cleaning, testing, greasing, and calibrating medium voltage switchgear and breakers. The contractor must also perform primary injection tests, time-line schedules for preventative maintenance, and electrical testing over a one year base period plus four option years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT F - ELECTRICAL ONE LINES _12-28-2018_.pdf | ||
| ATTACHMENT A - Annual Infrared Testing UPDATED 4_2022.xlsx | XLSX spreadsheet | |
| ATTACHMENT H - Utility Shutdown Request Form.docx | DOCX document | |
| ATTACHMENT D - Basic Site Plan_02Apr13.pdf | ||
| 36C25222Q0586.docx | DOCX document | |
| ATTACHMENT I - VA DIRECTIVE 1028 dated 24 Feb 2020.docx | DOCX document | |
| ATTACHMENT G - MEDICAL CENTER ENGINEERING SHUTDOWN SOP.docx | DOCX document | |
| ATTACHMENT E - Existing IR ports_ Micro IR port 1.jpg | JPG image | |
| ATTACHMENT C - Panel list.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACT YEAR REQUIRED: See statement of Work for details |
| TESTING TYPE DESCRIPTION: 1) Infrared/ultrasound 2) Clean, test, grease, and calibrate as stated in statement of work |
BLDG CATEGORY OC Device EE # DESCRIPTION Mod # Ser # Test Complete
| BLDG 2 | Switchgear | Electronic | 15671 | Generator #1 Emer.Bus Breaker | VR | 17-63360 |
| BLDG 2 | Switchgear | Electronic | 15663 | Generator #2 Emer.Bus Breaker | VR | 17-63366 |
| BLDG 2 | Switchgear | Electronic | 16352 | Generator #3 Emer.Bus Breaker | VR | 17-66997 |
| BLDG 2 | Switchgear | Electronic | 15664 | 52-F1 Spare Breaker | VR | 17-63364 |
| BLDG 2 | Switchgear | Electronic | 15665 | 52-F2 Spare Breaker | VR | 17-63368 |
| BLDG 2 | Switchgear | Electronic | 15666 | Bldg 11-B Feed #1 Breaker | VR | 17-63367 |
| BLDG 2 | Switchgear | Electronic | 15667 | Boiler House-A Feed Breaker | VR | 17-63365 |
| BLDG 2 | Switchgear | Electronic | 15668 | Bldg 11-F Feed #2 Breaker | VR | 17-63363 |
| BLDG 2 | Switchgear | Electronic | 15669 | Boiler House - E Feed #2 Breaker | VR | 17-63361 |
| BLDG 2 | Switchgear | Electronic | 15670 | Bldg 3-G Feed Breaker | VR | 17-63362 |
| BLDG 2 | Switchgear | Electronic | 15661 | 52-F8 Spare Breaker | VR | 17-63369 |
| BLDG 11 | Switchgear | Electronic | 15674 | Emerg.Dist. Switchgear- Incomin Feed Main #1 | VR | 17-64382 |
| BLDG 11 | Switchgear | Electronic | 15675 | Emerg.Dist. Switchgear- S.Emerg.Sub Feed | VR | 17-64385 |
| BLDG 11 | Switchgear | Electronic | 15676 | Emerg.Dist. Switchgear- CLC Emerg.Sub Feed #1 | VR | 17-64392 |
| BLDG 11 | Switchgear | Electronic | 15677 | Emerg.Dist. Switchgear- X-RAY/FP Emergsub feed #2 | VR | 17-64389 |
| BLDG 11 | Switchgear | Electronic | 15678 | Emerg.Dist. Switchgear- X-Ray/FP Emerg.Sub. Feed #1 | VR | 17-64381 |
| BLDG 11 | Switchgear | Electronic | 15679 | Emerg.Dist. Switchgear- Spare | VR | 17-64384 |
| BLDG 11 | Switchgear | Electronic | 15680 | Emerg.Dist. Switchgear- N.Emerg.Sub. Feed | VR | 17-64390 |
| BLDG 11 | Switchgear | Electronic | 15681 | Emerg.Dist. Switchgear- CLC Emerg.Sub. Feed #2 | VR | 17-64391 |
| BLDG 11 | Switchgear | Electronic | 15682 | Emerg.Dist. Switchgear- Chill 5-8.Emerg.Sub.Feed | VR | 17-64387 |
| BLDG 11 | Switchgear | Electronic | 15683 | Emerg.Dist. Switchgear- Chiller 1-4 Emerg Sub feed | VR | 17-64383 |
| BLDG 11 | Switchgear | Electronic | 15684 | Emerg.Dist. Switchgear- Spare | VR | 17-64393 |
| BLDG 11 | Switchgear | Electronic | 15685 | Emerg.Dist. Switchgear- Incoming Feed Main #2 | VR | 17-64388 |
| BLDG 11 | Switchgear | Electronic | 16391 | Emerg.Dist. Switchgear- Auto Tie Breaker | VR | 17-64386 |
&"-,Bold"&14MEDIUM VOLTAGE SWITCH GEAR TESTING&12 Infrared and Ultrasound Testing Electrical Testing and Maintenance&"-,Regular"&11 &"-,Bold"&14SCHEDULE B
Sheet2
| Date of Test : | |||||||
| Company : | |||||||
| Technician: | |||||||
| BLDG | CATEGORY | OC Device | EE # | DESCRIPTION | Mod # | Ser # | Test Complete |
| BLDG 2 | Switchgear | Electronic | 15661 | Generator #1 Emer.Bus Breaker | VR | 17-63369 |
| BLDG 2 | Switchgear | Electronic | 15663 | Generator #2 Emer.Bus Breaker | VR | 17-63366 |
| BLDG 2 | Switchgear | Electronic | 16352 | Generator #3 Emer.Bus Breaker | VR | 17-66997 |
| BLDG 2 | Switchgear | Electronic | 15664 | 52-F1 Spare Breaker | VR | 17-63364 |
| BLDG 2 | Switchgear | Electronic | 15665 | 52-F2 Spare Breaker | VR | 17-63368 |
| BLDG 2 | Switchgear | Electronic | 15666 | Bldg 11-B Feed #1 Breaker | VR | 17-63367 |
| BLDG 2 | Switchgear | Electronic | 15667 | Boiler House-A Feed Breaker | VR | 17-63365 |
| BLDG 2 | Switchgear | Electronic | 15668 | Bldg 11-F Feed #2 Breaker | VR | 17-63663 |
| BLDG 2 | Switchgear | Electronic | 15669 | Boiler House - E Feed #2 Breaker | VR | 17-63361 |
| BLDG 2 | Switchgear | Electronic | 15670 | Bldg 3-G Feed Breaker | VR | 17-63362 |
| BLDG 2 | Switchgear | Electronic | 15671 | 52-F8 Spare Breaker | VR | 17-63360 |
| BLDG 11 | Switchgear | Electronic | 15674 | Emerg.Dist. Switchgear- Incomin Feed Main #1 | VR | 17-64382 |
| BLDG 11 | Switchgear | Electronic | 15675 | Emerg.Dist. Switchgear- S.Emerg.Sub Feed | VR | 17-64385 |
| BLDG 11 | Switchgear | Electronic | 15676 | Emerg.Dist. Switchgear- CLC Emerg.Sub Feed #1 | VR | 17-64392 |
| BLDG 11 | Switchgear | Electronic | 15677 | Emerg.Dist. Switchgear- Chiller 1-4.Emerg.Sub Feed | VR | 17-64389 |
| BLDG 11 | Switchgear | Electronic | 15678 | Emerg.Dist. Switchgear- X-Ray/FP Emerg.Sub. Feed #1 | VR | 17-64381 |
| BLDG 11 | Switchgear | Electronic | 15679 | Emerg.Dist. Switchgear- Spare | VR | 17-64384 |
| BLDG 11 | Switchgear | Electronic | 15680 | Emerg.Dist. Switchgear- N.Emerg.Sub. Feed | VR | 17-64390 |
| BLDG 11 | Switchgear | Electronic | 15681 | Emerg.Dist. Switchgear- CLC Emerg.Sub. Feed #2 | VR | 17-64391 |
| BLDG 11 | Switchgear | Electronic | 15682 | Emerg.Dist. Switchgear- Chill 5-8.Emerg.Sub.Feed | VR | 17-64387 |
| BLDG 11 | Switchgear | Electronic | 15683 | Emerg.Dist. Switchgear- X-Ray/FP.Emerg.Sub. Feed #2 | VR | 17-64383 |
| BLDG 11 | Switchgear | Electronic | 15684 | Emerg.Dist. Switchgear- Spare | VR | 17-64393 |
| BLDG 11 | Switchgear | Electronic | 15685 | Emerg.Dist. Switchgear- Incoming Feed Main #2 | VR | 17-64388 |
| BLDG 11 | Switchgear | Electronic | 16391 | Emerg.Dist. Switchgear- Auto Tie Breaker | VR | 17-64386 |
&"-,Bold"&12Electrical Medium Voltage Switchgear Testing
&14Schedule B&12
Sheet3
| Panel | Breakers | Areas of Concern |
| South Service | ||
| Elevators | East Elevator and Freight (Service) Elevator | |
| C3,C4,C5,C6 | Audiology, East,West, Service Elevator lights, Phone pager system, lights/receptacles 3,4,5,6 center | |
| SBP-C | DP-PH1 panel: AHU-11(3,4,5 floors) west penthouse power | |
| ATS-CR | Pharmacy, script pro, outpat recept, volunteer, SURGERY, 4E & ICU, | |
| ATS-CR2 | ALL LAB PWER/LIGHTS, PACS RM, NUCLEAR MED , 4E & ICU UPS Recept. CR-7 ??? | |
| ATS-CR3 | Pharmacy, surgery, 2nd flr Outpat, | |
| ATS-EQ | Kitchen Clrs/frzers, PACS A/C, Sumps, Med air/vacuum, West Elev, Exh. Fans, Chemo/Laminar Hoods,Out pat auto doors, dental air KRAC UNITS | |
| ATS-LS | IRM, Smoke dampers Egress lighting, fire alarm panels, pre-action sytms, Morg frzzr, | |
| 5,6 East | 5th & 6th east recept & Lights | |
| CB,C1,C2 | Front sign OGJ, Holman room, police office Recept, front auto doors, front lobby lights, surg cooridor lights, | |
| 3,4 East | 4 East/ICU recept , 3rd & 4th lights power | |
| North Service | ||
| SBP | AHU-4, 7, 8, 12, 20Pneum,atic tube blower, RF-7, - surgery fan coils, Load dock lift, compactor, Street lighting front, XRAY AHU | |
| SBA | Canteen, surgery GU XR Panel, Kitchen - power, offices, | |
| B,1 Outpat (M) | Hyd. Elevators, SPD, Outpatient 1st flr, | |
| WBA,W1N,W1S,W2 | Kitchen office lights, Dishwash, CLC East Lights / Recept (Dining room), AHU-5, Dental Air handler, dental lab, | |
| 3,4 West | Menatl Health lights/recept, Opthamology lights recept, | |
| 5,6 West | Physical therapy, chirpopractor, 6th West power lights, | |
| TB | Engineering | |
| KP | Kitchen Main Power, some office?, | |
| E1S,E1SA (L1c or D) | OLD ED AREA power lights, OLD Pharmacy Waiting Area, NEW OUTPAT L1C and L1D Panels | |
| LPL | Laundry / Logistics | |
| EB,EB-A,E1C,E1D | PACS A/C #2, East bsmt recpt/light, Pharmacy, zebra printers, refrig | |
| ATS-EQ2 | 6th east Penthouse AHU-10, IRM lIebert units, Toilet exh, CELLCOM, ISOLATION RMS EXH, AHU-1 & 3 | |
| E2CU, E2CA, E2C | X-Ray lights/power, surgery - cysto, endo lights, nuc exh, Nuc med light/recpt, surgery cooridor lighting | |
| M1-2A | 2nd story outpat, penthouse?, | |
| Outpat. Penthouse |
| CLC | ||
| CLC-ATS-CR2 | ||
| CLC-ATS-LS2 | ||
| CLC-ATS-EQ2 | ||
| NH-ME1 | ||
| LNB-1 | ||
| LNB-2 | ||
| DPEQ1 | Surgery Chiller | |
| X Chill | ||
| Bldg 3 |
Sheet4 Bldg 2 Generator Distribution
South Service North emergency Substation Bldg 11 Emergency Distribution South Emergency Substation North Service
ATS-CR ATS-EQ2
ATS-LS SBP
| SBA | |
| ATS-EQ | |
| B,1 Outpat |
ATS-CR2 WBA,W1N,W1S,W2
ATS-CR3 3/4 East
| 5/6 West | |
| Elevators east/Frt | |
| TB |
C3,C4,C5,C6 KP
| E1S,E1SA, L1C, L1D | |
| SBP-C |
| LPL | |
| 5/6 East | |
| EB,EBA,E1C,E1D |
| CB,C1,C2 | |
| E2C,E2CA |
3/4 East M1-2A
Outpat Pent
Sheet5
Bldg 2 Generator Distribution
Bldg 11 Emergency Distribution CLC NH DWSB Service
CLC Emergency Substation CLC- ATS-1600
CLC-ATS-CR2 NH-ME1
LNB-1
CLC-ATS-LS2
LNB-2
| CLC-ATS-EQ2 | |
| DPEQ1 |
Sheet6
Bldg 2 Generator Distribution
Bldg 11 Emergency Distribution
Fire /X-Ray Emergency Substation X-Ray / Fire 480 Volt Utility Service
X-Ray Distribution Panel
Fire Pump ATS
X-Ray ATS
Sheet7
Bldg 2 Generator Distribution
Bldg 2 Emergency Substation
Bldg 2 Utility Distribution
ATS-1
ATS-2
ATS-3
Sheet8
| Location | Device | Description | Time of Day | Max Down time | |
| Notes | |||||
| Day One: | |||||
| Bldg # 1 | Main Breakers | CLC Utility SVCE | 3:00 am - 6:00 am | ||
| Bldg # 2 | Med. Volt Breaker | Generator # 1 | After 9:00 am | ||
| Bldg # 2 | Med. Volt Breaker | Generator # 2 | After 9:00 am | ||
| Bldg # 2 | Med. Volt Breaker | Generator # 3 | After 9:00 am | ||
| Bldg # 2 | Med. Volt Breaker | Bldg # 2 feed #1 | After 9:00 am | ||
| Bldg # 2 | Med. Volt Breaker | Bldg # 2 Feed #2 | After 9:00 am | ||
| Bldg # 11 | Med. Volt Breaker | Fire Pump / Xray Feed # 1 | At Will | ||
| Bldg # 11 | Med. Volt Breaker | Fire Pump / Xray Feed # 2 | At will | ||
| Bldg # 11 | Emergency Substation | X-RAY/FP EM-SUB | At will | ||
| Bldg # 11 | Emergency Substation | Chiller 1-4 | At will | ||
| Bldg # 11 | Emergency Substation | Chiller 5-7 | At will | ||
| Bldg # 2 | Emergency Substation | Boiler House (Bldg #2) | After 9:00 am | ||
| Day Two: | Bldg # 1 | Main disconnect 3000A | North Service | 3:00 am-6:00 am | |
| Bldg #11 | Med. Volt Breaker | South EM. Sub | 3:00 am-6:00 am | ||
| Bldg # 1 | Main Breaker 3000A | Master Pact N. utility Main | 3:00 am- 6:00am | ||
| Bldg # 1 | Main Breaker 3000A | Master Pact N. Em. Main | 3:00 am - 6:00 am | ||
| Bldg # 1 | Dist Breakers | N. Service Panel Board | 3:00 am - 6:00 am | ||
| Bldg # 2 | Main Breaker 2000A | Master Pact BH Utility Main | After 9:00 am | ||
| Bldg # 2 | Main Breaker 2000A | Master Pact BH EM. Main | After 9:00 am | ||
| Day Three: | Bldg # 1 | Main Disconnect 3000A | South Service | 3:00 am - 6:00am | |
| Bldg #11 | Med. Volt Breaker | North EM. Sub Feed | 3:00 am - 6:00am | ||
| Bldg # 1 | Main Breaker 3000A | Master Pact S. utility Main | 3:00 am- 6:00am | ||
| Bldg # 1 | Main Breaker 3000A | Master Pact S. Em. Main | 3:00 am - 6:00 am | ||
| Bldg # 1 | Dist Breakers | S. Service Panel Board | 3:00 am - 6:00 am | ||
| BLdg # 3 | Emergency Transform | Blldg # 3 Em Power | At will | ||
| Bldg # 3 | Main Breaker 400A | Utility Main Breaker | 5:00 pm - 8:00 pm | ||
| Bldg # 3 | Main Breaker 400A | Emergency Main Breaker | 5:00 pm - 8:00 pm | ||
| Day Four: | Bldg # 1 | Emergency Substation | North EM Sub | 3:00 am - 6:00 am | |
| Bldg #11 | Main Breakers | Chiller 5-7 | 3:00 am - 6:00 am | ||
| Bldg #11 | Main Breakers | Chiller 1-4 | 3:00am - 6:00 am | ||
| Bldg # 1 | Emergency Substation | South EM Sub | 7:00 am - 11:00 am | ||
| Bldg # 1 | Emergency Substation | CLC - Em. Sub | At will | ||
| Bldg # 1 | Med. Volt Breaker | CLC-EM SUB FEED #1 | At will | ||
| Bldg # 1 | Med. Volt Breaker | CLC-EM SUB FEED #2 | At will | ||
| Bldg # 2 | Med. Volt Breaker | Bldg #3 feed | At will | ||
| Bldg # 2 | Med. Volt Breaker | Bldg #11 feed # 1 | At will | FEED #2 Ready | |
| Bldg #11 | Med. Volt Breaker | Main # 1 | At will | TIE CLOSED | |
| Bldg #2 | Med. Volt Breaker | Bldg #11 feed # 2 | At will | FEED #1 Ready | |
| Bldg #11 | Med. Volt Breaker | Main # 2 | At will | TIE CLOSED | |
| ???????? | Location | Device | Description | Time of Day | Max Down Time |
| BLDG 11 | EM Tie Breaker | ???CAN BOTH SERVICE BE | OFF AT SAME TIME | ||
| BLDG 11 | CHILLER Tie Breaker | ???CAN BOTH SERVICE BE | OFF AT SAME TIME | ||
| Bldg # 1 | N & S Tie Breaker | ???CAN BOTH SERVICE BE | OFF AT SAME TIME | ||
| Fill In | |||||
| Bldg # 1 | Primary Injection Test | ||||
| AHU 10 | 300 amp | ||||
| AHU 10 | 300 amp | ||||
| Liebert IRM | 300amp | Cannot be done | |||
| AHU 11 | 300 amp | ||||
| AHU 11 | 300 amp | ||||
| Hyd Elevator # 1 | 300 amp | ||||
| Hyd Elevator # 2 | 300 amp | ||||
| Old RTU 4 Breaker | 350 amp | ||||
| SBP-C: DP-PH1 | 600 amp | ||||
| EQ 5: DP-PH2 | 600 amp | Cannot be done | |||
| SBP: MPA/MPB | 300 amp | OFF TOUR | |||
| SBP: SBP-A | 300 amp | ||||
| H Chill Beakers | 4 Breaker - 300 amp ea | ||||
| X-Ray SUB Dist | 400 amp | OFF TOUR | |||
| CLC DPEQ | 400 amp (Surgery Chiller) | OFF TOUR | |||
| CLC EQ ATS | 600 amp | ||||
| CLC NH-ME1 | 400 amp | ||||
| LS-UPS Main | 400 Amp | Cannot be done |
Facility Electrical Testing /PM Time-line Schedule