Attachment B Architectural Drawings RFP 26031.pdf
PDF 5 MB Posted
- Attached to
- Morton Theatre Stage Access Renovation
- Solicitation number
- PE-62960-NONST-2026-000000113
- Issued by
- Atkinson County, Georgia
About this file
This document is a set of architectural drawings and specifications for the Morton Theatre Stage Access Renovation project, prepared by Architectural Collaborative for the City of Athens-Clarke County, Georgia. The project consists of replacing existing stage stairs with new code-compliant stairs that will land within existing boxes on either side of the stage while maintaining approximately 32 inches of clear width. The scope includes construction of new stairs with oak treads and risers, new handrails and guardrails compliant with 2024 International Building Code standards, removal and replacement of a corner post to improve bearing conditions and load path, installation of new flooring to match existing finishes, modifications to existing knee walls and the footlight trough, and repainting of new steel components to match existing finishes. The project must comply with the 2024 IBC, IRC, IFC, and other applicable Georgia amendments, as well as NFPA 101 Life Safety Code and ADA Standards. No changes to the existing means of egress from the stage or auditorium are included, and the project improves stage access without reducing accessibility. The architectural team includes Architectural Collaborative in Athens, Georgia, with structural engineering by Sheats Structural Consulting in Winder, Georgia.
The specifications require AISC-certified fabricators for metal railings, with materials including ASTM A36 steel sections, A501 hot-formed structural tubing, and A53 Grade B Schedule 40 pipe. All welds must be continuously welded and ground smooth, and all components must be shop-primed. Paint colors are to be commercial quality (Benjamin Moore, Sherwin Williams, or PPG equivalent) with zero-VOC formulations, matching existing brown wainscot paneling for railings and existing floor stain colors for new oak elements. Wood stain shall be Bona Chroma Waterborne or equivalent. All metal railing fabricators must provide two-year warranties covering materials and workmanship from the date of substantial completion, and paint manufacturers must provide five-year material defect warranties. Shop drawings for railing components, paint and stain samples on rigid backing, and a minimum four-square-foot mock-up of all finishes are required submissions. Contractors must allow 15 days for initial review and 15 days for resubmittals of all submittals and shop drawings prior to fabrication or installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price Proposal Schedule RFP 26031 Morton Thea.xlsx | XLSX spreadsheet | |
| RFP _26031 Morton Theatre Stage Access Renova.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS AND SYMBOLS ARE USED ON DRAWINGS CONTAINED IN THE SET.
SYMBOLS AND ABBREVIATIONS ON THIS SHEET APPLY ONLY TO ARCHITECTURAL DRAWINGS
ACOUSTIC
ADHESIVE
ADDENDUM
AREA DRAIN
ACRYLIC
ACST
A/C
ADD
ADH
AD
ACR
ADJUSTABLE
ALTERNATE
ALUMINUM
ANODIZED
ASPHALT
ADJST
AFF
AHU
ALUM
ALT
ANOD
ARCH
ASPH
APPROX
ADJ ADJACENT
AIR CONDITIONING
AIR HANDLING UNIT
ABOVE FINISHED FLOOR
ARCHITECT(URAL)
APPROXIMATE (LY)
FLOOR DRAIN
FINISH(ED)
FIRE EXTINGUISHER
FEC
FD
FBO
FIN
FEX
FUTURE
FOOTING
FOUNDATION
FIRE RESISTIVE
FACE OF STUD
FOOT, FEET
GAUGE, GAGE
GALVANIZED
GYPSUM BOARD
GRAB BAR
FND
FOS
FR
FTG
FUT
FT
GA
GB
GALV
GBAR
FLR(G) FLOOR (ING)
FURNISHED BY OWNER
FIRE EXTINGUISHER CABINET
AUTOMATIC
BETWEEN
BOARD
BEAM
BLOCK (ING)
BUILDING
BOTTOM
BY OTHERS
AUTO
BTWN
BD
BLK(G)
BLDG
BOT
BO
BM
BRICK
BEARING
BASEMENT
BOTH SIDES
CABINET
CORNER GUARD
BS
BRK
BRG
BUR
BSMT
CFM
CAB
CG
BR BACKER ROD
CUBIC FEET/MINUTE
BUILT UP ROOFING
CEILING
CLOSET
CENTERLINE
CONTROL JOINT
CENTER
COLUMN
CLEANOUT
CLEAR (ANCE)
CJ
CIPC
CLG
CLO
CL
CMU
CTR
COL
COMP
CO
CLR
CONCRETE
CORRIDOR
COORDINATE
CORRUGATED
CONTRACT (OR)
CERAMIC TILE
CARPET (ED)
COLD WATER
CONC
CONT
CONTR
CORR
CT
CPT
CW
COORD
CORRUG
CSNK
CONST CONSTRUCTION
CONCRETE MASONRY UNIT
CAST-IN-PLACE CONCRETE
COMPRESS(ED, ION, IBLE, OR)
CONTINUOUS OR CONTINUE
COUNTERSINK/COUNTERSUNK
GRILLE
GLASS, GLAZING
GR
GL
GC GENERAL CONTRACT (OR)
DOUBLE
DISPOSAL
DIMENSION
DIAMETER
DEEP
DAMPPROOFING
DOWN
DF
DEMO
DBL
DIAM
DISP
DIM
DP
DPF
DN
DOWNSPOUT
DRAWING
DETAIL
EACH
DS
DWG
DTL
EA
EJ
DOORDR
DRINKING FOUNTAIN
DEMOLISH, DEMOLITION
EXPANSION JOINT
ELEVATION
ELECTRIC (AL)
ENTRANCE
ENCLOSE (URE)
EQUIPMENT
EQUAL
EXHAUST
ELEV
ELEC
ENT
ENC
EQ
EQP
EWC
EXH
EXPOSED
EXISTING
EXTERIOR
EXPANSIONEXPN
EXP
EXG
EXT
ELECTRIC WATER COOLER
CONTENT INDEX
DISCIPLINE INDEX
SHEET NUMBERING
MATERIAL PATTERNS
TEXT SYMBOLS
GRAPHIC SYMBOLS
9'-0"
C
A
E
L
M
G
P
S
A-401
X
:OR/
X'
X"
ROOM IDENTIFICATION:
DETAIL IDENTIFICATION: DASHED
LINE INDICATES EXTENT OF
ENLARGED PLAN OR DETAIL
CEILING HEIGHT ABOVE FLOOR
TOILET ACCESSORY INDICATOR:
TA= TOILET ACCESSORY
NUMBER= ITEM NUMBER
WORK NOTE INDICATOR
WINDOW OR LOUVER TYPE INDICATOR:
WINDOWS HAVE A NUMBER DESIGNATION
LOUVERS HAVE A LETTER DESIGNATION
WALL TYPE INDICATOR: REFER
TO THE WALL TYPES SHEET FOR
WALL TYPE ASSEMBLY.
NORTH INDICATOR
INTERIOR ELEVATION SYMBOL: THE
DARKENED CORNERS INDICATE DRAWN
WALLS. ELEVATION DRAWINGS ARE
ARRANGED NUMERICALLY BY ROOM
NUMBER ON THE INTERIOR ELEVATION
SHEETS.
STRUCTURAL GRIDLINE IDENTIFIER
EXTERIOR ELEVATION SYMBOL:
UPPER=THE ELEVATION NUMBER
LOWER=THE SHEET WHERE DRAWN
MATCHLINE FLAG
ELECTRICAL DRAWINGS
ARCHITECTURAL DRAWINGS
CIVIL OR SURVEY DRAWINGS
LANDSCAPE DRAWINGS
MECHANICAL DRAWINGS
GENERAL INFORMATION
PLUMBING DRAWINGS
STRUCTURAL DRAWINGS
BUILDING SECTIONS
EXTERIOR ELEVATIONS
ROOF DRAWINGS
SCHEDULES
SUPPLEMENTAL DRAWINGS
SUPPLEMENTAL DWGS
DISCIPLINE ABBREVIATION
DETAILS
SHEET NUMBER
BATT INSULATION
BRICK
CONCRETE BLOCK
CAST-IN-PLACE CONCRETE
EARTH OR BACKFILL
PLANS INCLUDING SITE, FLOOR, CEILING AND
GENERAL INFORMATION AND STANDARDS
ENLARGED PLANS, SECTIONS AND ELEVATIONS
DRAWING CONTENT CATEGORY
STEEL
PLYWOOD
PRECAST CONCRETE
AND
AT
BY
RIGID INSULATION
PER
(X) FEET
POUND OR NUMBER
(X) INCHES
PLASTER & GYPSUM BOARD
NUMBER= ITEM NUMBER
EQUIPMENT TYPE INDICATOR:
LETTER= GROUP FUNCTION
A
A-410
WA.1
TA-2
WALL SECTION SYMBOL:
UPPER=THE SECTION NUMBER
LOWER=THE SHEET WHERE DRAWN
CABINET TYPE SYMBOL:
UPPER=CABINET STYLE
LOWER=CABINET SIZE IN INCHES
BUILDING SECTION SYMBOL:
UPPER=THE SECTION NUMBER
LOWER=THE SHEET WHERE DRAWN
A
DETAIL SYMBOL:
UPPER=THE SECTION NUMBER
LOWER=THE SHEET WHERE DRAWN
SYMBOLS LEGEND
Room name
N
E-1
IF INTERIOR FURNISHINGS
T TECHNOLOGY DRAWINGS
AV AUDIO VISUAL DRAWINGS
FP FIRE PROTECTION
VT VERTICAL TRANSPORTATION DRAWINGS
A1.1
A1.1
A1.1
A-410
PRESSURE TREATED
PAVEMENT
PLYWOOD
QUANTITY
POLYVINYL CHLORIDE
PSI
PSF
PT
PVMT
QTY
PWD
PVC
RADIUS
REMOVE
ROOF DRAIN
REFERENCE, REFER TO
REINFORCING
ROOM
REQUIRE (D)
RIGHT OF WAY
ROUGH OPENING
RD
RE
REINF
REM
RCP
RAD
RM
REQ
RO
ROW
R
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
RESISTANCE, THERMAL, RISER
REFLECTED CEILING PLAN
SCHEDULE
RESTROOM
SOLID CORE
SPLASH BLOCK
SECTION
SHEET
STORM DRAIN
RR
SC
SBLK
SCH
SD
SHT
SEC
SIMILAR
SLAB ON GRADE SOG
SIM
SHEATHING SHTH
LINEAL
LIBRARY
LOCKER
LIGHT
MAINTAIN (ENANCE)
MAXIMUM
MASONRY
LIB
LIN
LKR
LT
MAINT
MC
MAS
MAX
MECHANICAL CONTRACTOR
METAL
MINIMUM
MANHOLE
MECHANIC (AL)
MANUFACTURE (ER)
MISCELLANEOUS
MOUNT (ED), (ING)
MASONRY OPENING
MIRROR
MET
MECH
MIN
MH
MFR
MISC
MT
MR
MO
MIR
NOMINAL
NUMBER
NOISE REDUCTION COEFFICIENT
NOT IN CONTRACT
NOT TO SCALE
OVERALL
OBSCURE
ON CENTER (S)
NRC
NO
NOM
NIC
NTS
OA
OB
OC
MTL MATERIAL (S)
OPENING
OPPOSITE HAND
OUTSIDE DIAMETER
OPPOSITE
OVERHEAD
PERPENDICULAR
PARALLEL
OUNCE
OH
OD
OPG
OPP
OPH
ORD
PC
PERP
PAR
OZ
PAINT(ED)
PLUMBING
PLASTIC LAMINATE PLAM
PLBG
PNT
PLATE PL
MOISTURE RESISTANT
OVERFLOW ROOF DRAIN
PRECAST CONCRETE
NOT APPLICABLENA
NONE REQUIRED NR
RB RESILIENT BASE
PORCELAIN PRN
OWNER FURNISHED CONTRACTOR
INSTALLED
OFCI
HOLLOW CORE
HOSE BIB HB
HC H
HOUR
HEIGHT
HARDWARE
HOLLOW METAL
HIGH POINT
HORIZONTAL
HEATER
HOT WATER
HM
HOR
HDW
HR
HT
HPT
HW
HTR
HVAC
HWH
HCAP HANDICAPPED
INCH(ES)
INFORMATION
INCANDESCENT
INSULATE (D), (ION)
INSIDE DIAMETER
INCLUDE (D), (ING)
INVERT
JOINT
LABORATORY
INTERIOR
IN
ID
INCAN
INS
INFO
INCL
INV
LAB
JT
INT
POUND(S)
LAVATORY LAV
LB
LAM LAMINATE (D)
HEATING/VENTILATION/AC
HOT WATER HEATER
SQUARE
SPECIAL
SPECIFICATION (S)
STAINLESS STEEL
SQ
SPEC
SPL
SST
STEEL
STORAGE
STANDARD
STRUCTURAL
TREAD
SUSPENDED
SYMMETRICAL
TOP AND BOTTOM
STRUC
STL
STO
STD
STC
T
T&B
SUS
SYM
TELEPHONE
THRESHOLD
TONGUE AND GROOVE
TEMPERATURE
THICK (NESS)
TOP OF
TOP OF BEAM
TOP OF PARAPET
TOP OF INSULATION
TOP OF CURB
THROUGH
TEMP
THK
THR
T&G
TEL
TO
TOB
TOI
TOP
TOC
THRU
SOUND TRANSMISSION CLASS
TRANSOM
TOP OF STEEL
TOILET PARTITION
TOP OF WALL
TYPICAL
TERRAZZO
TUBE STEEL
TELEVISION
TR
TOW
TPART
TOSTL
TPD
TV
TS
TZ
TYP
UNFINISHED
VAPOR BARRIER
VARIABLE (VARIES)
URINAL
UL
UNFIN
UON
VB
VCT
VAR
UR
TOILET PAPER DISPENSER
UNDERWRITERS LABORATORY
UNLESS OTHERWISE NOTED
VINYL COMPOSITION TILE
VESTIBULE
WITH
VERIFY IN FIELD
WIDE OR WIDTH
WOOD
WITHOUT
WATER CLOSET
WATERPROOF (ING)
VIF
W
VEST
W/
W/O
WP (G)
WD
WC
WATER RESISTANT
WELDED WIRE FABRIC WWF
WR
VERTICAL VERT
TOP OF SLAB TOS
TOP OF MASONRY TOM
SHEET TABLE OF CONTENTS
PROJECT TEAM
ARCHITECT: ARCHITECTURAL COLLABORATIVE
1328 PRINCE AVE, SECOND FLOOR
ATHENS, GA 30606
CONTACT: LORI BORK NEWCOMER, PRINCIPAL
OFFICE: 706.355.3010
EMAIL: LORI@ARCOLLAB.NET
STRUCTURAL ENGINEER
SHEATS STRUCTURAL CONSULTING
P.O. BOX 1775
WINDER, GA 30680
CONTACT: REED SHEATS, PRESIDENT
MOBILE: 770.868.9000
EMAIL: RSHEATS@SHEATSCONSULTING.COM
GENERAL
G-001 COVER
G-002 SPECIFICATIONS & CODE PLAN
ARCHITECTURAL
A-101 DEMO & PROPOSED FLOOR PLANS
A-102 ENLARGED PLAN, DETAILS
STRUCTURAL
S-100 GENERAL NOTES
Project Information
Project Name: Morton Theater Stage Stair Renovation
Project Location: 195 W Washington St Athens, GA 30601
Jurisdiction: Athens Clarke County
Project Description: This project consists of the replacement of existing stage stairs, which are not part of the regular means of egress from the stage or the auditorium, with new stairs that will land within the existing boxes at each side of the stage. To accommodate the new stairs, a column at the corner of the boxes will be adjusted to provide a better clear width and to improve the load path of the column.
Applicable Codes and Standards
Means of Egress
Accessibility
• 2024 International Building Code (IBC) with Georgia Amendments
• 2024 International Residential Code (IRC) with Georgia Amendment
• 2024 International Fire Code (IFC) as adopted by the Safety Fire Commisioner
• 2024 International Plumbing Code (IPC) with Georgia Amendments
• 2024 International Mechanical Code (IMC) with Georgia Amendments
• 2024 International Fuel Gas Code (IFGC) with Georgia Amendments
• 2024 International Swimming Pool and Spa Code (ISPSC) with Georgia Amendments
• 2026 Georgia Amendments to the 2023 National Electrical Code (NEC)
• International Energy Conservation Code, 2015 Edition with Georgia Supplements and Amendments
• NFPA 101 Life Safety Code, 2024 Edition with Georgia Amendments
• Georgia Accessibility Code, 2012 Edition
• 2010 ADA Standards for Accessible Design
No changes to means of egress. New stage stair(s) to be constructed to maintain ~32" clear width for length of stair per on site discussion with Fire Marshal on 2025.01.17.
No reduction of accessibility. New stair improves stage access with code compliant handrail.
P R
IN
C E A
V E N
U E
S E C
O N
D F
LO
O
R
A
TH
E N
S
G A
T:
.3
.3
P R O J E C T :
T I T L E :
I S S U E :
D A T E :
G-001
2026.02.05
FOR BID &
CONSTRUCTION
MORTON THEATER STAGE
STAIRS
195 W WASHINGTON ST
ATHENS, GA 30601
COVER SHEET
M O R T O N T H E A T E R - S T A G E S T A I R S
ATHENS , GA
SPECIFICATIONS
1. GENERAL NOTES
1. ALL WORK INCLUDED IN THIS CONTRACT SHALL COMPLY WITH THE LATEST EDITION OF
INTERNATIONAL BUILDING CODE AND ALL OTHER LAWS AND CODES OF LOCAL, COUNTY, AND
STATE, JURISDICTION INVOLVED.
2. THE GENERAL CONTRACTOR SHALL GIVE ALL NOTICES AND SHALL COMPLY WITH ALL LAWS,
ORDINANCES, RULES, REGULATIONS, AND ORDERS OF PUBLIC AUTHORITY BEARING ON THE
PERFORMANCE OF THE WORK. IF THE CONTRACTOR OBSERVES THAT ANY OF THE CONTRACT
DOCUMENTS ARE AT VARIANCE THEREWITH IN ANY RESPECT HE SHALL PROMPTLY NOTIFY THE
ARCHITECT OF ANY CHANGES REQUIRING ADJUSTMENT WITH APPROPRIATE MODIFICATION.
3. ONLY APPROVED 'CONSTRUCTION DOCUMENTS' MARKED DRAWINGS INCORPORATING ALL
ADDENDUM AND DIMENSION CLARIFICATIONS SHALL BE USED DURING THE EXECUTION OF THE
WORK.
4. THE CONTRACTOR SHALL USE WRITTEN DIMENSIONS ONLY, OR AS DIRECTED BY THE ARCHITECT. THE
CONTRACTOR SHALL NOT SCALE DRAWINGS.
5. CONTRACTOR OR OWNER INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. IF THE OWNER, CONTRACTOR OR THEIR REPRESENTATIVE(S) AUTHORIZES DEVIATIONS, RECORDED OR UNRECORDED, FROM THE DOCUMENTS PREPARED BY THE ARCHITECT, THE OWNER SHALL NOT BRING ANY CLAIM AGAINST THE ARCHITECT AND SHALL INDEMNIFY AND HOLD THE ARCHITECT, ITS AGENTS AND EMPLOYEES HARMLESS FROM
AND AGAINST CLAIMS, LOSSES, DAMAGES, AND EXPENSES, INCLUDING BUT NOT LIMITED TO
DEFENSE COSTS AND THE TIME OF THE ARCHITECT, TO THE EXTENT SUCH CLAIM, LOSS, DAMAGE OR EXPENSE ARISES OUT OF OR RESULTS IN WHOLE OR IN PART FROM SUCH DEVIATIONS, REGARDLESS OF WHETHER OR NOT SUCH CLAIM, LOSS, DAMAGE OR EXPENSE IN CAUSED IN PART BY A PARTY
INDEMNIFIED UNDER THIS PROVISION.
6. CONTRACTOR VERIFICATION & RESPONSIBILITIES:
A. THE GENERAL CONTRACTOR SHALL VISIT THE SITE PRIOR TO STARTING THE WORK. THE
CONTRACTOR SHALL VERIFY INTERIOR BUILDING DIMENSIONS, AND COMPARE THAT WITH THE
DIMENSIONS SHOWN ON THE DRAWINGS. WHERE CONFLICT EXISTS, THE CONTRACTOR SHALL
NOTIFY THE ARCHITECT UPON RECOGNITION OF ANY DISCREPANCY.
B. THE CONTRACTOR SHALL CAREFULLY STUDY ALL PLANS AND DRAWINGS, AND SHALL REPORT
IMMEDIATELY TO THE ARCHITECT ANY ERRORS, INCONSISTENCIES OR OMISSIONS HE MAY
DISCOVER. THE CONTRACTOR SHALL NOT WORK WITHOUT DRAWINGS. THE CONTRACTOR
SHALL CONSULT THE ARCHITECT & SUBMIT REQUIRED SHOP DRAWINGS AND/OR LITERATURE FOR
APPROVAL PRIOR TO STARTING THE WORK.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION OF
SUBCONTRACTORS' WORK TO SECURE COMPLIANCE OF DRAWINGS AND SPECIFICATIONS, THE
ACCURATE LOCATION OF STRUCTURE MEMBERS, AND OPENINGS FOR MECHANICAL,
ELECTRICAL, AND MISCELLANEOUS EQUIPMENT.
D. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL OPENINGS FOR MECHANICAL AND
ELECTRICAL EQUIPMENT WITH RESPECTIVE SUBCONTRACTORS, AS WELL AS SHOP DRAWINGS
REVIEWED BY THE ARCHITECT.
E. THE CONTRACTOR SHALL VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT AND PROVIDE ALL
BUCK-OUT BLOCKING AND BACKING REQUIRED TO PERFORM THE WORK.
F. THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL
COMPONENTS UNTIL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH
THE PLANS AND AS REQUIRED TO PERFORM THE WORK.
G. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE WORK.
H. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS WITH THE LOCAL AUTHORITY HAVING JURISDICTION FOR THIS PROJECT. THE OWNER WILL COVER ALL PERMIT FEES, SUCH FEES SHOULD NOT BE INCLUDED IN BID FOR CONSTRUCTION.
I. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL TRADES REQUIRED TO PROPERLY
COMPLETE THE PROJECT AND THE INTENTIONS SET FORTH IN THE CONSTRUCTION
DOCUMENTS.
7. CROSS REFERENCES SHOWN ON DRAWINGS DO NOT NECESSARILY INDICATE ALL LIKE CONDITIONS AND DO NOT LIMIT APPLICATION OF ANY DRAWING OR DETAIL. THEY MAY APPLY TO OTHER, SAME, OR SIMILAR CONDITIONS NOT REFERENCED.
8. INTERIOR WALL DIMENSIONS, UNLESS NOTED OTHERWISE, ARE TO FACE OF STUD FRAMING FOR ALL
NEW WALLS & FACE OF FINISH FOR EXISTING WALLS.
9. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, THE APPLICABLE
SIMILAR DETAILS SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE ARCHITECT.
CLOSEOUT PROCEDURES
1. CLOSEOUT SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF CLEANING AGENT
B. CONTRACTOR'S LIST OF INCOMPLETE ITEMS - INITIAL AT SUBSTANTIAL COMPLETION
C. CERTIFIED LIST OF INCOMPLETE ITEMS - FINAL SUBMITTAL AT FINAL COMPLETION
D. CERTIFICATES OF RELEASE - FROM AUTHORITIES HAVING JURISDICTION
E. CERTIFICATE OF INSURANCE - FOR CONTINUING COVERAGE
2. MAINTENANCE MATERIAL SUBMITTALS
A. SCHEDULE OF MAINTENANCE MATERIAL ITEMS - FOR MAINTENANCE MATERIAL SUBMITTAL ITEMS
REQUIRED BY OTHER SECTIONS
B. COMPLY WITH OWNER REQUIREMENTS FOR MAINTENANCE ("ATTIC STOCK") MATERIALS
3. SUBSTANTIAL COMPLETION PROCEDURES
A. CONTRACTOR'S LIST OF INCOMPLETE ITEMS: PREPARE AND SUBMIT A LIST OF ITEMS TO BE
COMPLETED AND CORRECTED (CONTRACTOR'S "PUNCH LIST"), INDICATING THE VALUE OF
EACH ITEM ON THE LIST AND REASONS WHY THE WORK IS INCOMPLETE. PROVIDE THE
FOLLOWING PUNCH LISTS:
a. BUILDING EXTERIOR
b. ROOMS
c. SITE, CIVIL, AND LANDSCAPE AREAS
B. INSPECTION: SUBMIT A WRITTEN REQUEST FOR INSPECTION TO DETERMINE SUBSTANTIAL
COMPLETION A MINIMUM OF 10 DAYS PRIOR TO DATE THE WORK WILL BE COMPLETED AND
READY FOR FINAL INSPECTION AND TESTS. ON RECEIPT OF REQUEST, ARCHITECT WILL EITHER
PROCEED WITH INSPECTION OR NOTIFY CONTRACTOR OF UNFULFILLED REQUIREMENTS.
ARCHITECT WILL PREPARE THE CERTIFICATE OF SUBSTANTIAL COMPLETION AFTER INSPECTION OR
WILL NOTIFY CONTRACTOR OF ITEMS, EITHER ON CONTRACTOR'S LIST OR ADDITIONAL ITEMS
IDENTIFIED BY ARCHITECT, THAT MUST BE COMPLETED OR CORRECTED BEFORE CERTIFICATE WILL
BE ISSUED.
a. REPEAT SAME INSPECTION PROCEDURE AS APPLICABLE FOR FINAL COMPLETION
4. SUBMITTAL OF PROJECT WARRANTIES
A. TIME OF SUBMITTAL: SUBMIT WRITTEN WARRANTIES ON REQUEST OF ARCHITECT FOR
DESIGNATED PORTIONS OF THE WORK WHERE WARRANTIES ARE INDICATED TO COMMENCE
ON DATES OTHER THAN DATE OF SUBSTANTIAL COMPLETION, OR WHEN DELAY IN SUBMITTAL
OF WARRANTIES MIGHT LIMIT OWNER'S RIGHTS UNDER WARRANTY
B. ORGANIZE WARRANTY DOCUMENTS INTO AN ORDERLY SEQUENCE BASED ON THE TABLE OF
CONTENTS OF PROJECT MANUAL
C. WARRANTY ELECTRONIC FILE: PROVIDE WARRANTIES AND BONDS IN PDF FORMAT. ASSEMBLE
COMPLETE WARRANTY AND BOND SUBMITTAL PACKAGE INTO A SINGLE ELECTRONIC PDF FILE
WITH BOOKMARKS ENABLING NAVIGATION TO EACH ITEM. PROVIDE BOOKMARKED TABLE OF
CONTENTS AT BEGINNING OF DOCUMENT.
D. PROVIDE ADDITIONAL COPIES OF EACH WARRANTY TO INCLUDE IN OPERATION AND
MAINTENANCE MANUALS.
FINAL CLEANING
1. MATERIALS
A. CLEANING AGENTS: USE CLEANING MATERIALS AND AGENTS RECOMMENDED BY
MANUFACTURER OR FABRICATOR OF THE SURFACE TO BE CLEANED. DO NOT USE CLEANING
AGENTS THAT ARE POTENTIALLY HAZARDOUS TO HEALTH OR PROPERTY OR THAT MIGHT
DAMAGE FINISHED SURFACES
2. GENERAL
A. PERFORM FINAL CLEANING. CONDUCT CLEANING AND WASTE-REMOVAL OPERATIONS TO
COMPLY WITH LOCAL LAWS AND ORDINANCES AND FEDERAL AND LOCAL ENVIRONMENTAL
AND ANTIPOLLUTION REGULATIONS.
3. CLEANING
A. EMPLOY EXPERIENCED WORKERS OR PROFESSIONAL CLEANERS FOR FINAL CLEANING. CLEAN
EACH SURFACE OR UNIT TO CONDITION EXPECTED IN AN AVERAGE COMMERCIAL BUILDING
CLEANING AND MAINTENANCE PROGRAM. COMPLY WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS.
PROJECT RECORD DOCUMENTS
1. RECORD DRAWINGS
A. RECORD PRINTS: MAINTAIN ONE SET OF MARKED-UP PAPER COPIES OF THE CONTRACT
DRAWINGS AND SHOP DRAWINGS, INCORPORATING NEW AND REVISED DRAWINGS AS
MODIFICATIONS ARE ISSUED
B. RECORD DIGITAL DATA FILES: IMMEDIATELY BEFORE INSPECTION FOR CERTIFICATE OF
SUBSTANTIAL COMPLETION, REVIEW MARKED-UP RECORD PRINTS WITH ARCHITECT. WHEN
AUTHORIZED, PREPARE A FULL SET OF CORRECTED DIGITAL DATA FILES OF THE CONTRACT
DRAWINGS.
C. FORMAT: IDENTIFY AND DATE EACH RECORD DRAWING; INCLUDE THE DESIGNATION "PROJECT
RECORD DRAWING" IN A PROMINENT LOCATION
2. RECORD PRODUCT DATA
A. RECORDING: MAINTAIN ONE COPY OF EACH SUBMITTAL DURING THE CONSTRUCTION PERIOD
FOR PROJECT RECORD DOCUMENT PURPOSES. POST CHANGES AND REVISIONS TO PROJECT
RECORD DOCUMENTS AS THEY OCCUR; DO NOT WAIT UNTIL END OF PROJECT.
B. PREPARATION: MARK PRODUCT DATA TO INDICATE THE ACTUAL PRODUCT INSTALLATION WHERE
INSTALLATION VARIES SUBSTANTIALLY FROM THAT INDICATED IN PRODUCT DATA SUBMITTAL
C. FORMAT: SUBMIT RECORD PRODUCT DATA AS ANNOTATED PDF ELECTRONIC FILE
3. MISCELLANEOUS RECORD SUBMITTALS
A. ASSEMBLE MISCELLANEOUS RECORDS REQUIRED BY OTHER SPECIFICATIONS SECTIONS FOR
MISCELLANEOUS RECORD KEEPING AND SUBMITTAL IN CONNECTIONS WITH ACTUAL
PERFORMANCE OF THE WORK. BIND OR FILE MISCELLANEOUS RECORDS AND IDENTIFY EACH,
READY FOR CONTINUED USE AND REFERENCE.
4. MAINTENANCE OF RECORD DOCUMENTS: STORE RECORD DOCUMENTS IN THE FIELD OFFICE APART
FROM THE CONTRACT DOCUMENTS USED FOR CONSTRUCTION. DO NOT USE PROJECT RECORD
DOCUMENTS FOR CONSTRUCTION PURPOSES. MAINTAIN RECORD DOCUMENTS IN GOOD ORDER
AND IN A CLEAN, DRY, LEGIBLE CONDITION, PROTECTED FROM DETERIORATION AND LOSS. PROVIDE ACCESS TO PROJECT RECORD DOCUMENTS FOR ARCHITECT'S REFERENCE DURING NORMAL WORKING
HOURS.
OPERATION AND MAINTENANCE DATA
1. CLOSEOUT SUBMITTALS
A. SUBMIT OPERATION AND MAINTENANCE MANUALS INDICATED. PROVIDE CONTENT FOR EACH
MANUAL AS SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, AND AS REVIEWED AND
APPROVED AT THE TIME OF SECTION SUBMITTALS. SUBMIT REVIEWED MANUAL CONTENT
FORMATTED AND ORGANIZED AS REQUIRED BY THIS SECTION.
B. FORMAT: SUBMIT OPERATION AND MAINTENANCE MANUALS ON DIGITAL MEDIA ACCEPTABLE
TO ARCHITECT. ENABLE REVIEWER COMMENTS ON DRAFT SUBMITTALS.
a. ALSO PROVIDE ONE HARD COPY IN 3-RING BINDER WITH SECTION TABS
SUBMITTALS REQUIRED
05 - METALS:
• METAL RAILINGS (SHOP DRAWINGS)
06 - WOOD & COMPOSITES:
• MISCELLANEOUS ROUGH CARPENTRY (PRODUCT DATA)
• FINISH CARPENTRY (SHOP DRAWINGS & PRODUCT DATA)
• HARDWOOD FLOORING (PRODUCT DATA, SHOP DRAWINGS, & MINIMUM SAMPLE OF THREE 24" LONG BOARDS
REPRESENTING THE RANGE OF SPECIFIED GRAIN, COLOR, AND CHARACTER AS NOTED ON DRAWINGS)
09 - FINISHES:
• PAINTING AND COATING (PRODUCT DATA & SAMPLES APPLIED TO RIGID BACKING)
• STAINING AND TRANSPARENT FINISHING (PRODUCT DATA & SAMPLES APPLIED TO RIGID BACKING)
• PROVIDE IN PLACE MOCK-UP OF ALL PAINT AND STAIN FINISHES. ARCHITECT WILL SELECT LOCATION.
APPLICATION AREA TO BE A MINIMUM OF 4 SQ.FT.
SHOP DRAWING & SUBMITTAL PROCEDURES
1. EACH SUBMITTAL & RESUBMITTAL TO INCLUDE THE FOLLOWING INFORMATION:
A. PROJECT NAME
B. DATE
C. NAME OF ARCHITECT
D. NAME OF CONSTRUCTION MANAGER
E. NAME OF CONTRACTOR
F. NAME OF FIRM OR ENTITY THAT PREPARED SUBMITTAL
G. NAMES OF SUBCONTRACTOR, MANUFACTURER, AND SUPPLIER
H. UNIQUE SUBMITTAL NUMBER, INCLUDING REVISION IDENTIFIER. INCLUDE SPECIFICATION SECTION
NUMBER WITH SEQUENTIAL IDENTIFIER AND SUFFIX FOR RESUBMITTALS
I. CATEGORY AND TYPE OF SUBMITTAL
J. SUBMITTAL PURPOSE AND DESCRIPTION
K. NUMBER AND TITLE OF SPECIFICATION SECTION
L. DRAWING NUMBER AND DETAIL REFERENCES, AS APPROPRIATE
M. INDICATION OF FULL OR PARTIAL SUBMITTAL
N. LOCATION(S) WHERE PRODUCT IS TO BE INSTALLED, AS APPROPRIATE
O. OTHER NECESSARY IDENTIFICATION
P. REMARKS
Q. SIGNATURE OF TRANSMITTER
2. ON EACH SUBMITTAL, CLEARLY INDICATE DEVIATIONS FROM REQUIREMENTS IN THE CONTRACT DOCUMENTS, INCLUDING MINOR VARIATIONS AND LIMITATIONS. INCLUDE RELEVANT ADDITIONAL
INFORMATION AND REVISIONS, OTHER THAN THOSE REQUESTED BY ARCHITECT ON PREVIOUS
SUBMITTALS. INDICATED BY HIGHLIGHTING ON EACH SUBMITTAL OR NOTING ON ATTACHED SEPARATE
SHEET.
3. FOR ELECTRONIC SUBMITTALS, PREPARE SUBMITTALS AS A PDF PACKAGE, INCORPORATING COMPLETE
INFORMATION INTO EACH PDF FILE. NAME PDF FILE WITH SUBMITTAL NUMBER.
4. COORDINATE PREPARATION AND PROCESSING OF SUBMITTALS WITH PERFORMANCE OF CONSTRUCTION ACTIVITIES INCLUDING FABRICATION, PURCHASING, TESTING, DELIVERY, OTHER SUBMITTALS, AND RELATED
ACTIVITIES WHICH REQUIRE SEQUENTIAL ACTIVITY.
5. SUBMIT, AS AN ACTION SUBMITTAL, A LIST OF SUBMITTALS, ARRANGED IN CHRONOLOGICAL ORDER BY DATES REQUIRED BY CONSTRUCTION SCHEDULE. WHEN ESTABLISHING DATES, INCLUDE TIME NEEDED FOR REVIEW, ORDERING, MANUFACTURING, FABRICATION, AND DELIVERY. INCLUDE ADDITIONAL TIME FOR MAKING CORRECTIONS OR REVISIONS TO SUBMITTALS AS NOTED BY ARCHITECT. INITIAL SUBMITTAL SCHEDULE TO BE SUBMITTED CONCURRENTLY WITH STARTUP CONSTRUCTION SCHEDULE AND INCLUDE ALL SUBMITTALS REQUIRED DURING THE FIRST 60 DAYS OF CONSTRUCTION. FINAL SUBMITTAL SCHEDULE TO BE SUBMITTED CONCURRENTLY WITH COMPLETION OF FIRST SUBMITTAL OF CONTRACTOR'S SCHEDULE AND INCLUDE ALL SUBMITTALS REQUIRED FOR CONSTRUCTION. REVISED SUBMITTAL SCHEDULES TO BE
SUBMITTED AS NECESSITATED BY CHANGES TO CONSTRUCTION SCHEDULE.
6. SUBMIT ALL ITEMS REQUIRED FOR EACH SUBMITTAL BELOW CONCURRENTLY UNLESS PARTIAL SUBMITTALS
FOR PORTIONS OF THE WORK ARE INDICATED ON THE APPROVED SUBMITTAL SCHEDULE
7. ALLOW FOR THE FOLLOWING SUBMITTAL REVIEW TIME, INCLUDING TIME FOR RESUBMITTALS. NO EXTENSION OF CONTRACT TIME WILL BE AUTHORIZED BECAUSE OF FAILURE TO TRANSMIT SUBMITTALS
ENOUGH IN ADVANCE OF THE WORK TO PERMIT PROCESSING, INCLUDING RESUBMITTALS.
A. ALLOW 15 DAYS FOR INITIAL REVIEW OF EACH SUBMITTAL. ALLOW ADDITIONAL TIME IF
COORDINATION WITH SUBSEQUENT SUBMITTALS IS REQUIRED
B. IF INTERMEDIATE SUBMITTAL IS NECESSARY, PROCESS IT IN THE SAME MANNER AS AN INITIAL
SUBMITTAL
C. ALLOW 15 DAYS FOR REVIEW OF EACH RESUBMITTAL
8. ARCHITECT'S REVIEW OR CORRECTIONS OF SUBMITTALS AND SHOP DRAWINGS REFER ONLY TO THE GENERAL ARRANGEMENT AND CONFORMANCE OF THE SUBMITTAL SUBJECT WITH THE DESIGN CONCEPT
AND WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. UNDER NO CIRCUMSTANCES
SHOULD THE CONTRACTOR CONSIDER THE REVIEW TO INCLUDE THE DIMENSIONS, QUANTITIES, AND DETAILS OF THE ITEMS, NOR AN APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS.
9. ARCHITECT'S REVIEW SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS OR
OMISSIONS IN THE SUBMITTALS AND SHOP DRAWINGS
10. ARCHITECT'S REVIEW OF SUBMITTALS AND SHOP DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR OF DIRECT RESPONSIBILITY FOR ANY DEVIATION FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS DIRECTED SPECIFIC ATTENTION TO THE DEVIATION AT THE TIME OF SUBMISSION AND THE ARCHITECT AND/OR OWNER HAS PROVIDED WRITTEN APPROVAL TO THE SPECIFIC
DEVIATION
11. ARCHITECT'S REVIEW OF SUBMITTALS AND SHOP DRAWINGS SHALL NOT BE CONSTRUED AS
AUTHORIZATON TO CHANGE THE CONTRACT SUM OR CONTRACT TIME
DIVISION 5: METAL RAILINGS
5.1 ADMINISTRATIVE REQUIREMENTS
A. COORDINATION:
a. COORDINATE SELECTION OF SHOP PRIMERS WITH TOPCOATS TO BE APPLIED
OVER THEM. COMPLY WITH PAINT & COATING MANUFACTURERS' WRITTEN
INSTRUCTIONS TO ENSURE THAT SHOP PRIMERS & TOPCOATS ARE
COMPATIBLE WITH ONE ANOTHER.
5.2 QUALITY ASSURANCE
A. FABRICATOR QUALIFICATIONS
a. A QUALIFIED FABRICATOR THAT IS CERTIFIED BY THE AMERICAN INSTITUTE
FOR STEEL CONSTRUCTION (AISC) UNDER AISC 201.
5.3 PRODUCTS
A. METAL RAILINGS - GENERAL
a. REGULATORY REQUIREMENTS: PROVIDE RAILINGS COMPLYING WITH THE
MOST STRINGENT REQUIREMENTS OF LOCAL, STATE, AND FEDERAL
REGULATIONS; WHERE REQUIREMENTS OF THE CONTRACT DOCUMENTS
EXCEED THOSE OF REGULATIONS, COMPLY WITH THE CONTRACT
DOCUMENTS.
b. DIMENSIONS: AS INDICATED ON DRAWINGS
c. METAL JOINTING AND FINISH QUALITY LEVELS: PROVIDE AS FOLLOWS FOR
ALL RAILINGS OF THIS SECTION.
• INCLUDES EXPOSED AND NON-EXPOSED JOINTS.
• WELDED JOINTS: CONTINUOUSLY WELDED AND GROUND SMOOTH
AND FLUSH.
• MECHANICAL JOINTS: BUTTED TIGHT, FLUSH, AND HAIRLINE;
CONCEALED FASTENINGS ONLY.
• EXPOSED EDGES AND CORNERS: EASED TO SMALL UNIFORM RADIUS.
• METAL SURFACES TO BE POINTED: SANDED OR GROUND SMOOTH,
SUITABLE FOR HIGHEST QUALITY GLOSS FINISH.
d. FASTENERS: SAME MATERIAL OR COMPATIBLE WITH MATERIALS BEING
FASTENED; TYPE CONSISTENT WITH DESIGN AND SPECIFIED QUALITY LEVEL.
e. ANCHORS & RELATED COMPONENTS: SAME MATERIAL AND FINISH AS
ITEMS TO BE ANCHORED, EXCEPT WHERE SPECIFICALLY INDICATED
OTHERWISE; PROVIDE ALL ANCHORS AND FASTENERS REQUIRED.
f. CONTINUOUS SEAL JOINED PIECES BY CONTINUOUS WELDS
g. SHOP PRIME ALL COMPONENTS
5.4 MATERIALS - STEEL
A. METAL RAILINGS - GENERAL
a. STEEL SECTIONS: ASTM A36/A36M.
b. STEEL TUBING: ASTM A501/A501M HOT-FORMED STRUCTURAL TUBING.
c. PLATES: ASTM A283/A283M.
d. PIPE: ASTM A53/A53M, GRADE B SCHEDULE 40
e. STEEL BOLTS, NUTS, AND WASHERS: ASTM A307, GRADE A, PLAIN
5.5 WARRANTY
A. SPECIAL INSTALLER WARRANTY: FURNISH WARRANTY SIGNED BY THE INSTALLER
GUARANTEEING MATERIALS AND WORKMANSHIP FOR THE WORK OF THIS
SECTION. WARRANTY PERIOD: TWO YEARS FROM DATE OF SUBSTANTIAL
COMPLETION.
DIVISION 9: FINISHES - PAINTING & STAINING
9.1 MATERIALS
A. SELECTED PAINT COLORS AND PRODUCT SHALL BE COMMERCIAL QUALITY
BENJAMIN MOORE, SHERWIN WILLIAMS, PPG, OR APPROVED EQUAL. BASIS OF
DESIGN: SHERWIN WILLIAMS PROMAR 200.
B. SELECTED WOOD STAIN BASIS OF DESIGN: BONA CHROMA WATERBORNE
WOOD FLOOR COLORATION OR EQUAL. COLORS TO BE MIXED AS NEEDED TO
MATCH EXISTING FLOOR FINISH.
C. VERIFY COMPATIBILITY WITH PRODUCTS PRIOR TO APPLICATION.
D. PROVIDE MANUFACTURER'S BEST QUALITY PAINT PRODUCT FROM THEIR LINE. ALL
PAINTS TO BE ZERO-VOC AND STAINS TO BE LOW-VOC.
E. PAINT FOR INTERIOR EXPOSED METAL TO BE PRODUCT RATED FOR THAT
SUBSTRATE.
9.2 PAINTING
A. WHERE INDICATED ON DRAWINGS, INTERIOR PARTITIONS, MILLWORK, AND
METAL RAILINGS TO BE PAINTED WITH LATEX PAINT TO MATCH EXISTING COLORS
& OWNER COLOR/PRODUCT RECORDS. RECORDS WILL BE PROVIDED UPON
CONTRACTOR'S REQUEST.
B. ALL PAINT SHEENS TO BE CONFIRMED BY ARCHITECT FOR EACH SUBSTRATE TYPE
PRIOR TO INSTALLATION
a. PLASTER OR GYPSUM WALL BOARD: EGGSHELL
b. WOOD TRIM & EXPOSED WOOD STRUCTURE: SEMI-GLOSS
c. METAL RAILINGS: SEMI-GLOSS
9.3 WARRANTY
A. MANUFACTURER WARRANTY: PROVIDE MANUFACTURER'S WARRANTY COVERING
MANUFACTURING AND MATERIAL DEFECT, WHERE ITEMS FAIL TO PERFORM AS
DESIGNED AND MANUFACTURED. WARRANTY PERIOD: FIVE YEARS FROM
SUBSTANTIAL COMPLETION.
B. SPECIAL INSTALLER WARRANTY: FURNISH A WRITTEN WARRANTY SIGNED BY THE
INSTALLER GUARANTEEING MATERIALS AND WORKMANSHIP FOR THE WORK OF
THIS SECTIONS. WARRANTY PERIOD: TWO YEARS FROM DATE OF SUBSTANTIAL
COMPLETION. Project Information
Project Name: Morton Theater Stage Stair Renovation
Project Location: 195 W Washington St Athens, GA 30601
Jurisdiction: Athens Clarke County
Project Description: This project consists of the replacement of existing stage stairs, which are not part of the regular means of egress from the stage or the auditorium, with new stairs that will land within the existing boxes at each side of the stage. To accommodate the new stairs, a column at the corner of the boxes will be adjusted to provide a better clear width and to improve the load path of the column.
Applicable Codes and Standards
Means of Egress
Accessibility
• 2024 International Building Code (IBC) with Georgia Amendments
• 2024 International Residential Code (IRC) with Georgia Amendment
• 2024 International Fire Code (IFC) as adopted by the Safety Fire Commisioner
• 2024 International Plumbing Code (IPC) with Georgia Amendments
• 2024 International Mechanical Code (IMC) with Georgia Amendments
• 2024 International Fuel Gas Code (IFGC) with Georgia Amendments
• 2024 International Swimming Pool and Spa Code (ISPSC) with Georgia Amendments
• 2026 Georgia Amendments to the 2023 National Electrical Code (NEC)
• International Energy Conservation Code, 2015 Edition with Georgia Supplements and Amendments
• NFPA 101 Life Safety Code, 2024 Edition with Georgia Amendments
• Georgia Accessibility Code, 2012 Edition
• 2010 ADA Standards for Accessible Design
No changes to means of egress. New stage stair(s) to be constructed to maintain ~32" clear width for length of stair per on site discussion with Fire Marshal on 2025.01.17.
No reduction of accessibility. New stair improves stage access with code compliant handrail.
EXISTING STAGE EXIT
TO REMAIN
EXISTING STAGE EXIT
TO REMAIN
DN
UP
NEW STAGE STAIRS
REPLACE EXISTING
DNNO CHANGE TO AUDITORIUM
EGRESS CONDITIONS
P R
IN
C E A
V E N
U E
S E C
O N
D F
LO
O
R
A
TH
E N
S
G A
T:
.3
.3
P R O J E C T :
T I T L E :
I S S U E :
D A T E :
G-002
2026.02.05
FOR BID &
CONSTRUCTION
MORTON THEATER STAGE
STAIRS
195 W WASHINGTON ST
ATHENS, GA 30601
SPECIFICATIONS &
CODE PLAN
1/8" = 1'-0"
LIFE SAFETY PLAN
UP
A-102
DN
DN
NEW STAGE STAIR, LANDING, AND
ASSOCIATED ELEMENTS PER
DRAWINGS ON A-102
REMOVE AND REPLACE POST TO
IMPROVE BEARING CONDITIONS PER
STRUCTURAL RECOMMENDATIONS
REMOVE AND REPLACE POST TO
IMPROVE BEARING CONDITIONS PER
STRUCTURAL RECOMMENDATIONS
NEW STAGE STAIR, LANDING AND
ASSOCIATED ELEMENTS SIM AND
REFLECTED TO OTHER SIDE PER
DRAWINGS ON A-102
REMOVE PORTION OF THE FOOT LIGHT TROUGH
THAT CONFLICTS WITH THE EXTENTS OF THE NEW
STAIRS/LANDING, COORDINATE WITH STAIR
PLANS/DETAILS AND VERIFY IN FIELD, ADJUST
SUPPORT FOR EDGE OF TROUGH AS NEEDED BASED
ON FIELD CONDITIONS
CUT DOWN PORTION OF KNEE WALL AROUND BOX
SEATING AREA TO ALLOW STAIRS TO RUN THROUGH THAT
SPACE. COORDINATE WITH STAIR DETAILS
COORDINATE SELECTIVE DEMO IN KNEE WALL AND CEILING
OF BOX TO FACILITATE MOVING AND IMPROVEMENTS OF
CORNER POST PER STRUCTURAL RECOMMENDATIONS
DEMO ON THIS SIDE OF STAGE TO MATCH OPPOSITE SIDE
REMOVE POST AND PROVIDE TEMPORARY
SUPPORTS PER STRUCTURAL
REMOVE POST AND PROVIDE TEMPORARY
SUPPORTS PER STRUCTURAL
REMOVE ALL EXISTING STAIR AND RELATED RAILING
COMPONENTS
SALVAGE EXISTING BOX FRONT RAILING - SEE
PROPOSED PLANS FOR NECESSARY
MODIFICATIONS
P R
IN
C E A
V E N
U E
S E C
O N
D F
LO
O
R
A
TH
E N
S
G A
T:
.3
.3
P R O J E C T :
T I T L E :
I S S U E :
D A T E :
A-101
2026.02.05
FOR BID &
CONSTRUCTION
MORTON THEATER STAGE
STAIRS
195 W WASHINGTON ST
ATHENS, GA 30601
DEMO AND
PROPOSED FLOOR
PLAN
1/8" = 1'-0"
01 - LEVEL 1 - PROPOSED PLAN1/8" = 1'-0"
01 - LEVEL 1 - DEMO PLAN
STAIRS & RAILING TO BE REMOVED
NEW STAIR LOCATION THROUGH LOWER BOX
POST TO BE REPLACED AND RELOCATED PER
ARCHITECTURAL AND STRUCTURAL
DRAWINGS
OWNER TO RELOCATE SPEAKERS & CABLING
CONCRACTOR TO PATCH WALL PENETRATIONS
WHICH WILL NO LONGER BE IN USE. BLEND
SMOOTH AND FLUSH WITH WALL FINISH AND
REPAINT WALL AS NEEDED
SALVAGE CORNER RAIL STANCHION FOR
RELOCATION AND REUSE PER DRAWINGS
REMOVE RAILING AND WALL SECTION
FOR NEW STAIR LOCATION AS
INDICATED IN DRAWINGS
CUT WOOD WALL CAP BACK AS
NEEDED TO ACCESS NEW POST
LOCATION. JOINT OF NEW CAP
MATERIAL TO EXISTING TO BE
HAIRLINE AND FLUSH.
TRIM RAILING BACK PER DRAWINGS
REPLACE AND RELOCATE POST PER DRAWINGS
PHOTOS OF EXISTING CONDITIONS
(NOTE: ONLY ONE SIDE OF THEATER IS SHOWN IN PHOTOS FOR CLARITY. ALL NOTES APPLY TO BOTH STAGE RIGHT AND STAGE LEFT)
POST TO REMAIN
GENERAL NOTES
1. DRAWINGS ON THIS SHEET ARE FOR PLAN NORTH (STAGE RIGHT/HOUSE LEFT)
STAIRS). PLAN SOUTH STAIRS ARE TO BE SIMILAR AND REFLECTED.
2. PAINT COLOR FOR ALL NEW STEEL RAILING COMPONENTS (ASIDE FROM
COMPONENTS OF EXISTING BOX WALL CAP RAIL) TO BE BROWN TO MATCH
EXISTING WAINSCOT PANELING. ARCHITECT TO CONFIRM EXACT COLOR AND
REVIEW CONTRACTOR'S PAINT SAMPLE FOR APPROVAL
3. SUBMIT SHOP DRAWINGS FOR RAILING COMPONENTS FOR REVIEW BEFORE
FABRICATION.
R
IS
ER
S
- 3
V
IF
EXTEND FLAT PORTION OF FLOOR WITHIN BOX TO KNEE
WALL/EDGE OF ORCHESTRA PIT. TIE IN AND MATCH
WOOD FLOORING IN SPECIES, GRADE, SIZE, GRAIN
AND STAIN COLOR
NEW KNEE WALL AT EDGE OF
STAIR, CURVE TO MEET PILASTER AT
BOX SEAT KNEE WALL AND EDGE
OF PROSCENIUM SURROUND (SEE
PLAN), STOP AT 42" ABOVE STAGE
LEVEL AND PROVIDE 1x CAP WITH
BULLNOSE/EASED EXPOSED EDGE,
PAINT TO MATCH ADJACENT WALLS
1.25" NOMINAL DIA. (1.66" O.D.) PIPE HANDRAIL,
MOUNT BRACKETS TO PILASTER AND KNEE WALL,
TERMINATE BOTTOM END TO FLOOR, TERMINATE TOP
EXTENSION TO WALL AT PROSCENIUM SURROUND, PAINT
- 6
- 0
"MIN BEYOND BOTTOM NOSING
EXTEND HANDRAIL 1 TREAD DEPTH MIN BEYOND TOP NOSING
EXTEND HANDRAIL 12"
PROVIDE BLOCKING IN NEW KNEE
WALL TO ATTACH HANDRAIL
BRACKETS
2x12 SUB-RISER TYP, ATTACH AT EACH
END TO WALL/CURB FRAMING PER
ENLARGED PLAN AND DETAILS
2x4 TREAD SUPPORT TYP, ATTACH TO SUB-
RISER TO SUPPORT BACK OF EACH TREAD
3/4" SUBFLOOR AT STAIR LANDING,
ADJUST LEDGER AND TOP SUB-RISER TO
ACCOUNT FOR ADDITIONAL THICKNESS
5/4 SOLID OAK TREADS
AND OAK RISERS, STAIN
TO MATCH FLOOR
RUN RAIL POST TO ORIGINAL FLOOR. PROVIDE 1/4" THICK x 5"x7" TALL PADDLE PLATE, FLARE BEVEL WELDED TO POST
AND THROUGH BOLTED WITH FOUR (4)-1/2" DIA. BOLTS AT
5" O.C. (VERTICAL) TO FULL DEPTH SOLID WOOD BLOCKING
EACH SIDE. ADD WOOD SPACERS/SHIMS AS NEEDED
EXISTING POST BEYOND
A-102
NEW LANDING FLUSH WITH EXISTING
STAGE LEVEL, CUT TO FIT EDGE OF
STAGE
EXISTING EDGE OF STAGE
DN
A-102
FRAME AND EXTEND FLAT
FLOORING PLATFORM TO EXTENTS
OF BOX AREA, MATCH FLOORING
SPECIES, GRADE, SIZE, GRAIN,
AND STAIN COLOR TO EXISTING
FLOORING, CUSTOM STAIN MIX
MAY BE REQUIRED FOR MATCH,
VERIFY STAIN COLOR WITH
SAMPLE PROVIDED TO
OWNER/ARCHITECT
NEW HANDRAIL, MOUNT TO CORNER
PILASTER AND WALL WITH BRACKETS,
TERMINATE TOP END TO WALL,
EXTEND BOTTOM END MIN. 1 TREAD
DEPTH PAST BOTTOM NOSING AND
TERMINATE TO FLOOR
M A
IN
TA
IN
2"
C
LE
A R, V
IF
REMOVE AND REPLACE CORNER POST OF BOXES PER PROVIDED DIMENSIONS.
SEE STRUCTURAL SHEET FOR FASTENING AND OTHER DETAIL REQUIREMENTS
NEW CURVED KNEE WALL /STAIR CURB
BUILT ON ORCHESTRA PIT FLOOR, ALIGN
BOTTOM END TO FACE OF BOX SEAT
KNEE WALL AND ALIGN TOP CAP WITH
STAGE FLOOR/LANDING, PROVIDE
REMOVABLE ACCESS PANEL IN WALL
BETWEEN STUDS
MOUNT NEW GUARDRAIL ON KNEE
WALL/STAIR CURB, SEE ELEVATION
FOR MORE INFORMATION
NEW KNEE WALL AT EDGE OF STAIR,
CURVE TO MEET PILASTER AT BOX
SEAT KNEE WALL AND EDGE OF
PROSCENIUM SURROUND
RIP 2x STUDS AS NEEDED TO
PROVIDE NAILING SURFACE AND
BACKING TO SET CURVE OF NEW
KNEE WALL, CUT TOP AND BOTTOM
PLATES TO MATCH CURVE AND
EXISTING WALL
A-102
PROVIDE PARTIAL HEIGHT
STUD/BLOCKING DIRECTLY BELOW
EACH SUB-RISER AT THIS SIDE OF STAIR.
CONNECT STUD/BLOCKING TO
EXISTING WALL AS REQUIRED. NAIL
STUD/BLOCKING TO ADJACENT FULL
HEIGHT STUD (SHIM AS REQUIRED).
2x6 LEDGER, FASTEN TO EDGE OF
STAGE
C
LE
A R
-1
/4
M
IN
2x LANDING JOIST, MAX 16" SPACING
FOOT LIGHT TROUGH, CUT BACK TO
MEET FACE OF NEW KNEE
WALL/EDGE OF LANDING
NEW CURB/CORNER INFILL, FINISH
WITH 1/4" BEADBOARD PAINTED TO
MATCH ADJACENT WAINSCOT, CAP
WITH 1x MATERIAL WITH
BULLNOSE/EASED EXPOSED EDGE
12" FROM INSIDE STAIR EDGE
11" MIN TREAD DEPTH W/IN
REMOVE EXISTING RAILING CORNER SUPPORT AND REINSTALL INBOARD OF NEW
POST LOCATION, CUT RAIL AND THREAD NEW CUT END TO FIT INTO RELOCATED
SUPPORT, TOUCH UP PAINT TO MATCH EXISTING AS NEEDED
REMOVE EXISTING RAILING CORNER SUPPORT AND REINSTALL
INBOARD OF NEW POST LOCATION, CUT RAIL AND THREAD NEW CUT
END TO FIT INTO RELOCATED SUPPORT, TOUCH UP PAINT TO MATCH
EXISTING AS NEEDED
B/ T
PO
ST
S
C
LE
A R
M
IN
A-102
REMOVE AND REPLACE POST. SEE STRUCTURAL DRAWING
SUPPORT SUB-RISERS ON SHELF
BETWEEN NEW STUDS PER DETAIL 4
REMOVE EXISTING RAILING CORNER SUPPORT AND REINSTALL INBOARD OF NEW
POST LOCATION, CUT RAIL AND THREAD NEW CUT END TO FIT INTO RELOCATED
SUPPORT, TOUCH UP PAINT TO MATCH EXISTING AS NEEDED
REMOVE AND REPLACE CORNER POST OF BOXES PER
STRUCTURAL ENGINEER'S INSTRUCTIONS, PAINTED FINISH PER
SPECS
NEW REMOVABLE GUARDRAIL AT OPEN SIDE OF NEW STAIRS,
1-1/4" NOMINAL DIAMETER (1.66" O.D.) PIPE TOP RAIL AND
VERTICALS, 1/2" STL ROUND BAR TYPICAL HORIZONTALS,
SPACED 4" MAX,
NEW CURVED KNEE WALL /STAIR CURB
BUILT ON ORCHESTRA PIT FLOOR, ALIGN
BOTTOM END TO FACE OF BOX SEAT
KNEE WALL AND ALIGN TOP CAP WITH
STAGE FLOOR/LANDING
A B O
V E
S
TA
IR
N
O S
IN
G
- 6
1x4 WOOD BASE, PAINTED
PROVIDE REMOVABLE ACCESS PANEL IN
WALL BETWEEN STUDS, MIN. 14.5" W x
36" H, SET FRAMING ACCORDINGLY
REMOVE EXISTING RAILING CORNER SUPPORT AND REINSTALL INBOARD OF NEW
POST LOCATION, CUT RAIL AND THREAD NEW CUT END TO FIT INTO RELOCATED
SUPPORT, TOUCH UP PAINT TO MATCH EXISTING AS NEEDED
REMOVE AND REPLACE POST. SEE STRUCTURAL DRAWING,
PAINTED FINISH PER SPECS
MOUNTING PLATE, RE: DETAILS
3/8" DIA THROUGH
BOLT, TYP
2"x2"x1/4" TAB, TOP
AND BOTTOM, SHOP
WELD TO POST AND TO
MOUNTING PLATE WITH
1/4" FILLETS, EACH SIDE
2 1/2"
± 3' - 0" VIF
1/8" RADIUS MIN.
EASED EDGE
A-102
SHADED AREAS IN THIS VIEW INDICATE
EXISTING/UNALTERED ELEMENTS TO REMAIN
REPLACE PORTION OF EXISTING CAP DISTURBED BY POST REPLACEMENT IN KIND
AND FINISH TO DISGUISE JOINT IN MATERIAL, PAINT TO MATCH EXISTING
BLUE SHADED ELEMENTS TO
BE DEMO'D. COORDINATE
EXTENTS OF DEMO WITH
EXTENTS OF NEW STAIR AND
WALL ELEMENTS
COORDINATE DEMO OF POST
AND TEMPORARY SUPPORT
WITH STRUCTURAL DRAWINGS
PRESERVE EXISTING
ELEMENTS/MATERIALS IN ALL
LOCATIONS EXCEPT WHERE
SPECIFICALLY IDENTIFIED FOR
DEMO. CONTACT ARCHITECT
WITH ANY QUESTIONS
ABOUT DEMO SCOPE
STAGE STAIR, RAILING
BOX SEATING KNEE WALL
AND CAP ABOVE
AUDTORIUM FLOOR
BETWEENPOST AND WALL
FOOTLIGHT TROUGH, SET
EDGE OF NEW STAIR
WALL/CURB AND ALIGN
DEMO WITH THAT EDGE
5"
7 1/4"
EQ
S
PA
C
IN
G
M A
X
1/4" BEADBOARD PANELING,
PAINTED, SELECT TO MATCH SPACING
AND PROFILE OF EXG BEADBOARD,
USE TRIM NAILS AND CONSTRUCTION
ADHESIVE AS NEEDED TO HOLD SHAPE
OF CURVE
(2)2x4 SHELF TO SUPPORT SUB-RISER.
CONNECT TO STUD AT EACH END WITH
SIMPSON A34 ANGLE BELOW PLUS
(4)-10d TOE NAILS. USE #9x1-1/2" SD
SCREWS TO INSTALL ANGLE
2x12 SUB-RISER
5/4 OAK TREAD,
1.25" NOMINAL DIA. (1.66" O.D.)
STEEL PIPE POST, PAINTED
1/2" STEEL ROUND BAR
INTERMEDIATE RAILS, PAINTED
1.25" NOMINAL DIA. (1.66" O.D.)
STEEL PIPE TOP RAIL, PAINTED,
MAINTAIN 42" MIN ABOVE WALKING
SURFACE/LINE OF STAIR NOSINGS
1/4" OAK VENEER SKIRT, PAINTED
ANCHOR BOTTOM PLATE OF WALL TO
EXISTING FLOOR WITH 10d NAILS AT 4"
O.C. AND SIMPSON SDWC 15600
SCREWS THROUGH FLOORING/SUBFLOOR
TO BLOCKING AT 8" O.C.
1x4 WOOD BASE, PAINTED
1x8 WOOD CAP WITH
BULLNOSE/EASED EDGES, PAINTED
1/2" SCOTIA MOLDING, BOTH
SIDES, PAINTED
1/2" PLYWOOD SUBSTRATE, KERF
CUT ±1/4" DEEP APPROX. EVERY 1"
ON BACKSIDE DO CREATE CURVE
ADD MIN. 2x FULL DEPTH BLOCKING
BETWEEN JOISTS BELOW WALL
EXISTING FLOOR
ASSEMBLY
A
B O
V E
W A
LK
IN
G
S U
RF
A
C E/
LI
N
E O
F S
TA
IR
N
O S
IN
G S
2 1/4"
EXISTING WALL
TOP PLATE OF KNEE WALL, TRIM TO FIT
1x WOOD CAP TO KNEE WALL, BULLNOSE/EASED EXPOSED EDGE, PAINTED
PROVIDE BLOCKING IN KNEE WALL
AND COORDINATE WITH HANDRAIL
BRACKET LOCATIONS
1/2" GB, PAINTED
1.25" NOMINAL DIA. (1.66" O.D.) PIPE
HANDRAIL, PAINT
STEEL HANDRAIL BRACKET: 1/2" ROUND
BAR SUPPORT AND 1/4" THICK x 3" DIA
ROUND PLATE W/ (3) HOLES FOR 1/4"
COUNTERSUNK WOOD SCREWS
SHIM AND CONNECT BLOCKING TO
EXISTING WALL AS REQUIRED
VARIES, SEE PLAN
1"
1 1/2"
1"
MOUNTING PLATE
4" V x 3-1/2" H x 1/4" THICK PLATE WITH (4) 0.19" DIA x 2-1/2" TO 3"
LONG SCREWS, COUNTERSINK HEADS
TAB PLATE
TAB PLATE WELDED TO MOUNTING PLATE
2x2x1/4" PLATE
1"
1/2" DIA x 1" LONG, SLOTTED HOLE
TAB PLATE WELDED TO RAIL POST
3/4" 1 1/4"
RAIL POST
1/2" DIA HOLE
SET SCREW (x2)
1-1/4" DIA SOLID STEEL ROD
RING PLATE OR TAB TO STOP
RAIL POST
- 4
CONTINOUS TOP PLATE (2-2x4), CORE NEATLY AT ROD
1.66" O.D. (1.38" I.D.) PIPE
(5) #10 SCREWS, TOP AND
BOTTOM OF PLATE
1/4" x 3-1/2" x34" STEEL
PADDLE PLATE
WOOD CAP PER ADJACENT DETAIL
A-102
1-1/4" DIA SOLID STEEL ROD, FLARE BEVEL
WELDED, EACH SIDE TO PADDLE PLATE
(2)-2x4 SHELF TO SUPPORT SUB-RISER.
CONNECT TO STUD AT EACH END WITH
SIMPSON A34 ANGLE BELOW PLUS
(4)-10d TOE NAILS. USE #9x1-1/2" SD
SCREWS TO INSTALL ANGLE
1/4" PADDLE PLATE, SEE OTHER DETAIL
(2)-2x4 FULL HEIGHT STUD AT
RAIL POST/PADDLE PLATE
ADD 2x4 FULL HEIGHT ADJACENT
TO RAIL CONNECTOR
SIMPSON A34 ANGLE AT SUB-
RISER WITH #9x1-1/2" SD SCREWS
SUB-RISER
SUB-RISER
NOTE: WHERE 2 SUB-RISERS FALL IN SAME
SPACE BETWEEN STUDS, NOTCH LOWER
SUB-RISER TO ACCOMMODATE UPPER SHELF
P R
IN
C E A
V E N
U E
S E C
O N
D F
LO
O
R
A
TH
E N
S
G A
T:
.3
.3
P R O J E C T :
T I T L E :
I S S U E :
D A T E :
A-102
2026.02.05
FOR BID &
CONSTRUCTION
MORTON THEATER STAGE
STAIRS
195 W WASHINGTON ST
ATHENS, GA 30601
STAIR AND RAILING
DETAILS
3/4" = 1'-0"
NEW STAIR SECTION
3/4" = 1'-0"
NEW STAIRS ENLARGED PLAN
3/4" = 1'-0"
NEW STAIR ELEVATION
STAIR PERSPECTIVE
STAIR PERSPECTIVE - DEMO
3/4" = 1'-0"
KNEE WALL, CURB, AND GUARD DETAIL
3/4" = 1'-0"
HANDRAIL DETAIL
1 1/2" = 1'-0"
MOUNTING AND TAB PLATES
3/4" = 1'-0"
RAIL MOUNTING SECTION DETAIL
3/4" = 1'-0"
RAIL MOUNTING PLAN DETAIL
P
R I N
C E
A
V E
N U
E
S E
C O
N D
F
L O
O R
A T
H E
N S
G
A
T
P R O J E C T :
T I T L E :
I S S U E :
D A T E :
S-100
ATHENS, GEORGIA
STAGE STAIR
195 W. WASHINGTON STREET
MORTON THEATER
IMPROVEMENTS
GENERAL NOTES
05 FEBRUARY 2026
| Sheets |
| G-002 - SPECIFICATIONS & CODE PLAN |
| A-101 - DEMO AND PROPOSED FLOOR PLAN |
| A-102 - STAIR AND RAILING DETAILS |
| G-001 - COVER SHEET |
File details come from the government source that posted it. Updated .