ATTACHMENT B - AF-1222-Boiler or Pressure Vessel Inspection Report.pdf
PDF 30 KB Posted
- Solicitation number
- 36C25223Q0561
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25223Q0561 0001.docx | DOCX document | |
| ATTACHMENT C - Monroe County WI WD 15-4929 (Rev-20) dated 06.27.2022.docx | DOCX document | |
| 36C25223Q0561_1.docx | DOCX document | |
| ATTACHMENT A - VA DIRECTIVE 1810_D_2023-01-04.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
24. LAST HYDROSTATIC TEST
DATE:
2. DATE OF INSPECTION
1. TYPE OF INSPECTION
INTERNAL AND EXTERNAL
A
VA
BOILER OR
3. INSPECTION/DELIVERY ORDER NO.
VB
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST
B
PRESSURE VESSEL
INSPECTION REPORT
VC
EXTERNAL UNDER OPERATION
C
4. CONTRACT NUMBER
VD
EXTERNAL UNDER HYDROSTATIC TEST
D
VE
EXPANSION/RECEIVER TANK
E
5. INSTALLATION
6. STATE
7. ZIP CODE
9. TYPE
FIRE TUBE
CAST IRON
8. PLANT OR BLDG.
WATER TUBE
EXPANSION TANK
OTHER (Specify)
10. PLANT
MANNED
UNMANNED
11A. PRESSURE PREVIOUS INSPECTION
11B. PRESSURE THIS INSPECTION
12. USE
13A. YEAR BUILT
13B. YEAR INSTALLED
POWER
STEAM HEATING
14A. PRIMARY FUEL (Boiler) 14B. SECONDARY FUEL (Boiler)
PROCESS
STORAGE
15. DESIGN WORKING PRESSURE OR TEMPERATURE
HTHW
HEAT EXCHANGE
16. MANUFACTURER
OTHER (Specify)
17. MANUFACTURER'S RATING MBTU
18A. NATIONAL BOARD NUMBER
18B. USAF NUMBER
19. METHOD OF FIRING (Boilers)
20. SAFETY RELIEF VALVES SETTING
21. EXPLAIN IF PRESSURE CHANGED
NEW
RETEST
22. PRESSURE GAGE TESTED
YES
NO
23. PURPOSE OF HYDROSTATIC TEST
25. HYDROSTATIC TEST
DATE:
YES
NO
PSI:
PSI:
STATEMENT OF BASE CIVIL ENGINEER
26.
REPAIRS MADE SINCE LAST INSPECTION
NONE
OTHER (Specify) 27.
INTERNAL INSPECTION
DESCRIBE INSPECTION FULLY (State location of any damage or deposits, i.e., scale, grease, oil or others; any corrosion, pitting, grooving, cracking or lamination; any evidence of overheating, broken or loose items, etc.)
28.
EXTERNAL INSPECTION
CONDITION OF BOILERS VESSELS AND PLANT (Describe fully and state location of any corrosion, leakages, evidence of overheating, soot or other destructive accumulations, or safety or ASME violations, etc.)
29. SETTINGS, LININGS, SUPPORTS AND BAFFLES
INSPECTION OF SAFETY DEVICE
30. SAFETY
31. SIZE
32. TOTAL CAPACITY
33. CONDITION AND HOW TESTED
RELIEF
VALVES
NUMBER:
CFM:
BTU/HR:
LB/HR:
PRESSURE
GAGES
34.
35. CORRECTION TAKEN
(If none give reason)
36. OTHER
37. CONDITION
ITEMS
38. REGULATORS
39. CONDITION
AND
CONTROLS
40. ASME CODES
DOES PLANT COMPLY WITH CODE, WELDING, MATERIALS, CONFIGURATION, ETC?
YES
NO
PREVIOUS EDITION IS OBSOLETE.
AF IMT 1222, 19990201, V2
INSPECTOR STATEMENT
41. WAS BOILER OR VESSEL PREPARED FOR THOROUGH EXAMINATION (If NO, state what was not and why in Remarks and Recommendations of Inspector.)
DOES PLANT COMPLY WITH CODE, WELDING, MATERIALS, CONFIGURATION, ETC?
YES
NO
42. WAS BOILER ENTERED FOR THE INSPECTION (If NO, state what was not and why in Remarks and Recommendations of Inspector.)
YES
NO
REMARKS AND RECOMMENDATIONS OF THE INSPECTOR
43. LIST ALL DEFICIENCIES TO BE CORRECTED OR REPAIRED (Use a continuation sheet if necessary._)
NAME AND TITLE OF AIR FORCE REPRESENTATIVE
ACCOMPANYING INSPECTOR
44. TYPED NAME AND TITLE OF INSPECTOR
45.
46A. SIGNATURE OF INSPECTOR
46B. DATE OF SIGNATURE
46C. INSPECTOR'S NATIONAL BOARD
COMMISSION NUMBER
47.
ACTION TAKEN ON RECOMMENDATIONS
DATE AND ACTION TAKEN OR TO BE TAKEN
48. TYPED NAME, TITLE AND GRADE OF OFFICER IN CHARGE
49. SIGNATURE OF OFFICER IN CHARGE
50. DATE OF SIGNATURE
AF IMT 1222, 19990201, V2
(REVERSE)
8.2.1.3158.1.475346.466429
| TypInsp: 0 |
| TypInsp_2: 0 |
| TypInsp_3: 0 |
| TypInsp_4: 0 |
| TypInsp_5: 0 |
| CHECK1: 0 |
| CHECK2: 0 |
| CHECK10: 0 |
| CHECK11: 0 |
| CHECK15: 0 |
| CHECK16: 0 |
| AsmeYes: 0 |
| AsmeNo: 0 |
| CHECK14: 0 |
| CHECK17: 0 |
| CHECK12: 0 |
| CHECK13: 0 |
| CHECK5: 0 |
| CHECK7: 0 |
| CHECK6: 0 |
| CHECK3: 0 |
| CHECK8: 0 |
| CHECK4: 0 |
| CHECK9: 0 |
| TypeA: 0 |
| TypeB: 0 |
| TypeA_2: 0 |
| TypeB_2: 0 |
| OthrCkA: 0 |
| IntrnlA: 0 |
| IntrnlVA: 0 |
| B: 0 |
| C: 0 |
| G: 0 |
| I: 0 |
| H: 0 |
| F: 0 |
| J: 0 |
| K: 0 |
| Enter date as YYYYMMDD: |
| InspDONum: |
| CntrNum: |
| Installtn: |
| State: |
| ZipCode: |
| PlntBldg: |
| OtrSpfyA: |
| PresInspB: |
| PresInstA: |
| OtrSpfyB: |
| YrBuilt: |
| YrInstll: |
| PriBoilr: |
| SecBoilr: |
| DsgWkPTp: |
| Manufac: |
| ManfRatg: |
| NatlBdNum: |
| UsafNum: |
| MethFrBlr: |
| SftyRelV: |
| PressChg: |
| Enter Date as YYYYMMDD: |
| LstHTPsi: |
| Enter Date as YYYYMMDD: |
| HyTstPsi: |
| OthSpfyC: |
| IntrInsp: |
| ExtrInsp: |
| SeLiSuBa: |
| ISDSize: |
| ISDNum: |
| TtCapCFM: |
| TlCapBTU: |
| TlCapLB: |
| CndHowTs: |
| PGCorrct: |
| OtItmCnd: |
| RegCtrCon: |
| InsStmYs: 0 |
| InsStmNo: 0 |
| EntrBlrYs: 0 |
| EntrBlrNo: 0 |
| DefCorRpr: |
| NameInsp: |
| NamTlRep: |
| SignInsp: |
| Enter date as YYYYMMDD: |
| NtlBdCmNo: |
| DteActn: |
| NTGrOIC: |
| SignOIC: |
| Enter date as YYYYMMDD: |
File details come from the government source that posted it. Updated .