This is a Quality Assurance Surveillance Plan (QASP) for the B42 Resident Kitchens and Finishes project at WG (Bill) Hefner VA Medical Center, Building 42 Community Living Center (Project 659-26-001), dated May 26, 2026. The QASP establishes the systematic method by which the Government will evaluate the Contractor's performance against requirements specified in the Performance Work Statement (PWS). The Contracting Officer (CO) maintains sole authority to make contract changes, while the Contracting Officer's Representative (COR) monitors technical performance and compliance. The Contractor is responsible for performing all services in accordance with the PWS, applicable regulations, safety requirements, and VA policies, with all identified deficiencies corrected at no additional cost to the Government.

The plan establishes six performance objectives with corresponding surveillance methods and Acceptable Quality Levels (AQLs). Removal of finishes and casework requires 100% compliance verified through weekly COR inspections. Installation of modular casework and replacement finishes each require 95% compliance verified through random inspections and must meet specifications and manufacturers' guidelines without defects. Protection of utilities demands 100% compliance with no plumbing or electrical damage through ongoing observation. Site cleanliness and safety require 95% compliance with daily walkthroughs to ensure work areas remain clean and safe. Deliverables submission requires 100% compliance with reports submitted as required, verified through document review.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

TITLE: B42 Resident Kitchens and Finishes LOCATION: WG (Bill) Hefner VA Medical Center, Building 42 Community Living Center

PROJECT: 659-26-001

DATE: May 26, 2026

1.0 Purpose

This Quality Assurance Surveillance Plan (QASP) provides a systematic method for the

Government to evaluate the services the Contractor is required to perform as described in the

Performance Work Statement (PWS). The QASP focuses on the level of performance required, rather than the methodology used by the Contractor.

2.0 Authority

This QASP is developed pursuant to Federal Acquisition Regulation (FAR) Part 46, which requires Government surveillance of contractor performance to ensure services meet contract requirements.

3.0 Government Roles and Responsibilities

The Contracting Officer (CO) is the only individual authorized to make changes to the contract.

The Contracting Officer’s Representative (COR) is responsible for monitoring the Contractor’s technical performance and verifying compliance with the PWS.

4.0 Contractor Roles and Responsibilities

The Contractor shall ensure all services are performed in accordance with the PWS, applicable regulations, safety requirements, and VA policies. The Contractor shall correct all deficiencies identified through Government surveillance at no additional cost to the Government.

5.0 Performance Standards and Acceptable Quality Levels (AQLs) The following table outlines the performance objectives, performance standards, methods of surveillance, and acceptable quality levels (AQLs).

Performance Objective

Performance Standard Surveillance Method AQL

Removal of finishes and casework

All removal tasks completed per PWS requirements

Weekly inspections by

COR

100% compliance

Installation of modular casework

Installed per specifications and without defects

Random inspections 95% compliance

Installation of replacement finishes

Installed per specification, to manufacturers’ guidelines, and without defects

Random inspections 95% compliance

Protection of utilities No plumbing/electrical damage occurs

Ongoing observation 100% compliance Site cleanliness and safety

Work areas maintained clean and safe

Daily walkthrough 95% compliance Deliverables submitted

Reports submitted as required

Document review 100% compliance