This statement of work outlines well redevelopment services required at the White Sulphur Springs National Fish Hatchery. The contractor will redevelop four water supply wells through bore-blasting, chemical treatments including acid, polyphosphate and chlorine, yield testing, and video inspections. Services include well inspections, pump and motor evaluations, redevelopment of Wells A, B, E and F between February and April 2024 to support hatchery operations. The contractor must follow all applicable safety and environmental regulations in conducting this work at the hatchery located in White Sulphur Springs, West Virginia.

View the file

Other files

File Type Posted
Sol_140FC224Q0001_Amd_0001.pdf PDF
Attachment_B_-_Wage_Determination_No__WV20230061.pdf PDF
Sol_140FC224Q0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

WATER WELL REDEVELOPMENT

White Sulphur Springs National Fish Hatchery

White Sulphur Springs, WV

Rev 10-23-2023

United States Fish and Wildlife Service Fisheries Division 300 Westgate Center Dr.

Hadley, MA 01035

Page | 1

PART 1 GENERAL

1.01 DESCRIPTION OF WORK

The work consists of redevelopment of four (4) water supply wells, at the White Sulphur Springs National Fish Hatchery in White Sulphur Springs, WV. The wells are designated as:

Fish Production Well A Fish Production Well B Fish Production Well E Fish Production Well F

This work includes:

A. Pumping (well yield – stepped drawdown) tests for each well prior to and after well redevelopment. The results of the initial pump test shall be sent to the Government upon completion.

B. Videotaping each well before and after redevelopment. Two digital copies of each video produced for each well along with a written description of the condition of each well including the condition of column pipe, well casing, well screen, shall be furnished to the Government.

C. Chemical treatment and physical agitation of each well.

D. Providing well reports for each well:

The reports shall include:

a. A written description of the redevelopment procedures undertaken, including any notes or observations made during the well redevelopment.

b. A table showing the static drawdown (ft), flow rate (gpm), pumping level (ft), measured draw down (ft), specific capacity (gpm/ft), discharge pressure (psi), Total Dynamic Head (TDH (ft) and well motor amperages for each phase for each event (pre-test, cleaning, post-test, etc.).

c. A graph of depicting the drawdown AND recovery of the well (y-axis) over time (x-axis) during the redevelopment.

E. Testing/evaluating the four (4) existing well pump/motors and preparing a repair cost estimate as necessary. This includes providing an inspection/evaluation report, recommended repairs, if any, along with a construction cost estimate for the pump and motor for each well.

Page | 2

F. Included in the test/evaluation procedure is the painting of the column pipe. See Section 1.04 for testing/inspection procedures.

1.02 SITE INSPECTION

A. Before submitting a proposal, prospective proposers are encouraged to visit the worksite.

Inspection of the site should be confirmed in advance by contacting the Contracting Officer who will announce a date and time in the solicitation.

B. The White Sulphur Springs National Fish Hatchery is located at 400 East Main Street. White

Sulphur Springs, WV 24986 (Greenbrier County, West Virginia approximately 82 miles southeast of Charleston, WV. From I-64, take the White Sulphur Springs exit to U.S. 60).

1.03 EXISTING CONDITIONS AND NEW WORK

Wells A and B are adjacent to one another and supply water from the same aquifer. Wells A and B cannot be operated simultaneously. Wells A and B are equipped with 15 hp and 30 hp vertical turbine pumps, respectively. Well A is used primarily as a backup to well B and is also used at the beginning of the pumping season when hatchery water demands are lower.

Well E is located on property adjacent to the hatchery and owned by the City of White Sulphur Springs. A 25-horsepower submersible pump is installed within well E. In 1990, the hatchery contracted with the City of White Sulphur Springs to lease well E for a 99-year term.

Well F is located behind the Mussel Shop and is 6” diameter pipe and is 150’deep. The well pumps 50 gpm from a submersible Grundfos Pump, model # A7110000-P10847270. This well seems to have been constructed in 2008/2009.

See Appendix A for hatchery site plan and well locations, and Appendix B for well head photos.

WELL A

Well A is a 6" diameter rock well, constructed to a depth of 205 ft.; cased to a depth of 161 feet;

drilled in 1964; and test pumped to deliver 300 gpm at a pumping level of 110 feet. The well casing is grouted in rock. The pump is a Crane-Deming vertical turbine pump rated to deliver 300 gpm @ 120 ft. tdh. It was installed during May 1990 by Carl Johnson Plumbing. The pump and motor components include a three-stage bowl assembly model XH6, curve no. PC3168Z-20, bowl #4482, all-iron, discharge head SD54-10 cast iron, overall length 155 ft., 15 HP motor, 3500 rpm, 230/460 or 208 volt, 3 phase, WP-1 enclosure, 1.15 S.F., column, and shafting: 4"x 3/4". Impeller no. 22957.

WELL B

Page | 3

Well B is 10" diameter and a depth of approximately 175 feet. It contains a vertical turbine pump rated to deliver 500 gpm at 170 feet tdh. The vertical turbine pump is set approximately 174 feet below grade and was installed during May 1989. It is powered by a 30 horsepower, 1800 rpm motor connected to a 6" x 1.25" column assembly. The pump/motor assembly failed in 2023 and was replaced in late summer 2023.

WELL E

Well E (City Well) is a 6" diameter steel cased well constructed to a depth of 182 feet. The static water level is approximately 15-1/2 feet below grade. This well was test pumped by Mundy Drilling Co. on June 12, 1989, at a rate of 285 gpm for 24 hours at a pumping water level of 114 feet. The well pump is a Goulds model 300L stainless steel, installed August 1990 by International Water Corp., rated to deliver 300 gpm against 200 ft head, 25 HP. Pump is set approx. 142 feet below grade. It delivers water through a 3" discharge and column pipe.

WELL F

Well F is a 6” diameter steel cased well constructed to a depth of 150 feet. The well pumps 50 gpm from a submersible Grundfos Pump, model # A7110000-P10847270. This well seems to have been constructed in 2008/2009.

All the existing gate valves and check valves at the wells appear to be operating properly. This contractor shall test the operation and evaluate the condition of these valves and report their findings in the inspection report.

1.04 INSPECTION AND MAINTENANCE OF EXISTING PUMPS AND MOTORS

A. Inspection and maintenance of existing well pump and motor.

1. Field testing of the pump:

a. Prior to removal, a field performance test shall be conducted on the existing pump. See Section 1.05.C

2. Field testing motor and wiring:

a. Field test of resistance to ground, MegOhm test for each phase.

3. Following field testing, the existing submersible pump and motor serving each of the wells shall be removed by the Contractor taking care not to damage the equipment of the existing infrastructure. Once removed, the pump shall be disassembled, cleaned, and inspected by a technician with a minimum of three (3) years’ experience in large water supply well pump inspection and repair. Inspection of the pump and pump motor shall include, as a minimum, the following:

Page | 4

a. Motor inspection:

1. Use of caliber to evaluate thrust bearing wear

2. Visual inspection for damage and / or discoloration

3. Visual inspection of insulation jacket on motor leads and submersible power cable for cracks, etc.

4. Measuring the motor’s electrical output to ensure it is within manufacturer’s specifications.

5. Ensuring the motor is operating within the parameters (e.g., temperature, etc.)

recommended by the manufacturer.

6. Performing a visual inspection of the wiring to insure items such as the insulation on the wires is not dried out or fraying, etc.

b. Submersible Pump Bowl Inspection:

1. Pressure wash bowl exterior and inspect for damage and / or discoloration.

2. Disassemble and pressure wash internal components.

3. Visually inspect wear surfaces for signs of advanced or abnormal wear.

4. Check the bowl assembly and impellers for wear or other defects.

5. Visually inspect bowl fasteners and collets for corrosion.

6. Visually inspect pump shaft for excessive wear.

7. Visually inspect impellers for wear and corrosion / deterioration.

8. Carefully dismantling, inspecting, and measuring, wear tolerances to ensure they are within manufacturer’s specifications.

9. Hand cleaning, to ensure cleanliness and provide a secondary inspection.

10. Replacing all o-rings and seals.

11. Fully load testing to ensure it meets the manufacturers specifications for, delivery rate (gallon per minute) at pressure (TDH or total discharge head), efficiency, and pressure differential (suction versus discharge).

c. Column Pipe. Once cleaned, the pump column pipe shall be painted with a protective paint to include a primer paint as recommended by the pump manufacturer.

B. Provide a written Pump Inspection Report that details the condition of the equipment and provides recommendations for repairs as needed with unit pricing for any proposed repair / replacement parts. No repairs are to be completed without prior written authorization from the USFWS.

1.05 WELL REDEVELOPMENT

A. The Contractor shall furnish all labor, equipment, chemicals, and materials necessary to clean, redevelop, and attempt to return to original capacity, each of the existing four (4) wells.

Page | 5

B. Measure and record static water level, depth of well, and test flow rate with corresponding vacuum gauge reading. These measurements shall be taken and recorded before, during, and after, cleaning each well.

C. Perform a pre- and post-rehabilitation, step drawdown test of the well to determine the approximate well yield before and after the rehabilitation.

a. This test shall be a step drawdown test and consist of operating the pump at a minimum of three (3) rates – approximately 40%, 70%, and a minimum of 100%- 105% of the rated design capacity where water levels and discharge pressures are monitored and recorded along with flow rates so that a representative performance curve can be generated for comparison to the original catalog curve for the pump. Each individual pumping rate shall be held constant for a minimum of 2 hours and until the drawdown in the well has stabilized, i.e., remains constant. Recorded drawdown measurements shall be required to confirm drawdown stabilization at each step.

b. The improvement in well capacity shall be reported in terms of percent increase in specific capacity measured as gallons per minute per foot of drawdown.

c. The test shall be performed by pumping the well to waste through a yard, hydrant, or station blow-offline so that flow measurements can be obtained using an orifice pipe or pitot tube.

D. As stated above, following both the pre- and post-rehabilitation yield tests of the well, conduct a video survey of the entire depth of the well for visual assessment of its condition before and after rehabilitation. The reason for the pre and post treatment video survey is to determine the well’s mechanical integrity, type of treatment required and overall effect of rehabilitation.

E. Each well shall be redeveloped using “boreblast” high-pressure gas impulse technology system; the “Airburst Technology” process, or by another equivalent means approved by the Contracting Officer. The redevelopment method shall include and be designed to provide effective chemical treatment using smaller amounts of chemicals than would be required by traditional well rehabilitation methods.

F. The “boreblast” system shall utilize a high-pressure gas impulse generator to deliver precisely timed high-pressure waves, transforming the potential energy in compressed gas into useful mechanical energy to remove scale and build-up from well screens and rock formations, disperse treatment chemicals, and remove fine materials from wells. The impulse generator shall be lowered into the well on a double braided high pressure hydraulic hose spooled on an electric or hydraulic winch. Depending on the chemistry of the groundwater, the impulse gas may be either an inert gas such as nitrogen or high-pressure air generated on site. The pressure shall be capable of being varied from a few hundred psi up to 4,500 psi.

The auto-firing mechanism, discharging at four second intervals, shall not require a special electrical circuit or electrical connections down-hole for operation. The impulse generator

Page | 6 diameter and gas volume may be modified in the field to meet well geometry and treatment requirements. The “boreblast” redevelopment process shall be conducted as follows:

a. The operator shall have the ability to select impulse generator diameter, gas chamber volume, and operating pressures to match the well dimensions and conditions.

b. To obtain maximum water column resonation the impulse generator shall be designed to discharge at a constant frequency of three to five seconds between discharges and shall not be adjustable.

c. The discharge gas shall be dry nitrogen delivered to the job site in pressures of 2,400 to

4,200 psi.

d. The bottom of the well shall be accurately determined by video or wire line.

e. Treatment shall begin in the lower most zone of water capture by the well. A zone is determined by soil and rock type.

f. A minimum of two bursts shall be made in each foot of zone to be treated.

g. A minimum of two passes shall be made through each treatment zone.

h. Following the initial treatment, the well depth shall be sounded to determine the amount of fill generated.

i. Excess fill shall be bailed or airlifted (forced with air pressure) out of the well. The well shall also be pumped to remove suspended solids.

j. Chemical treatment requirements shall be determined by analysis of a water sample to determine the appropriate treatment chemicals and shall at minimum consist of three (3) separate treatments; Muriatic acid; polyphosphate, and chlorine (Note, chlorine is toxic to fish). Following disinfection with chlorine, all residual chlorine shall be neutralized.

k. The treatment chemicals shall be placed in the treatment zones by tremie pipe.

Acid Treatment

1. The Contractor shall insure all OSHA standards regarding working with acids are followed.

2. The acid used to treat the well shall be 27.92% acid grade inhibited MURIATIC

ACID (hydrochloric acid).

3. The acid shall be placed in the bottom of the well; a small diameter (1/2" to 3/4") plastic pipe shall be inserted into the well, to a depth of three (3) feet off the bottom of the well, and enough acid shall be funneled into the plastic pipe to fill a five-foot

Page | 7 length of screen. The plastic pipe shall then be raised five feet and an equal volume of acid shall be added. This process shall be repeated until all the acid has been poured.

4. Vigorous surging of the well shall begin immediately following the introduction of the acid, and shall continue for two hours, whereupon the well shall be pumped clean and redeveloped.

5. For each acid treatment, the Contractor shall use a volume of 27.92% inhibited

MURIATIC ACID which is equal to twice the volume of the well screen.

6. The Contractor shall submit an acceptable plan for utilization (neutralization and disposal) of the acid pumped from the well before beginning this type of treatment.

Subsequent chemical treatment, if required shall be the same procedure as detailed above.

Polyphosphate Treatment and Chlorine Treatment (Disinfection)

1. The polyphosphate used for cleaning each well shall be sodium hexametaphosphate, and it shall be introduced to a well as water solution, after it has been dissolved by placing the polyphosphate in a wire basket or burlap bag and then suspending the container in water or as directed by manufacturer's recommendations.

2. For each 100 gallons of water contained in the well, the Contractor shall use about 30 pounds of polyphosphate and one pound of calcium hypochlorite or an equivalent amount of sodium hypochlorite.

a. If the calcium carbonate concentration in the ground water is above 100 ppm

(parts per million) (mg/l), the use of sodium hypochlorite is recommended instead of calcium hypochlorite.

b. Calcium hypochlorite or sodium hypochlorite that contain other chemicals of additives such as stabilizers, perfumes, algaecides, or other chemicals that are used for water supply disinfection should be certified that they follow or surpass the American National Standards Institute/NSF International (ANSI/NSF) Standard 60 for Drinking Water Treatment Chemicals – Health Effects, or an equivalent standard.

c. If a sodium hypochlorite solution is used it shall be less than 60 days old.

d. If tablets are to be used as a source of chlorine for a chlorine solution, they must first be broken up and dissolved in a 5-gallon pail or bulk tank.

e. The pH and temperature of the water used to make the chlorine solution shall be controlled to yield the greatest biocidal effects of the chlorine

Page | 8

f. Chlorine concentrations shall be kept between 250 ppm (parts per million) and 500 ppm.

g. The pH of the chlorine solution shall be controlled to less than 7.5.

3. The polyphosphate - hypochlorite solution shall be introduced to the well, vigorously surged for four hours, allowed to remain static for about 18 hours, and resurged for two hours, whereupon the well shall be pumped clean and redeveloped.

4. The Contractor shall record the pH and chlorine concentrations immediately and 24 hours after the final pump flush, or at the end of the redevelopment procedure. The Contractor shall neutralize all residual chlorine to ensure that no chlorine remains in the well water. All chemicals shall be pumped from the well and properly treated and disposed of.

l. After bore-blast and chemical treatments, check water turbidity:

1. The turbidity test will be the standard to determine the effectiveness of the well development work and as to when well development should be discontinued. In general, well development shall continue until the water turbidity does not exceed a maximum of one nephelometric turbidity unit (NTU). Turbidity measured by the degree to which particles in the water scatter light using an instrument named a nephelometer are reported as NTUs.

2. Conduct turbidity tests in the field by use of an EPA accepted portable type nephelometric turbidity meter or obtain turbidity results from a State of West Virginia approved laboratory. Calibrate portable nephelometric turbidity meter prior to using to taking readings according to manufacturer’s recommended procedures to ensure accurate test results.

3. Perform turbidity tests by checking turbidity after 4, 12, 18, and 24 hours of well development.

4. Contractor is responsible for paying for all costs incurred for testing.

m. After performing the post rehabilitation yield test and videotaping the well, return each well to service and submit copies of all records to the Contracting Officer.

1.06 REDEVELOPMENT AND TESTING

A. Redevelopment of each well shall include making the well clean to its original design depth, by surging and pumping until no traces of gravel, sand, silt, clay, or chemicals remain in the pump discharge water as described in the previous section.

Page | 9

B. The Contractor shall use an approved method of measuring the flow (orifice plate, flow tube, etc.) before and after cleaning operations.

C If after redevelopment, the yield of the well does not meet the original design yield (x gpm at y Total Dynamic Head (TDH)) and no increase in the specific capacity (gpm/ft) is shown, the Contractor shall, if directed by the Contracting Officer (CO), repeat the bore-blast and chemical treatment processes.

D. The Contractor shall furnish all necessary labor, equipment, and materials for testing the drawdown in each well.

E. Each well shall be pumped without interruption throughout the testing period.

F. No pumping tests shall be scheduled and/or conducted without prior approval of the CO.

G. Chlorine is toxic to fish. Prior to reintroducing the water supply from a well to the fish hatchery, the Contractor shall record the pH and chlorine concentrations immediately and 24 hours after the final pump flush, or at the end of the redevelopment procedure. The Contractor shall insure that no chlorine remains in the water.

H. All chemicals used in the redevelopment process shall be neutralized or disposed of by the

Contractor in an environmentally sound manner. Chemicals shall not cause harm or death to the existing fish population at the fish hatchery or within any river, stream, pond, or lake which could receive the discharge water.

I. The installation of any new (in-kind replacement or approved equal) pump/motors shall include unit assembly, installation, and a (minimum 2 hour) performance test conducted to verify proper operation of all components.

1.07 GENERAL TECHNICAL REQUIREMENTS

A. The Contractor shall perform all work in strict accordance with these specifications, subject to the terms and conditions of the contract.

B. All work shall comply with currently accepted well drilling methods and techniques as described in the book titled Groundwater and Wells by Fletcher G. Driscoll published in 1986 by Johnson Screens and the National Electric Code.

C. The work shall be performed in accordance with all applicable Federal, State, and local regulations including, but not limited to, all provisions of the State of West Virginia Department of Environmental Protection, U.S. Environmental Protection Agency and the Occupational Safety and Health Administration (OSHA) regulations and requirements. This includes all handling, cutting, connecting to, capping, and removing.

D. The Contractor shall be responsible for obtaining and paying for any permits associated with this work.

Page | 10

E. All work shall comply with the current edition of the National Fire Protection Association

(NFPA) 101 Life Safety Code, Uniform Building Code, American Welding Society standards, American Concrete Institute recommended practices, and applicable Federal, State, and local laws and regulations.

F. If the code provisions conflict, the more stringent code provision shall govern. In any instances where the drawings and specifications do not specify explicit materials or methods, then perform the work in accordance with the minimum requirements of the code applicable to the work.

G. The Contractor shall field verify all dimensions and conditions and shall notify the COR of any conflicts.

H. Construction (Progress) Schedule: Submit the proposed progress work schedule in accordance with contract clause 52.236-15 Schedules for Construction Contracts (APR 1984). Itemize each principal component/phase of work and the calendar days of anticipated performance. Submit a revised schedule any time the actual work progress lags the scheduled time by more than 14 calendar days.

I. Schedule-of-Values: Submit a detailed Schedule-of-Values within 7 days prior to the start of on-site construction work. Format the schedule-of-values to match the Schedule of Items and show sufficient additional detail, including labor, materials, and equipment, to allow accurate calculation of monthly progress payments. Lump sum items shall be broken down into their component parts as applicable with a cost shown for each, i.e., mobilization, bond and insurance, mechanical removal or installation, electrical installation, or wiring, for example, and any other trade work.

1.08 HATCHERY OPERATIONS

A. The hatchery will continue operations during the performance of this contract. The

Contracting Officer (CO) may require the Contractor to schedule his work during a time which would least interfere with the hatchery operations. If it becomes necessary to interrupt any function of the hatchery, the Contractor shall notify the CO and shall not proceed in such interruptions until such time as the CO makes provisions for and approves such operations. No work shall be performed which could contaminate the water supply or cause harm or death to the existing fish population.

B. To ensure that an adequate water supply is provided to the hatchery during the work, only one well may be out of service at any given time.

C. The well redevelopment work on operational wells A, B, E and F shall be performed and completed between February 1, 2024, and April 30, 2024, to enable the hatchery to operate these wells when they are needed for fish production purposes.

Page | 11

D. All work under this contract shall be performed during normal hatchery operating hours of 7:30 AM to 4:00 PM. No work shall be performed on Saturdays, Sundays, or federal holidays, unless authorized in advance by the CO.

1.09 ORGANIZATION AT THE SITE

A. Contractor Use of the Premises.

1. Storage Areas

a. Areas within the hatchery grounds are available for use by the Contractor to perform the work and for the storage of equipment, materials, and trailers during the life of the contract.

b. The Contractor shall confine storage areas to the limits as designated or approved by the CO and Hatchery Manager, and the Contractor and shall be responsible for the security of these areas.

2. Upon completion of the contract, the Contractor shall remove all equipment and materials, except as otherwise specified, and shall restore the site to its original condition, as approved by the CO, COR, and Hatchery Manager, at no additional cost to the Government.

B. Work Limits

1. Work shall be restricted to those areas near the wells (roughly 50 feet) in addition to any storage areas assigned to the Contractor.

C. Contractor Receipt of Supplies

1. The Contractor shall be responsible for making all arrangements required for the receipt and handling (including unloading) of materials and supplies at the job site.

1. Government personnel are not permitted to receive, unload, or to sign for items delivered to the site.

D. Protection of Turfed Areas

1. Damaged turfed areas, not otherwise scheduled to be treated, shall be repaired to original condition at no additional cost to the Government.

1.10 SUBMITTALS

A. For each of the required submittals listed below, the Contractor shall provide sufficient

Page | 12 information to allow the Government to determine if the materials, methods, and equipment meet the quality requirements specified. Submittal forms shall be furnished to the Contractor by the Government and shall be used when submitting all submittals.

1. Well Pump and Motor (if necessary): Manufacturer’s information – cut (data) sheets, shop drawings, etc. – for each replacement in-kind well pump / motor.

a. Pump – including but not limited to:

Make and model.

Acceptable manufacturers include Goulds, Grundfos, Christensen, American Marsh (As Approved) Number of stages.

Suction and discharge pipe sizes.

Material.

Speed (rpm).

Pump Curve with design point.

Percent efficiency.

Brake Horsepower (bhp).

Net Positive Suction Head (NPSH).

Bowl size, material.

Operating limitations.

b. Motor – including but not limited to:

Make and model.

Horsepower.

Speed (rpm).

Standards met.

Enclosure type and material.

Shaft size, keyway, coupling.

c. The well pump and motor shall be approved by the manufacturers to be capable of working together in the proposed well under the existing conditions.

d. The well pump and motor manufacturers shall be well known in the industry and have been in business for 10 years or more.

2. Resume of the individual(s) who shall disassemble, clean, and inspect well pumps and motors which clearly show they possess a minimum of three (3) years’ experience in large water supply well pump inspection and repair.

B. Pre and post well redevelopment reports, including condition of well, column pipe, well casing, well screen, etc., and flow yield tests.

C. Existing pump and motor inspection/evaluation reports, recommended repairs, if any, and cost estimate for repairs/replacement.

Page | 13

D. Digital copies of all pre and post redevelopment videos.5ro

E. At the pre-construction meeting, the successful bidder will be required to provide a schedule specifying approximately how long each well will be out of commission to complete the work.

F. FORMS: Each submittal item plus a completed Material Approval form shall be submitted by the Contractor directly to the CO for review.

G. SUBMITTAL APPROVAL: The Government shall have ten (10) business days from time of receipt to approve or deny a submittal.

PART 2 PRODUCTS

2.01 TEMPORARY EQUIPMENT AND MATERIALS

A. Flowmeter and Throttling Valve: Type and size capable of accurately measuring rates of flow over the entire range of testing.

B. Discharge Piping: Sufficient size and length to conduct all pumped water to an acceptable drainage course or effluent settling pond as approved by the CO.

H. In addition to those items described above, Contractor shall furnish, erect, and maintain all temporary construction facilities and controls necessary to complete the work in accordance with these specifications.

I. Temporary facilities shall be defined as: construction trailers, storage trailers, sanitary toilets, waste containers, staging, rigging, portable generators, required safety measures and any such facility required to complete the work but not incorporated as part of the complete project. All temporary services and facilities shall be removed at contractor’s expense prior to work being considered complete.

J. Electricity and non-potable water are available on-site but are not readily available in the project areas. Contractor may utilize existing utilities if no modifications of existing utilities are required. The Contractor shall make all investigations necessary to determine the availability of utilities at the site.

K. Telephone and drinking water are not available on-site.

L. Restrooms are available on-site. The Contractor shall provide temporary sanitation toilets.

M. The Contractor shall provide, erect, and maintain all measures (e.g., barricades, warning signs, flags, lights, etc.) as may be necessary to protect their work force, hatchery staff, and the public during execution of the project. All such protection shall comply with applicable

Page | 14

Federal, State, and local standards.

2.02 MATERIALS

A. All equipment parts in contact with the well water shall be stainless steel or all iron. The

Contractor shall not install any material containing cadmium, brass, bronze, copper, zinc, or their alloys which could become in contact with fish rearing water. These heavy metal materials have been shown to be toxic to fish.

PART 3 EXECUTION

3.01 PREPARATION

A Remove well cap, existing pumping equipment and all appurtenances.

B. Collect and record data on the construction and condition of the well as well as static water level.

3.02 VIDEO INSPECTION

A. Following both the pre-rehabilitation and final yield tests of the well, conduct a video survey of the entire depth of the well for visual assessment of its condition before and after rehabilitation.

3.03 MEANS AND METHODS

A. Means and methods chosen by the Contractor to complete this work may be rejected at any time by the Contracting Officer for the following reasons:

1. They may constitute a hazard to the work, persons, or property.

2. They will not produce finish work in accordance with the terms of the contract.

3. They are contrary to specified means or methods included in the contract.

4. All government equipment of any value that is replaced during this project shall remain government property unless released in writing by the CO.

3.04 ENVIRONMENTAL PROTECTION

A. All work shall be accomplished in such a manner that all waste materials, pollutants, and potential pollutants shall be completely disposed of in accordance with all applicable Federal, State, and local regulations.

B. At no time shall operations be attempted or permitted where or when such operations present a possibility of fouling the hatchery facility with waste materials, pollutants, or potential

Page | 15 pollutants.

3.05 INADVERTENT DISCOVERY

A. In the unlikely event an inadvertent discovery of cultural material is discovered during the project all work in the vicinity will cease and Craig Bockholt, Hatchery Manager, will be contacted immediately. Hatchery staff will take appropriate action to identify and determine significance of find before work in the area can continue. Work outside the immediate area can continue as planned. Cultural material includes but not limited to; glass, ceramic, bone, brick etc.

3.06 RESTORATION

A. The Contractor shall restore the construction area to a condition equal to or better than that prior to the start of the work.

B. If, during construction, public or private property is damaged or destroyed by the Contractor, the Contractor shall, at their expense such property to a condition equal to or better than that prior to the start of the work.

3.07 WORK SITE SAFETY

A. The Contractor shall be solely responsible for ensuring that all their on-site activities and equipment conform fully to all standards of the Department of Labor, Occupational Safety and Health Administration (OSHA) 29 CFR 1926 and 1910. Additionally, the contractor shall adhere to all applicable Federal standards, nationally recognized building codes, and nationally recognized safety codes such as the National Fire Protection Association (NFPA), and other nationally recognized consensus standards. The NFPA 101, Life Safety Code, will be used as the minimum criteria for life-safety features, and the NFPA 70, National Electrical Code (NEC), will be used as the minimum criteria for electrical installation.

B. A type of written Safety Plan shall be submitted consisting of a few paragraphs describing the anticipated hazards to the workers, USFWS employees, and the public associated with this type of work and the proposed steps taken to eliminate the hazards. The contractor shall submit a signed and dated Safety Plan for review and acceptance by the Contracting Officer or their representative before beginning work. Hiring a consultant to write the safety plan is not required for this project. Acceptance of the contractor’s safety plan does not relieve the contractor of the responsibility to comply with all contract requirements, applicable laws, and regulations. Within that Safety Plan there should be language regarding an exposure plan in the event of spill or other emergency pertaining to chemicals and processes. If permits are required in the instance of spill mitigation, they will be the responsibility of the contractor.

C. Safety controls for the protection of persons and property shall comply with all Federal, State, and local laws and regulations.

D. The Contractor shall notify the Contracting Officer of all accidents that have occurred at the project site. The Contractor shall submit an accident report to the Contracting Officer for any

Page | 16 accident that involves lost time by the injured employee regardless of whether professional medical treatment was required or not.

3.08 RECORDS, ACCESS, PERFORMANCE

A. Upon completion of all work as stated above, the Contractor shall deliver to the Contracting Officer all records, measurements, pumping rates, water levels, etc., and actual steps taken to clean the three wells. The Contractor shall also deliver all records, operations and maintenance manuals, and spare parts listing for any new parts and/or accessories provided for the submersible well pumps. Copies of these records can be emailed directly to the following addresses:

Craig Bockholt, Hatchery Manager White Sulfur Springs National Fish Hatchery 400 Main St E White Sulfur Springs, WV 24986 Email: craig_brockholt@fws.gov

Contracting Officer (as per contract) U. S. Fish and Wildlife Service Joint Administrative Operations

Keith Davis, Project Manager/COR U. S. Fish and Wildlife Service Infrastructure Management Division 300 Westgate Center Drive Hadley, MA 01035-9589 Office: 413 253-8638 Email: keith_davis@fws.gov

APPENDIX A

White Sulphur Springs NFH Site Plan and Well Locations

Page | 17

Page | 18

APPENDIX B

Photos of the Wells

Well Head A

Page | 19

Well Head B

Page | 20

Well Head E

Page | 21

Well House E

Page | 22

Well Head F

A. The Contractor shall be solely responsible for ensuring that all their on-site activities and equipment conform fully to all standards of the Department of Labor, Occupational Safety and Health Administration (OSHA) 29 CFR 1926 and 1910. Additiona...
B. A type of written Safety Plan shall be submitted consisting of a few paragraphs describing the anticipated hazards to the workers, USFWS employees, and the public associated with this type of work and the proposed steps taken to eliminate the haz...
C. Safety controls for the protection of persons and property shall comply with all Federal, State, and local laws and regulations.
D. The Contractor shall notify the Contracting Officer of all accidents that have occurred at the project site. The Contractor shall submit an accident report to the Contracting Officer for any accident that involves lost time by the injured employee ...