Attachment A - STENS Cost_Price Template_20221116.xlsx

XLSX spreadsheet 415 KB Posted

Attached to
Request for Proposals for Scientific, Technical, and Engineering Support for the Plum Island Animal Disease Center Decontamination and Closure Project
Solicitation number
70RSAT23R00000004
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Cost/Price Template for Scientific, Technical and Engineering Support for PIADC Decontamination and Closure

Prepared for: Plum Island Closure and Support (PICS) Program

Instructions

Spreadsheet Instructions:
1.Proposed costs should be provided using the pricing spreadsheet template ('BOE' tab) which includes a number of scope assumptions (along with those in the 'Assumptions' tab), to help guide offerors in preparing proposal materials. The spreadsheet also includes several “plug-in numbers” for ODC’s for various tasks, to be used as-is.

Offerors should populate the 'BOE' tab with the required data for estimated labor hours and rates, as well as Fringe, Overhead, G&A, and Fee, for the base year and all option years, to complete the specified scope of work. NOTE: For subcontracted labor, the offeror may provide fully burdened labor rates, rather than providing details regarding fringe, overhead, G&A and fee; however, this detailed information will need to be provided for all subcontracts directly to the Contracting Officer as part of the proposal.

Offerors may use the 'Additional Markups' column (on the ‘BOE’ Tab) to specify any unique markups that are not currently captured in the template, such as a Material Handling Fee applied to Materials and/or ODCs.

2. The 'BOE' tab contains pre-populated labor categories (referenced from the 'Labor Rates and Cost Factors' Tab) which are judged by the government to be appropriate to complete specified tasks and subtasks associated with the scope of work. However, offerors should consider this as for information only, and the final labor mix presented by an offeror should be justified based on the overarching technical approach defined by the offeror. Proposed subcontractor labor/costs shall be clearly identified as such in the 'BOE' tab (e.g., Sr. Scientist (subcontractor)).

In the event that an offeror deems additional/different labor categories to be required, please use the blank rows beneath the relevant task/subtask to capture the additional labor categories. If the blank rows provided are not sufficient, please add additional rows, using the “insert row” function in excel. The 'BOE' tab is configured so that once populated, all summary level cost rows (on the ‘BOE’ Tab) will be automatically calculated, and all of the data in the following Tabs will also be automatically populated:

-SBP by Year
-Cost Summary by CLIN
-Cost Summary by Year

In addition, DHS requests offerors clearly identify in Column A of the 'BOE' tab the estimated % of time each labor category would be working on-site vs. offsite. For example "Jr. Scientist (1 FTE, 50% on-site)" or similar.

3. The 'Labor Rates and Cost Factors’ tab is intended to capture all labor categories and rates used throughout the proposal as well as rates/multipliers used to account for Fringe, Overhead, G&A, Fee, Escalation, etc. (for the Prime Contractor). NOTE: For subcontracted labor, the offeror may provide fully burdened labor rates, rather than providing details regarding fringe, overhead, G&A and fee; however, this detailed information will need to be provided for all subcontracts directly to the Contracting Officer as part of the proposal.

Additional Subcontractor Pricing Instructions:

If the prime enters into Cost-type subcontracts and the total proposed Cost-type subcontract costs in the aggregate exceed 10% of the total proposed CPFF CLIN amount, then all proposed cost-type subcontractors must provide the required cost information to the same level of detail as the prime offeror. For subcontracts that are other than cost-type (i.e, FFP and T&M), cost data is not required; however, the prime must summarize the basis of their reasonableness determination for each subcontract no matter the contract type, in accordance with FAR Table 15-2. The certification requirement from FAR Table 15-2 does not apply since this procurement is being conducted competitively. If proposed subcontractors will not release this information to the prime offeror, the subcontractors may submit this information directly to the Government contacts listed in this solicitation. The submission due date for subcontractor’s cost information is the same as the offeror’s cost submission due date.

Labor categories currently included in this template are for information only, and the final labor mix presented should be justified based on the overarching technical approach defined by the offeror. The offeror should populate this tab with labor categories and rates used throughout their cost proposal. In the event that an offeror deems additional/different labor categories are required, please use the blank rows to capture the additional labor categories, including those associated with subcontracted labor (clearly identifying subcontracted labor as such). If the blank rows provided are not sufficient, please add additional rows, using the “insert row” function in excel.

4.Estimated ODCs are to include labor onboarding costs. This includes medical appointments, special agent training, PIV card access, and access to IT assets. These onboarding requirements will need to be repeated every 5 years for each employee. Note: All personnel are assumed to need the following: medical appointments, special agent training, PIV card access, and access to IT assets. The offeror should assume that these activities will cost approximately $10,000 per person and should be assumed to be required twice per person throughout project duration.
5.Costs accounting for project oversight are to be included for each task in the 'BOE' tab. Offerors should use the blank rows beneath relevant subtasks to capture costs associated with project oversight. If the blank rows provided are not sufficient, please add additional rows, using the “insert row” function in excel.

Assumptions

Key Cost Estimate Assumptions:
1.The project is assumed to begin in Q2 of FY2023. The full project duration is assumed to be 10 years. Project scope is detailed in the Scope of Work (SOW). Government assumptions regarding the required level of effort to support the scope are summarized below:

• Tasks 1: Routine Operation of the Mobile Decontamination Laboratory

- Mobile Trailer Lab Operations are assumed be performed for 10 years (Q2, FY23 to Q2, FY33).

• Task 2: Scientific Tasks (Activities to support Terminal Decon & Validation Planning)

- SME publications of the results of the Scientific Activities (see SOW) are assumed to be performed for 2.5 years (Q4, FY23 to Q2, FY26)

- Development of QA processes are assumed to be performed for 2 years (Q2, FY23 to Q2, FY25)

- QA program operations are assumed to be performed for 9 years (Q2, FY24 to Q2, FY33).

• Task 3: Execution of Scientific Activities are assumed to be performed for 2 years (Q2, FY23 to Q2, FY25). Note that years 3 through 10 are blacked out in the subsequent Tabs.

• Task 4: Facility Mod Planning, Engineering, and Oversight Tasks are assumed to be performed for 9 years (Q2, FY23 to Q2,FY32). Note that year 10 is blacked out in the subsequent Tabs.

- Review for potential facility modifications are assumed to be performed in Year 2 and 3 (Q2, FY24 to Q2, FY26).

- Planning tasks and engineering calculations to support facility modifications are assumed to be performed in Year 3 (Q2, FY25 to Q2, FY26).

- Oversight of facility modifications are assumed to be performed for 6.5 years, beginning half way through Year 3 (Q4, FY25 to Q2, FY32).

• Task 5: Subcontract and Manage an Independent Third-Party Laboratory Tasks are assumed be performed for 10 years (Q2, FY23 to Q2, FY33).

2. Government assumptions pertaining to labor categories and durations for each item that will comprise the estimate can be found in the 'BOE' tab.

Labor Rates and Cost Factors

Reference Listing of Labor Rates
by Labor Category (Prime Contractor)Reference Listing of Cost Factors (Prime Contractor)Reference Listing of Labor Rates

by Labor Category (Subcontractor)

Labor CategoryUnburdened Labor Rate
(Hourly Wage)Cost FactorRate or Multiplier (%)Labor CategoryFully Burdened Labor Rate (Hourly Wage)
Mechanical Engineer - SrFringeMechanical Engineer - Sr
Electrical Engineer - SrOverheadElectrical Engineer - Sr
Civil Engineer - SrG&ACivil Engineer - Sr
Environmental Engineer - SrFeeEnvironmental Engineer - Sr
Cost Estimator - midAdditional Markups*Cost Estimator - mid
SchedulerEscalationScheduler
Full-time Onsite Operational ManagerFull-time Onsite Operational Manager
QA InspectorQA Inspector
Project Manager - Sr* An example of an Additional Markup would be a Material Handling Fee that is applied to materials and/or ODCs. The offeror should clarify here in this table specifically what the "Additional Markup" is.Project Manager - Sr
AdminAdmin
Public Affairs SpecialistPublic Affairs Specialist
Sr. ScientistSr. Scientist
Jr. ScientistJr. Scientist
Biological EngineerBiological Engineer
Laboratory TechnicianLaboratory Technician
Safety SpecialistSafety Specialist
Biosafety Specialist/CoordinatorBiosafety Specialist/Coordinator

Cost Summary by Year

TaskContract TypeProject TotalBase YearOP YR 1OP YR 2OP YR 3OP YR 4
ERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!Total Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Project Total CostCLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Base Year Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 1 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 2 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 3 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 4 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 5 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 6 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 7 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 8 Total CostERROR:#REF!Hourly Labor Rate or Unit RateERROR:#REF!CLINTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)OP YR 9 Total Cost
1. Routine Operation of the Mobile Decontamination LaboratoryCPFF$ 250,000$ - 0$ - 0$ - 0$ 250,0000001$ 25,000$ - 0$ - 0$ - 0$ 25,0001001$ 25,000$ - 0$ - 0$ - 0$ 25,0002001$ 25,000$ - 0$ - 0$ - 0$ 25,0003001$ 25,000$ - 0$ - 0$ - 0$ 25,0004001$ 25,000$ - 0
2. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleCPFF$ - 0$ - 0$ - 0$ - 0$ - 00002$ - 0$ - 0$ - 0$ - 0$ - 01002$ - 0$ - 0$ - 0$ - 0$ - 02002$ - 0$ - 0$ - 0$ - 0$ - 03002$ - 0$ - 0$ - 0$ - 0$ - 04002$ - 0$ - 0
3. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationCPFF$ - 0$ - 0$ - 0$ - 0$ - 00003$ - 0$ - 0$ - 0$ - 0$ - 01003$ - 0$ - 0$ - 0$ - 0$ - 02003$ - 0$ - 0$ - 0$ - 0$ - 03003$ - 0$ - 0$ - 0$ - 0$ - 04003$ - 0$ - 0
4. Facility Modification Engineering, Planning and ImplementationCPFF$ - 0$ - 0$ - 0$ - 0$ - 00004$ - 0$ - 0$ - 0$ - 0$ - 01004$ - 0$ - 0$ - 0$ - 0$ - 02004$ - 0$ - 0$ - 0$ - 0$ - 03004$ - 0$ - 0$ - 0$ - 0$ - 04004$ - 0$ - 0
5. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationCPFF$ 500,000$ - 0$ - 0$ - 0$ 500,0000005$ 50,000$ - 0$ - 0$ - 0$ 50,0001005$ 50,000$ - 0$ - 0$ - 0$ 50,0002005$ 50,000$ - 0$ - 0$ - 0$ 50,0003005$ 50,000$ - 0$ - 0$ - 0$ 50,0004005$ 50,000$ - 0
Totals$ 750,000$ - 0$ - 0$ - 0$ 750,000$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0

Cost Summary by CLIN

CLINTaskYear
WagesFringeOverheadMaterials, ODCs and TravelTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostERROR:#REF!Base Labor RateQuantity
CLIN 00011. Routine Operation of the Mobile Decontamination LaboratoryBase Year$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000
CLIN 00022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleBase Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 00033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationBase Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 00044. Facility Modification Engineering, Planning and ImplementationBase Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 00055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationBase Year$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 10011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 1$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0
CLIN 10022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 10033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 10044. Facility Modification Engineering, Planning and ImplementationOP YR 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 10055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 1$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 20011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 2$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000
CLIN 20022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 20033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 20044. Facility Modification Engineering, Planning and ImplementationOP YR 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 20055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 2$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 30011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 3$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0
CLIN 30022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 30033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 30044. Facility Modification Engineering, Planning and ImplementationOP YR 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 30055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 3$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 40011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 4$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000
CLIN 40022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 40033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 40044. Facility Modification Engineering, Planning and ImplementationOP YR 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 40055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 4$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 50011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 5$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0
CLIN 50022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 50033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 50044. Facility Modification Engineering, Planning and ImplementationOP YR 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 50055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 5$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 60011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 6$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0
CLIN 60022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 60033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 60044. Facility Modification Engineering, Planning and ImplementationOP YR 6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 60055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 6$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 70011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 7$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000
CLIN 70022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 70033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 70044. Facility Modification Engineering, Planning and ImplementationOP YR 7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 70055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 7$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 80011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 8$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000
CLIN 80022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 80033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 80044. Facility Modification Engineering, Planning and ImplementationOP YR 8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 80055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 8$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000
CLIN 90011. Routine Operation of the Mobile Decontamination LaboratoryOP YR 9$ - 0$ - 0$ - 0$ 25,000$ 25,000$ - 0$ - 0$ - 0$ 25,000
CLIN 90022. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-ScaleOP YR 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 90033. Design and Execution of Applied Scientific Activities to Enable Biocontainment Facility DecontaminationOP YR 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 90044. Facility Modification Engineering, Planning and ImplementationOP YR 9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN 90055. Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator VerificationOP YR 9$ - 0$ - 0$ - 0$ 50,000$ 50,000$ - 0$ - 0$ - 0$ 50,000

BOE

DescriptionBase Year (Q2, FY23 to Q2, FY24)OP YR 1 (Q2, FY24 to Q2, FY25)OP YR 2 (Q2, FY25 to Q2, FY26)OP YR 3 (Q2, FY26 to Q2, FY27)OP YR 4 (Q2, FY27 to Q2, FY28)OP YR 5 (Q2, FY28 to Q2, FY29)
Hourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHourly Labor Rate or Unit RateHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total CostHours/QuantityWagesFringeOverheadTotal Direct + Indirect CostsG&AFeeAdditional Markups
(if applicable)Total Cost
Summary$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0$ - 0$ - 0$ 75,000$ - 0
1. Routine Operation of the Mobile Decontamination Laboratory$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0$ 25,000$ - 0$ - 0$ - 0
(Note: This includes all aspects of operating the mobile decontamination laboratory from receiving, processing and reporting on samples to maintaining a clean and safe work environment.) The mobile laboratory is expected to remain in operation throughout the Period of Performance and will support: Sampling & Analysis for B257 (40,750 sq ft.), Decontamination of B102 (11,740 sq ft), and Decontamination of B101/B111 (198,829/18,300 sq ft). The mobile laboratory is expected to be the primary laboratory for processing biological or chemical indicators to provide independent verification/validation of decontamination; however, a certain percentage of samples may need to be sent to an off-island laboratory for confirmatory testing and/or analyses beyond the capability of the mobile laboratory (see Task 5).
1.1 Oversite of placement of biological or chemical indicators, to support decontamination verification or quality assurance (QA).$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0$ 25,000.00$ - 0$ - 0$ - 0
(Note: Assume oversight of placement of ~2,700 biological and chemical indicators each year during the (10) year period of performance, for sampling and verification/validation activities in B257, B102, B101, and B111. Note: This is based on an estimate of the density of samples based on facility square footage. It is expected that level of oversight for this activity will vary over the period of performance (i.e., this is assumed as an average for the level of effort). Schedule: Performed throughout Physical decontamination of the Facility. Assume the following laborer/activities are needed: Sr Scientist to develop the plan and oversee. Jr Scientist to enact the plan/perform QA.
1.1.1 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.2 Jr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.3 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.4 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.5 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.6 Materials and Supplies$ 25,000.001$ 25,000.00$ 25,000.00$ 25,000.001$ 25,000.00$ 25,000.00$ 25,000.001$ 25,000.00$ 25,000.00$ 25,000.001$ 25,000.00$ 25,000.00$ 25,000.001$ 25,000.00
(Note: Accounts for costs associated with test kits, PPE, reagents, and other lab supplies. Test kits: Sample density for testing is assumed to be 10 for every 100 square feet, or roughly 27,000 samples total (2,700 per year on average). With a pack of 100 SCBIs estimated to be ~$500, total test kit costs are estimated to be $12,000 per year. Other lab supplies: estimated at $1,000 a month. ODC markup estimated at 4%.
1.1.7 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.8 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.1.9 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2 Biological or Chemical Indicator Processing for interpretation of results or shipment to a third-party laboratory depending on the needed analysis (See Task 5).$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
(Note: This includes Biological or Chemical Indicator Processing (this may include SCBIs, spore strips, and preparation and performance of analytical testing of decontamination samples.). Assume processing of ~2,700 biological and chemical indicators each year during the (10) year period of performance, for sampling and verification/validation activities in B257, B102, B101, and B111. Note: This is based on an estimate of the density of samples based on facility square footage. It is expected that level of effort for this activity will vary over the period of performance (i.e., this is assumed as an average for the level of effort). It is assumed that the following labor categories/durations are needed to support task 1.2: Laboratory Tech, Jr. Scientist, Sr. Scientist, and Admin. Task 1.2 is assumed to be performed throughout physical decontamination of the facility. It is assumed that the technician is to perform SCBI testing, the Jr Scientist is to perform analytical testing as needed, and the Sr Scientist to provide testing oversight. Technician labor accounted for here account for all activities in Task 1 (Subtasks 1.1 through 1.5.)
1.2.1 Laboratory Technician$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.2 Jr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.3 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.4 Admin$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.5 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.6 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.7 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.8 Materials and Supplies$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.9 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.10 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.2.11 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3 Documentation of sampling and results$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
(Note: Scope includes: including annotated photographs, to ensure and record methods meet sampling and decontamination requirements. A report with all documentation will be provide quarterly (at a minimum) for review. Task 1.3 is assumed to be performed throughout physical decontamination of the Facility. It is assumed that the following labor categories and durations will be needed: Jr Scientist, Sr Scientist, and Admin.)
1.3.1 Jr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.2 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.3 Admin$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.4 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.5 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.6 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.7 Materials and Supplies$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.8 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.9 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.3.10 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4 Provide a Monthly Report of Operations$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
(Note: This will include: Any safety issues; Type and number of samples processed; Type and number of positive samples, potential cause of result, and actions taken to remedy, Type and number of samples sent for 3rd Party Analysis; Status of Documentation; Regulatory reports issued; Regulatory concerns or issues. It is assumed that Task 1.4 is performed throughout physical decontamination of the Facility. It is assumed that the following labor categories and durations are needed: Jr Scientist, Sr Scientist and Admin .)
1.4.1 Jr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.2 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.3 Admin$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.4 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.5 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.6 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.7 Materials and Supplies$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.8 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.9 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.4.10 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5 Functional activities associated with routine operations of a BSL-2 operational space$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
(Note: This includes plans and methods to meet existing facility programs, as required. It is assumed that task 1.5 is performed throughout physical decontamination of the Facility. It is assumed that the following labor categories and durations are needed: Sr Scientist, Admin, Safety Professional, and Biosafety Professional.)
1.5.1 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.2 Admin$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.3 Safety Specialist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.4 Biosafety Specialist/Coordinator$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.5 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.6 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.7 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.8 Materials and Supplies$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.9 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.10 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1.5.11 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ERROR:#REF!ERROR:#REF!ERROR:#REF!
2. Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-Scale$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0. ,l ,,.,$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
(Note: Access to a cadre of SME’s representing a range of expertise and experience in biological decontamination of facility-scale biocontainment laboratories is necessary to facilitate a range of PICS activities. These individuals should be available to work both onsite and remotely, using a labor mix deemed appropriate for the stated activities, along with additional tasks that may arise during the period of performance. However, it is assumed this Task 2 work would be primarily performed with offsite personnel in support of the Task 3 work, which would be primarily performed by on-site personnel.)
2.1 Development and review of facility decontamination plans$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
(Note: Development/Review will be based on industry-best practices, applicable regulations, regulatory constraints, and prior experience with similar biocontainment facilities that previously utilized high-consequence infectious pathogens as part of programmatic scope, preferably those affecting livestock of economic importance. This activity interfaces with Tasks 3.1, 3.5, and Task 4; specifically.)

Key Scope Assumptions include:

- It is assumed that no further decon/validation plan will need to be developed for building B257.

- It is assumed that the decon plan of B102 is already developed and thus only the review of the decontamination plan and development of QA/QC processes for verification of proper execution of that Plan is included in this scope.

- It is assumed that the scope includes development of the decontamination and validation plan(s) for B101 and B111. (i.e., this could be a single plan as these facilities are connected). It is important to note that other work scopes within this SOW will define the technologies/methods that will be used for the decontamination & validation (Tasks 3.1 and 3.5) and will define any facility modifications needed to prepare the facility for decontamination (Task 4); i.e., the results of these other Tasks serve as inputs to the development of the overall decontamination & validation plan under this Task 2.1.

This activity interfaces with Task 3.1 (literature review), Task 3.5 (collaborative translation of scientific findings into a decon plan for the facility) and Task 4 (Facility modifications for decontamination).

Assumed deliverables include a report of each plan reviewed.

2.1.1 Review of B102 Decon Plan$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Assumes reviewers will include: Jr. Scientist, Sr. Scientist, Biological Engineer, Mechanical Engineer, Electrical Engineer, Civil Engineer, Biosafety Specialist/Coordinator, and Safety Specialist.
2.1.1.1 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.2 Biological Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.3 Mechanical Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.4 Electrical Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.5 Civil Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.6 Biosafety Specialist/Coordinator$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.7 Safety Specialist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.8 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.9 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.10 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.11 Materials and Supplies$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.12 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.13 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.14 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2 Develop Decon & Validation Plan for B101/B111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Assumes the following personnel will be the key authors: Jr. Scientist, Sr. Scientist, Biological Engineer.

Assumes the following personnel will be reviewers: Safety Specialist, Biosafety Specialist/Coordinator.

Assumes the following personnel will be consulting and providing input to the key authors: Mechanical Engineer, Electrical Engineer, Civil Engineer.

Note that this activity is informed by the scientific work performed under Task 3.1 and Task 3.5, as well as the planned facility modification work performed under Task 4.

(i.e., At this time, the authors of this decon plan will know the approved decontamination and validation methods and will know the planned modification to the facilities to support terminal decontamination.)

2.1.2.1 Jr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.2 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.3 Biological Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.4 Mechanical Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.5 Electrical Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.6 Civil Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.7 Cost Estimator$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.8 Scheduler$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.9 Biosafety Specialist/Coordinator$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.10 Safety Specialist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.11 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.12 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.1.13 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.14 Materials and Supplies$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.15 Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.16 ODCs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.1.2.17 Small Business Participation Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2 Development and validation of method to facilitate terminal decontamination processes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Note: Includes method development and validation to facilitate terminal decontamination processes for multiple surfaces and enclosures of facility-scale, involving high-consequence viral and bacterial pathogens.

This Task provide SME-level input to support execution of Task 3 (experimental design, input on application at larger scale.)

Assumes the following personnel are needed: Jr. Scientist, Safety Specialist, Biosafety Specialist/Coordinator, Biological Engineer, and Sr Scientist.).

Assumed deliverables include a decontamination process plan.

2.1.1 Jr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2.2 Safety Specialist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2.3 Biosafety Specialist/Coordinator$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2.4 Biological Engineer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2.5 Sr Scientist$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2.6 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.2.7 [blank]$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .