Attachment A Statment of Work.doc

DOC document 69 KB Posted

Attached to
B533 Processing Water Samples for Renal Dialysis, located at VA Puget Sound Health Care System
Solicitation number
36C26026Q0762
Issued by

About this file

This is a Statement of Work (SOW) for a service contract to process water samples for the Renal Dialysis Unit at the VA Puget Sound Health Care System. The contract will provide testing services including Colony Forming Unit (CFU), LAL/Endotoxin, AAMI Water Panel, and Fluid Balance testing. These tests are required by the Advancement of Medical Instrumentation (AAMI) standards and equipment manufacturers to ensure patient safety. The contract will have a one-year Base Period beginning October 1, 2026, followed by four one-year Option Years. Annual testing quantities are: 81 CFU tests (19 monthly plus 16 semi-annual plus 30 redraws), 81 LAL/Endotoxin tests (same quantity structure), 29 AAMI Water Panel tests (19 annual plus 10 as needed), and 21 Fluid Balance tests (16 annual plus 5 as needed).

Performance monitoring will be conducted by Medical Instrument Technicians (MITs) who are responsible for collecting, packaging, and shipping samples to the selected laboratory. Laboratory results will be delivered via email three to four days after sample receipt, with MITs verifying receipt and confirming results meet regulatory limits. The contractor will track specimens and ensure they reach the laboratory for processing. The place of performance is the Renal Dialysis Unit, and delivery of processed specimen reports will occur on schedules appropriate to each test type. The solicitation number is 36C26026Q0762, and the opportunity type is listed as Pre-Solicitation.

View the file

Other files

File Type Posted
36C26026Q0762.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

as of 05/26/2026

1. Contract Title.

Renal Dialysis Unit Water Sample Testing

2. Background.

The Renal Dialysis Unit has been paying for testing with the use of Government Purchase Cards. The Government intends to award a contract with a one-year Base Period, and four one-year Option Years // Ordering Periods.

3. Scope.

This service contract will provide the processing of water samples for the Renal Dialysis Unit. This includes Colony Forming Unit, LALs, AAMI and Fluid Balance testing. These tests are required by the Advancement of Medical Instrumentation (AAMI) and by the manufacturers of equipment we use for the dialysis unit to ensure patient safety.

4. Specific Tasks.

The following is a chart of quantities of testing per year and extra lab draws. The added laboratory draws ensures coverage if samples do not meet standards and need to be retested after intervention or if work has been performed on equipment requiring cultures to be done per manufacturer prior to unit back to service.

Item
TEST
Monthly QTY
Annual Quantity
Semi Annual QTY
Total Yearly Testing
0001
Colony Count-48hr Test
19
16
16
51 + 30 for redraws = 81
0002
LAL/Endotoxin
19
16
16
51 + 30 for redraws = 81
0003
AAMI Water Panel

19 + 10 as needed = 29

0004
Fluid Balance

16 + 5 if needed = 21

5. Performance Monitoring (if applicable).

The required performance monitoring is completed with the end user following the progress of the laboratory process. The Medical Instrument Technicians (MIT) are responsible for taking the samples, packaging them and sending them to the selected laboratory for processing. The MIT’s will receive an email with the results of those laboratory draws three to four days after the laboratory receives them. It is the MITs responsibility to ensure the cultures have been received and the results are within regulatory limits.

6. Security Requirements.

N/A

7. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).

172576
172577
172578
172579
172580
172581
172582
172583
172584
172585
172586
172587
172588
172589
172590
195834
195835
195836
195837
195838
195839
195840
195841
195842
195843
195844
195845
195846
195847
195848
172591
168187
168186
168185
171468

8. Other Pertinent Information or Special Considerations.

a. Identification of Possible Follow-on Work.

Follow up is required in tracking specimens and ensuring they reach the laboratory for processing.

b. Identification of Potential Conflicts of Interest (COI).

N/A

e. Inspection and Acceptance Criteria.

N/A

9. Risk Control This service contract will provide the processing of water samples for the Renal Dialysis Unit. This includes Colony Forming Unit, LALs, AAMI and Fluid Balance testing. These tests are required by the Advancement of Medical Instrumentation (AAMI) and by the manufacturers of equipment we use for the dialysis unit to ensure patient safety.

10. Place of Performance.

This contract will be performed in the Renal Dialysis Unit

11. Period of Performance.

This contract will start on October 1, 2026, and will continue with at base plus four.

12. Delivery Schedule.

The delivery of reports from the processing of specimens will be sent after the appropriate time increments as required for each kind of test.

File details come from the government source that posted it. Updated .