Attachment A- Statement of Work Maumee Mowing 2024.docx
DOCX document 30 KB Posted
- Attached to
- Lawn Mowing services for the Brownstone Ranger District, Hoosier National Forest, located in Indiana.
- Solicitation number
- 12444524Q0018
- Issued by
-
Department of Agriculture Forest Service
About this file
This document includes a statement of work and performance work statement for a lawn mowing services contract for the Brownstone Ranger District of the Hoosier National Forest in Indiana. The purpose of the project is to maintain early successional habitat characteristics of designated wildlife openings totaling approximately 151 acres through bush hogging and removal of unwanted tree species less than 3 inches in diameter. The base amount is 65.1 acres with optional additional acreage up to 85.9 acres pending available funds. Work is to be completed between July 1, 2024 and November 30, 2024. The selected contractor will be required to use GPS to stay within boundaries and access routes, notify the contracting officer's representative at least 48 hours before starting work, and complete cleanup and repairs. Payments will be made after inspection and verification that acceptable quality levels have been met.
The related federal contract opportunity provides additional details on solicitation number 12444524Q0018 for lawn mowing services issued by the Department of Agriculture Forest Service. The description restates the purpose and scope of maintaining wildlife openings through bush hogging and tree removal. The period of performance is also specified as July 1, 2024 through November 30, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment G- NRE_Commercial Services RFQ_12444524Q0018.docx | DOCX document | |
| Attachment H- Vicinity Map 2.pdf | ||
| Attachment E- Vicinity Map.pdf | ||
| Attachment C- EXPERIENCE QUESTIONNAIRE.docx | DOCX document | |
| Attachment I- SF1449-12444524Q0018.pdf | ||
| Attachment D - Schedule of Items Maumee Mowing.doc | DOC document | |
| Attachment F- Wage Determinations.txt | TXT text file | |
| Attachment B- EVALUATION FACTORS Maumee Mowing 2024.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A Statement of Work
Maumee Opening Maintenance 2024 Brownstone Ranger District (RD) inside Hoosier NF Scope of Contract:
The purpose of the project is to maintain the early successional habitat characteristics of designated wildlife openings. Maintenance, such as bush-hogging, is needed to inhibit the growth of tree species. Contractor shall be able to identify and remove all unwanted tree species 3 inches and less Diameter at Breast Height (DBH) in project. Contractor shall use a GPS unit to stay within designated boundary area and access routes.
Approximately 151 acres of early succession land may be awarded to be mowed. Base amount is 65.1 acres (units # 1-17) with optional line items being awarded pending funds up to 85.9 acres. Work may begin on July 1,2024 and run through November 30, 2024. Access into the treatment area will be determined by Forest Service personnel using GPS shapefiles. Where necessary, contractor must pull and then replace barrier posts when egress to contract area is needed.
Contractor shall mobilize all equipment to each project site clean and dirt/weed free to reduce spread of invasive species. Inspection of cleaned equipment will be done by FS personnel before it is unloaded at the site. Minimum of 3 business days’ notice of mobilization to and from the site is required.
Maps will be provided by USFS along with GPS shapefiles of treatment unit boundaries and access routes. Before implementation, the project leader will meet the contractor on site.
Contractor shall notify Hoosier NF personnel no less than 48 hours prior to start of contract work.
Access routes will be pre-determined by FS personnel. Routes will be mowed the width of the path. Usually 4-8ft wide pending road/trail designed. Generally, this is accomplished by offsetting tracks and mowing path on one side of access going in and mow other side on the way out. Contractor will mow as close to ground as possible to not create a hazard. Some paths are too narrow and cannot be off-set, so Contractor will just mow on the way in. Contractor will not deviate off the specified GPS access path. Access paths will be cleared of any downed trees by Forest Service personnel by the July 1 start date, and any subsequent downed trees or obstacles shall be cleared by the contractor.
The Contractor is responsible for the cleanup of their trash, repair damage to resources and any spills, and will notify the COR immediately of any spills or damage. Operations will not be conducted during wet ground conditions where rutting will occur and cause damage. Any ruts made will be reported to FS personnel and repaired by contractor at contractor’s expense. Payments with be withheld until fixed.
During mowing operations, any findings of previously unknown heritage sites or archaeological artifacts (old homesites/foundations, wells, etc.) should be reported to the COR (contract officer representative), and any further mowing of the opening should cease until cleared by a FS specialist. Any other issues or unforeseen circumstances should be communicated with and addressed by FS personnel/COR.
Specification: The specified area will be mechanically mowing all live undesirable trees 3 inches and less DBH including all shrubs/saplings. Undesired trees are soft mass producers including but not limiting to: maples, tulips, beech, and pines. Leave trees that have been flagged or otherwise agreed upon by Hoosier NF personnel. All snags > 3” DBH will be left standing and undamaged. Winter cover of grasses and forbs (flowers) may remain un-mowed whenever possible.
Machinery must be capable of mowing/grinding all vegetation as close to ground surface as possible without soil disturbance (1-2 inches). All woody materials mowed must be ground and scattered so no piles are formed. Low ground pressure equipment is mandatory for this contract, as is equipment used to mow (i.e bush hog).
The Contractor shall progressively accomplish the work at a rate that will result in completion of the work within the time specified as determined by the final accepted work schedule for the awarded contract.
Inspections: The Contractor may set up the Work Plan and Schedule to include interim inspections; however, interim inspections will only be done upon completion of at least one line item (CLIN). The Contractor shall complete the CLIN work according to the approved Work Schedule, then request an inspection by the COR. 3 days’ notice will be given for COR to begin inspection process.
Inspection process by FS includes:
1) Walking the boundaries with GPS unit to ensure unit is completed up to the boundary and not beyond or shy. The mow-able boundary may be smaller than the GPS boundary due to operator unable to mow based on trees being too large (over 3in DBH) or snags in the way.
2) Visual inspection of damage to leave trees.
3) Visual inspection that all unwanted trees have been mowed to proper height.
4) Visual inspection of ground disturbance (ie rutting). This includes wildlife opening and access routes.
Invoicing: Invoicing is tied to successful inspection of completed work. The Contractor may only invoice after the COR has inspected the line item(s) work and the work is determined to have met the AQL. This applies to both interim and final payments.
Performance Work Statement and Quality Assurance Surveillance Plan (QASP):
Contract Line Item No. – Work Requirement
| Task / Critical Sub-tasks |
| Inspection requirements |
| *Acceptable Quality Level (AQL) |
| Monitoring Method |
Line Item: #1-5 Mowing
| Contractor will mechanically treat woody vegetation to the entire area according to the specifications on the Statement of Work. |
| Designated area 95% treated. |
AQL determinations are made by the COR upon inspection of the work.
These determinations are unilateral and not protestable
Minimum 95% removal of woody vegetation 3iches and less.
Visual and with use of GPS unit
Line Item: #1-5 Mowing
Staying within designated boundary and along access routes.
AQL determinations are made by the COR upon inspection of the work.
Not going off trail/road.
Staying off private land Visual and with use of GPS unit
Schedule (non-Line Item)
| Timely Completion of the contract work |
| Per the Work Schedule, the Contractor will complete all work prior to the contract end date. |
AQL determinations are made by the COR upon inspection of the work.
These determinations are unilateral and not protestable
All work must be complete by the end date of the contract and meet the AQL.
Visual and with use of GPS unit
*Meeting the AQL for Line Items: Contractor(s) must re-mow at their expense upon failure to meet AQL values at the final inspection for each contract line item where the work performed failed to reach the minimum acceptable target ratio and re-pair any damages.