This solicitation package includes a statement of work for greenhouse renovations at the USDA NRCS Plant Materials Center in Rose Lake, Michigan. The scope of work involves dismantling the existing 2,500 square foot double-bay greenhouse siding and mechanical systems; procuring and installing a new hydronic boiler heating system with perimeter fin pipes, two suspended unit heaters, and a centralized climate control system to manage heating, cooling, lighting, and irrigation; replacing the ceiling ventilation, installing guillotine wall vents and passive ventilation, and removing the evaporative cooling system; upgrading the irrigation and installing a water filtration system; replacing electrical receptacles and siding on the interior and exterior of the greenhouse and headhouse; installing new polycarbonate glazing, gutters, and doors; and addressing other repairs. The solicitation is identified as number 12FPC321B0015 and is issued by the USDA under the Under Secretary for Farm Production and Conservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12FPC321B0015_0002.pdf | ||
| 12FPC321B0015_0001.pdf | ||
| Solicitation 12FPC321B0015.pdf | ||
| Attachment B - Wage Determiniation_MI20200144.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rose Lake Plant Materials Center 7472 Stoll Rd East Lansing MI, 48823
STATEMENT OF WORK
GREENHOUSE RESTORATION,
HVAC, IRRIGATION UPGRADES
Problem Statement
The greenhouse at the Rose Lake PMC is currently inoperable and has been in disrepair for several years. The current 2,500 sq ft double-bay greenhouse will be separated into 1,250 sq ft east and west bays. These bays will be divided by a polycarbonate partition wall running north to south. The east bay will function as a four-season greenhouse and will require new glazing, vents, heating, control system, water filtration, and irrigation. The west bay will serve as a three-season greenhouse and need new glazing, venting, and have a unit heater installed.
1. Dismantle Current Greenhouse Siding and Mechanicals
• Dismantle and remove all existing polycarbonate material, cooling pad vent system, exterior fans, piping, footwall, doors, irrigation, unit heater, boiler system and existing heat piping material, and Priva control system
• Dispose of all materials in dumpster provided by contractor and recycle all reusable materials and equipment if possible
2. Heating: Boiler/Perimeter Fin Pipe/Piping Materials/and Unit Heater
• All heating and cooling systems will be connected to and controlled by the centralized control system.
• The heating system will have a high efficiency centralized propane gas boiler system. A hydronic aluminum perimeter finned system will be installed at the base walls of the greenhouse and connected to boiler system. The perimeter heating system will provide the primary source of heat to greenhouse so should be sized to provide adequate ambient temperature during winter months. It should have a 2-stage digital programmable wall-mounting type thermostat with a 50-90°F operating range and be programmable through a centralized control panel.
• Two additional suspended unit heaters will be purchased and installed to replace an older heat unit. The existent gas-fired Modine unit heater model # PV200 with functional output of 160,000 BTU/hr shall be replaced with 2 comparable, newer propane suspended unit heaters. There will be one heating unit in each bay. The units must be installed in a horizontal position with appropriate clearance according to industry safety standards. Horizontal unit heaters will be preferred to vertical configurations. The air stream from the unit heaters shall be free from interference to allow for satisfactory heat distribution.
• Performance for the perimeter wall fin heating, suspended unit heaters, and boiler should be at the highest efficiency standard for the industry.
• The walls behind the pipes should be appropriated insulated.
3. Cooling: Ceiling Vent/Passive Ventilation/ Guillotine Walls
• All heating and cooling systems will be connected to and controlled by the centralized control system.
• The ceiling in both east and west bays will have a full vertical vent to maximize light and ventilation, glazed with double-wall polycarbonate or similar material. Tempered glass glazing will be considered if it is the standard/industry recommended material. It will be connected to main control.
• Wall vents on the new greenhouse should be a passive/natural type ventilation system meeting the cooling needs of the entire 2,500 sq ft double bay greenhouse. Two guillotine walls, one on the east side of east bay, and one on the west side of west bay will be installed. This option is preferrable to exhaust fans due to the noise nuisance to neighbors; also, passive ventilation will reduce energy costs. The passive/natural guillotine wall vents should be the adequate size required to cool a 2,500 sq ft facility.
• Additional interior circulation fans should be added, and hung as necessary, to provide adequate venting in both east and west bays.
4. Environmental Control System
• The current Priva Maximizer Precision II climate control unit is obsolete and inoperable in its current state. The current system will be removed and recycled if possible.
• A new climate control system should be purchased and installed. It should be comparable in performance to the current control unit. It should control heating, cooling, ceiling and wall vents, circulating fans, humidity, lighting, and irrigation.
• The unit should be programmable for multiple zones and ideally equipped with smart technology that can be controlled via internet.
5. Plumbing: Irrigation, faucets
• Upright rigid bench mounted irrigation/misting is preferred. Irrigation should have micro-sprinkles upright, attached to rigid risers coming up from the benches. The piping should be connected to the well system and operated through a programmable controller unit. Old piping will be removed and disposed.
• A water filtration system will be installed in headhouse to filter well water sent to main office and greenhouse irrigation. The preferred system would be a reverse osmosis system equipped to filter iron and manganese for water for 1,250 sq ft. greenhouse. If an oxidation filter is required upstream for filtration system, that will be provided.
• Install 2 frost free wall-mounted outdoor faucets/hydrants on the south-facing exterior footwall and connect to the water source.
6. Electrical
• Current sodium lights are operable and will be reused and reinstalled.
• All outlets should have GFCI weatherproof receptacles.
• All electrical wiring shall be installed to meet OSHA standards.
• Lights will be controllable through central control system.
7. Growing Benches
• Current 6’ x 8’ benches will be reused, and reconfigured. They will be installed oriented east to west, in 5 rows (bench layout attached). The rows will be 6’ wide and 16’ long.
8. Interior and Exterior Siding & Doors
• All miscellaneous piping in interior should be removed and disposed of, recycling any applicable material. All siding should be removed from south wall of headhouse.
Appropriate weather resilient siding should be installed on the outside wall of headhouse to replace old siding. The ~2 ft tall footing around the exterior of the greenhouse should also be covered with durable siding/stone/cement face.
• Entrance doors on northside (headhouse) of greenhouse will be refaced.
• Exit door on south side of greenhouse will be replaced with a 72” W x 80” H steel double-door. A cement pad will be installed at the exterior threshold of the door.
• A polycarbonate partition wall will be installed dividing east and west bays so that the west bay can be closed off during winter. The north and south sides of the partition wall will have an 8’ x 8’ metal roll up door connecting the two sides.
• Two 8’ x 8’ metal roll-up doors will be installed in the northwest corner and southwest corner of east bay of greenhouse. These doors will connect the east and west bays along the polycarbonate partition wall. These doors should include electric roll-up door openers. Color to match color of exterior footwall (white).
9. Exterior: Glazing, Gutters, Downspouts
• The preferred design for the polycarbonate glazing system would be to include a low ~2 ft tall footwall around the base of the entire perimeter to prevent the polycarbonate material from coming into direct contact with ground where it can be damaged by landscaping equipment. All glazing ends should be adequately sealed, airtight, and secured with aluminum frame glazing.
• The exterior material should be industry-standard translucent UV-resistant polycarbonate paneling with 8mm twin wall thickness. The ends of the polycarbonate will be sealed to ensure air pockets act to insulate building. Polycarbonate with 8mm twin wall thickness preferred.
• Gutters and downspouts will be replaced with appropriately sized material to convey water, snowmelt, and snow.
• The ceiling gap between south wall of headhouse and greenhouse will be covered and sealed appropriately.
10. Miscellaneous Repairs
• Other miscellaneous repairs will include: disposal of former heating and irrigation systems; some cement patching; some interior wall patchwork in headhouse to seal holes from piping removal; propane gas line reorientation and fastening; refacing of door frames; replacement of damaged, cracked, or weathered vinyl siding.
*The contractor shall provide all labor, materials, supplies, tools, equipment, transportation, facilities, expertise, and supervision as necessary to repair greenhouse heating system for a 1,250 square foot greenhouse. All work shall conform to local, state, and national building code requirements for greenhouse installation.
STATEMENT OF WORK
GREENHOUSE DEMOLITION AND
RECONSTRUCTION
USDA-NRCS
Rose Lake Plant Materials Center 7472 Stoll Rd, East Lansing, MI 48823
Site Overview
Map Name Sq Ft Estimated Structure Heat Loss 1 Greenhouse Double Bay 2,500 152,000 BTU/hr1
1 Estimate provided by BioTherm Solutions- Heat loss calculations have been made based on NGMA standards with a 15 MPH velocity factor.
Figure 1. East side of building Figure 2. South side of building
Figure 3. West side of building Figure 4. North side of building
Figure 5. Interior of building
Boiler
Deficiency: Raypak hydronic heating boiler model# GHB-4 (H-183) is inefficient, and no longer in serviceable condition.
Corrective Action: Purchase and install higher efficiency boiler compatible with perimeter wall finned system.
Estimated Cost: $
Perimeter Fin-Pipe Heating System
Deficiency: Current hydronic heating inoperable due to leak in rubber tubing in radiant floor heating system.
Corrective Action: Purchase and install wall perimeter finned pipe convection system. Hydronic pipe system will be connected to new boiler and controlled through centralized control panel. It will be installed at the perimeter of greenhouse.
Suspended Unit Heater
Deficiency: The existent gas-fired Modine unit heater model # PV200 with 160,000 BTU/hr output is not efficient, and no longer serviceable.
Corrective Action: Current suspended heater will be replaced by a more efficient/cost effective unit heater installed in a horizontal position. Horizontal configurations required for appropriate head-clearance.
Two unit heaters total; one for east bay and one for west bay.
Greenhouse Climate Control Unit
Deficiency: The current Priva Maximizer Precision II climate control unit is inoperable, obsolete. No longer serviceable.
Corrective Action: Purchase and install a comparable automated climate control unit that can control heating, cooling, circulating fans, ceiling vents, side vents, humidity, lighting, and irrigation.
The current system will be removed and recycled if possible.
Cost: $
Exhaust Fan (4 fans total)
Deficiency: All 4 exhaust fans (American Coolair Co.) need bearings replaced in fan blades and perhaps motors replaced to improve functioning and performance. There may be other unidentified defective parts. No longer serviceable.
Corrective Action: Remove all 4 exhaust fans from east wall and replace with passive guillotine wall vent system (east bay). Additional interior suspended circulation fans should be added. All ventilation systems will be controlled by central environmental control unit.
Cost: $
Ceiling Ventilation
Deficiency: The ceiling ventilation assembly does not open or shut completely and will require carrier bearing replacement. The rack and pinion setup needs realignment and timing adjustment.
Corrective Action: The ceiling ventilation system will be removed and replaced with a full vertical vent to maximize light and ventilation. Vertical ceiling vents will be installed in east and west bays.
Evaporative Wet Wall Cooling Pad
Deficiency: The current greenhouse cooling pad and sump pump system is not in serviceable condition and needs to be discarded.
Corrective Action: The cooling pad will be dismantled and disposed of, recycling all materials if possible. This wall of the greenhouse (west wall) will have a guillotine wall vent installed.
Cost: $
Water Filtration System and Irrigation
Deficiency: Well water source known to contain large amounts of iron and manganese and is detrimental to greenhouse plants, equipment, and office water.
Corrective Action: A water filtration system will be installed in the headhouse. Irrigation to the greenhouse will be operated through a programmable controller unit.
Frost-Free Wall-Mounted Outdoor Faucets/Hydrants
Deficiency: Shade house structure requires 2 wall-mounted frost-free hydrants to service outdoor shade house seedlings.
Corrective Action: Replace old footwall siding and install 2 new frost-free faucets.
Cost: $
Interior and Exterior Siding and Doors
Deficiency: Interior siding of south-facing headhouse wall is damaged, weathered, and needs to be replaced.
Corrective Action: All miscellaneous piping in interior should be removed and disposed.
Holes will need to be filled or appropriately patched with wood siding. Current siding will be removed and disposed of and weather resilient siding will be installed.
Door Trim
Deficiency: Interior trim of south-facing headhouse garage door and greenhouse door are water-damaged and need to be replaced.
Southern entrance exterior door to the greenhouse rotted and deficient and needs to be replaced.
Corrective Action: Exit door on southside of greenhouse will be replaced with a 72” W x 80” H steel double-door. New trim will be sealed and painted white.
Polycarbonate Panels (greenhouse walls and roof)
Deficiency: >10 polycarbonate roof panels have been cracked or damaged through weathering and deterioration.
Corrective Action: Entire reskin/reglaze of current 2,500 sq ft greenhouse structure.
Purchase and installation of 4' x 8' (48" x 96") polycarbonate roof and wall panels. The polycarbonate should be in 8mm thick twin-wall sheets or a serviceable substitute grade.
Polycarbonate Partition Wall Dividing East and West Greenhouse Bays
Deficiency: East and west bays to be divided with a polycarbonate partition wall so that East Bay can be used for 4-season production and West Bay can be closed off and sealed during winter months.
Corrective Action: Install a polycarbonate partition wall with north and south roll-up access doors.
Perimeter Fin Heating
Proposed East-West Bench Layout