This is a Statement of Work for the furnishing and installation of a motorized overhead door at the Great Lakes St. Lawrence Seaway Development Corporation (GLS) Maintenance Base Building No. 3, located at 251 Fregoe Road, Massena, NY 13662.
The contractor shall furnish and install an overhead door with opening dimensions of 24 feet by 12 feet, capable of withstanding a 20 p.s.f. wind load in accordance with ASTM E330 using a 1.0 design factor (LRFD). The door curtain must consist of interlocking roll-formed 24-gauge galvanized steel slats with a 24-gauge backer slat and R-7.2 insulation. Additional specifications include weather seals on top, bottom, and sides; a bottom bar fabricated from two galvanized steel angles; guides fabricated from a minimum of three 3/16" structural steel angles; headplates fabricated from minimum 1/4" steel plate; a barrel fabricated from minimum 4-1/2" O.D. pipe with deflection not exceeding 0.03" per foot of span; helical wound torsion spring assemblies designed for 50,000 cycles minimum; and a hood fabricated from minimum 24-gauge galvanized steel sheet. The door finish must include hot-dipped galvanization per ASTM A653 A, a baked-on epoxy primer, and a brown polyester finish coat.
The operator system shall be a 120V single-phase motor-operated unit positioned interior right-hand, including one wall push-button opener, two remote controls, safety eyes, and a secondary chain hoist with chain keeper. Installation must be performed by trained door service technicians in compliance with manufacturer's assembly instructions and all OSHA standards. The contractor is responsible for site cleanup and daily removal of installation debris. No demolition is required; the owner will handle removal of the existing door. The contractor must provide all operation and parts manuals upon completion and shall furnish the manufacturer's standard 5-year warranty from date of plant shipment against defects in materials or workmanship, with spring wire featuring a 1-year warranty. The Period of Performance requires completion no more than 45 days after award, with scheduling to be coordinated at least one week in advance. The Government will supply 120-volt power within 10 feet of the operator's location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6923G526Q0078 QA.xlsx | XLSX spreadsheet | |
| RFQ 6923G526Q0078.pdf | ||
| Attachment C_SCA Wage Determination.pdf | ||
| Attachment B_Pricing Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Maintenance Base Overhead Door Replacement
1.0 Objective
The Great Lakes St. Lawrence Seaway Development Corporation (GLS) has a requirement for a contractor to furnish and install a new motorized overhead door on Maintenance Base Building No.
3 at GLS Maintenance Base located at 251 Fregoe Road, Massena, NY 13662.
2.0 Scope of Work
The Contractor shall furnish and install an overhead door meeting the following criteria:
• Opening Dimensions: 24’ x 12’.
• Wind Load: Standard door construction must withstand 20 p.s.f. in accordance with ASTM
E330 using a 1.0 design factor (LRFD).
• Curtain: Interlocking curtain slats roll-formed from 24-gauge galvanized steel. Must include a
24-gauge backer slat and R-7.2 insulation.
• Weather Seals: Must be applied to the top, bottom, and sides.
• Bottom Bar: Fabricated from two galvanized steel angles (standard for non-wind lock doors).
• Guides: Fabricated from a minimum of three 3/16" structural steel angles bolted together to form a guide channel.
• Headplates: Fabricated from minimum 1/4" steel plate for mounting the curtain, hood, and barrel assemblies.
• Barrel: Fabricated from minimum 4-1/2" O.D. pipe. Deflection under full load must not exceed
0.03" per foot of span.
• Springs: Helical wound torsion spring assemblies, grease-packed and designed for a standard minimum of 50,000 cycles of operation.
• Hood: Fabricated from minimum 24-gauge galvanized steel sheet shaped to fit within the headplates.
• Locking: Manual push-up doors must be furnished with interior slide bolt locks featuring a standard padlock provision.
• Finish: Curtain slats and hood must be hot-dipped galvanized per ASTM A653 A. Finish includes a baked-on epoxy primer and a brown polyester finish coat.
Operator & Electrical Specifications
• System Type: Motor-operation (standard).
• Motor: 120V, single-phase motor operator.
• Placement: Interior right hand.
• Controls & Accessories:
o One (1) wall push-button opener (interior).
o Two (2) remote controls.
o Safety eyes.
o Secondary chain hoist with a chain keeper.
The awarded contractor is responsible for keeping the onsite area clean and shall remove all installation debris (packaging, scrap metal, etc.) daily or upon completion.
3. Installation & Deliverables
• Installation: Rolling steel doors shall be installed and adjusted by trained door service technicians according to the manufacturer's assembly instructions.
o The awarded contractor shall adhere to all OSHA standards during installation services.
• Demolition: No demolition will be required by the contractor. The owner will demolish and dispose of the existing door.
• Deliverables: The contractor must include all operation and parts manuals upon completion.
• Warranty: Must provide the manufacturer's standard 5-year warranty from the date of plant shipment against defects in materials or workmanship. Spring wire features a 1-year warranty.
4. Government Furnished Utilities The Government will supply 120 voltages of power within 10 feet of the operator’s location.
5. Period of Performance The awarded contractor shall perform installation services no more than 45 days after award. The awarded contractor shall coordinate scheduling at least one week in advance prior to services.
6. Place of Performance The awarded contractor shall install the garage door at Maintenance Base Building No. 3 at GLS Maintenance Base located at 251 Fregoe Road, Massena, NY 13662.
Operator & Electrical Specifications