This document is a Summary of Work for the FR 2410 Gravel Supply Project in Hiawatha National Forest, Delta County. The project requires a contractor to furnish materials, equipment, trucking, labor, and aggregate for road construction, specifically hauling and spreading MDOT 23A gravel on Forest Road 2410. Key requirements include delivering 400-600 tons of aggregate per day between 7:00 AM and 3:30 PM, Monday through Thursday, using spreader chains to unload gravel in locations designated by Forest Service personnel. The Forest Service will provide traffic control signage, and the contractor must follow safety requirements while keeping the road open to the public, with an obligation to restore any damaged areas at no additional cost to the government.

View the file

Other files for this federal contract opportunity

Other files attached to Rapid River West Zone Gravel, newest first.
File Type Posted
NRE Commercial Supplies RFQ 20250611.pdf PDF
Attachment C - Maps.pdf PDF
Attachment B - Schedule of Items.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FR 2410 Gravel Supply Project Hiawatha National Forest

SUMMARY OF WORK

1.1 SUMMARY

A. Name of Project: FR 2410 Gravel Supply Project

B. Work for this project consists of: Furnish all material, equipment & trucking, labor including wages, supervision, transportation, weight slips, MDOT 23A gravel, and misc. materials necessary to complete aggregate hauling and chain spreading/unloading on FR 2410 as stated in the specifications and attachments.

1. Forest Service will provide traffic control signage. These signs will warn the public of “Road Construction Ahead”. The Contractor will follow all Safety requirements on the Forest Service Road system. The roads will be open to the Public during project activities.

2. Contractor shall supply, haul, and place MDOT 23A aggregate.

3. Contractor shall unload gravel using spreader chains in locations designated by

Forest Service personnel.

4. The Contractor shall deliver at a minimum of 400 tons/day and no more than

600 tons/day.

5. The Contractor shall deliver aggregate between 7:00 AM and 3:30 PM, Monday through Thursday.

6. Contractor shall provide weight slips (date/time) for every load of gravel delivered. All weight slips at the end of each day shall be provided to the Forest Service Representative.

1.2 LOCATION

A. FR 2410 is located approximately 7 miles North of US Highway 2/FH-13 intersection in Delta County.

1.3 USE OF PREMISES

A. General: The Contractor shall limit his operations to the construction limits within the defined area of FR 2410.

B. Preservation of Natural Features: Contractor shall confine all operations to work limits of the project and prevent damage to natural surroundings. Contractors shall restore damaged areas at no additional expense to the Government.

1.
1.1 summary
A. Name of Project: FR 2410 Gravel Supply Project
B. Work for this project consists of: Furnish all material, equipment & trucking, labor including wages, supervision, transportation, weight slips, MDOT 23A gravel, and misc. materials necessary to complete aggregate hauling and chain spreading/unload...
1. Forest Service will provide traffic control signage. These signs will warn the public of “Road Construction Ahead”. The Contractor will follow all Safety requirements on the Forest Service Road system. The roads will be open to the Public during...
2. Contractor shall supply, haul, and place MDOT 23A aggregate.
3. Contractor shall unload gravel using spreader chains in locations designated by Forest Service personnel.
4. The Contractor shall deliver at a minimum of 400 tons/day and no more than 600 tons/day.
5. The Contractor shall deliver aggregate between 7:00 AM and 3:30 PM, Monday through Thursday.
6. Contractor shall provide weight slips (date/time) for every load of gravel delivered. All weight slips at the end of each day shall be provided to the Forest Service Representative.
1.2 location
A. FR 2410 is located approximately 7 miles North of US Highway 2/FH-13 intersection in Delta County.
1.3 USE OF PREMISES
A. General: The Contractor shall limit his operations to the construction limits within the defined area of FR 2410.
B. Preservation of Natural Features: Contractor shall confine all operations to work limits of the project and prevent damage to natural surroundings. Contractors shall restore damaged areas at no additional expense to the Government.