Attachment A - Statement of Work.pdf
PDF 194 KB Posted
- Attached to
- Removal and Disposal of Hazardous Waste
- Solicitation number
- 1240BG23Q0032
- Issued by
-
Department of Agriculture Forest Service
About this file
This statement of work outlines requirements for a hazardous waste removal and disposal project. The selected contractor must properly prepare and dispose of accumulated hazardous waste at a USDA Forest Service research facility located in Placerville, California, in accordance with applicable laws and regulations. Key deliverables include a final waste disposal report documenting waste identification, volumes, packaging, transportation, treatment/disposal, and costs. The contractor must also provide signed manifests and related documentation. Work must begin within 30 days of the final work plan and be completed within 45 days of starting field activities. The pickup location is specified. Personnel are required to follow all applicable laws and the contractor is authorized to sign hazardous waste documents on behalf of the Forest Service. No other requirements are specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B - Pest Chemicals.pdf | ||
| Solicitation_1240BG23Q0032_PSW_Removal and Disposal of Hazardous Waste.docx | DOCX document | |
| Attachment C - Identifed Chemicals.pdf | ||
| Attachment E - Wage Determination No. 2015-5631.txt | TXT text file | |
| Attachment D - Photos of Liquid Chemicals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Attachment A
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards Attachment
Project Removal and Disposal of Hazardous Waste
General Information
1.0 Scope of Work
Dispose of accumulated hazardous waste located in 2480 Carson Rd. Placerville CA 95667
2.0 Background
Research facility with accumulation of hazardous waste that is expired requires removal and disposal.
Contractor Requirements
3.0 Technical Requirements / Tasks
o Contractor shall properly prepare and dispose of hazardous waste consisting of solids, liquids, and gas cylinders.
o Applicable state and local laws, regulations, codes, and ordinances shall be followed when performing activities identified in this Task Order.
o Quantity and Waste type as well as photos can be found Attachment A, Attachment B, and Attachment C o The contractor is authorized to sign uniform hazardous waste manifest forms (40 CFR Part 262)
(“manifests”) and land ban notifications/certifications/demonstrations (40 CFR Part 268.7 and .8) (“land ban records”) for the hazardous wastes being addressed under this Task Order. The contractor shall sign the manifests and land ban records after writing or printing in the phrase “On behalf of the USDA Forest Service” in the signature block. The contractor shall not be considered a generator of hazardous wastes solely as a result of having signed the manifests or land ban records on behalf of the Forest Service.
Nothing contained in this paragraph shall be construed to create an agency relationship between the contractor and the Forest Service except with respect to the authorization to sign the manifests and land ban records. This authorization only extends to the waste being addressed under this specific Task Order.
o Generator Code: US21805Generator EPA ID#: CA8122390034 o Detailed description and documentation of the site-specific operations performed. Including, but not limited to hazardous material identification, sampling and analytical data, and hazardous materials and contaminated media (soil, water, etc.) volumes and quantities.
o Final disposition of the hazardous material/hazardous waste (method of reuse, recycling, or treatment/disposal of hazardous material/hazardous waste). Including facility name, address, and ID number.
o Method of packaging of hazardous material/hazardous waste for transportation and disposal. This includes the method of transport and name, address, and EPA- Identification Number of all transporters.
o Itemized costs for handling, transport, and disposal. Cost documentation shall be of sufficient detail to allow for potential cost recovery against the responsible party.
o Copies of all signed manifests, land disposal restriction forms, waste profile sheets, laboratory test results, and any other supporting documentation pertaining to the specific task.
o
4.0 Government Furnished
N/A
5.0 Deliverables / Schedule
Key Deliverables Item No. Deliverable Objective Due 1 Final Waste
Disposal Report
i. Detailed description and documentation of the site-specific operations performed. Including, but not limited to hazardous material identification, sampling and analytical data, and hazardous materials and contaminated media (soil, water, etc.) volumes and quantities.
ii. Final disposition of the hazardous material/hazardous waste (method of reuse, recycling, or treatment/disposal of hazardous material/hazardous waste).
Including facility name, address, and ID number.
iii. Method of packaging of hazardous material/hazardous waste for transportation and disposal. This includes the method of transport and name, address, and EPA- Identification Number of all transporters.
iv. Itemized costs for handling, transport, and disposal. Cost documentation shall be of sufficient detail to allow for potential cost recovery against the responsible party.
v. Copies of all signed manifests, land disposal restriction forms, waste profile sheets, laboratory test results, and any other supporting documentation pertaining to the specific task.
Conduct field work Field mobilization within 30 days of completion of Final Work Plan, weather permitting.
Final Report Within 45 days of completion of field work (an extension may be approved by the COR)
Schedule
Conduct field work Field mobilization within 30 days of completion of Final Work Plan, weather permitting.
Final Report Within 45 days of completion of field work (an extension may be approved by the COR)
6.0 Travel
Pickup Site is 2480 Carson Rd. Placerville CA 95667
7.0 Contractor’s Key Personnel
Personnel will possess and follow applicable state and local laws, regulations, codes and ordinances shall be followed when performing activities identified in this Task Order.
The contractor is authorized to sign uniform hazardous waste manifest forms (40 CFR Part 262) (“manifests”) and land ban notifications/certifications/demonstrations (40 CFR Part 268.7 and .8) (“land ban records”) for the hazardous wastes being addressed under this Task Order. The contractor shall sign the manifests and land ban records after writing or printing in the phrase “On behalf of the USDA Forest Service” in the signature block.
The contractor shall not be considered a generator of hazardous wastes solely as a result of having signed the manifests or land ban records on behalf of the Forest Service. Nothing contained in this paragraph shall be construed to create an agency relationship between the contractor and the Forest Service except with respect to the authorization to sign the manifests and land ban records. This authorization only extends to the waste being addressed under this specific Task Order.
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment Attachment A Statement of Work Attachment B Pest Chemicals Attachment C Identified Chemicals - Shed Only Attachment D Photos of Liquid Chemicals Attachment E Wage Determination
| Project |
| General Information |
| Contractor Requirements |
| Key Deliverables |
File details come from the government source that posted it. Updated .