Attachment A - Statement of Work.docx

DOCX document 641 KB Posted

Attached to
Skid Steer Cab Repair Federal contract opportunity
Solicitation number
12444526Q0007
Issued by
Department of Agriculture Forest Service

About this file

This is a Statement of Work (SOW) for the repair of a government-owned 2023 Caterpillar 299D3XE skid steer that sustained damage when a tree fell on it during operations at Oakwood Bottoms Wetland on September 9, 2025. The Shawnee National Forest requires complete replacement of all cab, electrical, and cooling system components damaged in the incident. The contractor must store the unit indoors during repairs to protect the unsealed cab from external elements and conduct comprehensive testing of all electrical and mechanical systems to ensure operational status before return to service. Deliverables include one fully operational skid steer with a 60-calendar-day completion timeline from receipt, accompanied by an itemized receipt documenting all replaced components.

The USDA Forest Service intends to award this contract on a single-source basis to John Fabick Tractor Co under FAR 13.106-1(b)(1)(i). The government furnishes the asset, and no travel, unique security requirements, data rights, or Section 508 compliance obligations apply. No contractor key personnel are specified for this repair effort.

View the file

Other files for this federal contract opportunity

Other files attached to Skid Steer Cab Repair, newest first.
File Type Posted
SF 1449 .pdf PDF
Attachment B - Schedule of Items.xlsx XLSX spreadsheet
Attachment C - Wage Determination.pdf PDF
Attachment D - Continuation of 1449.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Project WCF 0908 EN 2501-735 Caterpillar 299D3XE Skid Steer, Cab and cooling system replacement.

General Information

1.0 Scope of Work

Replace all cab, electrical, and cooling system damaged from incident. Test to ensure all replacement parts are working properly before pick-up.

2.0 Background

On September 9th 2025 while working in Oakwood Bottoms Wetland a green tree unexpectedly fell onto EN 2501 Skid Steer. The skid steer was there performing mastication duties on a recently closed timber sale. The operator was out of the machine performing other duties and heard tree roots snapping and a tree falling. He stated that he then heard a loud bang and realized the tree had fallen on the skid steer. He immediately contacted the fleet manager and safety officer to inform them of the incident that occurred. From the phone call he was encouraged to take many pictures of the scene and equipment damage. There appears to be damage to the cab, door, external cooling package, lighting, and various electronics in the cab interior.

Because of the end of the year and the furlough it took until October 22nd, 2025, to get a quote for repair. The dealership took many extensive pictures to determine what was damaged. They did not take anything apart to do a deep analysis. The dealership gave a good estimate that it appears to cover all of the damage that is present.

This unit as it sits is inoperable and is an integral part of the fleet for emergency fire line and timber production. The forest would like to have it repaired and back in service as quickly as possible

Contractor Requirements

3.0 Technical Requirements / Tasks

Remove and replace all components damaged from incident. These repairs consist of all cab components, attached electrical, and cooling package that is currently damaged. The Shawnee NF would like for the unit to be stored inside before cab is repaired to protect the non-sealed cab from outside elements. All electrical and mechanical systems attached to the repairs are to be tested and operational before returning to service. An itemized receipt of all components replaced shall accompany the machine upon pick-up by FS personnel.

4.0 Government Furnished

The asset is a government-owned 2023 Caterpillar 299D3XE.

5.0 Deliverables / Schedule

Deliver ONE (1) fully operational 2023 Caterpillar 299D3XE after completing all necessary cab, electrical, and cooling package repairs. The deliverable date shall be 60 calendar days from the date of receipt.

6.0 Travel

No Government travel is planned.

7.0 Contractor’s Key Personnel

None

8.0 Security Requirements

Specify security requirements that apply to the contract performance. Specify the level of clearances required and identify positions that are applicable.

No unique or additional security requirements.

9.0 Data Rights

None

10.0 Section 508 – Electronic and Information Technology Standards N/A Attachment image1.jpg image2.jpg image3.jpg image4.jpg

File details come from the government source that posted it. Updated .