Statement of Work: Semiconductor Lead Times Data Section 1: Background
The Government Accountability Office (GAO) has initiated an engagement on the Global Semiconductor Shortage under the Comptroller General's authority. GAO requires data on semiconductor lead times, the time between when a semiconductor is ordered and when it is delivered, to support analyses of the global semiconductor shortage.
Section 2: Purpose
GAO often needs data resources to provide quantitative evidence to support analytic findings to support its work for the U.S. Congress. Examples of these analytic findings are found on the agency’s web site: https://www.gao.gov.
The data will enable GAO to assess the extent of the shortage on an ongoing basis and assess the impact of the shortage on manufacturers who incorporate semiconductors into their products. Specifically, lead times segmented by semiconductor device type will allow GAO to trace impacts of increased lead times to the manufacturers who incorporate certain device types into their products.
Section 3: Scope of Work
The vendor shall provide a product with data as described below. The data shall cover average semiconductor lead times for global semiconductor manufacturers delivering to customers in the United States.
Deliverables
1. Time series dataset: The vendor shall provide a time series dataset with semiconductor lead times, in weeks, for semiconductors. The time series dataset shall cover lead times for the time period from November 2019 through the present.
2. Subscription: For twelve consecutive months during the period of performance, the vendor shall update the dataset monthly and send updates to GAO within one week of each month’s end.
3. Documentation: The vendor shall provide GAO with data documentation, such as technical and user guides, that enables GAO to assess the reliability of the data. This documentation, or other information provided, shall include details about the sources of the data and steps taken ensure its accuracy, completeness, and comparability over time, as well as known limitations to the data. The documentation shall also include information about data segmentation by semiconductor device type and information about the sources used for data collection.
Section 4: Delivery
1. The vendor shall deliver dataset in comma-separated values (CSV) format or similar file format and delivered via email or another readily available means of transmission.
2. The vendor shall provide technical support by telephone and email to troubleshoot technical problems of access, downloading, and use of data.
3. The vendor shall provide analytic support by telephone and email to advise GAO on best methods to obtain needed data and to discuss data sources and data quality assurance steps.
4. Schedule of deliverables:
| Description |
| Date |
| Time |
| Place |
| Recipient |
| Lead Times Dataset |
| 7/5/2022 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 8/5/2022 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 9/5/2022 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 10/5/2022 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 11/5/2022 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 12/5/2022 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 1/5/2023 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 2/5/2023 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 3/5/2023 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 4/5/2023 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 5/5/2023 |
| 12:00pm ET |
| CO, CS, COR |
| Lead Times Dataset |
| 6/5/2023 |
| 12:00pm ET |
| CO, CS, COR |
Section 5: Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI)
No government property will be furnished to the contractor.
Section 6: Security
No badges or other measures needed.
Section 7: Travel
No travel requirements.
Section 8: Special Material Requirements
We do not anticipate any special material requirements. Any product purchase is contingent upon the compliance with GAO’s current IT security environment.
Section 9: Other Unique Requirements
None are known.
Section 10: Place of Performance
GAO is headquartered in Washington, DC and has 11 field offices. The chief place of performance will be GAO Headquarters in Washington, DC.
Section 11: Period of Performance
The Period of Performance (POP) includes a base period of 1 year.
Section 12: Contract Administration
GAO Contracting Points of Contact:
Acquisition Management, Financial Management & Budget Office
Government Accountability Office
441 G St NW, Washington, DC 20548
Technical Point of Contact: TBD
PAGE
File details come from the government source that posted it. Updated .