Attachment_A_Statement_of_Work.doc
DOC document 49 KB Posted
- Attached to
- Inspect, test, and repair handicap fishing docks
- Solicitation number
- 140G0122Q0067
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0122Q0067_Amd_0002.pdf | ||
| Attachment_D_Questions_Responses_0002_0002.docx | DOCX document | |
| Sol_140G0122Q0067_Amd_0001.pdf | ||
| Attachment_B_Wage_Determination.pdf | ||
| Sol_140G0122Q0067.pdf | ||
| Attachment_C_Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0
INTRODUCTION
The EESC Leetown Science Center has a need to inspect, test, and repair the handicap fishing docks at the Veterans fishing area. In an effort to maintain a great relationship with the community, an outreach program has been established with Veterans. This program helps veterans to enjoy the sport of fishing in a peaceful and relaxing manor.
2.0
BACKGROUND
The National Fish Health Research Laboratory and the Animal Health Team are part of the U.S. Geological Survey’s Eastern Ecological Science Center, located at 11649 Leetown Road, Kearneysville, WV 25430. Research conducted at this facility includes study of infectious and noninfectious diseases of fishes and other aquatic organisms. The facility also conducts research on invasive fish species with the intent of better understanding the adaptations these fish are applying in these new, nonnative habitats and developing ways to stop their spread and potentially eradicate them.
3.0
SCOPE
The scope of work includes but is not limited to:
· Inspect the 3 docks for structural integrity, provide report to Technical Liaison (TL).
· Upon review of the report, a work plan shall be provided to the TL within 15 days.
· Ensure that the pier supports are still considered structurally safe.
· Replace all deck boards with new 2 by material that is labeled for ground contact.
· New lumber shall be installed with screws that are labeled for use with pressure treated lumber.
· Boards shall be installed with a standard gap for drainage.
· Any railing boards found to be defective shall be replaced.
· Any joists found to be defective shall be replaced.
Contractor is responsible for:
· Verifying all dimensions.
· Coordination with the TL for scheduling.
· Providing report to TL on any and all issues with the docks.
· Completion of all work in compliance with industry standards.
· Protecting the water and wildlife in the pond.
· Checking in and out daily / COVID requirements Contractor shall not proceed with any work until all required submittals are approved by the TL.
4.0
APPLICABLE DOCUMENTS
5.0
TECHNICAL REQUIREMENTS
Contractor shall obtain all permits required by federal, state and local regulations prior to commencement of work. All required paperwork and calculations required to obtain any permits shall be provided to the TL at time of submission as well as the permits themselves upon receipt of the documents from the permitting agencies.
Contractor must be licensed to work in the State of West Virginia.
6.0
DELIVERABLES
Schedule: Work may not begin without the approval of the timeline by the TL. The project schedule shall be a chart which graphically depicts the proposed sequence to accomplish each work feature or operation. It shall show start dates and completion dates for each event on a horizontal time scale. The progress schedule time scale shall begin with the Notice to Proceed and indicate the number of days to completion. The schedule will be the reference to which the contractor’s progress and efforts are compared. Three paper copies or one soft copy shall be submitted to the TL.
7.0
OTHER REQUIREMENTS
Pre-Construction Meeting:
The contractor shall schedule and conduct a pre-construction meeting on-site with the TL to review the requirements and conditions of this contract. The contractor shall have the project manager, field superintendent, and all subcontractors on site, or available by conference call, for the pre-construction meeting with Government officials prior to the commencement of work for this project.
Outages and Interruptions:
The contractor is advised that the Science Center will continue to perform research functions during the contract. Work shall be conducted as to minimize interruption to service. Contractor shall notify TL at least 3 days prior to any and all outages and interruptions. Contractor shall not proceed with work without approvals from the TL. Changes to the schedule require the submission of a new schedule to the TL for review.
Working Hours:
Normal working hours for the construction work at the Science Center shall be 7:30am- 4:00pm, Monday - Friday. The contractor and sub-contractors (if required) shall not work Saturdays, Sundays, legal holidays, or non-normal working hours, unless otherwise authorized by the TL. Request to work other than the normal hours shall be made, and approved, in writing through the TL. Work performed during “other than the normal hours” shall not change the total cost to the government.
Changes/Clarifications:
All work must be completed as shown in the contract documents. If ‘no cost’ change orders are to be made, a written request to the TL must be made detailing why the work cannot be completed as shown, as well as the corrective action suggested by the contractor. For change orders which will alter the price or requirements of the contract, Contracting Officer approval must be given in writing before beginning the work described.
Disposal and Transporting of Debris and Material:
All materials and construction debris shall be removed from the work area and placed in an approved dumpster or removed from the site daily by the contractor.
Organization and storage of contractor(s) items at the site:
The TL shall designate areas where the contractor can store or place materials and equipment for short-term storage in preparation for installation. There is limited space on site for the storage of contractor equipment. There is no inside storage space available. Storage and security of materials and equipment as required for the performance of the contract requirements are the responsibility of the contractor. The contractor shall be responsible for making all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site. Upon completion of the contract, the contractor shall remove all equipment and excess materials, and shall restore the site to its original condition, as approved by the TL, at no additional cost to the government.
Site Cleanliness:
The contractor shall maintain the site free of construction debris outside of approved containers (dumpsters). The contractor shall provide dust protection and shall maintain cleanliness of the work site by promptly removing debris, tools, and excess material.
Contractor Parking, Security, and Smoking Regulations:
The contractor shall maintain a daily log of all contractor and subcontractor employees (date, name, arrival time, departure time) and provide a copy of the log to the TL at least weekly. The TL will designate a parking area (or areas) for the contractor to park vehicles. There shall be no smoking in any buildings at any time. All personnel that smoke will have to do so outside in designated smoking areas.
Environmental Protection:
The contractor and subcontractors shall perform all work and activities in accordance with local, state, and Federal environmental regulations.
Safety:
The contractor and subcontractors shall perform all work and activities in accordance with local, state, and Federal safety regulations, including OSHA, NEC, and USGS policy.
Notice to the Government of Delays:
In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the TL and Contracting Officer in writing, giving pertinent details. This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or any rights or remedies provided by law or under this contract.
140G0122Q0067
Attachment A Statement of Work
File details come from the government source that posted it. Updated .