ATTACHMENT_A_Specifications_Water_Interconnection_to_Ridgeville_Ph_2B_-_January_2026.pdf

PDF 24 MB Posted

Attached to
Water Interconnection to Ridgeville - Phase 2B
Solicitation number
2026-47
Issued by
Dillon County, South Carolina

About this file

Water Interconnection to Ridgeville - Phase 2B

This specification document outlines the technical requirements and contract procedures for the Water Interconnection to Ridgeville Project Phase 2B, a municipal water infrastructure project administered by Dorchester County Water and Sewer (DCWS) in South Carolina. The project involves the installation of approximately 27,000 linear feet of new 16-inch water main via open-cut and trenchless methods, including one jack and bore operation and five horizontal directional drill (HDD) operations. Associated work includes installation of approximately 10 linear feet of 12-inch water main, 32 gate valves, 22 fire hydrant assemblies, 8 air release valves, 79 water service lines, surface restoration, sediment and erosion control, traffic management, and all incidental work necessary for completion. The contract encompasses divisions covering mobilization/demobilization, water main construction, appurtenances, testing, disinfection, and final restoration. The project will be evaluated on a unit price basis with specific line items for pipe installation by material type and installation method, fittings, valves, services, and restoration activities. All materials must be manufactured in the United States, and the contractor must provide comprehensive project controls including scheduling, submittals, quality control testing, and record documentation throughout construction.

Contract execution requires adherence to DCWS minimum standards, AWWA standards, ASTM specifications, and applicable South Carolina Department of Environmental Services regulations. The contractor is responsible for all permits, utility locating, environmental controls including erosion and sedimentation management, dewatering, traffic control, and protection of existing utilities and structures. Hydrostatic pressure testing, bacteriological sampling, and disinfection of potable water mains must be completed prior to final acceptance. The contractor must maintain a two-year warranty period following final payment and provide as-built documentation certified by a licensed South Carolina surveyor. Payment will be processed within 21 working days of approved applications, with retainage held per contract terms. The project includes detailed specifications for HDD operations with inadvertent release control plans, fusion techniques for polyvinyl chloride pipe, equipment requirements, and comprehensive environmental protection measures, particularly regarding drilling fluid containment and disposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

*All materials shall be made in the U.S.*

Contract Documents

WATER INTERCONNECTION TO RIDGEVILLE � PHASE 2B

Prepared for:

Dorchester County Water and Sewer

235 Deming Way

Summerville, SC 29483

January 2026

700 Huger Street

Columbia, SC 29201

MBI Project 196703

PAGE LEFT INTENTIONALLY BLANK

Table of Contents

• Bid Form

• Technical Specifications

DIV 01

Section 01010 Summary of Work

Section 01025 Measurement and Payment

Section 01026 Applications for Payment

Section 01035 Change Order Procedures

Section 01046 Control of Work

Section 01050 Project Controls (Surveying)

Section 01200 Project Meetings

Section 01300 Submittals

Section 01310 Construction Scheduling

Section 01320 Construction Photographs and Video Recording

Section 01370 Schedule of Values

Section 01400 Quality Control

Section 01490 Mobilization � Demobilization

Section 01500 Temporary Facilities

Section 01570 Maintenance and Protection of Traffic

Section 01600 Delivery, Storage, and Handling

Section 01720 Project Record Documents

Section 01735 Warranties and Bonds

Section 01740 Contract Closeout

DIV 02

Section 02011 Test Pits

Section 02050 Demolition, Abandonment, and Salvage

Section 02100 Clearing and Grubbing

Section 02221 Trench Excavation, Bedding, and Backfill

Section 02230 Granular Fill Materials

Section 02240 Dewatering and Drainage

Section 02250 Sheeting and Bracing

Section 02270 Sedimentation and Erosion Control

Section 02558 HDD Inadvertent Release Control Plan

Section 02559 Horizontal Directional Drill

Section 02560 FPVC via HDD

Section 02575 Pavement, Markings, and Appurtenances

Section 02670 Water Main Testing and Acceptance

Section 02675 Disinfection of Potable Water Mains

Section 02930 Loaming, Seeding, and Sodding

APPENDIX

A. DCWS Minimum Standards for the Design and Construction of Water and

Sanitary Sewer Systems; Latest Edition B. Geotechnical Report C. Approved Permits

CZC Certification Dorchester County Public Works SCDES Drinking Water Construction Permit SCDOT Encroachment Permit – Temporary Construction Entrance SCDOT Encroachment Permit - Water SCDES NPDES Coverage Wetlands Permit

D. SCIIP Federal Terms

Date:

Stage:

Michael Baker International Inc. Project:

700 Huger Street Location:

Columbia, SC 29201 Preparer:

Unit Measure Total Cost

1 1 LS

2 1 LS

3 6.5 AC

4 8,000 LF

5 1 LS

6 1 LS

7 4,653 LF

8 1,280 LF

9 14,586 LF

10 2,572 LF

11 30 LF

12 439 LF

13 62 LF

14 8 LF

15 69 LF

16 3,317 LF

17 56 LF

18 2 LF

19 59 EA

20 50 EA

21 14 EA

22 10 EA

23 32 EA

24 1 EA

25 1 EA

26 1 EA

27 1 EA

28 6 EA

29 49 EA

30 30 EA

31 22 EA

32 8 EA

Water Construction Subtotal

Fire Hydrant Assembly; Including 16-inch X 6-inch DIRJ Tee

Air Release Valve Assembly with Valve Marker

Long Water Service Connection via Dry Bore

Short Water Service Connection via Open-Cut

12-inch X 12-inch Cut-In DIRJ Tee

16-inch X 16-inch DIRJ Tee

12-inch DIRJ Gate Valve (Includes Valve Box)

16-inch X 12-inch DIRJ Reducer

16-inch X 16-inch Cut-In DIRJ Tee

16-inch DIRJ FPVC Connection

16-inch DIRJ Gate Valve (Includes Valve Box)

16-inch DIRJ 22.5° Bend

16-inch DIRJ 11.25° Bend

16-inch DIRJ 90° Bend

16-inch DIRJ 45° Bend

16-inch FPVC DR18 DIPS (I.D. = 15.35-inch) via Horizontal Directional Drill

24-inch Steel Casing via Jack and Bore

12-inch C900 DR 18 (235 PSI) PVC Pipe via Open-Cut (Restrained Joint)

Areas Outside R/W

16-inch CL250 DI Carrier Pipe (Inside Steel Casing)(Restrained Joint)

Areas Inside R/W and up to 5-ft from EOP

Areas Outside R/W

Areas Outside R/W

16-inch CL250 DIP via Open-Cut - Restrained Joint

Areas under Pavement or within 5-ft of EOP

Areas Outside R/W

16-inch C900 DR 18 (235 PSI) PVC Pipe via Open-Cut (Non-Restrained Joint)

Areas Inside R/W and up to 5-ft from EOP

16-inch C900 DR 18 (235 PSI) PVC Pipe via Open-Cut (Restrained Joint)

Areas Inside R/W and up to 5-ft from EOP

Control of Existing Stream Flows

Maintenance & Protection of Traffic

General Construction Subtotal

Silt Fence

Base Bid (PVC Pipe)

Description of Work Unit Cost

General Construction

Mobilization/Demobilization

Water Construction

Bid Form

Issued for Bid

Water Interconnection to Ridgeville - Phase 2B

Ridgeville, SC

Sediment & Erosion Control

Clearing & Grubbing

33 6.5 AC

34 120 LF

35 110 LF

36 200 LF

37 40 LF

38 557 LF

39 358 TN

40 926 TN

41 10 CY

42 1,645 SY

43 8,223 CY

44 16,650 TN

45 8,223 CY

46 70 LF

Restoration Items Subtotal

Base Bid Total

Lane Striping Replacement

Restoration Items Subtotal

General Construction Subtotal

Water Construction Subtotal

Over Excavation and Disposal of Unsuitable Soils

No. 57 Stone as Backfill for Unsuitable Soils

Suitable Backfill

Concrete Pavement

Remove and Properly Dispose of Existing Pavement

HMA Surface Course with Binder

Base Course

Remove and Replace Existing Storm Drainage with 18-inch RCP Class III

Remove and Replace Fence, in kind

Restoration Items

Grassing

Remove and Replace Existing Storm Drainage with 15-inch RCP Class III

Temporary Storm Drainage with 18-inch HDPE

Temporary Storm Drainage with 24-inch HDPE

Dorchester County Water & Sewer Water Interconnection to Ridgeville � Phase 2

Summary of Work

01010 - 1

SECTION 01010

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION OF WORK

A. The work of this Contract begins along Givhans Road (SC HWY 27) and terminates near the

DCWS Water Tower located near SC HWY 61 in Dorchester County, South Carolina.

1.02 SCOPE OF WORK

A. Furnish all labor, materials, and equipment required to install approximately 27,000 linear feet

(LF) of new 16-inch water main via mostly open-cut, along with one (1) jack and bore operation and five (5) horizontal directional drill operations; approximately 10 LF of 12-inch water main;

(32) 16� DIRJ gate valves; (1) 12� DIRJ gate valve; (22) fire hydrant assemblies; (8) air release valves; and (79) new water service lines; associated appurtenances; surface restoration; and other all incidentals, as detailed in the Contract Documents and as specified herein.

B. The Work includes, but is not necessarily limited to, the following:

1. Clear the site of trees, brush, fences, and obstructions occupying space needed for construction.

2. Install new water main and appurtenances. Test and place into operation.

3. Sediment and erosion control measures.

4. Traffic control measures.

1.03 SUGGESTED GENERAL WORK SEQUENCE

A. Perform Work in sequence listed below to ensure completion of the Work in the Contract Time.

Completion dates of the various stages shall be in accordance with the approved construction schedule submitted by the Contractor.

1. Contractor to provide a proposed work sequence at the start of construction to be approved the by the Owner/Engineer.

1.04 CONTRACTOR'S USE OF PREMISES

A. Contractor shall assume full responsibility for security of their and their subcontractor�s materials and equipment stored on the site.

B. If directed by the Owner or Engineer, move any stored items which interfere with operations of

Owner or other contractors, at no additional cost to the Owner.

C. Contractor shall obtain and pay for use of additional storage or work areas if needed to perform the Work.

D. Use of premises shall be restricted to all applicable permit requirements and applicable Owner agreements such as easements.

Summary of Work

01010 - 2

END OF SECTION

Measurement and Payment

01025 - 1

SECTION 01025

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.01 SCOPE OF WORK

A. This Section includes specifications for the measurement and payment of the various elements of the Work with provisions applicable to lump sum prices, unit prices, and allowances, if applicable.

B. The Contractor shall receive no payment for any portion of the work until it is installed. The only exception to this is payment for stored materials on site if the Contract provides for the payment of stored materials. Partial payment may be requested for items partially installed.

1.02 LUMP SUM ITEMS

A. Lump Sum measurement will be for the entire item, unit of work, structure, or combination thereof, as specified and as indicated in the Schedule of Prices in the Bid Form. Measurement and payment for all bid items indicated as Lump Sums shall include the cost of all labor, materials, and equipment necessary to furnish, install, clean, test, and place each bid item into operation, including permitting, general conditions, overhead, and profit.

B. Progress payments will be based on the Schedule of Values, as specified in Section 01370, prepared by the Contractor and approved by the Owner/Engineer before acceptance of the first Application for Payment.

C. In order for the Contractor to request progress payments against Lump Sum items, Contractor shall provide a breakdown in sufficient measurable detail that is acceptable to the Owner/Engineer.

D. Measurement

1. Measurement shall be based on the estimated percent complete of each Lump Sum item based on the Schedule of Values, as specified in Section 01370.

E. Payment

1. Payment will be made at the lump sum price proportional to the completion percentages approved by the Owner/Engineer.

1.03 UNIT PRICE ITEMS

A. Quantity and measurement estimates stated in the Schedule of Prices in the Bid Form are estimates for bidding purposes only. Actual payments shall be based on actual quantities installed, in-place, as measured and/or verified by the Owner/Engineer.

B. Unless otherwise provided in the General Conditions, the bid unit prices shall be in effect throughout the contract duration, regardless of variances between the estimated quantities and the actual installed quantities.

01025 - 2

C. The Contractor shall make no claim, nor receive any compensation, for anticipated profits, loss of profit, damages, or any extra payment due to any difference between the amounts of work actually completed, or materials or equipment furnished, and the estimated quantities.

D. Unless otherwise approved by the Owner, any unit quantities exceeded may not be invoiced until the estimated quantity is increased by contract change order.

E. Contractor shall assist Owner/Engineer by providing necessary equipment, workers, and survey personnel as required to measure quantities.

F. Measured quantities shall be rounded to the nearest whole integer, unless the value of the unit price exceeds $100, in which case measured quantities shall be rounded to the nearest half unit.

G. Measurement

1. Measurement for progress payment shall be made by, or approved by, the Owner/Engineer based on the estimated effective quantity installed. The effective quantity installed represents the actual units or quantities installed, adjusted for incomplete elements or components.

2. Unless otherwise provided for in the Schedule of Prices in the Bid Form, unit price items are all-inclusive of all related work, direct and indirect, to provide a complete and functional item. For example, underground water pipe installation would include pipe, trenching, shoring, dewatering, bedding, installation, backfill, testing, flushing, disinfection, and commissioning; including all labor, materials, and equipment necessary to furnish, install, clean, test, and place into operation; including permitting, general conditions, overhead and profit.

3. The final measurement shall be based on actual quantities, jointly measured by Contractor and Owner/Engineer, complete, fully, tested and placed into service.

H. Payment

1. Progress payments shall be in accordance with the contract documents based on estimated effective quantities installed, paid at the bid unit price.

2. The final payment shall be based on actual quantities, fully installed, tested, and placed into service, paid at the bid unit price.

PART 2 BID ITEMS

2.01 GENERAL CONSTRUCTION (ITEMS 1 - 6)

A. Mobilization/Demobilization (Item 1)

1. Method of Measurement: Mobilization/Demobilization shall be a lump sum. This Item is meant for non-recurrent and general expenses related to establishment and close-out of the Work.

2. Basis of Payment: Mobilization/Demobilization shall be paid for on a lump sum basis. This price and payment shall be full compensation for all costs associated with initiating and completing the Contract, exclusive of the cost of materials. Payment shall include

01025 - 3 compensation for all expenses related to moving equipment onto and away from the jobsite, performance and payment bonds and other securities required, insurances, necessary permits and fees, posting required notices, project sign, Engineer or Contractor�s field office installation, if required, including hooking up initial utilities, site preparation, protection/support of existing utilities, removal of any field offices and temporary utilities and roadways, removal and replacement of signs, and the general costs associated with initiating the Work on site to assure that it is proceeding in a continuous manner. No additional payment shall be made for interim mobilization or demobilization associated with shutdown of Work by Contractor or Owner.

a. Mobilization/Demobilization shall also include all Contract general requirements including but not limited to full compensation for furnishing construction schedules including baseline and periodic updates; providing and maintaining the quality control plan; providing the project superintendent, project manager and project Engineer (if applicable) full-time; establishing and maintaining any laydown yards; maintaining on-site field office and Engineer�s field office if required; recurring expenses following initial mobilization; providing and maintaining dumpsters, security, fencing, and dust control; monthly utility charges; construction photographs and/or videos; ongoing maintenance of As-Builts; equipment maintenance; surveying, survey controls, and staking out of easements; project closeout costs; and all temporary facilities, labor, equipment and materials required for or incidental to the Work for which separate payment is not provided under other Bid Items.

b. Payments shall be made in three equal installments. The first two (2) installments shall coincide with the first two (2) monthly payment requisitions, contingent upon Owner acceptance of the baseline construction schedule, compliance with Section 01490 and demonstration of satisfactory construction progress, as determined by the Owner/Engineer. The third installment shall be made when the Contractor has completed all construction activity, including final cleanup, punch list Items, compliance with Section 01490 and satisfactory submission of As-Builts.

c. The cost for this Item shall not exceed four percent (4%) of the Total Bid Price, excluding this Item itself.

B. Sediment & Erosion Control (Item 2)

1. Method of Measurement: Sediment & Erosion Control shall be a lump sum. This Item shall include costs related to sediment and erosion control that may be required over the term of the Work for the entire Contract.

2. Basis of Payment: Sediment & Erosion Control shall be paid for on a lump sum basis. This price and payment shall be full compensation for furnishing all labor, equipment, materials, and tools necessary to control sediment and erosion, as specified in the technical specifications. Payment shall include installing, maintaining, and removal of the S&EC devices, tree protection, turbidity curtain, traffic rated ramps, construction entrances, inlet protection, stone for filtration devices, filter boxes, straw mulch, erosion control blankets, concrete washouts, and all else incidental thereto for which separate payment is not provided under other Bid Items.

a. Payment shall be made as determined by the Owner/Engineer on a percent complete basis in accordance with the accepted Schedule of Values (Section 01370).

01025 - 4

C. Clearing & Grubbing (Item 3)

1. Method of Measurement: Clearing & Grubbing shall be measured as the number of acres required to be cleared and grubbed. This Item shall include costs related to removing and disposing of vegetation that may be required over the term of the Work for the entire Contract.

2. Basis of Payment: Clearing & Grubbing shall be paid for at the contract unit price per acre, completed. This price and payment shall be full compensation for furnishing all labor, equipment, materials, and tools necessary for removing and properly disposing of trees, stumps, bushes, shrubs, vegetation, logs, rubbish, and other objectionable material, as specified in the Contract Documents; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

D. Silt Fence (Item 4)

1. Method of Measurement: Silt Fence shall be measured per linear foot, installed. This Item shall include any costs related to silt fence that may be required over the term of the Work for the entire Contract.

2. Basis of Payment: Silt Fence shall be paid for at the contract unit price per linear foot installed. This price and payment shall be full compensation for furnishing all labor, equipment, materials, and tools necessary with the erection of the silt fence. Payment shall include installation, maintenance, moving, adjusting, cleaning, replacement of damaged or worn devices, and final removal; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

a. Payment shall be made for silt fence only when it is installed in the ground and no so-called proportional payment shall be made for silt fence on the site, but not yet installed.

E. Control of Existing Stream Flows (Item 5)

1. Method of Measurement: Control of Existing Stream Flows shall be a lump sum. This Item shall include costs related to dewatering excavations within streams/creeks.

2. Basis of Payment: Control of Existing Stream Flows shall be paid for on a lump sum basis.

This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to handle ground water and surface water for installation within streams/creeks. Payment shall include design and permitting of dewatering system;

installation of impervious dams necessary to perform a stream crossing; sinking well points;

furnishing, installing and maintaining pumping systems including all pumps, piping, casing and other appurtenances; filter sand required for underdrains or pumping systems;

furnishing, installing and maintaining observation wells; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

a. Payment shall be made as determined by the Owner/Engineer on a percent-complete basis in accordance with the accepted Schedule of Values (Section 01370).

b. Basic trench dewatering, which does not require a design, permitting, deep wells, well points, or complex pumping, shall be paid for under the individual pipe Items.

01025 - 5

F. Maintenance & Protection of Traffic (Items 6)

1. Method of Measurement: Maintenance & Protection of Traffic shall be a lump sum. This Item shall include costs related to traffic control that may be required over the term of the Work for the entire Contract.

2. Basis of Payment: Maintenance & Protection of Traffic shall be paid for on a lump sum basis. This price and payment shall be full compensation for furnishing all labor, equipment, materials, and tools necessary in the preparation of traffic control plans (including detours).

Payment shall include erection, maintenance, moving, adjusting, cleaning, replacement of damaged or worn devices, and final removal of devices; temporary traffic-rated steel plates, as necessary; labor for any required flaggers; labor for performing the maintenance of vehicular and pedestrian traffic; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

a. Payment shall be made as determined by the Owner/Engineer on a percent-complete basis in accordance with the accepted Schedule of Values (Section 01370).

2.02 WATER CONSTRUCTION (ITEMS 7 � 32 & 47 - 48)

A. Water Pipe (Items 7 � 15 & 47 - 48)

1. Method of Measurement: Water Pipe shall be measured per linear foot installed at the specified size and material. Measurement for payment does not signify that the water line is accepted. Measurement for length of pipe shall be along the horizontal centerline of the pipe with no deduction for fittings. Measurement shall be to the nearest whole foot.

2. Basis of Payment: Water Pipe shall be paid for at the contract unit price per linear foot, installed. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to install the water pipe, in the respective material and quantity. Payment shall include any trench excavation (except rock and boulder excavation); removal and proper off-site disposal of unsuitable soils found from existing grade to bottom of proposed trench; installing adequate pipe bedding and backfill;

compaction and compaction testing; restoring the trench surface to existing grade; basic dewatering and drainage; restraining pipe, as necessary; laying, jointing, cleaning, disinfection, testing/sampling, and acceptance of the pipe per DCWS Specs Section 7 � Water

Distribution System Construction Procedures; connections to existing water systems (including coordination with Owner/Engineer); sheeting and/or shoring in accordance with OSHA, including driving and removing devices; tracer wire and metallic detection tape, as necessary; resetting property pins by Licensed South Carolina Surveyor; resetting mailboxes; temporarily holding utility power poles along with coordination of utility owner;

and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

B. Water Pipe Installed via Horizontal Directional Drill (Item 16)

1. Method of Measurement: Water Pipe Installed via Horizontal Directional Drill shall be measured per two-dimensional, horizontal linear foot of pipe installed via directional drilling.

01025 - 6

2. Basis of Payment: Water Pipe Installed via Horizontal Directional Drill shall be paid for at the contract unit price per two-dimensional, horizontal linear foot of pipe installed via directional drilling. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to install the water pipe. Payment shall include any trench excavation (except rock and boulder excavation); removal and proper off-site disposal of unsuitable soils found from existing grade to bottom of proposed trench; any necessary backfilling and compaction; providing Owner approved Installation Plan and

Inadvertent Release Control Plan; bore logs; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; installing tracer wire, as necessary; testing and acceptance of pipe; pipe stringout/laydown; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

C. Steel Casing Installed via Jack and Bore (Item 17)

1. Method of Measurement: Steel Casing Installed via Jack and Bore shall be measured per linear foot of casing installed at the specified size. This price does NOT include the cost of the carrier pipe through the casing. Measurement for length of casing shall be along the horizontal centerline of the casing. Measurement shall be to the nearest whole foot.

2. Basis of Payment: Steel Casing Installed via Jack and Bore shall be paid for at the contract unit price per linear foot of casing installed. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include installing the steel casing; excavation of launch and receive pits, including removal and proper off-site disposal of unsuitable soils found from existing grade to bottom of proposed trench (except rock and boulder excavation); basic dewatering and drainage; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; bedding, backfill; compaction and compaction testing; spiders/spacers;

watertight seals; surface restoration; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

D. DIRJ Fittings (Items 18 � 22 & 25 - 28)

1. Method of Measurement: DIRJ Fittings shall be measured per each fitting installed of the specified size and material.

2. Basis of Payment: DIRJ Fittings shall be paid for at the contract unit price per each fitting installed. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment shall include cutting and connecting to water main; excavation including removal and proper off-site disposal of unsuitable soils found from existing grade to the bottom of the proposed trench (except rock and boulder excavation); bedding and backfill; compaction and compaction testing; basic dewatering and drainage; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

E. DIRJ Valve (Items 23 - 24)

1. Method of Measurement: DIRJ Valve shall be measured per each valve installed of the specified size and material.

01025 - 7

2. Basis of Payment: DIRJ Valve shall be paid for at the contract unit price per each valve installed. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to install the valve. Payment shall include valve and valve box; valve marker as necessary; cutting and connecting to pipe; excavation including removal and proper off-site disposal of unsuitable soils found from existing grade to the bottom of the proposed trench (except rock and boulder excavation); bedding and backfill; compaction and compaction testing; basic dewatering and drainage; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

F. Long Water Service Connection via Dry Bore (Item 29)

1. Method of Measurement: Long Water Service Connection via Dry Bore shall be measured per each long service installed. Long Water Service Connections are defined as water services installed via dry-bore.

2. Basis of Payment: Long Water Service Connection via Dry Bore shall be paid for at the contract unit price per each service installed. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment includes service saddle, corporation stop, piping and 2� HDPE casing, fittings, service marker stake, any necessary tracer wire, and trench excavation (except rock and boulder excavation), backfilling and compaction; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

G. Short Water Service Connection via Open-Cut (Item 30)

1. Method of Measurement: Short Water Service Connection via Open-Cut shall be measured per each short service installed. Short Water Service Connections are defined as water services installed via open-cut.

2. Basis of Payment: Short Water Service Connection via Open-Cut shall be paid for at the contract unit price per each short connection installed. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. This payment shall include service saddle, corporation stop, piping, fittings, service marker stake, any necessary tracer wire, and trench excavation (except rock and boulder excavation), backfilling and compaction; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

H. Fire Hydrant Assembly (Item 31)

1. Method of Measurement: Fire Hydrant Assembly shall be measured per each assembly installed. This Item includes the 16�x6� DIRJ Tee.

2. Basis of Payment: Fire Hydrant Assembly shall be paid for at the contract unit price per each assembly installed. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment shall include fire hydrant; 16�x6� DIRJ Tee, 6� DIRJ gate valve and valve box, 6� DIRJ piping, fittings, appurtenances; cutting and connecting to water main; excavation including removal and proper off-site disposal of unsuitable soils found from existing grade to the bottom of the proposed trench (except rock and boulder excavation); bedding and backfill; compaction and

01025 - 8 compaction testing; basic dewatering and drainage; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

I. Air Release Valve Assembly with Valve Marker (Item 32)

1. Method of Measurement: Air Release Valve Assembly with Valve Marker shall be measured per each installed quantity.

2. Basis of Payment: Air Release Valve Assembly with Valve Marker shall be paid for at the contract unit price per each installed quantity. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment shall include curb stop, piping; cast iron meter box and lid; air release valve and valve marker; service clamp; tracer wire; bedding, backfill, and compaction; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

2.03 RESTORATION ITEMS (ITEMS 33 - 46)

A. Grassing (Item 33)

1. Method of Measurement: Grassing shall be measured per acre of seed placed.

2. Basis of Payment: Grassing shall be paid for at the contract unit price per acre of seeding placed. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment shall include any loaming and seeding; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

B. Remove and Replace Storm Drainage Pipe (Items 34 - 35)

1. Method of Measurement: Remove and Replace Storm Drainage Pipe shall be measured in place on a linear foot basis for the specified size and material. Measurement of pipe for length shall be along the horizontal centerline of the pipe. Measurement shall be to the nearest whole foot.

2. Basis of Payment: Remove and Replace Storm Drainage Pipe shall be paid for at the contract unit price per linear foot. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment shall include any trench excavation (except rock and boulder excavation); removal and proper off-site disposal of unsuitable soils found from existing grade to bottom of proposed trench; installing adequate pipe bedding and backfill; compaction and compaction testing;

restoring the trench surface to existing grade; basic dewatering and drainage; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

a. Payment shall be made for pipe only when it is installed in the ground and no so-called proportional payment shall be made for pipe on the site, but not yet installed.

01025 - 9

C. Temporary Storm Drainage Pipe (Items 36 - 37)

1. Method of Measurement: Temporary Storm Drainage Pipe shall be measured in place on a linear foot basis for the specified size and material. This item shall include storm drainage pipe installed for temporary construction entrances. Measurement of pipe for length shall be along the horizontal centerline of the pipe. Measurement shall be to the nearest whole foot.

2. Basis of Payment: Temporary Storm Drainage Pipe shall be paid for at the contract unit price per linear foot. This price and payment shall include full compensation for furnishing all labor, equipment, tools, and materials necessary to complete the work. Payment shall include any trench excavation (except rock and boulder excavation); removal and proper off-site disposal of unsuitable soils found from existing grade to bottom of proposed trench;

installing adequate pipe bedding and backfill; compaction and compaction testing; restoring the trench surface to existing grade; basic dewatering and drainage; sheeting and/or shoring in accordance with OSHA, including driving and removing devices; and all else incidental thereto for which separate payment is not provided under other items in the Bid Form.

a. Payment shall be made for pipe only when it is installed in the ground and no so-called proportional payment shall be made for pipe on the site, but not yet installed.

b. Payment shall include removal at the end of construction when the temporary construction entrance is removed.

D. Remove and Replace Fence (Item 38)

1. Method of Measurement: Remove and Replace Fence shall be measured per linear foot of fence removed and replaced, in kind.

2. Basis of Payment: Remove and Replace Fence shall be paid for at the contract unit price per linear foot of fence removed and replaced, in kind. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include removal; hauling and proper off-site disposal of any unusable parts of the fence; replacement in kind for any damaged existing fence; and all else, thereto, for which separate payment is not provided under other Bid Items.

E. HMA Surface Course with Binder (Item 39)

1. Method of Measurement: HMA Surface Course with Binder shall be measured per tonnage placed. Truck tickets shall be provided by the Contractor for documentation.

2. Basis of Payment: HMA Surface Course with Binder shall be paid for at the contract unit price per tonnage placed. The price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include binder; backfill; compaction and compaction testing; cleaning and priming edges of existing pavement; preparing the surface for pavement; furnishing and placing tack coat;

maintaining final pavement and repairing damaged pavement throughout the warranty period; and all else, thereto, for which separate payment is not provided under other Bid Items.

01025 - 10

F. Base Course (Item 40)

1. Method of Measurement: Base Course shall be measured per tonnage placed. Truck tickets shall be provided by the Contractor for documentation.

2. Basis of Payment: Base Course shall be paid for at the contract unit price per tonnage placed.

This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work; and all else, thereto, for which separate payment is not provided under other Bid Items.

G. Concrete Pavement (Item 41)

1. Method of Measurement: Concrete Pavement shall be measured per cubic yards of concrete pavement (driveways) replaced, complete in place. Truck tickets shall be provided by the Contractor for documentation.

2. Basis of Payment: Concrete Pavement shall be paid for at the contract unit price per cubic yard of concrete placed. The price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include cleaning and priming the edges of the existing pavement; preparing the subsurface for concrete; all form work for installation; concrete material; finishing of the concrete;

maintaining and repairing concrete through the warranty period; and all else, thereto, for which separate payment is not provided under other Bid Items.

H. Remove and Properly Dispose of Existing Pavement (Item 42)

1. Method of Measurement: Remove and Properly Dispose of Existing Pavement shall be measured per square yards of pavement (asphalt and concrete) removed during excavation.

2. Basis of Payment: Remove and Properly Dispose of Existing Pavement shall be paid for at the contract unit price per square yard of pavement removed during excavation. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include demolition; saw cutting;

removal; hauling; proper off-site disposal of existing pavement; and all else, thereto, for which separate payment is not provided under other Bid Items.

I. Over Excavation and Disposal of Unsuitable Soils (Item 43)

1. Method of Measurement: Over Excavation and Disposal of Unsuitable Soils shall be measured per cubic yard of unsuitable soil excavated from bottom of proposed trench up to 2-feet below the bottom of proposed trench. Measurement shall be for the number of cubic yards excavated only. This price does NOT include material replacement. Truck tickets shall be provided by the Contractor for documentation.

2. Basis of Payment: Over Excavation and Disposal of Unsuitable Soils shall be paid for at the contract unit price per cubic yard of unsuitable soils removed. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include excavation of unsuitable soils (including hand excavation); hauling material; proper off-site disposal; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

01025 - 11

a. No payment shall be made for removal and replacement of unsuitable soils resulting from improper excavation, improper dewatering, or accidental over-excavation by the Contractor.

J. No. 57 Stone as Backfill for Unsuitable Soils (Item 44)

1. Method of Measurement: No. 57 Stone as Backfill shall be measured per tonnage of No. 57 Stone placed. Truck tickets shall be provided by the Contractor for documentation.

2. Basis of Payment: No. 57 Stone as Backfill shall be paid for at the contract unit price per tonnage placed. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include installing stone required for material replacement from rock and boulder excavation and over excavation of unsuitable soils found from bottom of proposed trench up to 2-feet below the bottom of proposed trench; compaction and compaction testing; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

K. Suitable Backfill (Item 45)

1. Method of Measurement: Suitable Backfill shall be measured per cubic yard of backfill placed. This Item is meant for material replacement for unsuitable soils found from existing grade to bottom of proposed trench. Truck tickets shall be provided by the Contractor for documentation.

2. Basis of Payment: Suitable Backfill shall be paid for at the contract unit price per cubic yard placed. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include installing suitable backfill for material replacement from excavation of unsuitable soils found from existing grade to bottom of proposed trench, as directed by Owner/Engineer;

compaction and compaction testing; and all else incidental, thereto, for which separate payment is not provided under other Bid Items.

L. Lane Striping Replacement (Item 46)

1. Method of Measurement: Lane Striping Replacement shall be measured per linear foot of striping installed.

2. Basis of Payment: Lane Striping Replacement shall be paid for per linear foot of striping installed. This price and payment shall be full compensation for furnishing all labor, equipment, tools, and materials necessary to complete this work. Payment shall include meeting road owner requirements; replacing any cross walk or stop bar paint; and all else, thereto, for which separate payment is not provided under other Bid Items.

01025 - 12

Applications for Payment

01026 - 1

SECTION 01026

APPLICATIONS FOR PAYMENT

PART 1 GENERAL

1.01 SCOPE OF WORK

A. This section includes the requirements that the Contractor shall follow for submitting applications for payment.

B. It�s noted that the Owner, at its sole discretion, may authorize the Engineer to act on its behalf for any or all the of the tasks describe herein.

1.02 RELATED WORK

A. Section 01025 - Measurement and Payment.

B. Section 01370 - Schedule of Values.

1.03 PROCEDURES FOR SUBMITTING APPLICATIONS FOR PAYMENT

A. The Contractor shall submit their draft Application for Payment on or before the third working day of each month, or another specific day established at the Pre-Construction Meeting as authorized by the Owner�s Project Manager (PM). The Owner will pay the Contractor the value of the work performed, as approved by the Engineer, less retainage, less the aggregate of previous payments, typically within 21 working days of receipt from Engineer of final approved

Application for Payment. Draft Applications for Payment that are submitted later will require additional time for processing for payment.

B. The Owner�s approving authority, usually the Engineer, will review the draft Application for

Payment and provide the Contractor with comments typically within 10 working days. The

Contractor shall then address all comments and be prepared to submit a final Application for

Payment on the established date of the Monthly Construction Progress meeting. Final

Applications for Payment that are submitted later will require additional time for processing for payment.

C. Each Application for Payment shall be an itemized Application for Payment that includes the work completed as of the date indicated on the application, with supporting documentation showing the extent of the work and/or quantities for which payment is requested. Supporting documentation shall be in a form, such as drawings, that represent the actual measurements and dimensions so they can be field verified and/or used in subsequent Applications for Payment.

Previous quantities paid shall also be shown in the supporting documentation for comparison purposes and for tracking previous quantities paid and the respective locations at which they were paid.

D. Each Application for Payment shall include a summary showing Adverse Weather Days (Weather

Delays/Rain Days) incurred for the month and the supporting documentation. See Contract

Article 8 - Section 8.8. Failure to submit this summary on a monthly basis forfeits the Contractor�s rights to further adverse weather claims.

01026 - 2

E. Applications for Payment will be made using the Owner�s standardized Application for Payment form(s). The PM will provide the Contractor an electronic copy of the form(s) prior to the first pay request. The Contractor shall reference the project name, purchase order number, description, and Engineer/Owner�s project number on all pay requests.

F. All final Applications for Payment must be addressed to the PM. Four (4) original Application for Payments shall be signed, dated, notarized and submitted for payment. Payments will not be processed from copies. At the Owner�s discretion, electronic submittals may be allowed if authorized at the Pre-Construction Meeting.

G. If the Construction Management Team requests changes prior to payment or rejects payment in its entirety, the Contractor will be notified of those changes and/or the reasons for rejection and what the Contractor must do before the Application for Payment will be considered.

H. Submittal of an itemized Application for Payment and supporting documentation by the

Contractor shall indicate that the Contractor has inspected those portions of the work included in the application and has determined and certifies that all portions of the work are in compliance with the Contract Documents and that the quantities submitted for payment are true and accurate.

I. Recommendations for payment will constitute a representation by the Owner based on supporting data that, to the best of the Owner�s knowledge, information, and belief the work has progressed to the point indicated. However, recommendation for payment does not waive claims for defects, does not constitute acceptance of work not in accordance with the Contract Documents, does not indicate that the work was constructed in accordance with the Contract Documents, and does not relieve the Contractor of the responsibility to correct any deficiencies or damaged work that may be found at a later date.

J. If payment is requested on a basis of materials not yet incorporated into the work but which are delivered, suitably stored, and verified by the PM, the bill of sale, invoice, or other documentation shall be submitted with the Application for Payment warranting to the Owner that the materials are free and clear of all liens and evidenced that the materials are covered by appropriate property insurance or other arrangements showing protection of materials. Payment for stored materials shall be limited to 60% of the contract price listed in the Schedule of Values. Stored materials shall be stored at an Owner approved location within the State of South Carolina. Payment for stored materials does not imply acceptance. Include in the Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed.

Differentiate between items stored on-site and items stored off-site.

1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of surety to payment, for stored materials.

2. Provide supporting documentation that verifies amount requested, such as paid invoices.

Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.

3. Provide summary documentation for stored materials. Submit and maintain a Stored

Materials Log. The Stored materials Log will indicate the following:

a. Value of materials previously stored and remaining stored as of date of previous

Applications for Payment.

01026 - 3

b. Value of previously stored materials put in place after date of previous Application for

Payment and on or before date of current Application for Payment.

c. Value of materials stored since date of previous Application for Payment and remaining stored as of date of current Application for Payment.

K. The Owner may withhold, in whole or in part, payments previously made to such extent as may be necessary in the Owner�s opinion to protect the Owner from loss for which the Contractor is responsible, including loss resulting from acts and/or omissions of the Contractor�s employees, subcontractors and their agents and employees, and other persons or entities performing portions of the work for, or on behalf of, the Contractor or any of its subcontractors because of, but not limited to, the following:

1. Defective work not remedied;

2. Third party claims filed or reasonable evidence indicating probable filing or such claims unless security acceptable to the Owner is provided by the Contractor;

3. Failure of the Contractor to make payments properly to subcontractors or for labor, materials and/or equipment;

4. Reasonable evidence that the work cannot be completed for the unpaid balance of the

Contract Sum;

5. Damage to the Owner or another Contractor;

6. Reasonable evidence that the work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; or

7. Persistent and repeated failure to carry out the work in accordance with the Contract

Documents.

L. The Contractor agrees that they will indemnify and hold the Owner harmless from all claims growing out of the lawful demands of subcontractors, laborers, workmen, mechanics, material, men, and furnishers of machinery and parts thereof, equipment, power tools, and all supplies, including commissary, incurred in the performance of this contract. The Contractor shall, at the

Owner�s request, furnish satisfactory evidence that all obligations of nature hereinabove designated have been paid discharged or waived. If the Contractor fails to do this the Owner may, after having served written notice on the Contractor, either pay unpaid bills, of which the Owner has written notice, or withhold from the Contractor�s unpaid compensation a sum of money deemed reasonably sufficient by the Owner to pay any and all lawful claims. When satisfactory evidence, as determined by the Owner, is furnished that all liabilities have been fully discharged, payment to the Contractor shall be resumed in accordance with the terms of this Contract. In no event shall the provisions of this paragraph be construed to impose any obligations upon the

Owner to either the Contractor or his surety. In paying any unpaid bills of the Contractor, the

Owner shall be deemed the agent of the Contractor, and any payment so made by the Owner shall be considered as payment made under the Contract to the Contractor, and the Owner shall not be liable to the Contractor for any such payment made in good faith.

01026 - 4

1.04 PROCEDURES FOR SUBMITTING APPLICATIONS FOR FINAL PAYMENT

A. The Contractor shall submit the following to the Owner prior to the Owner releasing final payment:

1. A certified copy of Engineer�s Substantial Completion Punch List endorsed and dated by

Owner/Engineer. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance. Owner/Engineer will promptly make such inspection and, when the Work is found acceptable under the Contract Documents and the Contract fully performed, the Owner/Engineer will promptly issue a final Certificate for Payment stating that to the best of the Owner/Engineer�s knowledge, information and belief and on the basis of on-site visits and inspections, the Work has been completed in accordance with terms and conditions of the Contract Documents and that the entire balance found to be due the

Contractor and noted in the final Certificate is due and payable.

2. In the event Contractor requests an inspection for final acceptance and it is determined that the Work is not ready and additional work is required, Contractor shall reimburse…