Main Building Demolition Golden Meadow Plant Materials Center
Construction Specification 3—Structure Removal
1. Scope The work shall consist of the removal, salvage, and disposal of structures from the designated areas.
2. Marking Method 1—Each structure or structure part to be removed will be marked with stakes, flags, paint, or other suitable method.
Method 2—The area boundaries from which structures must be removed will be marked using stakes, flags, paint, or other suitable method. Structures to remain undisturbed or to be salvaged will be designated by special markings.
3. Removal Method 1—All structures designated for removal in the contract shall be removed to the specified extent and depth.
Method 2—Within the areas so marked, all visible and buried structures identified shall be removed to the specified extent and depth.
4. Salvage Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged materials that are capable of being disassembled shall be dismantled into individual members or sections. Such materials shall be neatly and systematically match marked before disassembly. All connectors and other parts shall be marked to indicate their proper location and packed in suitable containers.
5. Disposal of refuse materials Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established by the contract, payment for the removal of each structure unit, except fences, is made at the contract unit price. Fences removed or removed and salvaged are measured to the nearest linear foot. Payment for fence removal or removal and salvage is made at the contract unit prices for each type and size of fence.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific lump sum prices are established by the contract, payment for structure removal is made at the contract lump sum price.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for
Main Building Demolition Golden Meadow Plant Materials Center any item of work described in the contract, but not listed as a contract line-item number in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
7. Items of work and construction details Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Structure removal shall consist of removal of all concrete, sheet piling, piping, conduit, lumber, and other materials associated with the structure. Materials shall be completely removed to full extents above and below ground.
b. In Section 2: Method 2 shall be used. Mark structures and utilities to remain.
c. In Section 3: Method 2 shall apply. Materials shall be completely removed to full extents above ground and as indicated in the scope below ground.
d. In Section 4, Select materials shall be salvaged for on-site use as indicated in the scope.
e. In Section 5, all concrete, lumber, steel, plastic and other materials associated with the structure are to be removed from site and disposed on at a properly registered landfill or recycling center.
f. In Section 6, Method 2 shall apply.
g. Items of Work Subsidiary to this item are:
1) Construction Specification 5 Pollution Control
2) Construction Specification 7 Construction Surveys